![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Northeast | Type | Bulk Storage Facility | ||||||||
County | Alachua | Status | OPEN | ||||||||
ID | 8500014 | Latitude | 29° 38' 43.7604 | ||||||||
Name |
LEWIS OIL CO INC 605 SE DEPOT AVE |
Longitude | 82° 19' 6.2688 | ||||||||
GAINESVILLE, FL 32601-7041 | LL Method | DPHO | |||||||||
Contact | WENDA LEWIS | LL Status | REVIEWED | ||||||||
Phone | (352) 376-3293 | Status Date | 10/13/2008 | ||||||||
Account Owner Information | |||||||||||
Name | LEWIS OIL CO INC PO BOX 141286 GAINESVILLE, FL 32614 |
Effective Date | 05/20/1994 | ||||||||
Contact | WENDA LEWIS (MGR) | ||||||||||
Phone | (352) 376-3293 | ||||||||||
WLEWIS@LEWISOILCO.COM | |||||||||||
Placard # / Date | 701567 - 10/02/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | LEWIS OIL CO INC PO BOX 141286 GAINESVILLE, FL 32614 |
Effective Date | 10/14/2003 | ||||||||
Contact | WENDA LEWIS (MGR) | ||||||||||
Phone | (352) 376-3293 | ||||||||||
WLEWIS@LEWISOILCO.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 17000 | New/Lube Oil (O) | 07/01/1950 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (O) Tight fill |
(B) Steel/galvanized metal (C) Fiberglass (F) Double wall (J) Pressurized piping system |
(2) Visual inspect pipe sumps (K) Monitor dbl wall pipe space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
10 | 2000 | Waste Oil (L) | 01/01/1997 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket |
(A) Abv, no soil contact | (F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
11 | 2000 | Waste Oil (L) | 01/01/1997 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket |
(A) Abv, no soil contact | (F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
12 | 1000 | New/Lube Oil (O) | 12/01/2001 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket (O) Tight fill |
(A) Abv, no soil contact | (F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
13 | 2000 | New/Lube Oil (O) | 09/01/2003 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (O) Tight fill |
(A) Abv, no soil contact (B) Steel/galvanized metal |
(2) Visual inspect pipe sumps (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
14 | 2000 | New/Lube Oil (O) | 09/01/2003 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (O) Tight fill |
(A) Abv, no soil contact (B) Steel/galvanized metal |
(2) Visual inspect pipe sumps (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
15 | 2000 | New/Lube Oil (O) | 11/01/2007 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (O) Tight fill (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (L) Bulk product system |
(Q) Visual inspection of ASTs | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 17000 | New/Lube Oil (O) | 07/01/1950 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (O) Tight fill |
(B) Steel/galvanized metal (C) Fiberglass (F) Double wall (J) Pressurized piping system |
(2) Visual inspect pipe sumps (K) Monitor dbl wall pipe space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 12000 | New/Lube Oil (O) | 07/01/1950 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (O) Tight fill |
(B) Steel/galvanized metal (C) Fiberglass (F) Double wall (J) Pressurized piping system |
(2) Visual inspect pipe sumps (K) Monitor dbl wall pipe space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 17000 | New/Lube Oil (O) | 07/01/1950 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (O) Tight fill |
(B) Steel/galvanized metal (C) Fiberglass (F) Double wall (J) Pressurized piping system |
(2) Visual inspect pipe sumps (K) Monitor dbl wall pipe space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 17000 | Fuel Oil - Distribution (N) | 07/01/1950 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (O) Tight fill |
(B) Steel/galvanized metal (C) Fiberglass (F) Double wall (J) Pressurized piping system |
(2) Visual inspect pipe sumps (K) Monitor dbl wall pipe space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 17000 | New/Lube Oil (O) | 07/01/1950 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (O) Tight fill |
(B) Steel/galvanized metal (C) Fiberglass (F) Double wall (J) Pressurized piping system |
(2) Visual inspect pipe sumps (K) Monitor dbl wall pipe space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
9 | 1000 | Waste Oil (L) | 07/01/1990 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (A) Abv, no soil contact | (I) Not required | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 260 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal (I) Suction piping system |
(I) Not required | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
8 | 260 | Leaded Gas (A) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal (I) Suction piping system |
(I) Not required | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 05/14/2023 | 05/14/2024 | SCOTTSDALE INSURANCE COMPANY | ||||||||
INSURANCE | 05/14/2022 | 05/14/2023 | SCOTTSDALE INSURANCE COMPANY | ||||||||
INSURANCE | 08/14/2020 | 05/14/2021 | SCOTTSDALE INSURANCE COMPANY | ||||||||
INSURANCE | 05/14/2019 | 05/14/2020 | ILLINOIS UNION INSURANCE COMPANY | ||||||||
INSURANCE | 05/14/2017 | 05/14/2018 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 05/14/2016 | 05/14/2017 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 01/31/2014 | 01/31/2015 | AIG | ||||||||
INSURANCE | 01/31/2014 | 01/31/2015 | AIG | ||||||||
INSURANCE | 01/31/2013 | 01/31/2014 | CHARTIS SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 01/31/2013 | 01/31/2014 | CHARTIS SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 01/31/2012 | 01/31/2013 | CHARTIS SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 01/31/2011 | 01/31/2012 | CHARTIS SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 01/31/2010 | 01/31/2011 | CHARTIS SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 01/31/2009 | 01/31/2010 | AMERICAN INTERNATIONAL SPECIALTY LINES | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 05/24/2005 | 05/24/2005 | IN-COMPLIANCE | OWENS_JS | 11/0 | COMPLIANCE ASSURANCE | |||||
TCI | 04/07/2004 | 04/07/2004 | IN-COMPLIANCE | OWENS_JS | 11/0 | COMPLIANCE ASSURANCE | |||||
TIN | 03/16/2004 | 03/16/2004 | IN-COMPLIANCE | OWENS_JS | 2/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes 2 -2,000 GALLON AST'S ADDED TO CONTAINMENT AREA | |||||||||||
TCI | 04/11/2003 | 04/21/2003 | IN-COMPLIANCE | OWENS_JS | 9/0 | COMPLIANCE ASSURANCE | |||||
TIN | 12/18/2001 | 12/19/2001 | IN-COMPLIANCE | CHANDLER_R | 9/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes INSTALLATION INSPECTION, ADDED 1 - 1000 GALLON DOUBLEWALL AST | |||||||||||
TCI | 12/18/2001 | 12/19/2001 | IN-COMPLIANCE | CHANDLER_R | 9/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes COMPLIANCE INSPECTION | |||||||||||
TCI | 12/28/2000 | 01/08/2001 | IN-COMPLIANCE | CHANDLER_R | 8/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes COMPLIANCE INSPECTION | |||||||||||
TXI | 03/03/2000 | 03/07/2000 | IN-COMPLIANCE | DC | 0/1 | COMPLIANCE ASSURANCE | |||||
Completion Notes CLOSURE INSPECTION - 280 GAL HEATING OIL TANK #7 | |||||||||||
TCI | 12/21/1999 | 01/21/2000 | IN-COMPLIANCE | CHANDLER_R | 9/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes COMPLIANCE INSPECTION | |||||||||||
TCI | 04/22/1999 | 06/02/1999 | IN-COMPLIANCE | CHANDLER_D | 8/0 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Electronic Communication | 09/28/2023 | Satisfied | RAMSEY_TH_1 | Routine Compliance | |||||||
Site Inspection | 09/22/2023 | Major Out of Compliance | RAMSEY_TH_1 | 12/0 | Routine Compliance | ||||||
Phone Conversation | 08/25/2023 | Satisfied | RAMSEY_TH_1 | Routine Compliance | |||||||
Enforcement Referral | 08/17/2023 | Accepted | RAMSEY_TH_1 | Enforcement | |||||||
Site Inspection | 06/07/2022 | Major Out of Compliance | ZIMMERMAN_RA_2 | 12/0 | Compliance Assistance | ||||||
Letter | 06/07/2022 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Electronic Communication | 06/07/2022 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Electronic Communication | 06/02/2022 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Site Inspection | 08/25/2020 | Major Out of Compliance | ZIMMERMAN_RA_2 | 12/0 | Routine Compliance | ||||||
Letter | 08/25/2020 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Electronic Communication | 08/25/2020 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Electronic Communication | 08/03/2020 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Letter | 04/13/2018 | Satisfied | ZIMMERMAN_RA_2 | Routine Compliance | |||||||
Electronic Communication | 04/13/2018 | Satisfied | ZIMMERMAN_RA_2 | Routine Compliance | |||||||
Site Inspection | 04/13/2018 | In Compliance | ZIMMERMAN_RA_2 | 12/0 | Routine Compliance | ||||||
Phone Conversation | 03/02/2018 | Satisfied | ZIMMERMAN_RA_2 | Routine Compliance | |||||||
Site Inspection | 01/09/2015 | In Compliance | HARRINGTON_RD_1 | 12/0 | Routine Compliance | ||||||
Electronic Communication | 01/09/2015 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Site Inspection | 11/30/2012 | In Compliance | HARRINGTON_RD_1 | 12/0 | Routine Compliance | ||||||
Electronic Communication | 11/30/2012 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 06/03/2011 | Satisfied | OWENS_JS_1 | Routine Compliance | |||||||
Site Inspection | 05/17/2011 | In Compliance | OWENS_JS_1 | 12/0 | Routine Compliance | ||||||
Emergency Preparedness Information | 05/17/2011 | Satisfied | OWENS_JS_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 05/17/2010 | Satisfied | OWENS_JS_1 | Routine Compliance | |||||||
Site Inspection | 05/17/2010 | In Compliance | OWENS_JS_1 | 12/0 | Routine Compliance | ||||||
Emergency Preparedness Information | 04/30/2009 | Satisfied | OWENS_JS_1 | Routine Compliance | |||||||
Site Inspection | 04/28/2009 | In Compliance | OWENS_JS_1 | 12/0 | Routine Compliance | ||||||
Site Inspection | 05/28/2008 | In Compliance | OWENS_JS_1 | 12/0 | Routine Compliance | ||||||
Site Inspection | 01/28/2008 | In Compliance | OWENS_JS_1 | 1/0 | Installation | ||||||
Site Inspection | 03/27/2007 | In Compliance | OWENS_JS_1 | 11/0 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/09/2007 | Satisfied | OWENS_JS_1 | Routine Compliance | |||||||
Site Inspection | 05/25/2006 | In Compliance | OWENS_JS_1 | 11/0 | Routine Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
08/25/2020 | 4042 | SNC-B | 4.19 Isolation block valve and anti-siphon valve not installed/maintained for storage tank systems with a gravity head on integral piping. This violation may lead to Placard Revocation and Delivery Prohibition. | Install anti-siphon or solenoid valves on the product piping exiting the dike field secondary containment, one to the underground piping and the other to the bulk dispenser loading rack; email proof o violation resolution to ACEPD – work order and pictures after anti-siphon or solenoid valves have been installed on the product piping. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
12/27/1988 | ACTIVE | 10 | EARLY DETECTION INCENTIVE-ELIGIBLE | ||||||||