Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Journal Report | |||||||||||
Report Run Date: 03/13/2025 Last Data Refresh: 03/12/2025 Report Generated from DOPPLER | |||||||||||
Facility ID: | 8841986 | ||||||||||
Facility Name: | MIAMI DADE CNTY-CHILDRENS COURTHOUSE | ||||||||||
11/14/2024 | Enforcement Referral Activity | Williams, Calvin E. | |||||||||
Activity Result: | Accepted | Activity Status: | Closed | ||||||||
Activity Closed Date: | 11/14/2024 | ||||||||||
Events: | |||||||||||
Event Type: | Activity/Document was acknowledged on this date | Date: | 11/14/2024 | ||||||||
Comment: | Acknowledged and Assigned by Ana M. Chirino | ||||||||||
Events: | |||||||||||
Event Type: | Activity/Document was accepted on this date | Date: | 11/14/2024 | ||||||||
Comment: | Accepted by Judy F. Dolan: will assign to Calvin Williams | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been submitted for approval | Date: | 11/14/2024 | ||||||||
Comment: | Submitted for approval by: Calvin E. Williams: LFCO | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been assigned | Date: | 11/14/2024 | ||||||||
Comment: | Assigned to Judy F. Dolan | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 11/14/2024 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 11/14/2024 | User: | WILLIAMS_CEW | ||||||||
Description: | LFCO | ||||||||||
11/14/2024 | Enforcement Tracking Activity | Dolan, Judy F. | |||||||||
Activity Status: | Open | ||||||||||
01/30/2024 | Editable Letter Activity | Williams, Calvin E. | |||||||||
Activity Title: | Compliance Assistance Offer Letter | Activity Status: | Open | ||||||||
01/08/2024 | Site Inspection Activity Closed | Williams, Calvin E. | |||||||||
Activity Result: | Minor Out of Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 01/03/2024 | ||||||||||
Activity Closed Date: | 01/30/2024 | Activity Closed By: | WILLIAMS_CEW | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 01/30/2024 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 01/08/2024 | User: | WILLIAMS_CEW | ||||||||
Description: | 1/3/2024 I, Calvin Williams, Southeast District of the Department of Environmental Protection, met with Adrian Callwood, Building Manger of Miami Dade County. I inspected a 10,000-gallon underground storage tank used for emergency generator diesel fuel. A VISUAL inspection showed that the tank pad was free of cracks and stains. The spill bucket was intact and free of debris and fluids. OVERFILL PROTECTION was provided by a flapper valve. Vent pipe was present. RELEASE DETECTION is provided by Pneumercator TMS 2000. Annual operability test (AOT) for the release detection was done on 12/29/2023. Three years were present. AOT for the overfill device was done on 12/29/2023. Three years were present. PIPING appeared to be in good condition. The triennial STP sump integrity test was not present. Annual line leak detector test was done on 12/29/2023. Thre years were present. RECORD of CFR was dated from 2/1/2023 to 1/31/2024. Monthly inspections are dated from 12/8/2020 to 12/2/2023. The placard was dated from 8/17/2021 to 6/30/2024. Report was emailed to Alex Munox, Director. CW | ||||||||||
01/03/2024 | Violation Open | Williams, Calvin E. | |||||||||
Significance: | Minor | Status: | Open | ||||||||
Criteria ID: | 6072 | ||||||||||
Rule: | 62-761.700(3), 62-761.700(3)(a), 62-761.700(3)(a)1, 62-761.700(3)(a)1.a, 62-761.700(3)(a)1.b, 62-761.700(3)(a)1.c, 62-761.700(3)(a)1.d, 62-761.700(3)(a)1.e, 62-761.700(3)(a)1.f, 62-761.700(3)(a)1.g, 62-761.700(3)(a)2 | ||||||||||
01/03/2024 | Violation Open | Williams, Calvin E. | |||||||||
Significance: | Minor | Status: | Open | ||||||||
Criteria ID: | 6072 | ||||||||||
Rule: | 62-761.700(3), 62-761.700(3)(a), 62-761.700(3)(a)1, 62-761.700(3)(a)1.a, 62-761.700(3)(a)1.b, 62-761.700(3)(a)1.c, 62-761.700(3)(a)1.d, 62-761.700(3)(a)1.e, 62-761.700(3)(a)1.f, 62-761.700(3)(a)1.g, 62-761.700(3)(a)2 | ||||||||||
03/10/2021 | Editable Letter Activity | Tubbs, Brianna | |||||||||
Activity Title: | In Compliance Letter | Activity Status: | Closed | ||||||||
Description: | 2020-05-15 Veeder Root Panel Printouts. | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 03/10/2021 | ||||||||
Comment: | Finished | ||||||||||
Events: | |||||||||||
Event Type: | Document has been sent | Date: | 03/03/2021 | ||||||||
Comment: | Sent | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 03/10/2021 | User: | TUBBS_B | ||||||||
Description: | Return to Compliance Letter | ||||||||||
View Attachment | |||||||||||
01/29/2021 | Editable Letter Activity | Tubbs, Brianna | |||||||||
Activity Title: | Compliance Assistance Offer Letter | Activity Status: | Closed | ||||||||
Events: | |||||||||||
Event Type: | Document has been sent | Date: | 02/01/2021 | ||||||||
Comment: | Sent | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 03/02/2021 | ||||||||
Comment: | Finished | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 03/02/2021 | User: | TUBBS_B | ||||||||
Description: | Compliance Assistance Offer Letter | ||||||||||
View Attachment | |||||||||||
01/20/2021 | Violation Closed | Tubbs, Brianna | |||||||||
Significance: | Minor | Status: | Closed | ||||||||
Criteria ID: | 4067 | ||||||||||
Rule: | 62-761.600(4) | ||||||||||
01/15/2021 | Site Inspection Activity Closed | Tubbs, Brianna | |||||||||
Activity Result: | Minor Out of Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 01/12/2021 | ||||||||||
Activity Closed Date: | 01/29/2021 | Activity Closed By: | TUBBS_B | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 01/29/2021 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 01/20/2021 | User: | TUBBS_B | ||||||||
Description: | A Routine Compliance Evaluation Inspection was conducted on January 12, 2021, with Brianna Tubbs, Environmental Specialist II, Florida Department of Environmental Protection and David Racine, Building Manager, Miami-Dade County. This facility had one (1) 10,000-gallon underground emergency generator diesel tank. The fill port spill containment area was clean. There was a small amount of water observed in the spill containment area, facility personnel addressed the issue at the time of the inspection. The fill port lid was correctly colored coded using the American Petroleum Institute (API) color coding system to identify the product inside the tank. Overfill protection was provided by an OPW 71SO Overfill Prevention Valve. The sump was dry and clean, the boots were pulled back, and the sensor was in the upright position. Release detection was provided by a Pneumercator TMS 2000. Piping to and from the emergency generator was painted and appeared in good condition. The day tank for the emergency generator was less than 550-gallons and unregulated. The monthly monitoring records and financial responsibility records were available for review on site. Visual monthly inspections were found to exceed 35 days in some instances; this issue was discussed on site with the operator that performs the inspections. The operator plans to perform inspections on the same day each month to avoid this issue in the future. The Certification of Financial Responsibility and Placard were complete. Annual Operability Tests (AOTs) for Release Detection and Overfill Protection were available and complete; however, AOTs for the inline mechanical line leak detector were not provided for review. Integrity Tests for the STP sump and double-walled Spill Buckets were available and complete. Alarm history records were provided for review. Facility has met the operator training certificate requirements. The inspection report will be emailed to David Racine. | ||||||||||
05/14/2018 | Editable Letter Activity | Maloney, David R | |||||||||
Activity Title: | Return to Compliance Letter | Activity Status: | Closed | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 05/14/2018 | ||||||||
Comment: | Finished | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 05/14/2018 | User: | MALONEY_D | ||||||||
Description: | Return to Compliance Letter | ||||||||||
View Attachment | |||||||||||
03/05/2018 | Editable Letter Activity | Maloney, David R | |||||||||
Activity Title: | Compliance Assistance Offer Letter | Activity Status: | Closed | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 03/05/2018 | ||||||||
Comment: | Finished | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 03/05/2018 | User: | MALONEY_D | ||||||||
Description: | Compliance Assistance Offer Letter | ||||||||||
View Attachment | |||||||||||
02/20/2018 | Violation Closed | Maloney, David R | |||||||||
Significance: | Minor | Status: | Closed | ||||||||
Criteria ID: | 4067 | ||||||||||
Rule: | 62-761.600(4) | ||||||||||
02/20/2018 | Violation Closed | Maloney, David R | |||||||||
Significance: | Minor | Status: | Closed | ||||||||
Criteria ID: | 4057 | ||||||||||
Rule: | 62-761.500(7)(e) | ||||||||||
02/19/2018 | Violation Closed | Maloney, David R | |||||||||
Significance: | Minor | Status: | Closed | ||||||||
Criteria ID: | 4068 | ||||||||||
Rule: | 62-761.700(1), 62-761.700(1)(a), 62-761.700(1)(a)1., 62-761.700(1)(a)2. | ||||||||||
02/15/2018 | Violation Closed | Maloney, David R | |||||||||
Significance: | Minor | Status: | Closed | ||||||||
Criteria ID: | 4012 | ||||||||||
Rule: | 62-761.405(3) | ||||||||||
02/12/2018 | Site Inspection Activity Closed | Maloney, David R | |||||||||
Activity Result: | Minor Out of Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 02/13/2018 | ||||||||||
Activity Closed Date: | 02/23/2018 | Activity Closed By: | MALONEY_D | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 02/23/2018 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 02/15/2018 | User: | MALONEY_D | ||||||||
Description: | A Petroleum Storage Tank Inspection was conducted on 02-13-2018 by David Maloney, ES-II, Judy Dolan, ES III with the Florida Department of Environmental Protection and David Racine, Building Manager 2, Miami-Dade County, Internal Services Department (ISD). The facility had one 10,000-gallon fiberglass (Xerxes brine filled interstitial) double wall emergency generator underground storage tank (UST) with double wall fiberglass piping underground and steel aboveground. An unregulated Pryco day tank with single wall steel piping and a Kohler Power Systems 2000 generator was located inside the generator building. The UST double wall spill containment bucket (visi-gauge indicated interstitial empty) and piping sump were dry and in good condition. Test boots were pulled back and the sump sensor was repositioned at the time of inspection. A Schrader valve was missing from the test boot where the piping entered the generator building. Fill port cover was API color coded. Flapper valve was utilized for overfill protection. UST had a Pneumercator TMS 2000 with a piping/STP sump sensor, two double wall sensors and a Pneumercator RS-2 remote overfill alarm that was inoperable at the time of inspection. The Pneumercator TMS 2000 was showing an SP2 Tank alarm at the time of inspection. Leak sensors were all normal. UST System Monthly Visual Inspection Checklists records were not available for 2018. Financial Mechanism was current and forms part I and P were completed at the time of inspection. Placard was current for 2017-2018. 2016-2017 placard was emailed to the department on 02-13-18. The UST was not registered in 2015-2016 and penalty registration fees were paid on the 2016-2017 registration. Annual Operability Test (AOT) for the Pneumercator TMS 2000 was perform on 04-10-2017 and was not conducted in 2018. AOT for the inline mechanical leak detector was not conducted in 2018. Perform UST System Monthly Visual Inspection Checklists on or before October 13, 2018. Complete and submit to the department a Storage Tank Incident Notification form for the Pneumercator TMS 2000 SP2 Tank alarm, investigate the cause of the incident and maintain records for three years. Repair or replace the Pneumercator RS-2 remote overfill alarm. Perform 2018 AOT for the Pneumercator TMS 2000, RS-2 remote fill alarm, inline mechanical leak detector, flapper valve and perform integrity testing on the double wall spill containment bucket, STP/piping sump and maintain records for three years. The department recommends cleaning, sealing and painting any components beginning to show signs of rust. The inspection report will be emailed to David Racine (Dracine@miamidade.gov) along with the Compliance Assistance offer Letter. | ||||||||||
05/12/2015 | Electronic Communication Activity | Brown, Stephen E. | |||||||||
Activity Closed Date: | 05/12/2015 | Activity Status: | Closed | ||||||||
Date: | 05/12/2015 | ||||||||||
Recipient: | Stephen Brown | ||||||||||
Sender: | Jorge Orol | ||||||||||
Subject: | Financial Responsibility | ||||||||||
Message: | Received copy of updated Bond Rating Test which now includes this facility. | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 05/12/2015 | ||||||||
Comment: | Finished | ||||||||||
04/15/2015 | Electronic Communication Activity | Brown, Stephen E. | |||||||||
Activity Closed Date: | 04/15/2015 | Activity Status: | Closed | ||||||||
Date: | 04/15/2015 | ||||||||||
Recipient: | Stephen Brown | ||||||||||
Sender: | Oliver Abeleda | ||||||||||
Subject: | Repairs to UST system | ||||||||||
Message: | Documents show repairs made | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 04/15/2015 | ||||||||
Comment: | Finished | ||||||||||
02/19/2013 | Attachment | Runte, Christopher S | |||||||||
12/26/2012 | Violation Closed | Brown, Stephen E. | |||||||||
Significance: | SNC-B | Status: | Closed | ||||||||
Criteria ID: | 1004 | ||||||||||
Rule: | 62-761.400(3)(a)1. | ||||||||||
Comments: | There are various financial responsibility mechanisms available: Risk Retention Group (RRG) Endorsements Certificate of Insurance Guarantee Letter of Credit Fully Funded Trust Fund Self-Insurance with letter from CFO Stand-by Trust Fund Bond Rating Test (Local Governments) Local Government Financial Test Local Government Guarantee Local Government Fund For detailed information, refer to the DEP's Financial Responsibility Handbook pages 2-1, 2-2. Verify which mechanism(s) are used by the facility. State and federal facilities are exempt from financial responsibility, being considered a type of self insurance. They are always in compliance for this category. Document state or federal as appropriate. Financial responsibility must be maintained on out-of-service tanks. Note: Mark the absence of/or the lack of complete info in the certification of financial responsibility under Rule 62-761.710(2). | ||||||||||
12/26/2012 | Violation Closed | Brown, Stephen E. | |||||||||
Significance: | Minor | Status: | Closed | ||||||||
Criteria ID: | 1025 | ||||||||||
Rule: | 62-761.500(2)(a) | ||||||||||
Comments: | Document deviation from all manufacturers' requirements. Obtain and review installation instructions. It is a good idea to accumulate a library of tank system specifications for either your office or yourself. | ||||||||||
12/26/2012 | Site Inspection Activity Closed | Lincheta, Carlos | |||||||||
Activity Result: | Major Out of Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 12/26/2012 | ||||||||||
Activity Closed Date: | 03/04/2015 | Activity Closed By: | BROWN_SE | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 03/04/2015 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 12/26/2012 | User: | LINCHETA_CR_1 | ||||||||
Description: | On site at 12:30 P.M. with Mr. Fred Struber, project manager from Cypress Construction Group, LLC, telephone number (954) 533-1199 and PCC056770 for the initial tank installation of one 10,000 gallon double wall fiberglass brine filled underground storage tank manufactured by XERXES Corporation. EQ-200. Approved plans dated 05/11/2011 were available on site and they were verified that they coincided with construction layout during the installation inspection. The tank will be installed at the north side of the property in an excavation with an area of 532 ft2 (14 ft X 38 ft) and a depth to water table of 7 ft. Tank will be used for the storage of emergency generator diesel. Two dead men were observed on site, both having dimensions of 1 ft X 1 ft X 32 ft. Upon examining the exterior of the tank, no holes or scrapes were noted. Tank interstice is filled with brine and primary tank UL S-533219 successfully held 3 PSI for at least 30 minutes during inspection. Fresh pea gravel was observed on site, gravel will be used to backfill storage tank system excavations. A registration form must be submitted to FDEP tank registration. Installation inspection outcome is satisfactory and plans were initialed. Next inspection must to be requested at least 48 hours in advanced. Please contact Mr. Horacio Wong at (305) 372-6832 to schedule the inspection. | ||||||||||
Comments: | |||||||||||
Comment Date: | 02/19/2013 | User: | RUNTE_C_3 | ||||||||
Description: | On site with Mr. Fred Struber, project manager from Cypress Construction Group, LLC, telephone number (954) 533-1199 and PCC056770 for a product piping and hydrostatic test installation inspection. Approved plans (05/11/2011) were on site. The piping run and orientation did not coincide with the plans. As per Mr. Struber there is a 2¿ wide pile driven into the ground and they had to readjust the piping run to go west to south rather then east to south as the approved plans displayed. Told Mr. Struber that new approved plans showing the actual piping layout need to be onsite for the final inspection. Piping Manufacturer: Ameron Product Piping Material & Size: Double Wall Fiberglass. Inner 3 inch and outer 4 inch diameter. Vent Piping Material & Size: Single Walll Fiberglass. 2 inch diameter. Primary product piping successfully held pressure for at least 30 minutes at 80 psi, while the secondary product piping held pressure successfully for at least 30 minutes at 3.5 psi. Primary vent piping successfully held pressure for at least 30 minutes at 3.5 psi. All product piping runs appear to be slopping back towards the tanks at least 1/8 of an inch per foot. The STP sump successfully held water at the same level for at least 30 minutes. No bubbles or leaks noted. The spill containment bucket successfully held water at the same level for at least 30 minutes. No bubbles or leaks noted. Pea rock on site will be used to backfill the piping run trench and tank sump excavation area. Tank and Line Tightness test results, Line Leak Detector test results, Veeder Root Certification, and double walled spill bucket vacuum test results, must be presented during the Final Construction Inspection. Inspection passed and plans were not initialed because there was no RER-DERM signature stamp on the plans.. Must schedule final construction inspection at least 48 hours in advanced with the Storage Tank Section (305-372-6600). Site diagram was drawn and pictures were taken. | ||||||||||
Comments: | |||||||||||
Comment Date: | 03/04/2015 | User: | BROWN_SE | ||||||||
Description: | 2-25-2015 Final Inspection. The double walled spill bucket gauge is showing a positive response. Please have it investigated and corrected as needed. The Pnuemercator does not appear to be in operation. Please submit documentation showing that it is operational. See violation The facility financial responsibility information is not on the county bond rating test and there is no current financial responsibility for the tank. Please provide documentation that the tank has been added to the list. See violation. | ||||||||||
Comments: | |||||||||||
Comment Date: | 03/02/2015 | User: | BROWN_SE | ||||||||
Description: | I inspected the site for a final installation inspection on 2-25-2015. Met on site with Mr. George J. Pembleton form Suffolk Construction The facility does not appear to be on the county's bond rating test. The spill bucket appeared to have several inches of water in it and the visigauge showed liquid in the interstice of the double walled spill bucket. The piping test boots did not appear to be pulled back. Unable to determine if the Pnuemercator is functional. The repairs must be completed in order to pass the final installation inspection. | ||||||||||
12/26/2012 | Site Inspection Activity Closed | Lincheta, Carlos | |||||||||
Activity Result: | Major Out of Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 12/26/2012 | ||||||||||
Activity Closed Date: | 03/04/2015 | Activity Closed By: | BROWN_SE | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 03/04/2015 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 12/26/2012 | User: | LINCHETA_CR_1 | ||||||||
Description: | On site at 12:30 P.M. with Mr. Fred Struber, project manager from Cypress Construction Group, LLC, telephone number (954) 533-1199 and PCC056770 for the initial tank installation of one 10,000 gallon double wall fiberglass brine filled underground storage tank manufactured by XERXES Corporation. EQ-200. Approved plans dated 05/11/2011 were available on site and they were verified that they coincided with construction layout during the installation inspection. The tank will be installed at the north side of the property in an excavation with an area of 532 ft2 (14 ft X 38 ft) and a depth to water table of 7 ft. Tank will be used for the storage of emergency generator diesel. Two dead men were observed on site, both having dimensions of 1 ft X 1 ft X 32 ft. Upon examining the exterior of the tank, no holes or scrapes were noted. Tank interstice is filled with brine and primary tank UL S-533219 successfully held 3 PSI for at least 30 minutes during inspection. Fresh pea gravel was observed on site, gravel will be used to backfill storage tank system excavations. A registration form must be submitted to FDEP tank registration. Installation inspection outcome is satisfactory and plans were initialed. Next inspection must to be requested at least 48 hours in advanced. Please contact Mr. Horacio Wong at (305) 372-6832 to schedule the inspection. | ||||||||||
Comments: | |||||||||||
Comment Date: | 02/19/2013 | User: | RUNTE_C_3 | ||||||||
Description: | On site with Mr. Fred Struber, project manager from Cypress Construction Group, LLC, telephone number (954) 533-1199 and PCC056770 for a product piping and hydrostatic test installation inspection. Approved plans (05/11/2011) were on site. The piping run and orientation did not coincide with the plans. As per Mr. Struber there is a 2¿ wide pile driven into the ground and they had to readjust the piping run to go west to south rather then east to south as the approved plans displayed. Told Mr. Struber that new approved plans showing the actual piping layout need to be onsite for the final inspection. Piping Manufacturer: Ameron Product Piping Material & Size: Double Wall Fiberglass. Inner 3 inch and outer 4 inch diameter. Vent Piping Material & Size: Single Walll Fiberglass. 2 inch diameter. Primary product piping successfully held pressure for at least 30 minutes at 80 psi, while the secondary product piping held pressure successfully for at least 30 minutes at 3.5 psi. Primary vent piping successfully held pressure for at least 30 minutes at 3.5 psi. All product piping runs appear to be slopping back towards the tanks at least 1/8 of an inch per foot. The STP sump successfully held water at the same level for at least 30 minutes. No bubbles or leaks noted. The spill containment bucket successfully held water at the same level for at least 30 minutes. No bubbles or leaks noted. Pea rock on site will be used to backfill the piping run trench and tank sump excavation area. Tank and Line Tightness test results, Line Leak Detector test results, Veeder Root Certification, and double walled spill bucket vacuum test results, must be presented during the Final Construction Inspection. Inspection passed and plans were not initialed because there was no RER-DERM signature stamp on the plans.. Must schedule final construction inspection at least 48 hours in advanced with the Storage Tank Section (305-372-6600). Site diagram was drawn and pictures were taken. | ||||||||||
Comments: | |||||||||||
Comment Date: | 03/04/2015 | User: | BROWN_SE | ||||||||
Description: | 2-25-2015 Final Inspection. The double walled spill bucket gauge is showing a positive response. Please have it investigated and corrected as needed. The Pnuemercator does not appear to be in operation. Please submit documentation showing that it is operational. See violation The facility financial responsibility information is not on the county bond rating test and there is no current financial responsibility for the tank. Please provide documentation that the tank has been added to the list. See violation. | ||||||||||
Comments: | |||||||||||
Comment Date: | 03/02/2015 | User: | BROWN_SE | ||||||||
Description: | I inspected the site for a final installation inspection on 2-25-2015. Met on site with Mr. George J. Pembleton form Suffolk Construction The facility does not appear to be on the county's bond rating test. The spill bucket appeared to have several inches of water in it and the visigauge showed liquid in the interstice of the double walled spill bucket. The piping test boots did not appear to be pulled back. Unable to determine if the Pnuemercator is functional. The repairs must be completed in order to pass the final installation inspection. | ||||||||||
12/26/2012 | Site Inspection Activity Closed | Lincheta, Carlos | |||||||||
Activity Result: | Major Out of Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 12/26/2012 | ||||||||||
Activity Closed Date: | 03/04/2015 | Activity Closed By: | BROWN_SE | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 03/04/2015 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 12/26/2012 | User: | LINCHETA_CR_1 | ||||||||
Description: | On site at 12:30 P.M. with Mr. Fred Struber, project manager from Cypress Construction Group, LLC, telephone number (954) 533-1199 and PCC056770 for the initial tank installation of one 10,000 gallon double wall fiberglass brine filled underground storage tank manufactured by XERXES Corporation. EQ-200. Approved plans dated 05/11/2011 were available on site and they were verified that they coincided with construction layout during the installation inspection. The tank will be installed at the north side of the property in an excavation with an area of 532 ft2 (14 ft X 38 ft) and a depth to water table of 7 ft. Tank will be used for the storage of emergency generator diesel. Two dead men were observed on site, both having dimensions of 1 ft X 1 ft X 32 ft. Upon examining the exterior of the tank, no holes or scrapes were noted. Tank interstice is filled with brine and primary tank UL S-533219 successfully held 3 PSI for at least 30 minutes during inspection. Fresh pea gravel was observed on site, gravel will be used to backfill storage tank system excavations. A registration form must be submitted to FDEP tank registration. Installation inspection outcome is satisfactory and plans were initialed. Next inspection must to be requested at least 48 hours in advanced. Please contact Mr. Horacio Wong at (305) 372-6832 to schedule the inspection. | ||||||||||
Comments: | |||||||||||
Comment Date: | 02/19/2013 | User: | RUNTE_C_3 | ||||||||
Description: | On site with Mr. Fred Struber, project manager from Cypress Construction Group, LLC, telephone number (954) 533-1199 and PCC056770 for a product piping and hydrostatic test installation inspection. Approved plans (05/11/2011) were on site. The piping run and orientation did not coincide with the plans. As per Mr. Struber there is a 2¿ wide pile driven into the ground and they had to readjust the piping run to go west to south rather then east to south as the approved plans displayed. Told Mr. Struber that new approved plans showing the actual piping layout need to be onsite for the final inspection. Piping Manufacturer: Ameron Product Piping Material & Size: Double Wall Fiberglass. Inner 3 inch and outer 4 inch diameter. Vent Piping Material & Size: Single Walll Fiberglass. 2 inch diameter. Primary product piping successfully held pressure for at least 30 minutes at 80 psi, while the secondary product piping held pressure successfully for at least 30 minutes at 3.5 psi. Primary vent piping successfully held pressure for at least 30 minutes at 3.5 psi. All product piping runs appear to be slopping back towards the tanks at least 1/8 of an inch per foot. The STP sump successfully held water at the same level for at least 30 minutes. No bubbles or leaks noted. The spill containment bucket successfully held water at the same level for at least 30 minutes. No bubbles or leaks noted. Pea rock on site will be used to backfill the piping run trench and tank sump excavation area. Tank and Line Tightness test results, Line Leak Detector test results, Veeder Root Certification, and double walled spill bucket vacuum test results, must be presented during the Final Construction Inspection. Inspection passed and plans were not initialed because there was no RER-DERM signature stamp on the plans.. Must schedule final construction inspection at least 48 hours in advanced with the Storage Tank Section (305-372-6600). Site diagram was drawn and pictures were taken. | ||||||||||
Comments: | |||||||||||
Comment Date: | 03/04/2015 | User: | BROWN_SE | ||||||||
Description: | 2-25-2015 Final Inspection. The double walled spill bucket gauge is showing a positive response. Please have it investigated and corrected as needed. The Pnuemercator does not appear to be in operation. Please submit documentation showing that it is operational. See violation The facility financial responsibility information is not on the county bond rating test and there is no current financial responsibility for the tank. Please provide documentation that the tank has been added to the list. See violation. | ||||||||||
Comments: | |||||||||||
Comment Date: | 03/02/2015 | User: | BROWN_SE | ||||||||
Description: | I inspected the site for a final installation inspection on 2-25-2015. Met on site with Mr. George J. Pembleton form Suffolk Construction The facility does not appear to be on the county's bond rating test. The spill bucket appeared to have several inches of water in it and the visigauge showed liquid in the interstice of the double walled spill bucket. The piping test boots did not appear to be pulled back. Unable to determine if the Pnuemercator is functional. The repairs must be completed in order to pass the final installation inspection. | ||||||||||
12/26/2012 | Site Inspection Activity Closed | Lincheta, Carlos | |||||||||
Activity Result: | Major Out of Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 12/26/2012 | ||||||||||
Activity Closed Date: | 03/04/2015 | Activity Closed By: | BROWN_SE | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 03/04/2015 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 12/26/2012 | User: | LINCHETA_CR_1 | ||||||||
Description: | On site at 12:30 P.M. with Mr. Fred Struber, project manager from Cypress Construction Group, LLC, telephone number (954) 533-1199 and PCC056770 for the initial tank installation of one 10,000 gallon double wall fiberglass brine filled underground storage tank manufactured by XERXES Corporation. EQ-200. Approved plans dated 05/11/2011 were available on site and they were verified that they coincided with construction layout during the installation inspection. The tank will be installed at the north side of the property in an excavation with an area of 532 ft2 (14 ft X 38 ft) and a depth to water table of 7 ft. Tank will be used for the storage of emergency generator diesel. Two dead men were observed on site, both having dimensions of 1 ft X 1 ft X 32 ft. Upon examining the exterior of the tank, no holes or scrapes were noted. Tank interstice is filled with brine and primary tank UL S-533219 successfully held 3 PSI for at least 30 minutes during inspection. Fresh pea gravel was observed on site, gravel will be used to backfill storage tank system excavations. A registration form must be submitted to FDEP tank registration. Installation inspection outcome is satisfactory and plans were initialed. Next inspection must to be requested at least 48 hours in advanced. Please contact Mr. Horacio Wong at (305) 372-6832 to schedule the inspection. | ||||||||||
Comments: | |||||||||||
Comment Date: | 02/19/2013 | User: | RUNTE_C_3 | ||||||||
Description: | On site with Mr. Fred Struber, project manager from Cypress Construction Group, LLC, telephone number (954) 533-1199 and PCC056770 for a product piping and hydrostatic test installation inspection. Approved plans (05/11/2011) were on site. The piping run and orientation did not coincide with the plans. As per Mr. Struber there is a 2¿ wide pile driven into the ground and they had to readjust the piping run to go west to south rather then east to south as the approved plans displayed. Told Mr. Struber that new approved plans showing the actual piping layout need to be onsite for the final inspection. Piping Manufacturer: Ameron Product Piping Material & Size: Double Wall Fiberglass. Inner 3 inch and outer 4 inch diameter. Vent Piping Material & Size: Single Walll Fiberglass. 2 inch diameter. Primary product piping successfully held pressure for at least 30 minutes at 80 psi, while the secondary product piping held pressure successfully for at least 30 minutes at 3.5 psi. Primary vent piping successfully held pressure for at least 30 minutes at 3.5 psi. All product piping runs appear to be slopping back towards the tanks at least 1/8 of an inch per foot. The STP sump successfully held water at the same level for at least 30 minutes. No bubbles or leaks noted. The spill containment bucket successfully held water at the same level for at least 30 minutes. No bubbles or leaks noted. Pea rock on site will be used to backfill the piping run trench and tank sump excavation area. Tank and Line Tightness test results, Line Leak Detector test results, Veeder Root Certification, and double walled spill bucket vacuum test results, must be presented during the Final Construction Inspection. Inspection passed and plans were not initialed because there was no RER-DERM signature stamp on the plans.. Must schedule final construction inspection at least 48 hours in advanced with the Storage Tank Section (305-372-6600). Site diagram was drawn and pictures were taken. | ||||||||||
Comments: | |||||||||||
Comment Date: | 03/04/2015 | User: | BROWN_SE | ||||||||
Description: | 2-25-2015 Final Inspection. The double walled spill bucket gauge is showing a positive response. Please have it investigated and corrected as needed. The Pnuemercator does not appear to be in operation. Please submit documentation showing that it is operational. See violation The facility financial responsibility information is not on the county bond rating test and there is no current financial responsibility for the tank. Please provide documentation that the tank has been added to the list. See violation. | ||||||||||
Comments: | |||||||||||
Comment Date: | 03/02/2015 | User: | BROWN_SE | ||||||||
Description: | I inspected the site for a final installation inspection on 2-25-2015. Met on site with Mr. George J. Pembleton form Suffolk Construction The facility does not appear to be on the county's bond rating test. The spill bucket appeared to have several inches of water in it and the visigauge showed liquid in the interstice of the double walled spill bucket. The piping test boots did not appear to be pulled back. Unable to determine if the Pnuemercator is functional. The repairs must be completed in order to pass the final installation inspection. |