![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Journal Report | |||||||||||
Report Run Date: 03/13/2025 Last Data Refresh: 03/12/2025 Report Generated from DOPPLER | |||||||||||
Facility ID: | 9804752 | ||||||||||
Facility Name: | DESOTO COUNTY PLANT LLC | ||||||||||
12/18/2024 | Enforcement Tracking Activity | Snyder, Ryan B | |||||||||
Activity Status: | Open | ||||||||||
04/11/2022 | Enforcement Referral Activity | Parks, Jeff S | |||||||||
Activity Result: | Accepted | Activity Status: | Closed | ||||||||
Activity Closed Date: | 12/18/2024 | ||||||||||
Events: | |||||||||||
Event Type: | Activity/Document was acknowledged on this date | Date: | 04/11/2022 | ||||||||
Comment: | Acknowledged and Assigned by Ryan B Snyder | ||||||||||
Events: | |||||||||||
Event Type: | Activity/Document was returned on this date | Date: | 04/11/2022 | ||||||||
Comment: | Returned by Ryan B Snyder: There is no memorandum attached to the enforcement case as per Guidance Document G within the contract. Information that needs to be contained within the memo is listed in Guidance Document G. Please complete and attached the memo prior to submitting for referral. | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been submitted for approval | Date: | 04/11/2022 | ||||||||
Comment: | Submitted for approval by: Jeff S Parks: No CFR >180 days | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been assigned | Date: | 04/11/2022 | ||||||||
Comment: | Assigned to Ryan B Snyder | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been submitted for approval | Date: | 10/28/2022 | ||||||||
Comment: | Submitted for approval by: Jeff S Parks: submitted | ||||||||||
Events: | |||||||||||
Event Type: | Activity/Document was acknowledged on this date | Date: | 12/13/2022 | ||||||||
Comment: | Acknowledged and Assigned by Rick R Roudebush | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been assigned | Date: | 12/13/2022 | ||||||||
Comment: | Assigned to Ryan B Snyder | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 12/18/2024 | ||||||||
Comment: | Finished | ||||||||||
Events: | |||||||||||
Event Type: | Activity/Document was accepted on this date | Date: | 12/18/2024 | ||||||||
Comment: | Accepted by Ryan B Snyder: a | ||||||||||
Comments: | |||||||||||
Comment Date: | 04/11/2022 | User: | PARKS_J_4 | ||||||||
Description: | No CFR >180 days | ||||||||||
Comments: | |||||||||||
Comment Date: | 04/11/2022 | User: | PARKS_J_4 | ||||||||
Description: | This facility has been sold to new ownership per Cathy French of LS Power (908)239-3974, Kfrench@LSpower.com | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 04/13/2022 | User: | PARKS_J_4 | ||||||||
Description: | Incoming email from K. French | ||||||||||
View Attachment | |||||||||||
04/11/2022 | Editable Letter Activity | Parks, Jeff S | |||||||||
Activity Title: | 1st Non-Compliance Letter | Activity Status: | Closed | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 04/11/2022 | ||||||||
Comment: | Finished | ||||||||||
Events: | |||||||||||
Event Type: | Document has been sent | Date: | 04/11/2022 | ||||||||
Comment: | Sent | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 04/11/2022 | User: | PARKS_J_4 | ||||||||
Description: | CAO | ||||||||||
View Attachment | |||||||||||
04/11/2022 | Phone Conversation Activity | Parks, Jeff S | |||||||||
Call Type: | Outgoing | Activity Status: | Closed | ||||||||
Phone Number: | (850) 444-6141 | Activity Closed Date: | 04/11/2022 | ||||||||
Subject: | J. Parks called to schedule the inspection. A message was left at 13:25. | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 04/11/2022 | ||||||||
Comment: | Finished | ||||||||||
04/11/2022 | Enforcement Referral Activity | Parks, Jeff S | |||||||||
Activity Result: | Accepted | Activity Status: | Closed | ||||||||
Activity Closed Date: | 12/18/2024 | ||||||||||
Events: | |||||||||||
Event Type: | Activity/Document was acknowledged on this date | Date: | 04/11/2022 | ||||||||
Comment: | Acknowledged and Assigned by Ryan B Snyder | ||||||||||
Events: | |||||||||||
Event Type: | Activity/Document was returned on this date | Date: | 04/11/2022 | ||||||||
Comment: | Returned by Ryan B Snyder: There is no memorandum attached to the enforcement case as per Guidance Document G within the contract. Information that needs to be contained within the memo is listed in Guidance Document G. Please complete and attached the memo prior to submitting for referral. | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been submitted for approval | Date: | 04/11/2022 | ||||||||
Comment: | Submitted for approval by: Jeff S Parks: No CFR >180 days | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been assigned | Date: | 04/11/2022 | ||||||||
Comment: | Assigned to Ryan B Snyder | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been submitted for approval | Date: | 10/28/2022 | ||||||||
Comment: | Submitted for approval by: Jeff S Parks: submitted | ||||||||||
Events: | |||||||||||
Event Type: | Activity/Document was acknowledged on this date | Date: | 12/13/2022 | ||||||||
Comment: | Acknowledged and Assigned by Rick R Roudebush | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been assigned | Date: | 12/13/2022 | ||||||||
Comment: | Assigned to Ryan B Snyder | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 12/18/2024 | ||||||||
Comment: | Finished | ||||||||||
Events: | |||||||||||
Event Type: | Activity/Document was accepted on this date | Date: | 12/18/2024 | ||||||||
Comment: | Accepted by Ryan B Snyder: a | ||||||||||
Comments: | |||||||||||
Comment Date: | 04/11/2022 | User: | PARKS_J_4 | ||||||||
Description: | No CFR >180 days | ||||||||||
Comments: | |||||||||||
Comment Date: | 04/11/2022 | User: | PARKS_J_4 | ||||||||
Description: | This facility has been sold to new ownership per Cathy French of LS Power (908)239-3974, Kfrench@LSpower.com | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 04/13/2022 | User: | PARKS_J_4 | ||||||||
Description: | Incoming email from K. French | ||||||||||
View Attachment | |||||||||||
04/01/2022 | Violation Open | Parks, Jeff S | |||||||||
Significance: | SNC-A | Status: | Open | ||||||||
Criteria ID: | 7010 | ||||||||||
Rule: | 62-762.421(2), 62-762.421(3)(c) | ||||||||||
04/01/2022 | Site Inspection Activity Closed | Parks, Jeff S | |||||||||
Activity Result: | Major Out of Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 04/01/2022 | ||||||||||
Activity Closed Date: | 04/11/2022 | Activity Closed By: | PARKS_J_4 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 04/11/2022 | ||||||||
Comment: | Finished | ||||||||||
11/28/2018 | Editable Letter Activity | Zimmerman, Chris A. | |||||||||
Activity Title: | In Compliance Letter | Activity Status: | Closed | ||||||||
Description: | 07/08/2019 Email - Routine Inspection Scheduling | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 11/28/2018 | ||||||||
Comment: | Finished | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 11/28/2018 | User: | ZIMMERMAN_CA_1 | ||||||||
Description: | ICL for inspection dated 11/21/2018 | ||||||||||
View Attachment | |||||||||||
11/21/2018 | Site Inspection Activity Closed | Zimmerman, Chris A. | |||||||||
Activity Result: | In Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 11/21/2018 | ||||||||||
Activity Closed Date: | 11/28/2018 | Activity Closed By: | ZIMMERMAN_CA_1 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 11/28/2018 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 11/21/2018 | User: | ZIMMERMAN_CA_1 | ||||||||
Description: | Checked required documentation (Visuals, insurance, maintenance records, etc..) along with required storage tank components (Tanks, lines, spill buckets, hoses, etc...) Updated registration info as needed. Alarm/Maintenance History: Nothing significant to note. Verified that tank still meets Out of Service requirements. | ||||||||||
10/13/2016 | Site Inspection Activity Closed | Zimmerman, Chris A. | |||||||||
Activity Result: | In Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 10/13/2016 | ||||||||||
Activity Closed Date: | 10/13/2016 | Activity Closed By: | ZIMMERMAN_CA_1 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 10/13/2016 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 10/13/2016 | User: | ZIMMERMAN_CA_1 | ||||||||
Description: | Checked required documentation (RDRL, Visuals, insurance, maintenance records, etc..) along with required storage tank components (Tanks, lines, spill buckets, hoses, etc...) Updated registration info as needed. Alarm/Maintenance History: Nothing significant to note. Tank was pumped and clean out back in 01/2013 and has not been in use for the last few years but was never up dated to an Out of service status. Tank status was update as of this compliance inspection and tank meets all of the Out of service requirements. The effective date for the OOS is 01/24/2013. Facility will have 10 years from this date to have tank placed back into service or properly closed in place or removed. | ||||||||||
07/22/2014 | Site Inspection Activity Closed | Zimmerman, Chris A. | |||||||||
Activity Result: | In Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 07/22/2014 | ||||||||||
Activity Closed Date: | 07/25/2014 | Activity Closed By: | ZIMMERMAN_CA_1 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 07/25/2014 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 07/22/2014 | User: | ZIMMERMAN_CA_1 | ||||||||
Description: | Checked required documentation (RDRL, Visuals, insurance, maintenance records, etc..) along with required storage tank components (Tanks, lines, spill buckets, hoses, etc...) Updated registration info as needed. Alarm/Maintenance History: Nothing significant to note. | ||||||||||
06/08/2011 | Site Inspection Activity Closed | Durrance, William K. | |||||||||
Activity Result: | In Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 06/08/2011 | ||||||||||
Activity Closed Date: | 06/08/2011 | Activity Closed By: | DURRANCE_WK_1 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 06/08/2011 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 06/08/2011 | User: | DURRANCE_WK_1 | ||||||||
Description: | 1-1,500,000 gal double walled AST. Using level gauges, alarms,flow shut off and catch basin for overfill protection. Using SPCC, tank interstice monitoring, tank bottom monitoring, double walled pipe space monitoring, continous electronic sensing for release detection. Tanks and piping are cathodically protected. CFR- Fr-satisfactory Placard-satisfactory RDRL-satisfactory Monthly inspections-satisfactory Monthly CP monitoring-satisfactory Tank CP functioning properly 3 amps, 6 volts Piping CP rectifier functioning properly 15 volts, 10 amps Annual CP Survey conducted 1/17/2011-passed Permalert PAL-AT eq#91 underground pipe leak monitor functioning properly. Annual Operability test conducted 3/28/2011-passed All alarms are monitored in control room. Tank-satisfactory Tank interstice-dry-satisfactory Tank outer containment-satisfactory Tank Breach of Integrity test conducted 6/2/2011 Piping and fittings-satisfactory No evidence of discharge. | ||||||||||
06/09/2010 | Site Inspection Activity Closed | Durrance, William K. | |||||||||
Activity Result: | In Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 06/09/2010 | ||||||||||
Activity Closed Date: | 06/09/2010 | Activity Closed By: | DURRANCE_WK_1 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 06/09/2010 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 06/09/2010 | User: | DURRANCE_WK_1 | ||||||||
Description: | 1-1,500,000 gal double walled AST. Using level gauges, alarms,flow shut off and catch basin for overfill protection. Using SPCC, tank interstice monitoring, tank bottom monitoring, double walled pipe space monitoring, continous electronic sensing for release detection. Tanks and piping are cathodically protected. CFR-satisfactory Placard-satisfactory RDRL-satisfactory Monthly inspections-satisfactory Monthly CP monitoring-satisfactory Tank CP functioning properly 1.6 amps, 7.5 volts Piping CP rectifier functioning properly 15 volts, 23 amps Permalert PAL-AT eq#91 underground pipe leak monitor functioning properly. All alarms are monitored in control room. Tank-satisfactory Tank interstice-dry-satisfactory Tank outer containment-satisfactory piping and fittings-satisfactory No evidence of discharge. | ||||||||||
04/28/2009 | Site Inspection Activity Closed | Durrance, William K. | |||||||||
Activity Result: | In Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 04/28/2009 | ||||||||||
Activity Closed Date: | 04/28/2009 | Activity Closed By: | DURRANCE_WK_1 | ||||||||
Comments: | |||||||||||
Comment Date: | 04/28/2009 | User: | DURRANCE_WK_1 | ||||||||
Description: | 1-1,500,000 gal double walled AST. Using level gauges, alarms,flow shut off and catch basin for overfill protection. Using SPCC, tank interstice monitoring, tank bottom monitoring, double walled pipe space monitoring, continous electronic sensing for release detection. Tanks and piping are cathodically protected. CFR-satisfactory Placard-satisfactory RDRL-satisfactory Monthly inspections-satisfactory Monthly CP monitoring-satisfactory Annual CP survey conducted 12/22/2008-Passed Conducted by Corrpro Tank CP functioning properly 1.6 amps, 7.5 volts Piping CP rectifier functioning properly 15 volts, 23 amps Permalert PAL-AT eq#91 underground pipe leak monitor functioning properly. All alarms are monitored in control room. Tank-satisfactory Tank interstice-dry-satisfactory Tank outer containment-satisfactory piping and fittings-satisfactory No evidence of discharge. | ||||||||||
04/28/2008 | Violation Closed | Durrance, William K. | |||||||||
Significance: | Minor | Status: | Closed | ||||||||
Criteria ID: | 2122 | ||||||||||
Rule: | 62-762.701(1)(c)3. | ||||||||||
Comments: | Facility must prove that all release detection devices, such as in line leak detectors, sump and liner sensors, etc. function properly. Sensing devices may be optical, vapor, float activated, discriminating, non discriminating, or tied into electrical circuits. | ||||||||||
04/28/2008 | Editable Letter Activity | Durrance, William K. | |||||||||
Activity Title: | 1st Non-Compliance Letter | Activity Status: | Closed | ||||||||
04/28/2008 | Site Inspection Activity Closed | Durrance, William K. | |||||||||
Activity Result: | Minor Out of Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 04/28/2008 | ||||||||||
Activity Closed Date: | 04/28/2008 | Activity Closed By: | DURRANCE_WK_1 | ||||||||
Comments: | |||||||||||
Comment Date: | 04/28/2008 | User: | DURRANCE_WK_1 | ||||||||
Description: | 1-1,500,000 gal double walled AST. Using level gauges, alarms,flow shut off and catch basin for overfill protection. Using SPCC, tank interstice monitoring, tank bottom monitoring, double walled pipe space monitoring, continous electronic sensing for release detection. Tanks and piping are cathodically protected. CFR+FR-satisfactory Placard-satisfactory exp.6/30/08 RDRL/SPCC-satisfactory Monthly inspections revied 4/13/06-4/16/08-satisfactory Monthly CP monitoring 4/1306-4/16/08-satisfactory Tank CP rectifier functioning properly 6volts, 7 amps Annual CP survey completeed 1/3/08-passed Piping CP rectifier functioning properly 15 volts, 23 amps Annual CP survey completed 1/3/08-passed Permalert PAL-AT eq#91 underground pipe leak monitor functioning properly. *NOTE* The annual operability certification test has not been conducted. All alarms are monitored in control room. Tank interstice-dry Tank -satisfactory Tank outer containment-satisfactory piping and fittings-satisfactory No evidence of discharge. | ||||||||||
05/02/2007 | Attachment | Durrance, William K. | |||||||||
04/27/2007 | Attachment | Durrance, William K. | |||||||||
04/26/2007 | Site Inspection Activity Closed | Durrance, William K. | |||||||||
Activity Result: | In Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 04/26/2007 | ||||||||||
Activity Closed Date: | 04/26/2007 | Activity Closed By: | DURRANCE_WK_1 | ||||||||
Comments: | |||||||||||
Comment Date: | 04/26/2007 | User: | DURRANCE_WK_1 | ||||||||
Description: | 1-1,500,000 gal AST using level gauges and alarms and flow shut off for overfill protection. Using SPCC plan, tank interstice monitoring, tank bottom monitoring, double walled piping space monitoring,and continous electronic monitoring for release detection. Using impressed current for corrosion protection. In service tank inspection conducted on 3/20/07 by Tank Engineering and Management Consultants Inc. EQ # 176. Tank to be found in good condition according to report. CFR- From 6/30/07-6/30/07-OK Placard displayed exp. 6/30/07 SPCC plan -OK CP monthly readings from 4/3/06-4/9/07-Ok Monthly inspection reviewed from 5/23/05-4/11/07-Ok *NOTE* several inspections exceeded the 35 day threshold. Please ensure that all inspections are completed within 35 days. CP rectifiers functioning properly. All tank interstice monitoring points clean and dry. Tank fill area with catch basin as extra protection-clean and dry. Piping monitored by Perm Alert PAL-AT EQ# 91 leak detector. Functioning properly. All sensors and alarms are continously monitored in main control room. Minor corrosion observed on bottom of outer tank shell. Minor corrosion observed on piping. Workers in process of scraping and re-painting piping. All valves-Ok No evidence of discharge. | ||||||||||
04/19/2006 | Legacy Activity | Durrance, William K. | |||||||||
Activity Name: | TANK ANNUAL COMPLIANCE INSPECTION | Activity Status: | Closed | ||||||||
05/19/2005 | Legacy Activity | Harrison, Billy L. | |||||||||
Activity Name: | TANK ANNUAL COMPLIANCE INSPECTION | Activity Status: | Closed | ||||||||
04/30/2004 | Legacy Activity | Keene, Keith K. | |||||||||
Activity Name: | TANK ANNUAL COMPLIANCE INSPECTION | Activity Status: | Closed | ||||||||
05/20/2003 | Legacy Activity | Keene, Keith K. | |||||||||
Activity Name: | TANK ANNUAL COMPLIANCE INSPECTION | Activity Status: | Closed | ||||||||
09/09/2002 | Legacy Activity | Keene, Keith K. | |||||||||
Activity Name: | TANK INSTALLATION - FINAL INSPECTION | Activity Status: | Closed | ||||||||