Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
||||||||||
Journal Report | |||||||||||
Report Run Date: 02/02/2025 Last Data Refresh: 02/01/2025 Report Generated from DOPPLER | |||||||||||
Facility ID: | 8838913 | ||||||||||
Facility Name: | ARMOUR TIGHT CONCRETE | ||||||||||
07/12/2021 | Editable Letter Activity | Brownlee, Sarah M | |||||||||
Activity Title: | Warning Letter | Activity Status: | Closed | ||||||||
Events: | |||||||||||
Event Type: | Activity has been submitted for approval | Date: | 07/12/2021 | ||||||||
Comment: | Submitted for approval by: Sarah M Brownlee | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 07/12/2021 | ||||||||
Comment: | Finished | ||||||||||
Events: | |||||||||||
Event Type: | Document has been sent | Date: | 07/12/2021 | ||||||||
Comment: | Sent | ||||||||||
Events: | |||||||||||
Event Type: | Activity/Document has been approved | Date: | 07/12/2021 | ||||||||
Comment: | Approved by Hannah Westervelt: approved. | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 07/12/2021 | User: | BROWNLEE_S | ||||||||
Description: | Warning Letter WL21-105TK41SWD | ||||||||||
View Attachment | |||||||||||
06/28/2021 | Enforcement Tracking Activity | Brownlee, Sarah M | |||||||||
Activity Status: | Open | ||||||||||
06/17/2021 | Electronic Communication Activity | Trethewey, Mark B. | |||||||||
Activity Closed Date: | 06/17/2021 | Activity Status: | Closed | ||||||||
Date: | 06/17/2021 | ||||||||||
Recipient: | Mark Trethewey | ||||||||||
Sender: | Amanda Hancock | ||||||||||
Subject: | No response from Armour Tight Concrete | ||||||||||
Message: | Hi Mark, I’ve forwarded this to Armour Tight. They are the ones responsible to pay. | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 06/17/2021 | ||||||||
Comment: | Finished | ||||||||||
06/17/2021 | Enforcement Referral Activity | Trethewey, Mark B. | |||||||||
Activity Result: | Accepted | Activity Status: | Closed | ||||||||
Activity Closed Date: | 06/28/2021 | ||||||||||
Events: | |||||||||||
Event Type: | Activity/Document was acknowledged on this date | Date: | 06/23/2021 | ||||||||
Comment: | Acknowledged and Assigned by Hannah Westervelt | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been assigned | Date: | 06/23/2021 | ||||||||
Comment: | Assigned to Sarah M Brownlee | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been submitted for approval | Date: | 06/17/2021 | ||||||||
Comment: | Submitted for approval by: Mark B. Trethewey: Referred for Enforcement | ||||||||||
Events: | |||||||||||
Event Type: | Activity/Document was accepted on this date | Date: | 06/28/2021 | ||||||||
Comment: | Accepted by Sarah M Brownlee: Accepted | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 06/28/2021 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 06/17/2021 | User: | TRETHEWEY_MB_1 | ||||||||
Description: | Referred for Enforcement | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 06/17/2021 | User: | TRETHEWEY_MB_1 | ||||||||
Description: | Enforcement Referral Form SWD - 6-17-2021 | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 06/17/2021 | User: | TRETHEWEY_MB_1 | ||||||||
Description: | Prop. appr. info | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 06/17/2021 | User: | TRETHEWEY_MB_1 | ||||||||
Description: | Corp info | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 06/17/2021 | User: | TRETHEWEY_MB_1 | ||||||||
Description: | Prop. appr. info 2 | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 06/17/2021 | User: | TRETHEWEY_MB_1 | ||||||||
Description: | Corp info 2 | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 06/17/2021 | User: | TRETHEWEY_MB_1 | ||||||||
Description: | Lynch oil corp info | ||||||||||
View Attachment | |||||||||||
06/17/2021 | Electronic Communication Activity | Trethewey, Mark B. | |||||||||
Activity Closed Date: | 06/17/2021 | Activity Status: | Closed | ||||||||
Date: | 06/17/2021 | ||||||||||
Recipient: | Amanda Hancock | ||||||||||
Sender: | Mark Trethewey | ||||||||||
Subject: | No response from Armour Tight Concrete | ||||||||||
Message: | Good afternoon Amanda, I inspected the attached Facility in February. I have not heard from John on the issues of Financial Responsibility or Placard. Can you provide ? Thanks, | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 06/17/2021 | ||||||||
Comment: | Finished | ||||||||||
02/09/2021 | Violation Open | Trethewey, Mark B. | |||||||||
Significance: | SNC-B | Status: | Open | ||||||||
Criteria ID: | 5005 | ||||||||||
Rule: | 62-762.401(5) | ||||||||||
02/09/2021 | Editable Letter Activity | Trethewey, Mark B. | |||||||||
Activity Title: | Compliance Assistance Offer Letter | Activity Status: | Closed | ||||||||
Description: | Compliance Assistance Offer Letter | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 02/09/2021 | ||||||||
Comment: | Finished | ||||||||||
Events: | |||||||||||
Event Type: | Document has been sent | Date: | 02/09/2021 | ||||||||
Comment: | Sent | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 02/09/2021 | User: | TRETHEWEY_MB_1 | ||||||||
Description: | CAO 2020-2021.035 | ||||||||||
View Attachment | |||||||||||
02/09/2021 | Violation Open | Trethewey, Mark B. | |||||||||
Significance: | Minor | Status: | Open | ||||||||
Criteria ID: | 5004 | ||||||||||
Rule: | 62-762.401(4), 62-762.401(4)(a), 62-762.401(4)(a)1., 62-762.401(4)(a)2., 62-762.401(4)(b), 62-762.401(4)(c), 62-762.401(4)(d), 62-762.401(4)(e), 62-762.401(4)(f), 62-762.401(4)(g), 62-762.401(4)(h), 62-762.401(4)(i) | ||||||||||
02/09/2021 | Violation Open | Trethewey, Mark B. | |||||||||
Significance: | SNC-B | Status: | Open | ||||||||
Criteria ID: | 5011 | ||||||||||
Rule: | 62-762.421(2) | ||||||||||
02/08/2021 | Site Inspection Activity Closed | Trethewey, Mark B. | |||||||||
Activity Result: | Major Out of Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 02/08/2021 | ||||||||||
Activity Closed Date: | 02/09/2021 | Activity Closed By: | TRETHEWEY_MB_1 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 02/09/2021 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 02/09/2021 | User: | TRETHEWEY_MB_1 | ||||||||
Description: | RECORDS: #8838913, 2/8/2021 Placard: #496037; issued 3/13/2017, 2 tanks listed. (1 is unregulated and has been removed). This is the last placard known. Fees for 2018, 2019 & 2020 have not been submitted. Immediately submit all fees to FDEP. Financial Responsibility: Last provided, Liberty Surplus; 5/3/2018 - 5/3/2019. Current Proof of Financial Responsibility not provided. CoFR: Not provided. Release Detection: a. This Facility has the following release detection methods: 1. Visual inspection of tank and equipment, manual monitoring of tank interstice (sight gauge). b. Facility monthly release detection results: 1. Reviewed the monthly visual inspection records from 6/30/2018 to 2/1/2021. Release detection includes condition of the tank, equipment, and the interstice. Most records were not performed within 35 days, the last four months are. Ensure that release detection is performed at least once a month not exceeding 35 days apart. Tests: 1. The annual operability test of the interstitial gauge was performed at inspection. Next test is due by 2/8/2022. PHYSICAL: Tank and equipment: The tank and equipment are in good condition. Signage is faded, recommend replacement of signage. Dispenser: One Fill-Rite tank mounted pump with internal ASV. System is on an impervious surface. | ||||||||||
02/01/2021 | Issue Document Activity | Trethewey, Mark B. | |||||||||
Activity Status: | Closed | ||||||||||
Contact Name: | John Miller | Activity Closed Date: | 02/09/2021 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 02/09/2021 | ||||||||
Comment: | Finished | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 02/09/2021 | User: | TRETHEWEY_MB_1 | ||||||||
Description: | 2/1/2021 Notification Letter | ||||||||||
View Attachment | |||||||||||
07/27/2018 | Site Inspection Activity Closed | Trethewey, Mark B. | |||||||||
Activity Result: | In Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 07/27/2018 | ||||||||||
Activity Closed Date: | 07/27/2018 | Activity Closed By: | TRETHEWEY_MB_1 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 07/27/2018 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 07/27/2018 | User: | TRETHEWEY_MB_1 | ||||||||
Description: | RECORDS: #8838913, 7/28/2018 Financial Responsibility: Liberty Surplus; 5/3/2018 - 5/3/2019. Violation Cited at Installation Inspection 4/25/2018: 1.Type: Violation Significance: SNC-B Rule: 62-762.501(2)(f), 62-762.501(2)(f)1. Violation Text: Shop fabricated storage tank system not installed with a spill containment system at each tank fill connection. Does not meet performance requirements. Explanation: EQ-681 for Pee-Dee ASTs requires overspill protection. Spill bucket is not installed on tank. Corrective Action: Immediately install approved spill bucket on system. Corrective Action Taken: Yes. Re-inspection confirms that Morrison Bros. model 516, 3.5-gallon spill bucket has been installed. EQ-345. Violation Cited at Compliance Inspection 5/4/2018: 1. Type: Violation Significance: SNC-B Rule: 62-762.602(1)(d), 62-762.602(1)(e) Violation Text: Release detection, including visual inspections not being conducted monthly (not to exceed 35 days) for field erected storage tank systems. For electronically monitored sumps, visual inspections not conducted every 6 months. Explanation: Monthly visual inspection records were not provided. Corrective Action: Immediately begin documenting monthly inspections. Release detection must include condition of the tank, equipment, and the interstice. Ensure that release detection is performed at least once a month not exceeding 35 days apart. Provide Manatee County PNRD with the next two months’ records for review. Corrective Action Taken: Yes. Two months records have been provided, performed once a month within 35 days apart. RE-INSPECTION ONLY. Certain records and equipment associated with routine compliance inspections were not checked. | ||||||||||
07/27/2018 | Issue Document Activity | Trethewey, Mark B. | |||||||||
Activity Status: | Closed | ||||||||||
Contact Name: | John Miller | Activity Closed Date: | 07/27/2018 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 07/27/2018 | ||||||||
Comment: | Finished | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 07/27/2018 | User: | TRETHEWEY_MB_1 | ||||||||
Description: | 7-27-2018 Return to Compliance Letter | ||||||||||
View Attachment | |||||||||||
05/04/2018 | Violation Closed | Trethewey, Mark B. | |||||||||
Significance: | SNC-B | Status: | Closed | ||||||||
Criteria ID: | 5104 | ||||||||||
Rule: | 62-762.602(1)(d), 62-762.602(1)(e) | ||||||||||
05/04/2018 | Editable Letter Activity | Trethewey, Mark B. | |||||||||
Activity Title: | Compliance Assistance Offer Letter | Activity Status: | Closed | ||||||||
Events: | |||||||||||
Event Type: | Document has been sent | Date: | 05/04/2018 | ||||||||
Comment: | Sent | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 05/04/2018 | ||||||||
Comment: | Finished | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 05/04/2018 | User: | TRETHEWEY_MB_1 | ||||||||
Description: | CAO 2017-2018.058 | ||||||||||
View Attachment | |||||||||||
05/04/2018 | Meeting Activity | Trethewey, Mark B. | |||||||||
Activity Closed Date: | 05/04/2018 | Activity Status: | Closed | ||||||||
Location: | Facility | ||||||||||
Subject: | Scheduled tentative TCI for 4/30/2018. Confirming Monday. | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 05/04/2018 | ||||||||
Comment: | Finished | ||||||||||
05/04/2018 | Electronic Communication Activity | Trethewey, Mark B. | |||||||||
Activity Closed Date: | 05/04/2018 | Activity Status: | Closed | ||||||||
Date: | 05/04/2018 | ||||||||||
Recipient: | John Miller | ||||||||||
Sender: | Mark Trethewey | ||||||||||
Subject: | Compliance Inspection | ||||||||||
Message: | Confirmed Compliance Inspection for 5/4/2018 | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 05/04/2018 | ||||||||
Comment: | Finished | ||||||||||
05/04/2018 | Site Inspection Activity Closed | Trethewey, Mark B. | |||||||||
Activity Result: | Major Out of Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 05/04/2018 | ||||||||||
Activity Closed Date: | 05/04/2018 | Activity Closed By: | TRETHEWEY_MB_1 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 05/04/2018 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 05/04/2018 | User: | TRETHEWEY_MB_1 | ||||||||
Description: | RECORDS: #8838913, 5/4/2018 Placard: #496037; issued 3/13/2017, 2 tanks listed. (1 is unregulated and has been removed). Financial Responsibility: Liberty Surplus; 5/3/2018 - 5/3/2019. CoFR: Blank provided for update. Release Detection: a. This Facility has the following release detection methods: 1. Visual inspection of tank and equipment, manual monitoring of tank interstice (sight gauge). b. Facility monthly release detection results: 1. Monthly visual inspection records were not provided. Immediately begin documenting monthly inspections. Release detection must include condition of the tank, equipment, and the interstice. Ensure that release detection is performed at least once a month not exceeding 35 days apart. Provide Manatee County PNRD with the next two months’ records for review. PHYSICAL: Tank and equipment: The tank and equipment are in good condition. Spill bucket must be installed (cited at TIN of 4/23/2018). Dispenser: One Fill-Rite tank mounted pump with internal ASV. System is on an impervious surface. | ||||||||||
04/27/2018 | Attachment | Trethewey, Mark B. | |||||||||
04/27/2018 | Editable Letter Activity | Trethewey, Mark B. | |||||||||
Activity Title: | Compliance Assistance Offer Letter | Activity Status: | Closed | ||||||||
Description: | Compliance Assistance Offer Letter | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 04/27/2018 | ||||||||
Comment: | Finished | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 04/27/2018 | User: | TRETHEWEY_MB_1 | ||||||||
Description: | CAO 2017-2018.055 | ||||||||||
View Attachment | |||||||||||
04/27/2018 | Attachment | Trethewey, Mark B. | |||||||||
04/26/2018 | Violation Closed | Trethewey, Mark B. | |||||||||
Significance: | SNC-B | Status: | Closed | ||||||||
Criteria ID: | 5043 | ||||||||||
Rule: | 62-762.501(2)(f), 62-762.501(2)(f)1. | ||||||||||
04/26/2018 | Violation Closed | Trethewey, Mark B. | |||||||||
Significance: | Minor | Status: | Closed | ||||||||
Criteria ID: | 5006 | ||||||||||
Rule: | 62-762.411(1)(b), 62-762.411(1)(c) | ||||||||||
04/25/2018 | Site Inspection Activity Closed | Trethewey, Mark B. | |||||||||
Activity Result: | Major Out of Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 04/25/2018 | ||||||||||
Activity Closed Date: | 04/27/2018 | Activity Closed By: | TRETHEWEY_MB_1 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 04/27/2018 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 04/26/2018 | User: | TRETHEWEY_MB_1 | ||||||||
Description: | Facility Name: Armour Tight Concrete Installation Inspection Field Notes SITE VISITS: Contractor: Facility/Supplier Activities: Installation inspection is being done after-the-fact. Initial notification was not received by Manatee County PNRD. Three registration events were recorded last year with two being deleted. Facility ID# 9815482 was recorded and deleted twice. The final ID was issued under a former number. Tank origin is unknown. The tank does not have overspill protection as required in EQ-681. 4/25/2018 – Mark Trethewey on-site at 11:30 AM. One (1), 2,500-gallon Pee-Dee (EQ-681) double-wall steel aboveground petroleum storage tank has been installed. The tank was set on a concrete pad. Interstitial monitoring is visual via Krueger sight gauge (EQ-675). Fuel is supplied by a Fill-Rite pump w/ internal ASV (tank top mounted). Overfill protection is visual level gauging within sight of the deliverer (also Krueger gauge). All equipment over impervious surface. All signage was properly applied. Tank UL# D-845977 RELEASE DETECTION, as of 4/25/2018: a. Manual interstitial monitoring (sight gauge). b. Monthly visual inspections which includes visual monitoring of the double-walled tank, fills and spill containments, piping condition and surrounding area. FINANCIAL RESPONSIBILITY: Not yet reviewed. INSTALLATION INSPECTION ONLY. Certain records and equipment associated with routine compliance inspections were not checked. Results discussed with manager, Compliance Inspection has been scheduled to be performed on 4/30/2018. |