DEP Logo Florida Department of
Environmental Protection


Bob Martinez Center
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
Storage Tanks &
Contamination
Monitoring Information
 
Cover Page Report
Report Run Date: 05/09/2025        Last Data Refresh: 05/08/2025        Report Generated from DOPPLER
 
District Northeast   Type    Retail Station
 
County Baker   Status    OPEN
 
ID 8500364   Latitude    30° 16' 55.234
 
Name BAKER BEVERAGE
207 W MACCLENNY AVE
Longitude    82° 7' 31.9036
  MACCLENNY, FL 32063-2031 LL Method    DPHO
 
Contact JULIAN PATEL   LL Status    REVIEWED
 
Phone (904) 874-8184   Status Date    06/15/2023
 
Account Owner Information
 
Name BAKER BEVERAGE
207 W MACCLENNY AVE
MACCLENNY, FL 32063
Effective Date    09/07/2006
 
Contact JULIAN PATEL
 
Phone (904) 259-8184
 
Email ANPATEL82@GMAIL.COM
  Placard # / Date    702381 - 10/21/2024
Property Owner Information
 
Name BAKER BEVERAGE
207 W MACCLENNY AVE
MACCLENNY, FL 32063
Effective Date    09/07/2006
 
Contact JULIAN PATEL
 
Phone (904) 259-8184
 
Email ANPATEL82@GMAIL.COM
 
 
 
 
 
 
 
 
 
Tank Tank Size Content Installed Placement Status
3 12000 Unleaded Gas (B) 01/01/2005 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(C) Steel
(L) Compartmented
(M) Spill containment bucket
(O) Tight fill
(P) Level gauges/alarms
(R) Double wall - tank jacket
  (C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(1) Continuous electronic sensing
(3) Electronic monitor pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
1 8000 Leaded Gas (A) 05/01/1983 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(F) Fiberglass clad steel
  (C) Fiberglass (8) Manually sampled wells
 
 
Tank Tank Size Content Installed Placement Status
2 8000 Unleaded Gas (B) 05/01/1983 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(F) Fiberglass clad steel
  (C) Fiberglass (8) Manually sampled wells
 
 
Insurance Documents
 
FR Type   Effective Date Expiration Date Company Name
INSURANCE   09/14/2024 09/15/2025 ACE AMERICAN INSURANCE COMPANY
INSURANCE   08/15/2023 08/15/2024 ACE AMERICAN INSURANCE COMPANY
INSURANCE   08/02/2022 08/02/2023 ACE AMERICAN INSURANCE COMPANY
INSURANCE   08/02/2021 08/02/2022 ACE AMERICAN INSURANCE COMPANY
INSURANCE   08/02/2020 08/02/2021 ACE AMERICAN INSURANCE COMPANY
INSURANCE   08/01/2019 08/01/2020 ACE AMERICAN INSURANCE COMPANY
INSURANCE   08/02/2018 08/02/2019 ACE AMERICAN INSURANCE COMPANY
INSURANCE   08/02/2017 08/02/2018 ACE AMERICAN INSURANCE COMPANY
INSURANCE   08/02/2016 08/02/2017 ACE AMERICAN INSURANCE COMPANY
INSURANCE   04/23/2015 04/23/2016 COMMERCE & INDUSTRY
INSURANCE   04/23/2014 04/23/2015 COMMERCE & INDUSTRY
INSURANCE   04/23/2012 04/23/2013 ZURICH-AMERICAN
INSURANCE   04/23/2012 04/23/2013 ZURICH-AMERICAN
INSURANCE   04/23/2011 04/23/2012 ZURICH-AMERICAN
INSURANCE   04/23/2010 04/23/2011 ZURICH-AMERICAN
INSURANCE   04/23/2009 04/23/2010 ZURICH-AMERICAN
INSURANCE   03/17/2004 03/17/2005 AIG
 
 
Legacy Compliance Activity Information
 
Activity
Code
Date
Initiated
Date
Completed
Results Inspector AST/UST
Count
Description
NCLI 03/08/2006 03/09/2006 MCNEIL 0/1 COMPLIANCE ASSURANCE
 
TCI 02/20/2006 SIGNIFICANT OUT-OF-COMPLIANCE MCNEIL 0/1 COMPLIANCE ASSURANCE
 
WLI 06/13/2005 06/13/2005 MCNEIL 0/0 COMPLIANCE ASSURANCE
 
TIN 01/11/2005 04/13/2005 IN-COMPLIANCE NESSLER 0/1 COMPLIANCE ASSURANCE
 
TXI 01/05/2005 02/28/2005 SIGNIFICANT OUT-OF-COMPLIANCE NESSLER 0/2 COMPLIANCE ASSURANCE
 
 Completion Notes 3/7/05 TCAR IS DUE
 
CRO 01/12/2004 01/12/2004 LUBINSKI 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes PETITION TO ENF FO SENT TO OGC
 
NCLI 01/12/2004 01/12/2004 LUBINSKI 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes 2 NEW VIOLOATIONS FOUND: REG FEES NOT PAID, OWNER INFO NOT UPDATED
 
TCI 01/08/2004 05/14/2004 SIGNIFICANT OUT-OF-COMPLIANCE LUBINSKI 0/2 COMPLIANCE ASSURANCE
 
 Completion Notes INSPECTION TO DETERMINE COMPLIANCE WITH FO.
 
TEQA 01/08/2004 02/03/2004 LUBINSKI_D 0/2 COMPLIANCE ASSURANCE
 
 Completion Notes TCR/QA INSPECTION DONE DUE TO REFERRAL.
 
SCOI 10/07/2003 10/07/2003 LUBINSKI 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes SFCO SENT TO RHODEN TO SETTLE. COMPLIANCE AND MAJOR PENALTY PORTION TO BE SETTLED WITH JULIN PATEL LATER.
 
LTR 05/27/2003 05/27/2003 LUBINSKI 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes LETTER SENT OUT TO PATEL CLOSING INFORMAL MEETING PERIOD; NOW HAVE 20 DAYS, UNTIL 6/18/03 TO FILE PETITION OR OTHER ACTION
 
MEET 05/21/2003 05/27/2003 LUBINSKI 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes LES STONE OF LV HIERS REPRESENTED JULIAN PATEL. AGREED TO CORRECT EVERYTHING, WILL CONSULT WITH PATEL ON PENALTY.
 
NOVI 05/08/2003 05/27/2003 LUBINSKI 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes NOV RECEIVED BY BOTH RHODEN AND PATEL.
 
WLI 04/25/2003 04/28/2003 TURNER_MS 0/2 COMPLIANCE ASSURANCE
 
NCLI 03/03/2003 03/05/2003 TURNER_MS 0/2 COMPLIANCE ASSURANCE
 
TCI 02/24/2003 03/05/2003 SIGNIFICANT OUT-OF-COMPLIANCE TURNER_MS 0/2 COMPLIANCE ASSURANCE
 
NOVO 07/18/2002 07/29/2002 LUBINSKI 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes NOV SENT TO OGC FOR REVIEW
 
TCR 04/25/2002 05/01/2002 SIGNIFICANT OUT-OF-COMPLIANCE TURNER_MS 0/2 COMPLIANCE ASSURANCE
 
RRBD 09/05/2001 09/13/2001 TURNER_MS 0/2 COMPLIANCE ASSURANCE
 
TCI 08/02/2001 09/04/2001 MINOR OUT-OF-COMPLIANCE TURNER_MS 0/2 COMPLIANCE ASSURANCE
 
RRBD 05/29/2001 06/06/2001 TURNER_MS 0/2 COMPLIANCE ASSURANCE
 
NCLI 05/22/2001 06/06/2001 TURNER_MS 0/2 COMPLIANCE ASSURANCE
 
TCI 05/08/2001 06/06/2001 SIGNIFICANT OUT-OF-COMPLIANCE TURNER_MS 0/2 COMPLIANCE ASSURANCE
 
WLI 07/07/2000 07/07/2000 LUBINSKI 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes W/ PENALTIES
 
CRDE 04/27/2000 05/02/2000 TURNER_MS 0/2 COMPLIANCE ASSURANCE
 
WLI 03/24/2000 04/06/2000 TURNER_MS 0/2 COMPLIANCE ASSURANCE
 
TCR 02/24/2000 03/06/2000 SIGNIFICANT OUT-OF-COMPLIANCE TURNER_MS 0/2 COMPLIANCE ASSURANCE
 
NCLI 01/28/2000 02/01/2000 TURNER_MS 0/2 COMPLIANCE ASSURANCE
 
TCI 01/13/2000 02/01/2000 SIGNIFICANT OUT-OF-COMPLIANCE TURNER_MS 0/2 COMPLIANCE ASSURANCE
 
TIN 10/06/1999 11/05/1999 IN-COMPLIANCE TURNER_MS 0/2 COMPLIANCE ASSURANCE
 
UTCI 08/31/1998 09/21/1998 IN-COMPLIANCE LUBINSKI 0/0 COMPLIANCE ASSURANCE
 
 
 
Compliance Activity Information
 
Activity
Code
Date
Completed
Results Inspector AST/UST
Count
Description
Letter 04/08/2025 Satisfied MCNEIL_A Enforcement
 
Enforcement Tracking 03/11/2025 Closed Without Enforcement JACKSON_SM Enforcement
 
Enforcement Referral 02/26/2025 Accepted AMES_J Enforcement
 
Incident 02/05/2025 Has not led to Discharge ROBBINS_JL_1 Incident
 
Electronic Communication 01/28/2025 Satisfied ROBBINS_JL_1 Compliance Assistance
 
Electronic Communication 01/24/2025 Satisfied ROBBINS_JL_1 Compliance Assistance
 
Enforcement Referral 01/21/2025 Accepted AMES_J Enforcement
 
Electronic Communication 01/07/2025 Satisfied ROBBINS_JL_1 Compliance Assistance
 
Electronic Communication 12/26/2024 Satisfied ROBBINS_JL_1 Compliance Assistance
 
Electronic Communication 11/26/2024 Satisfied ROBBINS_JL_1 Compliance Assistance
 
Electronic Communication 11/26/2024 Satisfied ROBBINS_JL_1 Compliance Assistance
 
Letter 10/24/2024 Satisfied ROBBINS_JL_1 Compliance Assistance
 
Site Inspection 10/24/2024 Major Out of Compliance ROBBINS_JL_1 0/1 Routine Compliance
 
Electronic Communication 09/19/2024 Satisfied ROBBINS_JL_1 Compliance Assistance
 
Enforcement Referral 04/06/2023 Rejected MACK_B_1 Enforcement
 
Electronic Communication 04/06/2023 Satisfied BRANCH_BL_1 Compliance Assistance
 
Document Management 04/06/2023 Satisfied BRANCH_BL_1 Incident
 
Incident 04/06/2023 Has not led to Discharge BRANCH_BL_1 Incident
 
Letter 04/06/2023 Satisfied BRANCH_BL_1 Compliance Assistance
 
Incident 04/06/2023 Has not led to Discharge BRANCH_BL_1 Incident
 
Document Management 04/06/2023 Satisfied BRANCH_BL_1 Incident
 
Electronic Communication 03/27/2023 Satisfied BRANCH_BL_1 Compliance Assistance
 
Site Inspection 01/06/2023 Major Out of Compliance BRANCH_BL_1 0/1 Routine Compliance
 
Letter 01/06/2023 Satisfied BRANCH_BL_1 Compliance Assistance
 
Letter 08/09/2021 Satisfied RICHARDS_JE_1 Compliance Assistance
 
Electronic Communication 08/04/2021 Satisfied GREGORY_HM_1 Compliance Assistance
 
Electronic Communication 08/04/2021 Satisfied RICHARDS_JE_1 Compliance Assistance
 
Phone Conversation 07/29/2021 Satisfied GREGORY_HM_1 Compliance Assistance
 
Phone Conversation 07/26/2021 Satisfied RICHARDS_JE_1 Compliance Assistance
 
Electronic Communication 07/23/2021 Satisfied GREGORY_HM_1 Compliance Assistance
 
Electronic Communication 07/22/2021 Satisfied GREGORY_HM_1 Compliance Assistance
 
Electronic Communication 07/20/2021 Satisfied GREGORY_HM_1 Compliance Assistance
 
Electronic Communication 07/08/2021 Satisfied RICHARDS_JE_1 Compliance Assistance
 
Electronic Communication 05/20/2021 Satisfied MACK_B_1 Compliance Assistance
 
Electronic Communication 05/20/2021 Satisfied MACK_B_1 Routine Compliance
 
Electronic Communication 05/20/2021 Satisfied MACK_B_1 Compliance Assistance
 
Letter 05/17/2021 Satisfied MACK_B_1 Compliance Assistance
 
Site Inspection 05/17/2021 Major Out of Compliance MACK_B_1 0/1 Routine Compliance
 
Enforcement Tracking 03/20/2019 Closed Without Enforcement OBRIEN_S Enforcement
 
Letter 03/20/2019 Satisfied OBRIEN_S Enforcement
 
Enforcement Referral 01/29/2019 Accepted GREGORY_HM_1 Enforcement
 
Electronic Communication 01/07/2019 Satisfied WESTERMAN_ML_1 Compliance Assistance
 
Electronic Communication 12/21/2018 Satisfied WESTERMAN_ML_1 Compliance Assistance
 
Electronic Communication 12/05/2018 Satisfied WESTERMAN_ML_1 Compliance Assistance
 
Electronic Communication 11/16/2018 Satisfied WESTERMAN_ML_1 Compliance Assistance
 
Site Inspection 10/24/2018 Minor Out of Compliance WESTERMAN_ML_1 0/1 Routine Compliance
 
Letter 10/24/2018 Satisfied WESTERMAN_ML_1 Compliance Assistance
 
Electronic Communication 09/10/2018 Satisfied WESTERMAN_ML_1 Routine Compliance
 
Electronic Communication 08/18/2016 Satisfied GREGORY_HM_1 Routine Compliance
 
Site Inspection 08/18/2016 In Compliance GREGORY_HM_1 0/1 Routine Compliance
 
Electronic Communication 08/01/2016 Satisfied GREGORY_HM_1 Routine Compliance
 
Site Inspection 11/22/2014 In Compliance SHULAW_BJ_1 0/1 Routine Compliance
 
Emergency Preparedness Information 11/22/2014 Satisfied SHULAW_BJ_1 Routine Compliance
 
Site Inspection 09/26/2012 In Compliance KASSEES_RP_1 0/1 Routine Compliance
 
Emergency Preparedness Information 09/17/2012 Satisfied KASSEES_RP_1 Routine Compliance
 
Record Document 04/18/2012 Satisfied MCNEIL_AP_1 Non-Compliance
 
Letter 04/04/2012 Satisfied MCNEIL_AP_1 Non-Compliance
 
Letter 04/04/2012 Satisfied MCNEIL_AP_1 Non-Compliance
 
Record Document 02/06/2012 Satisfied MCNEIL_AP_1 Non-Compliance
 
Site Inspection 12/21/2011 Major Out of Compliance MCNEIL_AP_1 0/1 Routine Compliance
 
Emergency Preparedness Information 12/21/2011 Satisfied MCNEIL_AP_1 Routine Compliance
 
Letter 12/21/2011 Satisfied MCNEIL_AP_1 Non-Compliance
 
Discharge Reporting 04/19/2011 Satisfied LUBINSKI_D Discharge
 
Site Inspection 12/03/2010 In Compliance MCNEIL_AP_1 0/1 Non-Compliance
 
Letter 11/04/2010 Satisfied MCNEIL_AP_1 Non-Compliance
 
Electronic Communication 11/03/2010 Satisfied MCNEIL_AP_1 Non-Compliance
 
Letter 08/31/2010 Satisfied MCNEIL_AP_1 Non-Compliance
 
Site Inspection 08/31/2010 Major Out of Compliance MCNEIL_AP_1 0/1 Routine Compliance
 
Site Inspection 12/30/2009 In Compliance LUBINSKI_D 0/1 Non-Compliance
 
Enforcement Tracking 12/30/2009 Closed Without Enforcement DOHANEY_T Enforcement
 
Enforcement Referral 12/09/2009 Accepted MCNEIL_AP_1 Enforcement
 
Letter 09/29/2009 Satisfied MCNEIL_AP_1 Non-Compliance
 
Site Inspection 05/05/2009 Minor Out of Compliance MCNEIL_AP_1 0/1 Routine Compliance
 
Letter 05/05/2009 Satisfied MCNEIL_AP_1 Non-Compliance
 
Enforcement Tracking 07/15/2008 Closed With Enforcement DOHANEY_T Enforcement
 
Record Document 07/15/2008 Satisfied DOHANEY_T Discharge
 
Issue Document 07/15/2008 Satisfied DOHANEY_T Discharge
 
Issue Document 05/02/2008 Satisfied LUBINSKI_D Enforcement
 
Record Document 05/02/2008 Satisfied LUBINSKI_D Discharge
 
Issue Document 04/08/2008 Satisfied DOHANEY_T Discharge
 
Record Document 04/08/2008 Satisfied DOHANEY_T Discharge
 
Site Inspection 03/17/2008 In Compliance MCNEIL_AP_1 0/3 Routine Compliance
 
Record Document 01/03/2008 Satisfied LUBINSKI_D Discharge
 
Issue Document 09/26/2007 Satisfied LUBINSKI_D Enforcement
 
Site Inspection 08/13/2007 Minor Out of Compliance MCNEIL_AP_1 0/1 Routine Compliance
 
Enforcement Referral 07/16/2007 Accepted DOHANEY_T Enforcement
 
Record Document 02/28/2007 Satisfied DOHANEY_T Enforcement
 
Emergency Preparedness Information 02/16/2007 Satisfied MCNEIL_AP_1 Routine Compliance
 
Site Inspection 12/15/2006 Minor Out of Compliance MCNEIL_AP_1 0/1 Routine Compliance
 
Letter 12/05/2006 Satisfied MCNEIL_AP_1 Closure
 
Record Document 10/13/2006 Satisfied DOHANEY_T Enforcement
 
Emergency Preparedness Information 09/29/2006 Satisfied MCNEIL_AP_1 Routine Compliance
 
 
 
No Open AOCs Found
 
 
Open Violations
 
Insp Date Vio # Significance Violation Text Corrective Action
11/26/2024 6009 Minor 4.1 Incident Notification Form (INF) not received in a timely manner. Fill out & return INF.
 
10/23/2024 6063 SNC-B 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. Abate corrosion from the Regular and Premium single walled spill buckets. Provide documentation / photos to EQD inspector.
 
 
 
Discharge Information
 
Discharge
Date
  Clean Up
Status
Score Eligibility Info Site Manager Phone
02/10/2005   COMPLETED 95