Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Journal Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
Facility ID: | 9819374 | ||||||||||
Facility Name: | CIRCLE K# 2707053 | ||||||||||
09/23/2024 | Editable Letter Activity | McKinney, Elisabeth K | |||||||||
Activity Title: | Return to Compliance Letter | Activity Status: | Closed | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 09/23/2024 | ||||||||
Comment: | Finished | ||||||||||
Events: | |||||||||||
Event Type: | Document has been sent | Date: | 09/23/2024 | ||||||||
Comment: | Sent | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 09/23/2024 | User: | MCKINNEY_EK_1 | ||||||||
Description: | 204-9-23 Report and letter email | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 09/23/2024 | User: | MCKINNEY_EK_1 | ||||||||
Description: | 2024-9-23 RTC Letter | ||||||||||
View Attachment | |||||||||||
09/09/2024 | Site Inspection Activity Closed | McKinney, Elisabeth K | |||||||||
Activity Result: | In Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 09/09/2024 | ||||||||||
Activity Closed Date: | 09/23/2024 | Activity Closed By: | MCKINNEY_EK_1 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 09/23/2024 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 09/09/2024 | User: | MCKINNEY_EK_1 | ||||||||
Description: | 09/09/2024 EM/TCI Met onsite with Bill Lowe of 7G Environmental for the routine storage tank compliance inspection. Release detection: -Visual inspection of the sumps, dispensers/liners, and spill buckets. -Electronic monitoring of the tank interstice, dispenser liners, and STP sumps using a Veeder Root TLS 450. -Panel indicated: "All Functions Normal". -Audible/visual tested - appeared functional. -Alarm history and liquid status report printed and on file: No unexplained alarms noted. -Mechanical line leak detectors present with annual 3gph testing. Tanks (3): (2) 20,000 gallons and (1) 12,000 compartmented (Premium/ E0) double-walled Xerxes fiberglass UST’s with associated underground Ameron Dualoy LCX fiberglass piping. Tanks are equipped with: -(4) Vent lines present with caps. -(4) STP sumps inspected: appeared dry and intact. (5) STP heads appeared in good condition. *(2) STP heads in Regular sump. Sensors appeared to be positioned correctly. Secondary piping appeared open to sumps. Mechanical line leak detectors present. -(4) double-walled spill buckets inspected: appeared dry and intact. -(4) Spill bucket interstitial gauges inspected: not currently indicating a leak. -Fill lids appeared to be properly marked. -Overfill protection: flow shut-off valves present in fills. Additional overfill protection sensors present outside on vent lines near tank pad. Alarm tested and appeared operational. -Dual point vapor recovery present. No obvious signs of leakage noted. Dispensers: -(7) Dispenser/liners inspected: appeared dry and intact. -Shear valves appeared anchored. -Hoses/nozzles appeared in good condition. -Sensors appeared to be positioned properly within sumps. No obvious signs of leakage noted. Records: -Current registration placard posted onsite -Monthly monitoring logs reviewed and include: Visual inspections of spill buckets, dispenser liners, and STP sumps (in addition to electronic monitoring). Alarm panel status checks. Audible/visual alarm test checks. Monthly printed alarm history reports. -Inspections completed within the 35 day. -Minor maintenance and water removal activities noted on logs | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 09/23/2024 | User: | MCKINNEY_EK_1 | ||||||||
Description: | 2024-9-9 Veeder Root Tape | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 09/23/2024 | User: | MCKINNEY_EK_1 | ||||||||
Description: | 2024-9-9 Veeder Root Overfill Alarm | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 09/23/2024 | User: | MCKINNEY_EK_1 | ||||||||
Description: | 2024-9-9 Veeder Root Tape | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 09/23/2024 | User: | MCKINNEY_EK_1 | ||||||||
Description: | 2024-9-9 Site Photo | ||||||||||
View Attachment | |||||||||||
06/06/2023 | Enforcement Referral Activity | Moseley, Amanda J | |||||||||
Activity Result: | Accepted | Activity Status: | Closed | ||||||||
Activity Closed Date: | 06/06/2023 | ||||||||||
Events: | |||||||||||
Event Type: | Activity/Document was acknowledged on this date | Date: | 06/06/2023 | ||||||||
Comment: | Acknowledged and Assigned by Shannon D Camp | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 06/06/2023 | ||||||||
Comment: | Finished | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been assigned | Date: | 06/06/2023 | ||||||||
Comment: | Assigned to Shannon D Camp | ||||||||||
Events: | |||||||||||
Event Type: | Activity/Document was accepted on this date | Date: | 06/06/2023 | ||||||||
Comment: | Accepted by Shannon D Camp: Refer to Statewide Enforcement | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been submitted for approval | Date: | 06/06/2023 | ||||||||
Comment: | Submitted for approval by: Amanda J Moseley: Referred to statewide Circle K enforcement case. | ||||||||||
Comments: | |||||||||||
Comment Date: | 06/06/2023 | User: | MOSELEY_AJ_1 | ||||||||
Description: | Referred to statewide Circle K enforcement case. | ||||||||||
06/06/2023 | Enforcement Tracking Activity | Camp, Shannon D | |||||||||
Activity Status: | Open | ||||||||||
04/26/2023 | Violation Closed | Howells, Elisabeth K | |||||||||
Significance: | Minor | Status: | Closed | ||||||||
Criteria ID: | 6002 | ||||||||||
Rule: | 62-761.350(1), 62-761.350(1)(c), 62-761.350(1)(d), 62-761.350(3)(b)2, 62-761.350(5)(a), 62-761.350(5)(b), 62-761.350(5)(c), 62-761.350(7) | ||||||||||
04/26/2023 | Editable Letter Activity | Howells, Elisabeth K | |||||||||
Activity Title: | Compliance Assistance Offer Letter | Activity Status: | Closed | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 04/26/2023 | ||||||||
Comment: | Finished | ||||||||||
Events: | |||||||||||
Event Type: | Document has been sent | Date: | 04/26/2023 | ||||||||
Comment: | Sent | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 04/26/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2023-4-26 CAO Letter | ||||||||||
View Attachment | |||||||||||
04/26/2023 | Electronic Communication Activity | Howells, Elisabeth K | |||||||||
Activity Closed Date: | 04/26/2023 | Activity Status: | Closed | ||||||||
Date: | 04/26/2023 | ||||||||||
Recipient: | Andrew Burress | ||||||||||
Sender: | Elisabeth Howells | ||||||||||
Subject: | Sent TIN report and CAO letter | ||||||||||
Message: | See attached | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 04/26/2023 | ||||||||
Comment: | Finished | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 04/26/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2023-4-26 Report and letter email | ||||||||||
View Attachment | |||||||||||
04/26/2023 | Violation Closed | Howells, Elisabeth K | |||||||||
Significance: | Minor | Status: | Closed | ||||||||
Criteria ID: | 6006 | ||||||||||
Rule: | 62-761.400(5) | ||||||||||
01/17/2023 | Site Inspection Activity Closed | Howells, Elisabeth K | |||||||||
Activity Result: | Minor Out of Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 01/17/2023 | ||||||||||
Activity Closed Date: | 04/26/2023 | Activity Closed By: | HOWELLS_EK_2 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 04/26/2023 | ||||||||
Comment: | Finished | ||||||||||
Events: | |||||||||||
Event Type: | Activity has not been approved | Date: | 01/20/2023 | ||||||||
Comment: | Not approved by Amanda J Moseley: Hey looks good! You don't submit these types of reports for approval until after the final inspection is completed. | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been submitted for approval | Date: | 01/20/2023 | ||||||||
Comment: | Submitted for approval by: Elisabeth K Howells | ||||||||||
Comments: | |||||||||||
Comment Date: | 01/19/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 11/9/2022 EH/TIA Met onsite with Ishmael of Ishmael's Petroleum LLC working under the license of (PCC1256857) for the tank integrity and anchoring inspection. Tank 1: 12,000 gallon double-walled Xerxes fiberglass UST to hold Diesel (EQ #200) UL# G-03538883 Tank 2: 20,000 gallon double-walled Xerxes fiberglass UST to hold Regular (EQ #200) UL# G-03538884 Tank 3: 20,000 gallon double-walled compartmented Xerxes fiberglass UST to hold Premium and Ethanol Free (EQ #200) UL# G-03538831 -Pressure was applied to the primary tanks during this inspection. Pressure readings were as follows: Tank #1: Start - 5 PSIG End - 5 PSIG Tank #2: Start -5 PSIG End - 5 PSIG Tank #3: Start - 5 PSIG End - 5 PSIG All manways and openings soaped- no bubbles noted. No change in pressure noted during inspection. -Entire tank exterior visually inspected. No damage or repairs noted. -Tanks were resting on pea gravel and clean soil. Anchoring Inspection: -Tanks were placed on pea gravel bed in excavation. -Pea gravel will be used as backfill material. -Proper spacing between and around the tanks according to manufacturer's specifications. -Tanks anchored using deadmen. Straps were provided by the manufacturer. -8 straps were used to anchor the compartmented tank. Straps were properly spaced. -Straps secured, cable ends directed away from the tanks. Turnbuckles were coated with mastic. Next inspection: Primary and secondary piping pressure test and hydrostatic test of the STP sumps and dispenser liners. | ||||||||||
Comments: | |||||||||||
Comment Date: | 02/01/2023 | User: | GLENNON_BM_1 | ||||||||
Description: | 1/17/2023 BG/TIA Met onsite with Ishmael of Ishmael's Petroleum LLC working under the license of (PCC1256857) for the piping pressue test and hydrostatic testing of the STP sumps and dispenser liners. -Air test of the Ameron Dualoy LCX fiberglass piping (EQ #291). Primary and secondary piping was pressurized on 12/16/2022. Initial primary piping gauge readings were as follows: R: 50 PSI; P: 49 PSI; D: 49 PSI; E0: 46 PSI Initial secondary piping gauge readings were as follows: R: 4 PSI; P: 4 PSI; D: 4 PSI; E0:46 PSI -All entry boots were inspected. Pressure was observed for approximately 45 minutes onsite. No drop in pressure noted. -Some pressure released from all gauges at the conclusion of the inspection - appeared operational. -Piping primary and secondary pressure tests passed. Hydrostatic test of the Containment Solutions sumps (EQ #395) and Bravo B7000 dispenser liners (EQ# 727). -All STP sumps and dispenser liners were filled with water to above the last seam and penetration and the water level was marked on 1/17/2023. -Shear valves have been capped and were not tested at this time. -Water level appeared to have remained static. -No signs of leakage or bubbling noted. -Exterior penetrations on all STP sumps and dispenser liners appeared dry. -Hydrostatic test of the STP sumps and dispenser liners passed. Next inspection: Final Inspection. | ||||||||||
Comments: | |||||||||||
Comment Date: | 04/14/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 4/14/2023 EH/TIN Met onsite with Adam Chavez of Ismeal Petroleum Services LLC working under the license of PCC1256857 for the final installation inspection. Release detection: -Visual inspection of the sumps, dispensers/liners, and spill buckets. -Electronic monitoring of the tank interstice, dispenser liners, and STP sumps using a Veeder Root TLS 450 (EQ #724). -All sensors tested during this inspection and passed. -Panel indicated: "All Functions Normal". -Audible/visual tested - appeared functional. -Mechanical line leak detectors present with annual 3gph testing. Tanks: (2) 20,000 gallons and (1) 12,000 compartmented (Premium/ E0) double-walled Xerxes fiberglass UST’s (EQ #200) with associated underground Ameron Dualoy LCX fiberglass piping (EQ #291). Tanks are equipped with: -(4) Vents present with caps. -(4) Containment Solutions sumps (EQ #395) inspected - appeared dry and intact. -STP heads appeared in good condition. -Sensors positioned correctly. -Secondary piping appeared open to sumps. -Mechanical line leak detectors present (EQ #335) -(4) EMCO Wheaton A1005-518 series spill buckets (EQ #695) inspected - appeared dry and intact. -(4) Spill bucket interstitial gauges present - appeared dry and intact. -Fill lids properly marked. -Overfill protection: EMCO Wheaton overfill prevention valves present in fills (EQ #414). -Dual point vapor recovery present. No obvious signs of leakage noted. Dispensers: -(7) Bravo B7000 dispenser liners (EQ# 727) inspected - appeared dry and intact. -Liners were properly sized to contain overhead equipment (conversion pans present). -Shear valves appeared anchored. -Hoses/nozzles appeared in good condition. No obvious signs of leakage noted. Records: -Current registration placard not posted on site, however, payment of registration placard has been made. Obtain registration placard, maintain original on site and submit a photo of the placard posted onsite to EPC. -No Class A, B or C Operator training certificates were available for review. Obtain Class A, B and C operator training certificates and submit copies of certificates to EPC upon completion. -Monthly monitoring inspections must be performed every calendar month within 35 days and include: Electronic monitoring of tank interstice, and sumps. Alarm panel status checks. Alarm status printouts. Alarm history report printouts. Biannual visual inspection of sumps and dispenser liners. Visual inspection of electronically monitored components must be performed every 6 months and recorded in logs. Alarm history report and liquid status must be printed monthly. Inspections must be performed once a month, not to exceed 35 days in between. Note: A survey drawing of installed tanks and underground integral piping, signed and sealed by a professional land surveyor or professional engineer licensed in the state of Florida, shall be maintained as a record in accordance with Rule 62-761.710, F.A.C. Note: Underground Storage System Installation and Removal Form for Certified Contractors must be submitted to EPC within 21 days. | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 04/11/2023 | User: | GLENNON_BM_1 | ||||||||
Description: | 2023-01-17 Dispensers | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 04/11/2023 | User: | GLENNON_BM_1 | ||||||||
Description: | 2023-01-17 Soap Test | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 04/26/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2023-4-14 Spill Bucket - E0 | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 04/11/2023 | User: | GLENNON_BM_1 | ||||||||
Description: | 2023-01-17 Gauge | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 04/11/2023 | User: | GLENNON_BM_1 | ||||||||
Description: | 2023-01-17 Soap Test | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 04/26/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2023-4-14 Site Photo | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 04/26/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2023-4-14 Spill Bucket - Premium | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 04/26/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2023-4-14 Spill Bucket - Regular | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 04/26/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2023-4-11 Operability Testing Results | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 04/26/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2023-4-14 Sump | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 04/26/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2023-4-14 Spill Bucket - Diesel | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 04/26/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2023-4-14 Dispenser Island | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 04/26/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2023-4-14 Dispenser Pan | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 01/20/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2022-11-09 Tank #3 Pressurized (Comp. 1 | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 01/20/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2022-11-09 Tank Placement | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 01/20/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2022-11-09 Revised Buoyancy Calculations | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 01/20/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2022-11-09 Tank Anchoring | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 01/20/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2022-11-09 Tank #2 Pressurized | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 01/20/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2022-11-09 Tank placement | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 01/20/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2022-11-09 Site Map | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 01/20/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2022-11-09 Installation Application | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 01/20/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2022-11-09 Tank 2 Placement | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 01/20/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2022-11-09 Tank Layout | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 01/20/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2022-11-09 Tank #1 Pressurized | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 01/20/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2022-11-09 Tank Pit | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 01/20/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2022-11-09 Pea Gravel | ||||||||||
View Attachment | |||||||||||
01/17/2023 | Site Inspection Activity Closed | Howells, Elisabeth K | |||||||||
Activity Result: | Minor Out of Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 01/17/2023 | ||||||||||
Activity Closed Date: | 04/26/2023 | Activity Closed By: | HOWELLS_EK_2 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 04/26/2023 | ||||||||
Comment: | Finished | ||||||||||
Events: | |||||||||||
Event Type: | Activity has not been approved | Date: | 01/20/2023 | ||||||||
Comment: | Not approved by Amanda J Moseley: Hey looks good! You don't submit these types of reports for approval until after the final inspection is completed. | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been submitted for approval | Date: | 01/20/2023 | ||||||||
Comment: | Submitted for approval by: Elisabeth K Howells | ||||||||||
Comments: | |||||||||||
Comment Date: | 01/19/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 11/9/2022 EH/TIA Met onsite with Ishmael of Ishmael's Petroleum LLC working under the license of (PCC1256857) for the tank integrity and anchoring inspection. Tank 1: 12,000 gallon double-walled Xerxes fiberglass UST to hold Diesel (EQ #200) UL# G-03538883 Tank 2: 20,000 gallon double-walled Xerxes fiberglass UST to hold Regular (EQ #200) UL# G-03538884 Tank 3: 20,000 gallon double-walled compartmented Xerxes fiberglass UST to hold Premium and Ethanol Free (EQ #200) UL# G-03538831 -Pressure was applied to the primary tanks during this inspection. Pressure readings were as follows: Tank #1: Start - 5 PSIG End - 5 PSIG Tank #2: Start -5 PSIG End - 5 PSIG Tank #3: Start - 5 PSIG End - 5 PSIG All manways and openings soaped- no bubbles noted. No change in pressure noted during inspection. -Entire tank exterior visually inspected. No damage or repairs noted. -Tanks were resting on pea gravel and clean soil. Anchoring Inspection: -Tanks were placed on pea gravel bed in excavation. -Pea gravel will be used as backfill material. -Proper spacing between and around the tanks according to manufacturer's specifications. -Tanks anchored using deadmen. Straps were provided by the manufacturer. -8 straps were used to anchor the compartmented tank. Straps were properly spaced. -Straps secured, cable ends directed away from the tanks. Turnbuckles were coated with mastic. Next inspection: Primary and secondary piping pressure test and hydrostatic test of the STP sumps and dispenser liners. | ||||||||||
Comments: | |||||||||||
Comment Date: | 02/01/2023 | User: | GLENNON_BM_1 | ||||||||
Description: | 1/17/2023 BG/TIA Met onsite with Ishmael of Ishmael's Petroleum LLC working under the license of (PCC1256857) for the piping pressue test and hydrostatic testing of the STP sumps and dispenser liners. -Air test of the Ameron Dualoy LCX fiberglass piping (EQ #291). Primary and secondary piping was pressurized on 12/16/2022. Initial primary piping gauge readings were as follows: R: 50 PSI; P: 49 PSI; D: 49 PSI; E0: 46 PSI Initial secondary piping gauge readings were as follows: R: 4 PSI; P: 4 PSI; D: 4 PSI; E0:46 PSI -All entry boots were inspected. Pressure was observed for approximately 45 minutes onsite. No drop in pressure noted. -Some pressure released from all gauges at the conclusion of the inspection - appeared operational. -Piping primary and secondary pressure tests passed. Hydrostatic test of the Containment Solutions sumps (EQ #395) and Bravo B7000 dispenser liners (EQ# 727). -All STP sumps and dispenser liners were filled with water to above the last seam and penetration and the water level was marked on 1/17/2023. -Shear valves have been capped and were not tested at this time. -Water level appeared to have remained static. -No signs of leakage or bubbling noted. -Exterior penetrations on all STP sumps and dispenser liners appeared dry. -Hydrostatic test of the STP sumps and dispenser liners passed. Next inspection: Final Inspection. | ||||||||||
Comments: | |||||||||||
Comment Date: | 04/14/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 4/14/2023 EH/TIN Met onsite with Adam Chavez of Ismeal Petroleum Services LLC working under the license of PCC1256857 for the final installation inspection. Release detection: -Visual inspection of the sumps, dispensers/liners, and spill buckets. -Electronic monitoring of the tank interstice, dispenser liners, and STP sumps using a Veeder Root TLS 450 (EQ #724). -All sensors tested during this inspection and passed. -Panel indicated: "All Functions Normal". -Audible/visual tested - appeared functional. -Mechanical line leak detectors present with annual 3gph testing. Tanks: (2) 20,000 gallons and (1) 12,000 compartmented (Premium/ E0) double-walled Xerxes fiberglass UST’s (EQ #200) with associated underground Ameron Dualoy LCX fiberglass piping (EQ #291). Tanks are equipped with: -(4) Vents present with caps. -(4) Containment Solutions sumps (EQ #395) inspected - appeared dry and intact. -STP heads appeared in good condition. -Sensors positioned correctly. -Secondary piping appeared open to sumps. -Mechanical line leak detectors present (EQ #335) -(4) EMCO Wheaton A1005-518 series spill buckets (EQ #695) inspected - appeared dry and intact. -(4) Spill bucket interstitial gauges present - appeared dry and intact. -Fill lids properly marked. -Overfill protection: EMCO Wheaton overfill prevention valves present in fills (EQ #414). -Dual point vapor recovery present. No obvious signs of leakage noted. Dispensers: -(7) Bravo B7000 dispenser liners (EQ# 727) inspected - appeared dry and intact. -Liners were properly sized to contain overhead equipment (conversion pans present). -Shear valves appeared anchored. -Hoses/nozzles appeared in good condition. No obvious signs of leakage noted. Records: -Current registration placard not posted on site, however, payment of registration placard has been made. Obtain registration placard, maintain original on site and submit a photo of the placard posted onsite to EPC. -No Class A, B or C Operator training certificates were available for review. Obtain Class A, B and C operator training certificates and submit copies of certificates to EPC upon completion. -Monthly monitoring inspections must be performed every calendar month within 35 days and include: Electronic monitoring of tank interstice, and sumps. Alarm panel status checks. Alarm status printouts. Alarm history report printouts. Biannual visual inspection of sumps and dispenser liners. Visual inspection of electronically monitored components must be performed every 6 months and recorded in logs. Alarm history report and liquid status must be printed monthly. Inspections must be performed once a month, not to exceed 35 days in between. Note: A survey drawing of installed tanks and underground integral piping, signed and sealed by a professional land surveyor or professional engineer licensed in the state of Florida, shall be maintained as a record in accordance with Rule 62-761.710, F.A.C. Note: Underground Storage System Installation and Removal Form for Certified Contractors must be submitted to EPC within 21 days. | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 04/11/2023 | User: | GLENNON_BM_1 | ||||||||
Description: | 2023-01-17 Dispensers | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 04/11/2023 | User: | GLENNON_BM_1 | ||||||||
Description: | 2023-01-17 Soap Test | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 04/26/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2023-4-14 Spill Bucket - E0 | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 04/11/2023 | User: | GLENNON_BM_1 | ||||||||
Description: | 2023-01-17 Gauge | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 04/11/2023 | User: | GLENNON_BM_1 | ||||||||
Description: | 2023-01-17 Soap Test | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 04/26/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2023-4-14 Site Photo | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 04/26/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2023-4-14 Spill Bucket - Premium | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 04/26/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2023-4-14 Spill Bucket - Regular | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 04/26/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2023-4-11 Operability Testing Results | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 04/26/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2023-4-14 Sump | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 04/26/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2023-4-14 Spill Bucket - Diesel | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 04/26/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2023-4-14 Dispenser Island | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 04/26/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2023-4-14 Dispenser Pan | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 01/20/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2022-11-09 Tank #3 Pressurized (Comp. 1 | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 01/20/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2022-11-09 Tank Placement | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 01/20/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2022-11-09 Revised Buoyancy Calculations | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 01/20/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2022-11-09 Tank Anchoring | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 01/20/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2022-11-09 Tank #2 Pressurized | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 01/20/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2022-11-09 Tank placement | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 01/20/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2022-11-09 Site Map | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 01/20/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2022-11-09 Installation Application | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 01/20/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2022-11-09 Tank 2 Placement | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 01/20/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2022-11-09 Tank Layout | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 01/20/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2022-11-09 Tank #1 Pressurized | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 01/20/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2022-11-09 Tank Pit | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 01/20/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2022-11-09 Pea Gravel | ||||||||||
View Attachment | |||||||||||
01/17/2023 | Site Inspection Activity Closed | Howells, Elisabeth K | |||||||||
Activity Result: | Minor Out of Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 01/17/2023 | ||||||||||
Activity Closed Date: | 04/26/2023 | Activity Closed By: | HOWELLS_EK_2 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 04/26/2023 | ||||||||
Comment: | Finished | ||||||||||
Events: | |||||||||||
Event Type: | Activity has not been approved | Date: | 01/20/2023 | ||||||||
Comment: | Not approved by Amanda J Moseley: Hey looks good! You don't submit these types of reports for approval until after the final inspection is completed. | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been submitted for approval | Date: | 01/20/2023 | ||||||||
Comment: | Submitted for approval by: Elisabeth K Howells | ||||||||||
Comments: | |||||||||||
Comment Date: | 01/19/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 11/9/2022 EH/TIA Met onsite with Ishmael of Ishmael's Petroleum LLC working under the license of (PCC1256857) for the tank integrity and anchoring inspection. Tank 1: 12,000 gallon double-walled Xerxes fiberglass UST to hold Diesel (EQ #200) UL# G-03538883 Tank 2: 20,000 gallon double-walled Xerxes fiberglass UST to hold Regular (EQ #200) UL# G-03538884 Tank 3: 20,000 gallon double-walled compartmented Xerxes fiberglass UST to hold Premium and Ethanol Free (EQ #200) UL# G-03538831 -Pressure was applied to the primary tanks during this inspection. Pressure readings were as follows: Tank #1: Start - 5 PSIG End - 5 PSIG Tank #2: Start -5 PSIG End - 5 PSIG Tank #3: Start - 5 PSIG End - 5 PSIG All manways and openings soaped- no bubbles noted. No change in pressure noted during inspection. -Entire tank exterior visually inspected. No damage or repairs noted. -Tanks were resting on pea gravel and clean soil. Anchoring Inspection: -Tanks were placed on pea gravel bed in excavation. -Pea gravel will be used as backfill material. -Proper spacing between and around the tanks according to manufacturer's specifications. -Tanks anchored using deadmen. Straps were provided by the manufacturer. -8 straps were used to anchor the compartmented tank. Straps were properly spaced. -Straps secured, cable ends directed away from the tanks. Turnbuckles were coated with mastic. Next inspection: Primary and secondary piping pressure test and hydrostatic test of the STP sumps and dispenser liners. | ||||||||||
Comments: | |||||||||||
Comment Date: | 02/01/2023 | User: | GLENNON_BM_1 | ||||||||
Description: | 1/17/2023 BG/TIA Met onsite with Ishmael of Ishmael's Petroleum LLC working under the license of (PCC1256857) for the piping pressue test and hydrostatic testing of the STP sumps and dispenser liners. -Air test of the Ameron Dualoy LCX fiberglass piping (EQ #291). Primary and secondary piping was pressurized on 12/16/2022. Initial primary piping gauge readings were as follows: R: 50 PSI; P: 49 PSI; D: 49 PSI; E0: 46 PSI Initial secondary piping gauge readings were as follows: R: 4 PSI; P: 4 PSI; D: 4 PSI; E0:46 PSI -All entry boots were inspected. Pressure was observed for approximately 45 minutes onsite. No drop in pressure noted. -Some pressure released from all gauges at the conclusion of the inspection - appeared operational. -Piping primary and secondary pressure tests passed. Hydrostatic test of the Containment Solutions sumps (EQ #395) and Bravo B7000 dispenser liners (EQ# 727). -All STP sumps and dispenser liners were filled with water to above the last seam and penetration and the water level was marked on 1/17/2023. -Shear valves have been capped and were not tested at this time. -Water level appeared to have remained static. -No signs of leakage or bubbling noted. -Exterior penetrations on all STP sumps and dispenser liners appeared dry. -Hydrostatic test of the STP sumps and dispenser liners passed. Next inspection: Final Inspection. | ||||||||||
Comments: | |||||||||||
Comment Date: | 04/14/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 4/14/2023 EH/TIN Met onsite with Adam Chavez of Ismeal Petroleum Services LLC working under the license of PCC1256857 for the final installation inspection. Release detection: -Visual inspection of the sumps, dispensers/liners, and spill buckets. -Electronic monitoring of the tank interstice, dispenser liners, and STP sumps using a Veeder Root TLS 450 (EQ #724). -All sensors tested during this inspection and passed. -Panel indicated: "All Functions Normal". -Audible/visual tested - appeared functional. -Mechanical line leak detectors present with annual 3gph testing. Tanks: (2) 20,000 gallons and (1) 12,000 compartmented (Premium/ E0) double-walled Xerxes fiberglass UST’s (EQ #200) with associated underground Ameron Dualoy LCX fiberglass piping (EQ #291). Tanks are equipped with: -(4) Vents present with caps. -(4) Containment Solutions sumps (EQ #395) inspected - appeared dry and intact. -STP heads appeared in good condition. -Sensors positioned correctly. -Secondary piping appeared open to sumps. -Mechanical line leak detectors present (EQ #335) -(4) EMCO Wheaton A1005-518 series spill buckets (EQ #695) inspected - appeared dry and intact. -(4) Spill bucket interstitial gauges present - appeared dry and intact. -Fill lids properly marked. -Overfill protection: EMCO Wheaton overfill prevention valves present in fills (EQ #414). -Dual point vapor recovery present. No obvious signs of leakage noted. Dispensers: -(7) Bravo B7000 dispenser liners (EQ# 727) inspected - appeared dry and intact. -Liners were properly sized to contain overhead equipment (conversion pans present). -Shear valves appeared anchored. -Hoses/nozzles appeared in good condition. No obvious signs of leakage noted. Records: -Current registration placard not posted on site, however, payment of registration placard has been made. Obtain registration placard, maintain original on site and submit a photo of the placard posted onsite to EPC. -No Class A, B or C Operator training certificates were available for review. Obtain Class A, B and C operator training certificates and submit copies of certificates to EPC upon completion. -Monthly monitoring inspections must be performed every calendar month within 35 days and include: Electronic monitoring of tank interstice, and sumps. Alarm panel status checks. Alarm status printouts. Alarm history report printouts. Biannual visual inspection of sumps and dispenser liners. Visual inspection of electronically monitored components must be performed every 6 months and recorded in logs. Alarm history report and liquid status must be printed monthly. Inspections must be performed once a month, not to exceed 35 days in between. Note: A survey drawing of installed tanks and underground integral piping, signed and sealed by a professional land surveyor or professional engineer licensed in the state of Florida, shall be maintained as a record in accordance with Rule 62-761.710, F.A.C. Note: Underground Storage System Installation and Removal Form for Certified Contractors must be submitted to EPC within 21 days. | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 04/11/2023 | User: | GLENNON_BM_1 | ||||||||
Description: | 2023-01-17 Dispensers | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 04/11/2023 | User: | GLENNON_BM_1 | ||||||||
Description: | 2023-01-17 Soap Test | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 04/26/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2023-4-14 Spill Bucket - E0 | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 04/11/2023 | User: | GLENNON_BM_1 | ||||||||
Description: | 2023-01-17 Gauge | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 04/11/2023 | User: | GLENNON_BM_1 | ||||||||
Description: | 2023-01-17 Soap Test | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 04/26/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2023-4-14 Site Photo | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 04/26/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2023-4-14 Spill Bucket - Premium | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 04/26/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2023-4-14 Spill Bucket - Regular | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 04/26/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2023-4-11 Operability Testing Results | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 04/26/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2023-4-14 Sump | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 04/26/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2023-4-14 Spill Bucket - Diesel | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 04/26/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2023-4-14 Dispenser Island | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 04/26/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2023-4-14 Dispenser Pan | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 01/20/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2022-11-09 Tank #3 Pressurized (Comp. 1 | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 01/20/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2022-11-09 Tank Placement | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 01/20/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2022-11-09 Revised Buoyancy Calculations | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 01/20/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2022-11-09 Tank Anchoring | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 01/20/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2022-11-09 Tank #2 Pressurized | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 01/20/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2022-11-09 Tank placement | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 01/20/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2022-11-09 Site Map | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 01/20/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2022-11-09 Installation Application | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 01/20/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2022-11-09 Tank 2 Placement | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 01/20/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2022-11-09 Tank Layout | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 01/20/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2022-11-09 Tank #1 Pressurized | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 01/20/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2022-11-09 Tank Pit | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 01/20/2023 | User: | HOWELLS_EK_2 | ||||||||
Description: | 2022-11-09 Pea Gravel | ||||||||||
View Attachment | |||||||||||
01/12/2023 | Issue Document Activity | Moseley, Amanda J | |||||||||
Activity Status: | Closed | ||||||||||
Contact Name: | Ismael Chavez | Activity Closed Date: | 01/12/2023 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 01/12/2023 | ||||||||
Comment: | Finished | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 01/12/2023 | User: | MOSELEY_AJ_1 | ||||||||
Description: | Install Approval Letter | ||||||||||
View Attachment |