Report Run Date: 03/13/2025        Last Data Refresh: 03/12/2025        Report Generated from DOPPLER
 
Facility ID: 9804752
Facility Name: DESOTO COUNTY PLANT LLC
 
12/18/2024 Enforcement Tracking Activity Snyder, Ryan B
Activity Status: Open
04/11/2022 Enforcement Referral Activity Parks, Jeff S
Activity Result: Accepted Activity Status: Closed
Activity Closed Date: 12/18/2024
Events:
Event Type: Activity/Document was acknowledged on this date Date: 04/11/2022
Comment: Acknowledged and Assigned by Ryan B Snyder
Events:
Event Type: Activity/Document was returned on this date Date: 04/11/2022
Comment: Returned by Ryan B Snyder: There is no memorandum attached to the enforcement case as per Guidance Document G within the contract. Information that needs to be contained within the memo is listed in Guidance Document G. Please complete and attached the memo prior to submitting for referral.
Events:
Event Type: Activity has been submitted for approval Date: 04/11/2022
Comment: Submitted for approval by: Jeff S Parks: No CFR >180 days
Events:
Event Type: Activity has been assigned Date: 04/11/2022
Comment: Assigned to Ryan B Snyder
Events:
Event Type: Activity has been submitted for approval Date: 10/28/2022
Comment: Submitted for approval by: Jeff S Parks: submitted
Events:
Event Type: Activity/Document was acknowledged on this date Date: 12/13/2022
Comment: Acknowledged and Assigned by Rick R Roudebush
Events:
Event Type: Activity has been assigned Date: 12/13/2022
Comment: Assigned to Ryan B Snyder
Events:
Event Type: Activity has been finished Date: 12/18/2024
Comment: Finished
Events:
Event Type: Activity/Document was accepted on this date Date: 12/18/2024
Comment: Accepted by Ryan B Snyder: a
Comments:
Comment Date: 04/11/2022 User: PARKS_J_4
Description: No CFR >180 days
Comments:
Comment Date: 04/11/2022 User: PARKS_J_4
Description: This facility has been sold to new ownership per Cathy French of LS Power (908)239-3974, Kfrench@LSpower.com
Attachments:
Attachment Date: 04/13/2022 User: PARKS_J_4
Description: Incoming email from K. French
View Attachment
04/11/2022 Editable Letter Activity Parks, Jeff S
Activity Title: 1st Non-Compliance Letter Activity Status: Closed
Events:
Event Type: Activity has been finished Date: 04/11/2022
Comment: Finished
Events:
Event Type: Document has been sent Date: 04/11/2022
Comment: Sent
Attachments:
Attachment Date: 04/11/2022 User: PARKS_J_4
Description: CAO
View Attachment
04/11/2022 Phone Conversation Activity Parks, Jeff S
Call Type: Outgoing Activity Status: Closed
Phone Number: (850) 444-6141 Activity Closed Date: 04/11/2022
Subject: J. Parks called to schedule the inspection. A message was left at 13:25.
Events:
Event Type: Activity has been finished Date: 04/11/2022
Comment: Finished
04/11/2022 Enforcement Referral Activity Parks, Jeff S
Activity Result: Accepted Activity Status: Closed
Activity Closed Date: 12/18/2024
Events:
Event Type: Activity/Document was acknowledged on this date Date: 04/11/2022
Comment: Acknowledged and Assigned by Ryan B Snyder
Events:
Event Type: Activity/Document was returned on this date Date: 04/11/2022
Comment: Returned by Ryan B Snyder: There is no memorandum attached to the enforcement case as per Guidance Document G within the contract. Information that needs to be contained within the memo is listed in Guidance Document G. Please complete and attached the memo prior to submitting for referral.
Events:
Event Type: Activity has been submitted for approval Date: 04/11/2022
Comment: Submitted for approval by: Jeff S Parks: No CFR >180 days
Events:
Event Type: Activity has been assigned Date: 04/11/2022
Comment: Assigned to Ryan B Snyder
Events:
Event Type: Activity has been submitted for approval Date: 10/28/2022
Comment: Submitted for approval by: Jeff S Parks: submitted
Events:
Event Type: Activity/Document was acknowledged on this date Date: 12/13/2022
Comment: Acknowledged and Assigned by Rick R Roudebush
Events:
Event Type: Activity has been assigned Date: 12/13/2022
Comment: Assigned to Ryan B Snyder
Events:
Event Type: Activity has been finished Date: 12/18/2024
Comment: Finished
Events:
Event Type: Activity/Document was accepted on this date Date: 12/18/2024
Comment: Accepted by Ryan B Snyder: a
Comments:
Comment Date: 04/11/2022 User: PARKS_J_4
Description: No CFR >180 days
Comments:
Comment Date: 04/11/2022 User: PARKS_J_4
Description: This facility has been sold to new ownership per Cathy French of LS Power (908)239-3974, Kfrench@LSpower.com
Attachments:
Attachment Date: 04/13/2022 User: PARKS_J_4
Description: Incoming email from K. French
View Attachment
04/01/2022 Violation Open Parks, Jeff S
Significance: SNC-A Status: Open
Criteria ID: 7010
Rule: 62-762.421(2), 62-762.421(3)(c)
04/01/2022 Site Inspection Activity Closed Parks, Jeff S
Activity Result: Major Out of Compliance Activity Status: Closed
On-Site Start Date: 04/01/2022
Activity Closed Date: 04/11/2022 Activity Closed By: PARKS_J_4
Events:
Event Type: Activity has been finished Date: 04/11/2022
Comment: Finished
11/28/2018 Editable Letter Activity Zimmerman, Chris A.
Activity Title: In Compliance Letter Activity Status: Closed
Description: 07/08/2019 Email - Routine Inspection Scheduling
Events:
Event Type: Activity has been finished Date: 11/28/2018
Comment: Finished
Attachments:
Attachment Date: 11/28/2018 User: ZIMMERMAN_CA_1
Description: ICL for inspection dated 11/21/2018
View Attachment
11/21/2018 Site Inspection Activity Closed Zimmerman, Chris A.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 11/21/2018
Activity Closed Date: 11/28/2018 Activity Closed By: ZIMMERMAN_CA_1
Events:
Event Type: Activity has been finished Date: 11/28/2018
Comment: Finished
Comments:
Comment Date: 11/21/2018 User: ZIMMERMAN_CA_1
Description: Checked required documentation (Visuals, insurance, maintenance records, etc..) along with required storage tank components (Tanks, lines, spill buckets, hoses, etc...) Updated registration info as needed. Alarm/Maintenance History: Nothing significant to note. Verified that tank still meets Out of Service requirements.
10/13/2016 Site Inspection Activity Closed Zimmerman, Chris A.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 10/13/2016
Activity Closed Date: 10/13/2016 Activity Closed By: ZIMMERMAN_CA_1
Events:
Event Type: Activity has been finished Date: 10/13/2016
Comment: Finished
Comments:
Comment Date: 10/13/2016 User: ZIMMERMAN_CA_1
Description: Checked required documentation (RDRL, Visuals, insurance, maintenance records, etc..) along with required storage tank components (Tanks, lines, spill buckets, hoses, etc...) Updated registration info as needed. Alarm/Maintenance History: Nothing significant to note. Tank was pumped and clean out back in 01/2013 and has not been in use for the last few years but was never up dated to an Out of service status. Tank status was update as of this compliance inspection and tank meets all of the Out of service requirements. The effective date for the OOS is 01/24/2013. Facility will have 10 years from this date to have tank placed back into service or properly closed in place or removed.
07/22/2014 Site Inspection Activity Closed Zimmerman, Chris A.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 07/22/2014
Activity Closed Date: 07/25/2014 Activity Closed By: ZIMMERMAN_CA_1
Events:
Event Type: Activity has been finished Date: 07/25/2014
Comment: Finished
Comments:
Comment Date: 07/22/2014 User: ZIMMERMAN_CA_1
Description: Checked required documentation (RDRL, Visuals, insurance, maintenance records, etc..) along with required storage tank components (Tanks, lines, spill buckets, hoses, etc...) Updated registration info as needed. Alarm/Maintenance History: Nothing significant to note.
06/08/2011 Site Inspection Activity Closed Durrance, William K.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 06/08/2011
Activity Closed Date: 06/08/2011 Activity Closed By: DURRANCE_WK_1
Events:
Event Type: Activity has been finished Date: 06/08/2011
Comment: Finished
Comments:
Comment Date: 06/08/2011 User: DURRANCE_WK_1
Description: 1-1,500,000 gal double walled AST. Using level gauges, alarms,flow shut off and catch basin for overfill protection. Using SPCC, tank interstice monitoring, tank bottom monitoring, double walled pipe space monitoring, continous electronic sensing for release detection. Tanks and piping are cathodically protected. CFR- Fr-satisfactory Placard-satisfactory RDRL-satisfactory Monthly inspections-satisfactory Monthly CP monitoring-satisfactory Tank CP functioning properly 3 amps, 6 volts Piping CP rectifier functioning properly 15 volts, 10 amps Annual CP Survey conducted 1/17/2011-passed Permalert PAL-AT eq#91 underground pipe leak monitor functioning properly. Annual Operability test conducted 3/28/2011-passed All alarms are monitored in control room. Tank-satisfactory Tank interstice-dry-satisfactory Tank outer containment-satisfactory Tank Breach of Integrity test conducted 6/2/2011 Piping and fittings-satisfactory No evidence of discharge.
06/09/2010 Site Inspection Activity Closed Durrance, William K.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 06/09/2010
Activity Closed Date: 06/09/2010 Activity Closed By: DURRANCE_WK_1
Events:
Event Type: Activity has been finished Date: 06/09/2010
Comment: Finished
Comments:
Comment Date: 06/09/2010 User: DURRANCE_WK_1
Description: 1-1,500,000 gal double walled AST. Using level gauges, alarms,flow shut off and catch basin for overfill protection. Using SPCC, tank interstice monitoring, tank bottom monitoring, double walled pipe space monitoring, continous electronic sensing for release detection. Tanks and piping are cathodically protected. CFR-satisfactory Placard-satisfactory RDRL-satisfactory Monthly inspections-satisfactory Monthly CP monitoring-satisfactory Tank CP functioning properly 1.6 amps, 7.5 volts Piping CP rectifier functioning properly 15 volts, 23 amps Permalert PAL-AT eq#91 underground pipe leak monitor functioning properly. All alarms are monitored in control room. Tank-satisfactory Tank interstice-dry-satisfactory Tank outer containment-satisfactory piping and fittings-satisfactory No evidence of discharge.
04/28/2009 Site Inspection Activity Closed Durrance, William K.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 04/28/2009
Activity Closed Date: 04/28/2009 Activity Closed By: DURRANCE_WK_1
Comments:
Comment Date: 04/28/2009 User: DURRANCE_WK_1
Description: 1-1,500,000 gal double walled AST. Using level gauges, alarms,flow shut off and catch basin for overfill protection. Using SPCC, tank interstice monitoring, tank bottom monitoring, double walled pipe space monitoring, continous electronic sensing for release detection. Tanks and piping are cathodically protected. CFR-satisfactory Placard-satisfactory RDRL-satisfactory Monthly inspections-satisfactory Monthly CP monitoring-satisfactory Annual CP survey conducted 12/22/2008-Passed Conducted by Corrpro Tank CP functioning properly 1.6 amps, 7.5 volts Piping CP rectifier functioning properly 15 volts, 23 amps Permalert PAL-AT eq#91 underground pipe leak monitor functioning properly. All alarms are monitored in control room. Tank-satisfactory Tank interstice-dry-satisfactory Tank outer containment-satisfactory piping and fittings-satisfactory No evidence of discharge.
04/28/2008 Violation Closed Durrance, William K.
Significance: Minor Status: Closed
Criteria ID: 2122
Rule: 62-762.701(1)(c)3.
Comments: Facility must prove that all release detection devices, such as in line leak detectors, sump and liner sensors, etc. function properly. Sensing devices may be optical, vapor, float activated, discriminating, non discriminating, or tied into electrical circuits.
04/28/2008 Editable Letter Activity Durrance, William K.
Activity Title: 1st Non-Compliance Letter Activity Status: Closed
04/28/2008 Site Inspection Activity Closed Durrance, William K.
Activity Result: Minor Out of Compliance Activity Status: Closed
On-Site Start Date: 04/28/2008
Activity Closed Date: 04/28/2008 Activity Closed By: DURRANCE_WK_1
Comments:
Comment Date: 04/28/2008 User: DURRANCE_WK_1
Description: 1-1,500,000 gal double walled AST. Using level gauges, alarms,flow shut off and catch basin for overfill protection. Using SPCC, tank interstice monitoring, tank bottom monitoring, double walled pipe space monitoring, continous electronic sensing for release detection. Tanks and piping are cathodically protected. CFR+FR-satisfactory Placard-satisfactory exp.6/30/08 RDRL/SPCC-satisfactory Monthly inspections revied 4/13/06-4/16/08-satisfactory Monthly CP monitoring 4/1306-4/16/08-satisfactory Tank CP rectifier functioning properly 6volts, 7 amps Annual CP survey completeed 1/3/08-passed Piping CP rectifier functioning properly 15 volts, 23 amps Annual CP survey completed 1/3/08-passed Permalert PAL-AT eq#91 underground pipe leak monitor functioning properly. *NOTE* The annual operability certification test has not been conducted. All alarms are monitored in control room. Tank interstice-dry Tank -satisfactory Tank outer containment-satisfactory piping and fittings-satisfactory No evidence of discharge.
05/02/2007 Attachment Durrance, William K.
04/27/2007 Attachment Durrance, William K.
04/26/2007 Site Inspection Activity Closed Durrance, William K.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 04/26/2007
Activity Closed Date: 04/26/2007 Activity Closed By: DURRANCE_WK_1
Comments:
Comment Date: 04/26/2007 User: DURRANCE_WK_1
Description: 1-1,500,000 gal AST using level gauges and alarms and flow shut off for overfill protection. Using SPCC plan, tank interstice monitoring, tank bottom monitoring, double walled piping space monitoring,and continous electronic monitoring for release detection. Using impressed current for corrosion protection. In service tank inspection conducted on 3/20/07 by Tank Engineering and Management Consultants Inc. EQ # 176. Tank to be found in good condition according to report. CFR- From 6/30/07-6/30/07-OK Placard displayed exp. 6/30/07 SPCC plan -OK CP monthly readings from 4/3/06-4/9/07-Ok Monthly inspection reviewed from 5/23/05-4/11/07-Ok *NOTE* several inspections exceeded the 35 day threshold. Please ensure that all inspections are completed within 35 days. CP rectifiers functioning properly. All tank interstice monitoring points clean and dry. Tank fill area with catch basin as extra protection-clean and dry. Piping monitored by Perm Alert PAL-AT EQ# 91 leak detector. Functioning properly. All sensors and alarms are continously monitored in main control room. Minor corrosion observed on bottom of outer tank shell. Minor corrosion observed on piping. Workers in process of scraping and re-painting piping. All valves-Ok No evidence of discharge.
04/19/2006 Legacy Activity Durrance, William K.
Activity Name: TANK ANNUAL COMPLIANCE INSPECTION Activity Status: Closed
05/19/2005 Legacy Activity Harrison, Billy L.
Activity Name: TANK ANNUAL COMPLIANCE INSPECTION Activity Status: Closed
04/30/2004 Legacy Activity Keene, Keith K.
Activity Name: TANK ANNUAL COMPLIANCE INSPECTION Activity Status: Closed
05/20/2003 Legacy Activity Keene, Keith K.
Activity Name: TANK ANNUAL COMPLIANCE INSPECTION Activity Status: Closed
09/09/2002 Legacy Activity Keene, Keith K.
Activity Name: TANK INSTALLATION - FINAL INSPECTION Activity Status: Closed