Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Journal Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
Facility ID: | 9816046 | ||||||||||
Facility Name: | WALMART 6398 - DUKE | ||||||||||
01/02/2025 | Enforcement Tracking Activity | Farrell, Jenny E | |||||||||
Activity Status: | Open | ||||||||||
12/26/2024 | Enforcement Referral Activity | Rivera, Janet | |||||||||
Activity Result: | Accepted | Activity Status: | Closed | ||||||||
Activity Closed Date: | 01/02/2025 | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been assigned | Date: | 01/02/2025 | ||||||||
Comment: | Assigned to Jenny E Farrell | ||||||||||
Events: | |||||||||||
Event Type: | Activity/Document was acknowledged on this date | Date: | 01/02/2025 | ||||||||
Comment: | Acknowledged and Assigned by Jenny E Farrell | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 01/02/2025 | ||||||||
Comment: | Finished | ||||||||||
Events: | |||||||||||
Event Type: | Activity/Document was accepted on this date | Date: | 01/02/2025 | ||||||||
Comment: | Accepted by Jenny E Farrell: Accepted, recent 2024 violations noted. JEF | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been submitted for approval | Date: | 12/26/2024 | ||||||||
Comment: | Submitted for approval by: Janet Rivera: Submitting referral due to violations over 90 days | ||||||||||
Comments: | |||||||||||
Comment Date: | 12/26/2024 | User: | RIVERA_JX_2 | ||||||||
Description: | Submitting referral due to violations over 90 days | ||||||||||
12/09/2024 | Electronic Communication Activity | Finney, Brittany N | |||||||||
Activity Closed Date: | 12/09/2024 | Activity Status: | Closed | ||||||||
Date: | 12/09/2024 | ||||||||||
Recipient: | brittany.finney@ocfl.net | ||||||||||
Sender: | Donald.Thibodeau@duke-energy.com | ||||||||||
Subject: | Walmart#6398 1569 Saxon Blvd., Deltona, FL 32725 | ||||||||||
Message: |
From: Finney, Brittany |
||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 12/09/2024 | ||||||||
Comment: | Finished | ||||||||||
12/04/2024 | Editable Letter Activity | Perez, Erick | |||||||||
Activity Title: | Compliance Assistance Offer Letter | Activity Status: | Closed | ||||||||
Events: | |||||||||||
Event Type: | Document has been sent | Date: | 12/04/2024 | ||||||||
Comment: | Sent | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 12/04/2024 | ||||||||
Comment: | Finished | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 12/04/2024 | User: | PEREZ_EX_1 | ||||||||
Description: | Pre Referral Letter | ||||||||||
View Attachment | |||||||||||
08/30/2024 | Violation Open | Finney, Brittany N | |||||||||
Significance: | Minor | Status: | Open | ||||||||
Criteria ID: | 7094 | ||||||||||
Rule: | 62-762.711(1) | ||||||||||
08/30/2024 | Editable Letter Activity | Finney, Brittany N | |||||||||
Activity Title: | Compliance Assistance Offer Letter | Activity Status: | Closed | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 09/04/2024 | ||||||||
Comment: | Finished | ||||||||||
Events: | |||||||||||
Event Type: | Document has been sent | Date: | 08/30/2024 | ||||||||
Comment: | Sent | ||||||||||
Events: | |||||||||||
Event Type: | Compliance Assistance Offer Verbal | Date: | 08/30/2024 | ||||||||
Comment: | Compliance Assistance Offer Verbal | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 09/04/2024 | User: | PIERCE_BN_1 | ||||||||
Description: | Compliance Assistance Offer Letter | ||||||||||
View Attachment | |||||||||||
08/16/2024 | Site Inspection Activity Closed | Finney, Brittany N | |||||||||
Activity Result: | Minor Out of Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 08/16/2024 | ||||||||||
Activity Closed Date: | 08/30/2024 | Activity Closed By: | PIERCE_BN_1 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 08/30/2024 | ||||||||
Comment: | Finished | ||||||||||
08/05/2024 | Electronic Communication Activity | Finney, Brittany N | |||||||||
Activity Closed Date: | 08/19/2024 | Activity Status: | Closed | ||||||||
Date: | 08/05/2024 | ||||||||||
Recipient: | MICHAEL.HAROLD@DUKE-ENERGY.COM | ||||||||||
Sender: | brittany.finney@ocfl.net | ||||||||||
Subject: | Tank Compliance Inspection due at FAC 9816046 | ||||||||||
Message: |
From: Finney, Brittany
Sent: Monday, August 5, 2024 1:11 PM
To: MICHAEL.HAROLD@DUKE-ENERGY.COM |
||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 08/19/2024 | ||||||||
Comment: | Finished | ||||||||||
10/01/2020 | Editable Letter Activity | Finney, Brittany N | |||||||||
Activity Title: | In Compliance Letter | Activity Status: | Closed | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 10/02/2020 | ||||||||
Comment: | Finished | ||||||||||
Events: | |||||||||||
Event Type: | Document has been sent | Date: | 10/02/2020 | ||||||||
Comment: | Sent | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 10/02/2020 | User: | PIERCE_BN_1 | ||||||||
Description: | In Compliance Letter | ||||||||||
View Attachment | |||||||||||
09/16/2020 | Site Inspection Activity Closed | Finney, Brittany N | |||||||||
Activity Result: | In Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 09/16/2020 | ||||||||||
Activity Closed Date: | 10/01/2020 | Activity Closed By: | PIERCE_BN_1 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 10/01/2020 | ||||||||
Comment: | Finished | ||||||||||
08/26/2020 | Electronic Communication Activity | Finney, Brittany N | |||||||||
Activity Closed Date: | 09/16/2020 | Activity Status: | Closed | ||||||||
Date: | 08/26/2020 | ||||||||||
Recipient: | Jaime.Seda@duke-energy.com; Kevin.Hinton@duke-energy.com | ||||||||||
Sender: | brittany.finney@ocfl.net | ||||||||||
Subject: | Re: Storage Tank Compliance Inspection due for FAC 9816046 WALMART 6398 - DUKE *Please reply regarding access code | ||||||||||
Message: | see attached | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 09/16/2020 | ||||||||
Comment: | Finished | ||||||||||
11/15/2019 | Editable Letter Activity | Finney, Brittany N | |||||||||
Activity Title: | Return to Compliance Letter | Activity Status: | Closed | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 01/24/2020 | ||||||||
Comment: | Finished | ||||||||||
Events: | |||||||||||
Event Type: | Document has been sent | Date: | 01/24/2020 | ||||||||
Comment: | Sent | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 01/24/2020 | User: | PIERCE_BN_1 | ||||||||
Description: | Return to Compliance Letter | ||||||||||
View Attachment | |||||||||||
11/11/2019 | Electronic Communication Activity | Finney, Brittany N | |||||||||
Activity Closed Date: | 01/24/2020 | Activity Status: | Closed | ||||||||
Date: | 11/11/2019 | ||||||||||
Recipient: | brittany.finney@ocfl.net | ||||||||||
Sender: | KevinLHintonSr@aol.com | ||||||||||
Subject: | WM6398 Deltona inspections | ||||||||||
Message: | From: Kevin L Hinton Sr [mailto:KevinLHintonSr@aol.com] Sent: Friday, October 25, 2019 4:47 PM To: Rauenzahn, Ruth Subject: WM6398 Deltona inspections Ruth, Please let me know if you have trouble with opening the attachments for WM6398 Deltona. Thanks; Kev | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 01/24/2020 | ||||||||
Comment: | Finished | ||||||||||
10/25/2019 | Electronic Communication Activity | Rauenzahn, Ruth | |||||||||
Activity Closed Date: | 10/25/2019 | Activity Status: | Closed | ||||||||
Date: | 10/25/2019 | ||||||||||
Recipient: | Ruth Rauenzahn | ||||||||||
Sender: |
Kevin Hinton |
||||||||||
Subject: | Open violations | ||||||||||
Message: | Rcvd photos of the tag on the tank and hydro-test of the spill bucket. | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 10/25/2019 | ||||||||
Comment: | Finished | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 10/25/2019 | User: | RAUENZAHN_RA_1 | ||||||||
Description: | Photos | ||||||||||
View Attachment | |||||||||||
10/14/2019 | Electronic Communication Activity | Finney, Brittany N | |||||||||
Activity Closed Date: | 10/14/2019 | Activity Status: | Closed | ||||||||
Date: | 10/14/2019 | ||||||||||
Recipient: | Jaime.Seda@duke-energy.com; Keith.Gutreuter@duke-energy.com | ||||||||||
Sender: | brittany.finney@ocfl.net | ||||||||||
Subject: | CRYSTAL PHOTONICS INC Tank Follow-up | ||||||||||
Message: | From: Finney, Brittany Sent: Monday, October 14, 2019 6:02 PM To: Jaime.Seda@duke-energy.com Cc: Keith.Gutreuter@duke-energy.com Subject: CRYSTAL PHOTONICS INC Tank Follow-up Hi Jaime, As discussed last week, I performed the after the fact installation inspections on the emergency generators at two Walmart sites, stores 5299 & 943. My supervisor performed an installation inspection for the tank behind store 6398. I've attached the reports for review. We are looking for: testing of the interstitial spaces of the tanks from the time of installation, the 2018 & 2019 annual testing of release detection and overfill protection equipment, integrity testing of the spill containment buckets, and FDEP approved equipment numbers (for the tank, spill containment bucket, release detection devices, & overfill protection equipment installed). If you have any of the requested information, please supply for review. Or if there is a testing company I can reach out to for these records, please let me know. The sites are about to be referred for enforcement as the violations have been open for several months. Please reach out to me with any questions. Thank you! Brittany Finney | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 10/14/2019 | ||||||||
Comment: | Finished | ||||||||||
10/02/2019 | Electronic Communication Activity | Rauenzahn, Ruth | |||||||||
Activity Closed Date: | 10/02/2019 | Activity Status: | Closed | ||||||||
Date: | 10/02/2019 | ||||||||||
Recipient: | Kevin Hinton, kevin.hinton@duke-energy.com | ||||||||||
Sender: | Ruth Rauenzahn | ||||||||||
Subject: | Need resolving documents as site is due to be referred to FDEP for enforcement. | ||||||||||
Message: | From: Rauenzahn, Ruth To: "Hinton Sr., Kevin L" Subject: Walmart Duke Sites - Due for Enforcement Date: Wednesday, October 02, 2019 11:08:14 AM Hi Kev, We have open violations for the sites below that are now due to be referred to FDEP for enforcement. Please send resolving documents as soon as possible. 9816119 DUKE - WALMART STORE 5299 06/28/2019 Documentation of testing of the storage tank's release detection system and overfill prevention system(s) (fuel level gauge, high level alarms/sensors) was not available during the inspection. 9816119 DUKE - WALMART STORE 5299 06/28/2019 FDEP approved equipment numbers were not provided for the AST and associated system components. 9816119 DUKE - WALMART STORE 5299 06/28/2019 1) Integrity testing of tank interstice not provided for review for time of installation. 2) Integrity testing of the spill bucket not provided for review. 9816117 DUKE - WALMART STORE 943 06/28/2019 FDEP approved equipment numbers were not provided for the AST and associated system components. 9816117 DUKE - WALMART STORE 943 06/28/2019 1) Integrity testing of tank interstice not provided for review for time of installation. 2) Integrity testing of the spill bucket not provided for review. 9816117 DUKE - WALMART STORE 943 06/28/2019 Documentation of testing of the storage tank's release detection system and overfill prevention system(s) (fuel level gauge, high level alarms/sensors) was not available during the inspection. 9816046 WALMART 6398 - DUKE 05/31/2019 Pleased provide the 2018 and 2019 tests of the interstitial sensor. 9816046 WALMART 6398 - DUKE 05/31/2019 Please provide the 2018 and 2019 tests of the overfill protection equipment. 9816046 WALMART 6398 - DUKE 05/31/2019 Please provide the initial test of the spill bucket on the AST system. Ruth Rauenzahn Environmental Program Supervisor Orange County Environmental Protection Division Storage Tank Compliance 3165 McCrory Place, Ste. 200 Orlando, FL 32803 | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 10/02/2019 | ||||||||
Comment: | Finished | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 10/02/2019 | User: | RAUENZAHN_RA_1 | ||||||||
Description: | |||||||||||
View Attachment | |||||||||||
07/12/2019 | Electronic Communication Activity | Rauenzahn, Ruth | |||||||||
Activity Closed Date: | 07/12/2019 | Activity Status: | Closed | ||||||||
Date: | 07/12/2019 | ||||||||||
Recipient: | Ruth Rauenzahn | ||||||||||
Sender: | Kev Hinton, kevin.hinton@duke-energy.com | ||||||||||
Subject: | FR documents | ||||||||||
Message: | Rcvd the FR documents for July 2019-2020. See attachment. Requested startup test records again. Email is attached. | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 07/12/2019 | ||||||||
Comment: | Finished | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 07/12/2019 | User: | RAUENZAHN_RA_1 | ||||||||
Description: | |||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 07/12/2019 | User: | RAUENZAHN_RA_1 | ||||||||
Description: | FR Documents | ||||||||||
View Attachment | |||||||||||
05/31/2019 | Attachment | Rauenzahn, Ruth | |||||||||
05/31/2019 | Editable Letter Activity | Rauenzahn, Ruth | |||||||||
Activity Title: | Compliance Assistance Offer Letter | Activity Status: | Closed | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 06/06/2019 | ||||||||
Comment: | Finished | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 05/31/2019 | User: | RAUENZAHN_RA_1 | ||||||||
Description: | Compliance Assistance Offer Letter | ||||||||||
View Attachment | |||||||||||
05/31/2019 | Electronic Communication Activity | Rauenzahn, Ruth | |||||||||
Activity Closed Date: | 05/31/2019 | Activity Status: | Closed | ||||||||
Date: | 05/31/2019 | ||||||||||
Recipient: | Kevin.hinton@duke-energy.com | ||||||||||
Sender: | Ruth Rauenzahn | ||||||||||
Subject: | Installation Inspection | ||||||||||
Message: | Emailed the installation inspection and CAO letter to Kevin Hinton. Email is attached. | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 05/31/2019 | ||||||||
Comment: | Finished | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 05/31/2019 | User: | RAUENZAHN_RA_1 | ||||||||
Description: | |||||||||||
View Attachment | |||||||||||
05/31/2019 | Attachment | Rauenzahn, Ruth | |||||||||
05/31/2019 | Violation Closed | Rauenzahn, Ruth | |||||||||
Significance: | Minor | Status: | Closed | ||||||||
Criteria ID: | 5102 | ||||||||||
Rule: | 62-762.601(7) | ||||||||||
05/31/2019 | Violation Closed | Rauenzahn, Ruth | |||||||||
Significance: | SNC-B | Status: | Closed | ||||||||
Criteria ID: | 5027 | ||||||||||
Rule: | 62-762.501(1)(b)10., 62-762.501(1)(b)11., 62-762.501(1)(b)8., 62-762.501(1)(b)9. | ||||||||||
05/31/2019 | Violation Closed | Rauenzahn, Ruth | |||||||||
Significance: | SNC-B | Status: | Closed | ||||||||
Criteria ID: | 5042 | ||||||||||
Rule: | 62-762.501(2)(e), 62-762.501(2)(e)1., 62-762.501(2)(e)2., 62-762.501(2)(e)2.a., 62-762.501(2)(e)2.b., 62-762.501(2)(e)2.c., 62-762.501(2)(e)2.d., 62-762.501(2)(e)3. | ||||||||||
05/31/2019 | Violation Closed | Rauenzahn, Ruth | |||||||||
Significance: | SNC-B | Status: | Closed | ||||||||
Criteria ID: | 5011 | ||||||||||
Rule: | 62-762.421(2) | ||||||||||
06/13/2018 | Electronic Communication Activity | Rauenzahn, Ruth | |||||||||
Activity Closed Date: | 06/13/2018 | Activity Status: | Closed | ||||||||
Date: | 06/13/2018 | ||||||||||
Recipient: | Kevin Hinton | ||||||||||
Sender: | Ruth Rauenzahn | ||||||||||
Subject: | Tank Installation | ||||||||||
Message: | Emailed Kevin to request initial test records for the tank, spill bucket Sentry Gauge and Madison sensor as well as financial responsibility documents. Email is attached. | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 06/13/2018 | ||||||||
Comment: | Finished | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 06/13/2018 | User: | RAUENZAHN_RA_1 | ||||||||
Description: | |||||||||||
View Attachment | |||||||||||
05/29/2018 | Electronic Communication Activity | Rauenzahn, Ruth | |||||||||
Activity Closed Date: | 05/29/2018 | Activity Status: | Closed | ||||||||
Date: | 05/29/2018 | ||||||||||
Recipient: | Kevin Hinton, kevin.hinton@duke-energy.com | ||||||||||
Sender: | Ruth Rauenzahn | ||||||||||
Subject: | Tank Installation | ||||||||||
Message: | Emailed a copy of my draft inspection to Mr. Hinton. Email is attached. | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 05/29/2018 | ||||||||
Comment: | Finished | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 05/29/2018 | User: | RAUENZAHN_RA_1 | ||||||||
Description: | |||||||||||
View Attachment | |||||||||||
05/21/2018 | Site Inspection Activity Closed | Rauenzahn, Ruth | |||||||||
Activity Result: | Major Out of Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 05/21/2018 | ||||||||||
Activity Closed Date: | 05/31/2019 | Activity Closed By: | RAUENZAHN_RA_1 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 05/31/2019 | ||||||||
Comment: | Finished | ||||||||||
05/16/2018 | Electronic Communication Activity | Becker, Glen | |||||||||
Activity Closed Date: | 05/16/2018 | Activity Status: | Closed | ||||||||
Date: | 05/16/2018 | ||||||||||
Recipient: | Glen Becker | ||||||||||
Sender: |
Brian Mellor |
||||||||||
Subject: | see attached | ||||||||||
Message: | see attached | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 05/16/2018 | ||||||||
Comment: | Finished | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 05/16/2018 | User: | BECKER_GT_1 | ||||||||
Description: | Install email & docs | ||||||||||
View Attachment |