DEP Logo Florida Department of
Environmental Protection


Bob Martinez Center
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
Storage Tanks &
Contamination
Monitoring Information
 
Cover Page Report
Report Run Date: 04/19/2025        Last Data Refresh: 04/18/2025        Report Generated from DOPPLER
 
District Northeast   Type    Retail Station
 
County Baker   Status    OPEN
 
ID 8500369   Latitude    30° 16' 34.6225
 
Name AARUHI LLC
7218 W MOUNT VERNON ST
Longitude    82° 9' 41.3957
  GLEN SAINT MARY, FL 32040-4915 LL Method    DPHO
 
Contact TEJAS PATEL   LL Status    REVIEWED
 
Phone (229) 506-9533   Status Date    06/15/2023
 
Account Owner Information
 
Name AARUHI LLC
7218 MOUNT VERNON STREET
GLEN ST MARY, FL 32040
Effective Date    01/28/2021
 
Contact TEJAS PATEL
 
Phone (229) 506-9533
 
Email TEJAS_4@YAHOO.COM
  Placard # / Date    683881 - 06/05/2024
Property Owner Information
 
Name AARUHI LLC
7218 MOUNT VERNON STREET
GLEN ST MARY, FL 32040
Effective Date    01/28/2021
 
Contact TEJAS PATEL
 
Phone (229) 506-9533
 
Email TEJAS_4@YAHOO.COM
 
 
 
 
 
 
 
 
 
Tank Tank Size Content Installed Placement Status
3 20000 Unleaded Gas (B) 09/01/2005 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(L) Compartmented
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
(R) Double wall - tank jacket
  (C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(1) Continuous electronic sensing
(2) Visual inspect pipe sumps
(3) Electronic monitor pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
1 4000 Unleaded Gas (B) 08/01/1978 UNDERGROUND Closed In Place (A)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(B) Internal lining
(C) Steel
(D) Unknown
(G) Sacrificial anode CP
(M) Spill containment bucket
  (G) Pipe trench liner
(J) Pressurized piping system
(K) Dispenser liners
(N) Approved synthetic material
(8) Manually sampled wells
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(M) Manual tank gauging - USTs
(N) Groundwater monitoring
 
 
Tank Tank Size Content Installed Placement Status
2 6000 Unleaded Gas (B) 08/01/1978 UNDERGROUND Closed In Place (A)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(B) Internal lining
(C) Steel
(D) Unknown
(G) Sacrificial anode CP
(M) Spill containment bucket
  (G) Pipe trench liner
(J) Pressurized piping system
(K) Dispenser liners
(N) Approved synthetic material
(8) Manually sampled wells
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(M) Manual tank gauging - USTs
(N) Groundwater monitoring
 
 
Insurance Documents
 
FR Type   Effective Date Expiration Date Company Name
INSURANCE   10/30/2024 10/30/2025 ACE AMERICAN INSURANCE COMPANY
INSURANCE   10/30/2023 10/30/2024 ACE AMERICAN INSURANCE COMPANY
INSURANCE   10/30/2022 10/30/2023 ACE AMERICAN INSURANCE COMPANY
INSURANCE   10/30/2021 10/30/2022 ACE AMERICAN INSURANCE COMPANY
INSURANCE   11/02/2020 11/02/2021 ACE AMERICAN INSURANCE COMPANY
INSURANCE   09/24/2019 09/24/2020 COMMERCE & INDUSTRY INSURANCE CO
INSURANCE   09/24/2018 09/24/2019 COMMERCE & INDUSTRY
INSURANCE   09/24/2017 09/24/2018 COMMERCE & INDUSTRY
INSURANCE   09/24/2016 09/24/2017 COMMERCE & INDUSTRY
INSURANCE   09/24/2015 09/24/2016 COMMERCE & INDUSTRY
INSURANCE   09/24/2012 09/24/2013 COMMERCE & INDUSTRY
INSURANCE   09/24/2010 09/24/2011 COMMERCE & INDUSTRY
INSURANCE   09/24/2009 09/24/2010 COMMERCE & INDUSTRY
INSURANCE   09/24/2008 09/24/2009 COMMERCE & INDUSTRY
 
 
Legacy Compliance Activity Information
 
Activity
Code
Date
Initiated
Date
Completed
Results Inspector AST/UST
Count
Description
DCS 12/09/2005 LUBINSKI 0/0 DISCHARGE PROJECT
 
 Completion Notes SAR DUE - SEND TO PCS
 
RRBD 01/12/2006 12/09/2005 LUBINSKI 0/0 DISCHARGE PROJECT
 
 Completion Notes SA INITIATION NOTIFICATION
 
DRFR 09/26/2005 MCNEIL 0/0 DISCHARGE PROJECT
 
 Completion Notes SOIL CONT. DURING TX ASSESS. LTD. TX WILL BE PERF. UPON RECPT. ANALYTICALS
 
TXI 09/23/2005 IN-COMPLIANCE MCNEIL 0/2 COMPLIANCE ASSURANCE
 
 Completion Notes 1-4K & 1-6K STEEL SW USTS REMOVED TCAR FILED W/NCHD 11/7/05.
 
TIV 09/15/2005 MCNEIL 0/1 COMPLIANCE ASSURANCE
 
RRBD 01/05/2005 01/05/2005 COMPLIANCE ASSURANCE
 
RRBD 10/05/2004 10/08/2004 COMPLIANCE ASSURANCE
 
RRBD 08/26/2004 08/26/2004 VELEZ 0/2 COMPLIANCE ASSURANCE
 
TCI 08/17/2004 08/26/2004 MINOR OUT-OF-COMPLIANCE VELEZ 0/2 COMPLIANCE ASSURANCE
 
RRBD 09/19/2003 09/22/2003 COMPLIANCE ASSURANCE
 
TCI 08/11/2003 08/21/2003 MINOR OUT-OF-COMPLIANCE GODWIN 0/2 COMPLIANCE ASSURANCE
 
 Completion Notes FAILURE TO REMOVE WATER COLLECTED IN STP SUMPS. FAILURE TO FILE AN INCIDENT FORM WITHIN 24 HOURS OR BEFORE THE CLOSE OF THE NEXT BUSINESS DAY.
 
RRBD 01/23/2003 01/31/2003 TURNER_MS 0/2 COMPLIANCE ASSURANCE
 
RRBD 12/05/2002 01/07/2003 TURNER_MS 0/2 COMPLIANCE ASSURANCE
 
WLI 12/04/2002 12/16/2002 TURNER_MS 0/2 COMPLIANCE ASSURANCE
 
NCLI 10/30/2002 11/04/2002 TURNER_MS 0/2 COMPLIANCE ASSURANCE
 
IRFR 10/30/2002 11/04/2002 TURNER_MS 0/2 DISCHARGE PROJECT
 
TCI 10/29/2002 11/04/2002 MINOR OUT-OF-COMPLIANCE TURNER_MS 0/2 COMPLIANCE ASSURANCE
 
RRBD 01/18/2002 01/29/2002 TURNER_MS 0/2 COMPLIANCE ASSURANCE
 
WLI 12/13/2001 12/26/2001 TURNER_MS 0/2 COMPLIANCE ASSURANCE
 
RRBD 12/03/2001 12/26/2001 TURNER_MS 0/2 COMPLIANCE ASSURANCE
 
 Completion Notes RESPONSE INADEQUATE; REQUESTED MORE INFO
 
NCLI 11/09/2001 12/10/2001 TURNER_MS 0/2 COMPLIANCE ASSURANCE
 
TCI 10/24/2001 11/07/2001 SIGNIFICANT OUT-OF-COMPLIANCE TURNER_MS 0/2 COMPLIANCE ASSURANCE
 
RRBD 01/02/2001 01/02/2001 TURNER_MS 0/2 COMPLIANCE ASSURANCE
 
WLI 11/17/2000 12/04/2000 TURNER_MS 0/2 COMPLIANCE ASSURANCE
 
 Completion Notes SECOND WL ISSUED TO EXTEND DEADLINE FOR COMPLIANCE.
 
WLI 09/18/2000 10/09/2000 TURNER_MS 0/2 COMPLIANCE ASSURANCE
 
NCLI 07/31/2000 08/02/2000 TURNER_MS /2 COMPLIANCE ASSURANCE
 
RRBD 07/25/2000 10/09/2000 TURNER_MS 0/2 COMPLIANCE ASSURANCE
 
TCI 07/25/2000 08/02/2000 SIGNIFICANT OUT-OF-COMPLIANCE TURNER_MS 0/2 COMPLIANCE ASSURANCE
 
TCI 07/15/1999 08/09/1999 IN-COMPLIANCE TURNER_MS 0/2 COMPLIANCE ASSURANCE
 
 
 
Compliance Activity Information
 
Activity
Code
Date
Completed
Results Inspector AST/UST
Count
Description
Electronic Communication 04/11/2025 Satisfied VILLEGASAVILA_OE_1 Compliance Assistance
 
Electronic Communication 04/08/2025 Satisfied VILLEGASAVILA_OE_1 Compliance Assistance
 
Letter 04/07/2025 Satisfied VILLEGASAVILA_OE_1 Compliance Assistance
 
Site Inspection 04/04/2025 Major Out of Compliance VILLEGASAVILA_OE_1 0/1 Routine Compliance
 
Electronic Communication 02/18/2025 Satisfied VILLEGASAVILA_OE_1 Compliance Assistance
 
Incident 04/10/2023 Has not led to Discharge ROBBINS_JL_1 Incident
 
Letter 04/07/2023 Satisfied ROBBINS_JL_1 Compliance Assistance
 
Electronic Communication 04/07/2023 Satisfied ROBBINS_JL_1 Compliance Assistance
 
Electronic Communication 04/07/2023 Satisfied ROBBINS_JL_1 Incident
 
Incident 04/07/2023 Has not led to Discharge ROBBINS_JL_1 Incident
 
Electronic Communication 04/06/2023 Satisfied ROBBINS_JL_1 Compliance Assistance
 
Document Management 03/27/2023 Satisfied ROBBINS_JL_1 Incident
 
Document Management 03/27/2023 Satisfied ROBBINS_JL_1 Incident
 
Electronic Communication 03/24/2023 Satisfied ROBBINS_JL_1 Compliance Assistance
 
Site Inspection 02/28/2023 Major Out of Compliance ROBBINS_JL_1 0/1 Routine Compliance
 
Letter 02/28/2023 Satisfied ROBBINS_JL_1 Compliance Assistance
 
Electronic Communication 01/20/2023 Satisfied ROBBINS_JL_1 Compliance Assistance
 
Electronic Communication 01/20/2023 Satisfied ROBBINS_JL_1 Compliance Assistance
 
Letter 06/17/2021 Satisfied BRANCH_BL_1 Compliance Assistance
 
Electronic Communication 06/17/2021 Satisfied BRANCH_BL_1 Compliance Assistance
 
Electronic Communication 06/04/2021 Satisfied BRANCH_BL_1 Compliance Assistance
 
Site Inspection 06/04/2021 Major Out of Compliance BRANCH_BL_1 0/1 Routine Compliance
 
Letter 06/04/2021 Satisfied BRANCH_BL_1 Compliance Assistance
 
Letter 11/21/2019 Satisfied MONDO_PW_1 Compliance Assistance
 
Letter 09/18/2019 Satisfied MONDO_PW_1 Compliance Assistance
 
Site Inspection 09/16/2019 Minor Out of Compliance MONDO_PW_1 0/1 Routine Compliance
 
Site Inspection 10/23/2017 In Compliance MONDO_PW_1 0/1 Compliance Assistance
 
Electronic Communication 10/23/2017 Satisfied MONDO_PW_1 Compliance Assistance
 
Letter 10/23/2017 Satisfied MONDO_PW_1 Compliance Assistance
 
Letter 08/31/2017 Satisfied RICHARDS_JE_1 Compliance Assistance
 
Letter 06/13/2017 Satisfied GREGORY_HM_1 Non-Compliance
 
Site Inspection 06/12/2017 Minor Out of Compliance GREGORY_HM_1 0/1 Routine Compliance
 
Electronic Communication 06/12/2017 Satisfied GREGORY_HM_1 Routine Compliance
 
Electronic Communication 05/22/2017 Satisfied GREGORY_HM_1 Routine Compliance
 
Electronic Communication 01/25/2016 Satisfied SHULAW_BJ_1 Non-Compliance
 
Letter 08/11/2015 Satisfied SHULAW_BJ_1 Non-Compliance
 
Electronic Communication 08/11/2015 Satisfied SHULAW_BJ_1 Non-Compliance
 
Issue Document 06/25/2015 Satisfied HOLTKAMP_JJ_1 Non-Compliance
 
Site Inspection 06/24/2015 Minor Out of Compliance SHULAW_BJ_1 0/1 Routine Compliance
 
Letter 06/24/2015 Satisfied SHULAW_BJ_1 Non-Compliance
 
Site Inspection 05/15/2013 In Compliance KASSEES_RP_1 0/1 Non-Compliance
 
Issue Document 03/29/2013 Satisfied KASSEES_RP_1 Routine Compliance
 
Letter 03/28/2013 Satisfied KASSEES_RP_1 Non-Compliance
 
Site Inspection 03/28/2013 Minor Out of Compliance KASSEES_RP_1 0/1 Routine Compliance
 
Emergency Preparedness Information 03/25/2013 Satisfied KASSEES_RP_1 Routine Compliance
 
Issue Document 11/22/2011 Satisfied TOWLE_M Discharge
 
Discharge Reporting 11/22/2011 Satisfied TOWLE_M Discharge
 
Issue Document 10/18/2011 Satisfied TOWLE_M Discharge
 
Issue Document 03/30/2011 Satisfied MCNEIL_AP_1 Routine Compliance
 
Site Inspection 03/30/2011 In Compliance MCNEIL_AP_1 0/1 Routine Compliance
 
Discharge Reporting 04/28/2010 Satisfied LUBINSKI_D Discharge
 
Enforcement Tracking 04/22/2010 Closed Without Enforcement LUBINSKI_D Enforcement
 
Site Inspection 04/06/2010 In Compliance MCNEIL_AP_1 0/1 Routine Compliance
 
Issue Document 09/02/2009 Satisfied TOWLE_M Discharge
 
Record Document 08/31/2009 Satisfied TOWLE_M Discharge
 
Record Document 08/14/2009 Satisfied LUBINSKI_D Enforcement
 
Issue Document 08/14/2009 Satisfied LUBINSKI_D Enforcement
 
Enforcement Referral 07/08/2009 Accepted LUBINSKI_D Enforcement
 
Record Document 03/12/2009 Satisfied TOWLE_M Discharge
 
Issue Document 03/12/2009 Satisfied TOWLE_M Discharge
 
Issue Document 02/10/2009 Satisfied TOWLE_M Discharge
 
Record Document 02/06/2009 Satisfied TOWLE_M Discharge
 
Site Inspection 01/22/2009 In Compliance MCNEIL_AP_1 0/1 Routine Compliance
 
Site Inspection 01/22/2009 In Compliance MCNEIL_AP_1 0/1 Routine Compliance
 
Record Document 10/24/2008 Satisfied TOWLE_M Discharge
 
Issue Document 10/24/2008 Satisfied TOWLE_M Discharge
 
Record Document 10/24/2008 Satisfied TOWLE_M Discharge
 
Record Document 06/19/2008 Satisfied TOWLE_M Discharge
 
Issue Document 06/19/2008 Satisfied TOWLE_M Discharge
 
Record Document 03/21/2008 Satisfied LUBINSKI_D Discharge
 
Issue Document 03/21/2008 Satisfied LUBINSKI_D Discharge
 
Site Inspection 01/09/2008 In Compliance MCNEIL_AP_1 0/1 Routine Compliance
 
Issue Document 12/05/2007 Satisfied LUBINSKI_D Discharge
 
Letter 09/10/2007 Satisfied LUBINSKI_D Discharge
 
Emergency Preparedness Information 02/16/2007 Satisfied MCNEIL_AP_1 Routine Compliance
 
Site Inspection 11/28/2006 In Compliance MCNEIL_AP_1 0/1 Routine Compliance
 
Emergency Preparedness Information 09/28/2006 Satisfied MCNEIL_AP_1 Routine Compliance
 
 
 
No Open AOCs Found
 
 
Open Violations
 
Insp Date Vio # Significance Violation Text Corrective Action
04/03/2025 6057 SNC-B 4.7 Release detection not installed, operated, and maintained per manufacturer's instructions and standards. The responsible party must repair/replace the sensor in the regular STP Sump and ensure the operation per the manufacturer's instructions and standards. After repair/replacement, resolution documentation and proof of the sensor operation must be provided.
 
 
 
Discharge Information
 
Discharge
Date
  Clean Up
Status
Score Eligibility Info Site Manager Phone
09/23/2005   COMPLETED 91