Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Journal Report | |||||||||||
Report Run Date: 03/13/2025 Last Data Refresh: 03/12/2025 Report Generated from DOPPLER | |||||||||||
Facility ID: | 9819042 | ||||||||||
Facility Name: | DAYBREAK MARKET & FUEL 6 LLC | ||||||||||
09/10/2024 | Electronic Communication Activity | Proffitt, Brooke | |||||||||
Activity Closed Date: | 09/10/2024 | Activity Status: | Closed | ||||||||
Date: | 09/10/2024 | ||||||||||
Recipient: | Brooke Proffitt | ||||||||||
Sender: | Hani Baskaron | ||||||||||
Subject: | Incoming email | ||||||||||
Message: | Resolving financial responsibility violation email | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 09/10/2024 | ||||||||
Comment: | Finished | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 09/10/2024 | User: | PROFFITT_B | ||||||||
Description: | Incoming Email | ||||||||||
View Attachment | |||||||||||
07/26/2024 | Enforcement Tracking Activity | Gillman, Mark | |||||||||
Activity Status: | Open | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 08/26/2024 | User: | BRISTOL_S | ||||||||
Description: | Warning Letter | ||||||||||
View Attachment | |||||||||||
07/24/2024 | Enforcement Referral Activity | Payne, Charles L. | |||||||||
Activity Result: | Accepted | Activity Status: | Closed | ||||||||
Activity Closed Date: | 07/26/2024 | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been submitted for approval | Date: | 07/24/2024 | ||||||||
Comment: | Submitted for approval by: Charles L. Payne: 04/10/2024 – CAO letter sent to Hani Baskaron, hsbpetro@yahoo.com & Robert Palmer, Robert@daybreakmarketandfuel.com with a response date of 04/25/2024. No Response from facility. During the Routine Inspection on 04/09/2024, the facility representative, Robert Palmer, told the inspector that he would get the appropriate paperwork and email for review. No information was received. See Enforcement Memo | ||||||||||
Events: | |||||||||||
Event Type: | Activity/Document was acknowledged on this date | Date: | 07/26/2024 | ||||||||
Comment: | Acknowledged and Assigned by Mark Gillman | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been assigned | Date: | 07/26/2024 | ||||||||
Comment: | Assigned to Mark Gillman | ||||||||||
Events: | |||||||||||
Event Type: | Activity/Document was accepted on this date | Date: | 07/26/2024 | ||||||||
Comment: | Accepted by Mark Gillman: Accepted | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 07/26/2024 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 07/24/2024 | User: | PAYNE_CL_1 | ||||||||
Description: | 04/10/2024 – CAO letter sent to Hani Baskaron, hsbpetro@yahoo.com & Robert Palmer, Robert@daybreakmarketandfuel.com with a response date of 04/25/2024. No Response from facility. During the Routine Inspection on 04/09/2024, the facility representative, Robert Palmer, told the inspector that he would get the appropriate paperwork and email for review. No information was received. See Enforcement Memo | ||||||||||
Comments: | |||||||||||
Comment Date: | 07/24/2024 | User: | PAYNE_CL_1 | ||||||||
Description: | 04/10/2024 – CAO letter sent to Hani Baskaron, hsbpetro@yahoo.com & Robert Palmer, Robert@daybreakmarketandfuel.com with a response date of 04/25/2024. No Response from facility. During the Routine Inspection on 04/09/2024, the facility representative, Robert Palmer, told the inspector that he would get the appropriate paperwork and email for review. No information was received. See Enforcement Memo | ||||||||||
07/24/2024 | Enforcement Referral Activity | Payne, Charles L. | |||||||||
Activity Result: | Accepted | Activity Status: | Closed | ||||||||
Activity Closed Date: | 07/26/2024 | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been submitted for approval | Date: | 07/24/2024 | ||||||||
Comment: | Submitted for approval by: Charles L. Payne: 04/10/2024 – CAO letter sent to Hani Baskaron, hsbpetro@yahoo.com & Robert Palmer, Robert@daybreakmarketandfuel.com with a response date of 04/25/2024. No Response from facility. During the Routine Inspection on 04/09/2024, the facility representative, Robert Palmer, told the inspector that he would get the appropriate paperwork and email for review. No information was received. See Enforcement Memo | ||||||||||
Events: | |||||||||||
Event Type: | Activity/Document was acknowledged on this date | Date: | 07/26/2024 | ||||||||
Comment: | Acknowledged and Assigned by Mark Gillman | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been assigned | Date: | 07/26/2024 | ||||||||
Comment: | Assigned to Mark Gillman | ||||||||||
Events: | |||||||||||
Event Type: | Activity/Document was accepted on this date | Date: | 07/26/2024 | ||||||||
Comment: | Accepted by Mark Gillman: Accepted | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 07/26/2024 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 07/24/2024 | User: | PAYNE_CL_1 | ||||||||
Description: | 04/10/2024 – CAO letter sent to Hani Baskaron, hsbpetro@yahoo.com & Robert Palmer, Robert@daybreakmarketandfuel.com with a response date of 04/25/2024. No Response from facility. During the Routine Inspection on 04/09/2024, the facility representative, Robert Palmer, told the inspector that he would get the appropriate paperwork and email for review. No information was received. See Enforcement Memo | ||||||||||
Comments: | |||||||||||
Comment Date: | 07/24/2024 | User: | PAYNE_CL_1 | ||||||||
Description: | 04/10/2024 – CAO letter sent to Hani Baskaron, hsbpetro@yahoo.com & Robert Palmer, Robert@daybreakmarketandfuel.com with a response date of 04/25/2024. No Response from facility. During the Routine Inspection on 04/09/2024, the facility representative, Robert Palmer, told the inspector that he would get the appropriate paperwork and email for review. No information was received. See Enforcement Memo | ||||||||||
04/10/2024 | Editable Letter Activity | Payne, Charles L. | |||||||||
Activity Title: | Compliance Assistance Offer Letter | Activity Status: | Closed | ||||||||
Events: | |||||||||||
Event Type: | Document has been sent | Date: | 04/10/2024 | ||||||||
Comment: | Sent | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 04/10/2024 | ||||||||
Comment: | Finished | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 04/10/2024 | User: | PAYNE_CL_1 | ||||||||
Description: | Compliance Assistance Offer Letter | ||||||||||
View Attachment | |||||||||||
04/09/2024 | Violation Closed | Payne, Charles L. | |||||||||
Significance: | Minor | Status: | Closed | ||||||||
Criteria ID: | 6062 | ||||||||||
Rule: | 62-761.600(4) | ||||||||||
04/09/2024 | Site Inspection Activity Closed | Payne, Charles L. | |||||||||
Activity Result: | Major Out of Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 04/09/2024 | ||||||||||
Activity Closed Date: | 04/10/2024 | Activity Closed By: | PAYNE_CL_1 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 04/10/2024 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 04/10/2024 | User: | PAYNE_CL_1 | ||||||||
Description: | Met onsite with Robert Palmer (Head of Maintenance - Daybreak) for this routine tank compliance inspection. A copy of the inspection report and compliance assistance letter will be emailed to Hani Baskaron (Owner) at hsbpetro@yahoo.com and Robert Palmer at robert@daybreakmarketandfuel.com. UNDERGROUND STORAGE TANKS (USTs): Both tanks are 20K DW Xerxes USTs (EQ-200). Both tanks are compartmented as well. Tank 1 contains 15K regular and 5K non-ethanol grade 90 octane fuel. Tank 2 contains 6K premium, 8K diesel and 6K non-ethanol grade 88 octane fuel. PIPING: DW OPW Flexworks Loop System Piping (EQ-709). STP SUMPS: OPW Tank Sumps (EQ-912). The diesel STP sump contains a small amount of product - violation issued. The other STP sumps are clean and dry. DISPENSER SUMPS: OPW Flexworks Dispenser Sumps (EQ-709). Dispenser sumps 12/13, 14/15 and 16/17 all contained a small amount of product - violation issued. The other dispenser sumps were clean and dry. SPILL BUCKETS: DW OPW Spill Buckets (EQ-708). Some of the spill buckets contained PCW - violation issued. VAPOR RECOVERY BUCKETS: SW OPW 1-2200 PEVR Vapor Buckets (EQ-829). All the vapor recovery buckets contained PCW - violation issued. RELEASE DETECTION: Veeder Root TLS-450 Automatic Tank Gauge & Associated Sensors (EQ-724). All sensors were normal at time of inspection. Monthly visual inspections are not being conducted - violation issued. Mr. Palmer stated that Petro Flow will be contracted to start conducting monthly inspections. Current FR was not available for review at time of inspection - violation issued. Annual testing of the ATG System is overdue - violation issued. Annual testing of the line leak detectors is overdue - violation issued. Annual testing of the overfill devices is overdue - violation issued. Annual testing of the spill bucket gauges is overdue - violation issued. See violation section of inspection for corrective actions. | ||||||||||
04/09/2024 | Violation Closed | Payne, Charles L. | |||||||||
Significance: | Minor | Status: | Closed | ||||||||
Criteria ID: | 6062 | ||||||||||
Rule: | 62-761.600(4) | ||||||||||
04/09/2024 | Violation Open | Payne, Charles L. | |||||||||
Significance: | SNC-B | Status: | Open | ||||||||
Criteria ID: | 6056 | ||||||||||
Rule: | 62-761.600(1)(d), 62-761.600(1)(e), 62-761.600(1)(g) | ||||||||||
04/09/2024 | Violation Closed | Payne, Charles L. | |||||||||
Significance: | Minor | Status: | Closed | ||||||||
Criteria ID: | 6062 | ||||||||||
Rule: | 62-761.600(4) | ||||||||||
04/09/2024 | Violation Closed | Payne, Charles L. | |||||||||
Significance: | Minor | Status: | Closed | ||||||||
Criteria ID: | 6073 | ||||||||||
Rule: | 62-761.700(3)(b), 62-761.700(3)(b)1, 62-761.700(3)(b)2 | ||||||||||
04/09/2024 | Violation Closed | Payne, Charles L. | |||||||||
Significance: | SNC-B | Status: | Closed | ||||||||
Criteria ID: | 6011 | ||||||||||
Rule: | 62-761.420(2) | ||||||||||
04/09/2024 | Violation Closed | Payne, Charles L. | |||||||||
Significance: | Minor | Status: | Closed | ||||||||
Criteria ID: | 6053 | ||||||||||
Rule: | 62-761.500(7)(c), 62-761.500(7)(c)1, 62-761.500(7)(c)2, 62-761.500(7)(d) | ||||||||||
04/08/2024 | Electronic Communication Activity | Payne, Charles L. | |||||||||
Activity Closed Date: | 04/08/2024 | Activity Status: | Closed | ||||||||
Date: | 04/08/2024 | ||||||||||
Recipient: | Hani Baskaron (hsbpetro@yahoo.com) | ||||||||||
Sender: | Charles Payne | ||||||||||
Subject: | TCI | ||||||||||
Message: | Scheduled TCI with Hani Baskaron for 4/9/24. | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 04/08/2024 | ||||||||
Comment: | Finished | ||||||||||
03/29/2023 | Editable Letter Activity | Payne, Charles L. | |||||||||
Activity Title: | In Compliance Letter | Activity Status: | Closed | ||||||||
Description: | RTC letter_3-17-2021 | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 03/29/2023 | ||||||||
Comment: | Finished | ||||||||||
Events: | |||||||||||
Event Type: | Document has been sent | Date: | 03/29/2023 | ||||||||
Comment: | Sent | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 03/29/2023 | User: | WILSON_ML_1 | ||||||||
Description: | In Compliance Letter | ||||||||||
View Attachment | |||||||||||
06/09/2022 | Site Inspection Activity Closed | Payne, Charles L. | |||||||||
Activity Result: | In Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 06/09/2022 | ||||||||||
Activity Closed Date: | 03/29/2023 | Activity Closed By: | PAYNE_CL_1 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 03/29/2023 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 03/29/2023 | User: | PAYNE_CL_1 | ||||||||
Description: | Type of Inspection: UST System Installation Location: 4560 Hwy 90, Pace, FL 32571 PSSC Contractor: SPATCO Energy Solutions PSSC License #1256982 Owner: Plaza Street Fund 140 LLC Contractor submitted the following documents prior to installation: Installation Notification Form, Site Plan, Equipment List with EQ numbers and Well Proximity Letter. Equipment Installed: UNDERGROUND STORAGE TANKS (USTs): Both tanks are 20K DW Xerxes USTs (EQ-200). Both tanks are compartmented as well. Tank 1 contains 15K regular and 5K non-ethanol grade 90 octane fuel. Tank 2 contains 6K premium, 8K diesel and 6K non-ethanol grade 88 octane fuel. PIPING: DW OPW Flexworks Loop System Piping (EQ-709). STP SUMPS: OPW Tank Sumps (EQ-912). DISPENSER SUMPS: OPW Flexworks Dispenser Sumps (EQ-709). SPILL BUCKETS: DW OPW Spill Buckets (EQ-708). VAPOR RECOVERY BUCKETS: SW OPW 1-2200 PEVR Vapor Buckets (EQ-829) RELEASE DETECTION: Veeder Root TLS-450 Automatic Tank Gauge & Associated Sensors (EQ-724). LINE LEAK DETECTORS: FE Petro Mechanical Leak Detectors (EQ-335). Tank #1 gauge was reading -19 Hg psi and Tank #2 vacuum gauge was reading -05 Hg psi prior to installing the tanks in the excavation and after the tank pit was backfilled. The tanks were ballasted with water after being placed in excavation. Our department observed the primary and secondary product lines holding pressure prior to being covered. Our department observed passing hydrostatic tests of the STP sumps, spill buckets, vapor buckets and dispenser sumps/liners. All shear valves were properly installed and bracket bolts were tight. The STP sump and dispenser sump sensors were positioned properly. The ATG System was completely installed/calibrated and a sensor status tape was printed at the time of final install inspection (all sensors normal). It appears that all the UST equipment has been installed per manufacturer's instructions. See attachments for post install testing results (all testing passed). |