![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Northeast | Type | Retail Station | ||||||||
County | Alachua | Status | OPEN | ||||||||
ID | 8500142 | Latitude | 29° 40' 26.2186 | ||||||||
Name |
LOC CARDLOCK 23RD AVE 1942 NE 23RD AVE |
Longitude | 82° 17' 58.237 | ||||||||
GAINESVILLE, FL 32603 | LL Method | DPHO | |||||||||
Contact | WENDALEWIS | LL Status | REVIEWED | ||||||||
Phone | (352) 376-3293 | Status Date | 03/21/2003 | ||||||||
Account Owner Information | |||||||||||
Name | LEWIS OIL CO INC PO BOX 141286 GAINESVILLE, FL 32614 |
Effective Date | 02/05/2015 | ||||||||
Contact | WENDA LEWIS (MGR) | ||||||||||
Phone | (352) 376-3293 | ||||||||||
WLEWIS@LEWISOILCO.COM | |||||||||||
Placard # / Date | 701570 - 10/02/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | LEWIS OIL CO INC PO BOX 141286 GAINESVILLE, FL 32614 |
Effective Date | 02/05/2015 | ||||||||
Contact | WENDA LEWIS (MGR) | ||||||||||
Phone | (352) 376-3293 | ||||||||||
WLEWIS@LEWISOILCO.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1R1 | 12000 | Unleaded Gas (B) | 08/01/1991 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2R1 | 12000 | Unleaded Gas (B) | 08/01/1991 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (C) Groundwater Monitoring Plan (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3R1 | 12000 | Unleaded Gas (B) | 08/01/1991 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 12000 | Unleaded Gas (B) | 03/01/1967 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(B) Steel/galvanized metal | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 12000 | Unleaded Gas (B) | 03/01/1967 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(B) Steel/galvanized metal | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 12000 | Vehicular Diesel (D) | 03/01/1967 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(B) Steel/galvanized metal | (8) Manually sampled wells | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
NONE | |||||||||||
INSURANCE | 05/14/2024 | 05/14/2025 | SCOTTSDALE INSURANCE COMPANY | ||||||||
INSURANCE | 05/14/2023 | 05/14/2024 | SCOTTSDALE INSURANCE COMPANY | ||||||||
INSURANCE | 05/14/2022 | 05/14/2023 | SCOTTSDALE INSURANCE COMPANY | ||||||||
INSURANCE | 05/14/2021 | 05/14/2022 | SCOTTSDALE INSURANCE COMPANY | ||||||||
INSURANCE | 05/14/2020 | 05/14/2021 | SCOTTSDALE INSURANCE COMPANY | ||||||||
INSURANCE | 05/14/2019 | 05/14/2020 | ILLINOIS UNION INSURANCE COMPANY | ||||||||
INSURANCE | 05/14/2017 | 05/14/2018 | ACE | ||||||||
INSURANCE | 05/14/2016 | 05/14/2017 | ACE | ||||||||
INSURANCE | 05/04/2016 | 05/04/2017 | ACE | ||||||||
INSURANCE | 01/31/2015 | 01/31/2016 | AIG | ||||||||
INSURANCE | 04/26/2013 | 04/26/2014 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 04/26/2010 | 04/26/2011 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 04/26/2009 | 04/26/2010 | ZURICH-AMERICAN | ||||||||
INSURANCE | 09/01/1989 | 09/01/1990 | FPLIPA | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCR | 09/27/2005 | 09/28/2005 | IN-COMPLIANCE | OWENS_JS | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes REINSPECTION OF REPAIRED DISPENSER #3/4 FOR INTEGRITY-PASSED, ANNUAL OPERABILITY TEST PERFORMED TODAY 9/27/05 | |||||||||||
RRBD | 09/07/2005 | 09/28/2005 | RAMSEY_T | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RECEIVED ATG PRINTOUTS AND MONTHLY VISUAL INSPECTION RECORDS FOR PAST YEAR. RECORDS REVIEWED, BUT NOT KEPT FOR FILE. | |||||||||||
SV | 08/31/2005 | 09/28/2005 | OWENS_JS | 0/3 | COMPLIANCE ASSURANCE | ||||||
Completion Notes SITE VISIT TO OBSERVE HYDO TEST OF DISPENSER LINERS. #1/2 OK, 3/4 HAD SLOW LEAK AND NEEDS REPAIRED. | |||||||||||
TCI | 08/05/2005 | 08/08/2005 | MINOR OUT-OF-COMPLIANCE | OWENS_JS | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes MLLD TEST 10/25/04, OPERABILITY TEST DUE NOW | |||||||||||
RRBD | 11/09/2004 | 11/09/2004 | RAMSEY_T | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RECEIVED DOCUMENTATION THAT ALL NON-COMPLIANCE ITEMS HAVE BEEN CORRECTED. VISUAL INSPECTION REVIEWED ON SITE BY JOE OWENS. | |||||||||||
TCI | 08/12/2004 | 08/16/2004 | SIGNIFICANT OUT-OF-COMPLIANCE | OWENS_JS | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 08/20/2003 | 08/21/2003 | RAMSEY_T | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RECEIVED COPY OF INSURANCE | |||||||||||
TCI | 08/11/2003 | 08/19/2003 | SIGNIFICANT OUT-OF-COMPLIANCE | OWENS_JS | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes LLD AND ANNUAL OPERABILITY TEST 8/4/03 | |||||||||||
RRBD | 10/21/2002 | 10/22/2002 | RAMSEY_T | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RESPONSE LETTER RECEIVED, ALL TESTS PERFORMED AND PLACARD ISSUED | |||||||||||
TCI | 09/18/2002 | 09/19/2002 | MINOR OUT-OF-COMPLIANCE | OWENS_JS | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes COMPLIANCE INSPECTION | |||||||||||
TCI | 07/13/2001 | 07/16/2001 | IN-COMPLIANCE | CHANDLER_R | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes COMPLIANCE INSPECTION | |||||||||||
TCI | 07/18/2000 | 07/21/2000 | IN-COMPLIANCE | DC | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes COMPLIANCE INSPECTION | |||||||||||
TCI | 07/13/1999 | 07/22/1999 | IN-COMPLIANCE | CHANDLER_D | 0/3 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Letter | 02/27/2025 | Satisfied | KEIM_MJ_1 | Compliance Assistance | |||||||
Electronic Communication | 02/27/2025 | Satisfied | KEIM_MJ_1 | Routine Compliance | |||||||
Electronic Communication | 02/27/2025 | Satisfied | KEIM_MJ_1 | Routine Compliance | |||||||
Site Inspection | 02/27/2025 | Minor Out of Compliance | KEIM_MJ_1 | 0/3 | Routine Compliance | ||||||
Enforcement Referral | 03/11/2024 | Accepted | KEIM_MJ_1 | Enforcement | |||||||
Electronic Communication | 05/15/2023 | Satisfied | KEIM_MJ_1 | Compliance Assistance | |||||||
Phone Conversation | 05/15/2023 | Satisfied | KEIM_MJ_1 | Compliance Assistance | |||||||
Electronic Communication | 05/15/2023 | Satisfied | KEIM_MJ_1 | Compliance Assistance | |||||||
Electronic Communication | 05/15/2023 | Satisfied | KEIM_MJ_1 | Compliance Assistance | |||||||
Electronic Communication | 04/29/2023 | Satisfied | KEIM_MJ_1 | Compliance Assistance | |||||||
Letter | 01/31/2023 | Satisfied | KEIM_MJ_1 | Compliance Assistance | |||||||
Electronic Communication | 01/31/2023 | Satisfied | KEIM_MJ_1 | Routine Compliance | |||||||
Site Inspection | 01/31/2023 | Minor Out of Compliance | KEIM_MJ_1 | 0/3 | Routine Compliance | ||||||
Electronic Communication | 01/31/2023 | Satisfied | KEIM_MJ_1 | Routine Compliance | |||||||
Letter | 08/20/2020 | Satisfied | ZIMMERMAN_RA_2 | Routine Compliance | |||||||
Electronic Communication | 08/20/2020 | Satisfied | ZIMMERMAN_RA_2 | Routine Compliance | |||||||
Site Inspection | 08/20/2020 | In Compliance | ZIMMERMAN_RA_2 | 0/3 | Routine Compliance | ||||||
Electronic Communication | 08/03/2020 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Letter | 10/04/2018 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Record Document | 10/04/2018 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Electronic Communication | 10/04/2018 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Letter | 09/20/2018 | Satisfied | LIBBY_KK_1 | Compliance Assistance | |||||||
Phone Conversation | 06/20/2018 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Site Inspection | 03/19/2018 | Minor Out of Compliance | ZIMMERMAN_RA_2 | 0/3 | Routine Compliance | ||||||
Letter | 03/19/2018 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Electronic Communication | 03/19/2018 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Phone Conversation | 03/02/2018 | Satisfied | ZIMMERMAN_RA_2 | Routine Compliance | |||||||
Record Document | 12/15/2015 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Phone Conversation | 10/30/2015 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Site Inspection | 10/30/2015 | Minor Out of Compliance | HARRINGTON_RD_1 | 0/3 | Routine Compliance | ||||||
Letter | 10/30/2015 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Meeting | 04/22/2014 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Site Inspection | 02/28/2014 | Major Out of Compliance | HARRINGTON_RD_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/28/2014 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Letter | 02/28/2014 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Electronic Communication | 02/28/2014 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Site Inspection | 07/10/2013 | In Compliance | OWENS_JS_1 | 0/3 | Installation | ||||||
Electronic Communication | 07/10/2013 | Satisfied | HARRINGTON_RD_1 | Installation | |||||||
TCAR | 04/23/2012 | Satisfied | RAMSEY_TH_1 | Closure | |||||||
Letter | 04/23/2012 | Satisfied | RAMSEY_TH_1 | Closure | |||||||
Site Inspection | 03/05/2012 | In Compliance | OWENS_JS_1 | 0/3 | Closure | ||||||
Record Document | 01/23/2012 | Satisfied | OWENS_JS_1 | Non-Compliance | |||||||
Letter | 12/16/2011 | Satisfied | RAMSEY_TH_1 | Non-Compliance | |||||||
Letter | 08/30/2011 | Satisfied | OWENS_JS_1 | Non-Compliance | |||||||
Site Inspection | 08/29/2011 | Minor Out of Compliance | OWENS_JS_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 12/03/2010 | In Compliance | OWENS_JS_1 | 0/3 | Non-Compliance | ||||||
Letter | 10/19/2010 | Satisfied | RAMSEY_TH_1 | Non-Compliance | |||||||
Site Inspection | 10/01/2010 | Major Out of Compliance | OWENS_JS_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 09/27/2010 | Satisfied | OWENS_JS_1 | Routine Compliance | |||||||
Letter | 09/01/2010 | Satisfied | OWENS_JS_1 | Non-Compliance | |||||||
Site Inspection | 09/01/2010 | Major Out of Compliance | OWENS_JS_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 08/26/2009 | In Compliance | OWENS_JS_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 10/31/2008 | In Compliance | OWENS_JS_1 | 0/3 | Routine Compliance | ||||||
Record Document | 09/26/2007 | Satisfied | OWENS_JS_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 07/27/2007 | Satisfied | OWENS_JS_1 | Routine Compliance | |||||||
Site Inspection | 07/27/2007 | Minor Out of Compliance | OWENS_JS_1 | 0/3 | Routine Compliance | ||||||
Letter | 07/27/2007 | Satisfied | OWENS_JS_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 02/07/2007 | Satisfied | OWENS_JS_1 | Routine Compliance | |||||||
Letter | 12/12/2006 | Satisfied | OWENS_JS_1 | Non-Compliance | |||||||
Site Inspection | 10/10/2006 | In Compliance | OWENS_JS_1 | 0/3 | Non-Compliance | ||||||
Emergency Preparedness Information | 09/21/2006 | Satisfied | OWENS_JS_1 | Routine Compliance | |||||||
Site Inspection | 08/02/2006 | Minor Out of Compliance | OWENS_JS_1 | 0/3 | Routine Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
02/27/2025 | 6066 | Minor | 4.4 Not repaired per applicable standards. | Repair the damaged conduit in the (RUL) sump and forward photographic documentation to the inspector to address this violation. | |||||||
02/27/2025 | 6073 | Minor | 4.9 Spill containment, dispenser liners, and piping sumps not accessible. Water or regulated substances not removed. | Have the debris removed and forward photographic documentation to the inspector to address this violation. | |||||||
02/27/2025 | 6024 | Minor | 2.2 Integrity test not performed on storage tank, integral piping, single-walled spill containment system, double-walled spill containment system, or doubled-walled sump prior to placing into service. | Have the conduit repaired and hydro test the (RUL) sump the forward the results to the inspector to address this violation. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
06/19/1991 | COMPLETED | ||||||||||
07/25/1988 | COMPLETED | 82 | EARLY DETECTION INCENTIVE-ELIGIBLE | ||||||||