![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 04/19/2025 Last Data Refresh: 04/18/2025 Report Generated from DOPPLER | |||||||||||
District | Northeast | Type | Retail Station | ||||||||
County | Baker | Status | OPEN | ||||||||
ID | 8500369 | Latitude | 30° 16' 34.6225 | ||||||||
Name |
AARUHI LLC 7218 W MOUNT VERNON ST |
Longitude | 82° 9' 41.3957 | ||||||||
GLEN SAINT MARY, FL 32040-4915 | LL Method | DPHO | |||||||||
Contact | TEJAS PATEL | LL Status | REVIEWED | ||||||||
Phone | (229) 506-9533 | Status Date | 06/15/2023 | ||||||||
Account Owner Information | |||||||||||
Name | AARUHI LLC 7218 MOUNT VERNON STREET GLEN ST MARY, FL 32040 |
Effective Date | 01/28/2021 | ||||||||
Contact | TEJAS PATEL | ||||||||||
Phone | (229) 506-9533 | ||||||||||
TEJAS_4@YAHOO.COM | |||||||||||
Placard # / Date | 683881 - 06/05/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | AARUHI LLC 7218 MOUNT VERNON STREET GLEN ST MARY, FL 32040 |
Effective Date | 01/28/2021 | ||||||||
Contact | TEJAS PATEL | ||||||||||
Phone | (229) 506-9533 | ||||||||||
TEJAS_4@YAHOO.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 20000 | Unleaded Gas (B) | 09/01/2005 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (L) Compartmented (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 4000 | Unleaded Gas (B) | 08/01/1978 | UNDERGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (B) Internal lining (C) Steel (D) Unknown (G) Sacrificial anode CP (M) Spill containment bucket |
(G) Pipe trench liner (J) Pressurized piping system (K) Dispenser liners (N) Approved synthetic material |
(8) Manually sampled wells (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (M) Manual tank gauging - USTs (N) Groundwater monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 6000 | Unleaded Gas (B) | 08/01/1978 | UNDERGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (B) Internal lining (C) Steel (D) Unknown (G) Sacrificial anode CP (M) Spill containment bucket |
(G) Pipe trench liner (J) Pressurized piping system (K) Dispenser liners (N) Approved synthetic material |
(8) Manually sampled wells (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (M) Manual tank gauging - USTs (N) Groundwater monitoring |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 10/30/2024 | 10/30/2025 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 10/30/2023 | 10/30/2024 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 10/30/2022 | 10/30/2023 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 10/30/2021 | 10/30/2022 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 11/02/2020 | 11/02/2021 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 09/24/2019 | 09/24/2020 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 09/24/2018 | 09/24/2019 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 09/24/2017 | 09/24/2018 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 09/24/2016 | 09/24/2017 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 09/24/2015 | 09/24/2016 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 09/24/2012 | 09/24/2013 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 09/24/2010 | 09/24/2011 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 09/24/2009 | 09/24/2010 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 09/24/2008 | 09/24/2009 | COMMERCE & INDUSTRY | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
DCS | 12/09/2005 | LUBINSKI | 0/0 | DISCHARGE PROJECT | |||||||
Completion Notes SAR DUE - SEND TO PCS | |||||||||||
RRBD | 01/12/2006 | 12/09/2005 | LUBINSKI | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes SA INITIATION NOTIFICATION | |||||||||||
DRFR | 09/26/2005 | MCNEIL | 0/0 | DISCHARGE PROJECT | |||||||
Completion Notes SOIL CONT. DURING TX ASSESS. LTD. TX WILL BE PERF. UPON RECPT. ANALYTICALS | |||||||||||
TXI | 09/23/2005 | IN-COMPLIANCE | MCNEIL | 0/2 | COMPLIANCE ASSURANCE | ||||||
Completion Notes 1-4K & 1-6K STEEL SW USTS REMOVED TCAR FILED W/NCHD 11/7/05. | |||||||||||
TIV | 09/15/2005 | MCNEIL | 0/1 | COMPLIANCE ASSURANCE | |||||||
RRBD | 01/05/2005 | 01/05/2005 | COMPLIANCE ASSURANCE | ||||||||
RRBD | 10/05/2004 | 10/08/2004 | COMPLIANCE ASSURANCE | ||||||||
RRBD | 08/26/2004 | 08/26/2004 | VELEZ | 0/2 | COMPLIANCE ASSURANCE | ||||||
TCI | 08/17/2004 | 08/26/2004 | MINOR OUT-OF-COMPLIANCE | VELEZ | 0/2 | COMPLIANCE ASSURANCE | |||||
RRBD | 09/19/2003 | 09/22/2003 | COMPLIANCE ASSURANCE | ||||||||
TCI | 08/11/2003 | 08/21/2003 | MINOR OUT-OF-COMPLIANCE | GODWIN | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes FAILURE TO REMOVE WATER COLLECTED IN STP SUMPS. FAILURE TO FILE AN INCIDENT FORM WITHIN 24 HOURS OR BEFORE THE CLOSE OF THE NEXT BUSINESS DAY. | |||||||||||
RRBD | 01/23/2003 | 01/31/2003 | TURNER_MS | 0/2 | COMPLIANCE ASSURANCE | ||||||
RRBD | 12/05/2002 | 01/07/2003 | TURNER_MS | 0/2 | COMPLIANCE ASSURANCE | ||||||
WLI | 12/04/2002 | 12/16/2002 | TURNER_MS | 0/2 | COMPLIANCE ASSURANCE | ||||||
NCLI | 10/30/2002 | 11/04/2002 | TURNER_MS | 0/2 | COMPLIANCE ASSURANCE | ||||||
IRFR | 10/30/2002 | 11/04/2002 | TURNER_MS | 0/2 | DISCHARGE PROJECT | ||||||
TCI | 10/29/2002 | 11/04/2002 | MINOR OUT-OF-COMPLIANCE | TURNER_MS | 0/2 | COMPLIANCE ASSURANCE | |||||
RRBD | 01/18/2002 | 01/29/2002 | TURNER_MS | 0/2 | COMPLIANCE ASSURANCE | ||||||
WLI | 12/13/2001 | 12/26/2001 | TURNER_MS | 0/2 | COMPLIANCE ASSURANCE | ||||||
RRBD | 12/03/2001 | 12/26/2001 | TURNER_MS | 0/2 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RESPONSE INADEQUATE; REQUESTED MORE INFO | |||||||||||
NCLI | 11/09/2001 | 12/10/2001 | TURNER_MS | 0/2 | COMPLIANCE ASSURANCE | ||||||
TCI | 10/24/2001 | 11/07/2001 | SIGNIFICANT OUT-OF-COMPLIANCE | TURNER_MS | 0/2 | COMPLIANCE ASSURANCE | |||||
RRBD | 01/02/2001 | 01/02/2001 | TURNER_MS | 0/2 | COMPLIANCE ASSURANCE | ||||||
WLI | 11/17/2000 | 12/04/2000 | TURNER_MS | 0/2 | COMPLIANCE ASSURANCE | ||||||
Completion Notes SECOND WL ISSUED TO EXTEND DEADLINE FOR COMPLIANCE. | |||||||||||
WLI | 09/18/2000 | 10/09/2000 | TURNER_MS | 0/2 | COMPLIANCE ASSURANCE | ||||||
NCLI | 07/31/2000 | 08/02/2000 | TURNER_MS | /2 | COMPLIANCE ASSURANCE | ||||||
RRBD | 07/25/2000 | 10/09/2000 | TURNER_MS | 0/2 | COMPLIANCE ASSURANCE | ||||||
TCI | 07/25/2000 | 08/02/2000 | SIGNIFICANT OUT-OF-COMPLIANCE | TURNER_MS | 0/2 | COMPLIANCE ASSURANCE | |||||
TCI | 07/15/1999 | 08/09/1999 | IN-COMPLIANCE | TURNER_MS | 0/2 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Electronic Communication | 04/11/2025 | Satisfied | VILLEGASAVILA_OE_1 | Compliance Assistance | |||||||
Electronic Communication | 04/08/2025 | Satisfied | VILLEGASAVILA_OE_1 | Compliance Assistance | |||||||
Letter | 04/07/2025 | Satisfied | VILLEGASAVILA_OE_1 | Compliance Assistance | |||||||
Site Inspection | 04/04/2025 | Major Out of Compliance | VILLEGASAVILA_OE_1 | 0/1 | Routine Compliance | ||||||
Electronic Communication | 02/18/2025 | Satisfied | VILLEGASAVILA_OE_1 | Compliance Assistance | |||||||
Incident | 04/10/2023 | Has not led to Discharge | ROBBINS_JL_1 | Incident | |||||||
Letter | 04/07/2023 | Satisfied | ROBBINS_JL_1 | Compliance Assistance | |||||||
Electronic Communication | 04/07/2023 | Satisfied | ROBBINS_JL_1 | Compliance Assistance | |||||||
Electronic Communication | 04/07/2023 | Satisfied | ROBBINS_JL_1 | Incident | |||||||
Incident | 04/07/2023 | Has not led to Discharge | ROBBINS_JL_1 | Incident | |||||||
Electronic Communication | 04/06/2023 | Satisfied | ROBBINS_JL_1 | Compliance Assistance | |||||||
Document Management | 03/27/2023 | Satisfied | ROBBINS_JL_1 | Incident | |||||||
Document Management | 03/27/2023 | Satisfied | ROBBINS_JL_1 | Incident | |||||||
Electronic Communication | 03/24/2023 | Satisfied | ROBBINS_JL_1 | Compliance Assistance | |||||||
Site Inspection | 02/28/2023 | Major Out of Compliance | ROBBINS_JL_1 | 0/1 | Routine Compliance | ||||||
Letter | 02/28/2023 | Satisfied | ROBBINS_JL_1 | Compliance Assistance | |||||||
Electronic Communication | 01/20/2023 | Satisfied | ROBBINS_JL_1 | Compliance Assistance | |||||||
Electronic Communication | 01/20/2023 | Satisfied | ROBBINS_JL_1 | Compliance Assistance | |||||||
Letter | 06/17/2021 | Satisfied | BRANCH_BL_1 | Compliance Assistance | |||||||
Electronic Communication | 06/17/2021 | Satisfied | BRANCH_BL_1 | Compliance Assistance | |||||||
Electronic Communication | 06/04/2021 | Satisfied | BRANCH_BL_1 | Compliance Assistance | |||||||
Site Inspection | 06/04/2021 | Major Out of Compliance | BRANCH_BL_1 | 0/1 | Routine Compliance | ||||||
Letter | 06/04/2021 | Satisfied | BRANCH_BL_1 | Compliance Assistance | |||||||
Letter | 11/21/2019 | Satisfied | MONDO_PW_1 | Compliance Assistance | |||||||
Letter | 09/18/2019 | Satisfied | MONDO_PW_1 | Compliance Assistance | |||||||
Site Inspection | 09/16/2019 | Minor Out of Compliance | MONDO_PW_1 | 0/1 | Routine Compliance | ||||||
Site Inspection | 10/23/2017 | In Compliance | MONDO_PW_1 | 0/1 | Compliance Assistance | ||||||
Electronic Communication | 10/23/2017 | Satisfied | MONDO_PW_1 | Compliance Assistance | |||||||
Letter | 10/23/2017 | Satisfied | MONDO_PW_1 | Compliance Assistance | |||||||
Letter | 08/31/2017 | Satisfied | RICHARDS_JE_1 | Compliance Assistance | |||||||
Letter | 06/13/2017 | Satisfied | GREGORY_HM_1 | Non-Compliance | |||||||
Site Inspection | 06/12/2017 | Minor Out of Compliance | GREGORY_HM_1 | 0/1 | Routine Compliance | ||||||
Electronic Communication | 06/12/2017 | Satisfied | GREGORY_HM_1 | Routine Compliance | |||||||
Electronic Communication | 05/22/2017 | Satisfied | GREGORY_HM_1 | Routine Compliance | |||||||
Electronic Communication | 01/25/2016 | Satisfied | SHULAW_BJ_1 | Non-Compliance | |||||||
Letter | 08/11/2015 | Satisfied | SHULAW_BJ_1 | Non-Compliance | |||||||
Electronic Communication | 08/11/2015 | Satisfied | SHULAW_BJ_1 | Non-Compliance | |||||||
Issue Document | 06/25/2015 | Satisfied | HOLTKAMP_JJ_1 | Non-Compliance | |||||||
Site Inspection | 06/24/2015 | Minor Out of Compliance | SHULAW_BJ_1 | 0/1 | Routine Compliance | ||||||
Letter | 06/24/2015 | Satisfied | SHULAW_BJ_1 | Non-Compliance | |||||||
Site Inspection | 05/15/2013 | In Compliance | KASSEES_RP_1 | 0/1 | Non-Compliance | ||||||
Issue Document | 03/29/2013 | Satisfied | KASSEES_RP_1 | Routine Compliance | |||||||
Letter | 03/28/2013 | Satisfied | KASSEES_RP_1 | Non-Compliance | |||||||
Site Inspection | 03/28/2013 | Minor Out of Compliance | KASSEES_RP_1 | 0/1 | Routine Compliance | ||||||
Emergency Preparedness Information | 03/25/2013 | Satisfied | KASSEES_RP_1 | Routine Compliance | |||||||
Issue Document | 11/22/2011 | Satisfied | TOWLE_M | Discharge | |||||||
Discharge Reporting | 11/22/2011 | Satisfied | TOWLE_M | Discharge | |||||||
Issue Document | 10/18/2011 | Satisfied | TOWLE_M | Discharge | |||||||
Issue Document | 03/30/2011 | Satisfied | MCNEIL_AP_1 | Routine Compliance | |||||||
Site Inspection | 03/30/2011 | In Compliance | MCNEIL_AP_1 | 0/1 | Routine Compliance | ||||||
Discharge Reporting | 04/28/2010 | Satisfied | LUBINSKI_D | Discharge | |||||||
Enforcement Tracking | 04/22/2010 | Closed Without Enforcement | LUBINSKI_D | Enforcement | |||||||
Site Inspection | 04/06/2010 | In Compliance | MCNEIL_AP_1 | 0/1 | Routine Compliance | ||||||
Issue Document | 09/02/2009 | Satisfied | TOWLE_M | Discharge | |||||||
Record Document | 08/31/2009 | Satisfied | TOWLE_M | Discharge | |||||||
Record Document | 08/14/2009 | Satisfied | LUBINSKI_D | Enforcement | |||||||
Issue Document | 08/14/2009 | Satisfied | LUBINSKI_D | Enforcement | |||||||
Enforcement Referral | 07/08/2009 | Accepted | LUBINSKI_D | Enforcement | |||||||
Record Document | 03/12/2009 | Satisfied | TOWLE_M | Discharge | |||||||
Issue Document | 03/12/2009 | Satisfied | TOWLE_M | Discharge | |||||||
Issue Document | 02/10/2009 | Satisfied | TOWLE_M | Discharge | |||||||
Record Document | 02/06/2009 | Satisfied | TOWLE_M | Discharge | |||||||
Site Inspection | 01/22/2009 | In Compliance | MCNEIL_AP_1 | 0/1 | Routine Compliance | ||||||
Site Inspection | 01/22/2009 | In Compliance | MCNEIL_AP_1 | 0/1 | Routine Compliance | ||||||
Record Document | 10/24/2008 | Satisfied | TOWLE_M | Discharge | |||||||
Issue Document | 10/24/2008 | Satisfied | TOWLE_M | Discharge | |||||||
Record Document | 10/24/2008 | Satisfied | TOWLE_M | Discharge | |||||||
Record Document | 06/19/2008 | Satisfied | TOWLE_M | Discharge | |||||||
Issue Document | 06/19/2008 | Satisfied | TOWLE_M | Discharge | |||||||
Record Document | 03/21/2008 | Satisfied | LUBINSKI_D | Discharge | |||||||
Issue Document | 03/21/2008 | Satisfied | LUBINSKI_D | Discharge | |||||||
Site Inspection | 01/09/2008 | In Compliance | MCNEIL_AP_1 | 0/1 | Routine Compliance | ||||||
Issue Document | 12/05/2007 | Satisfied | LUBINSKI_D | Discharge | |||||||
Letter | 09/10/2007 | Satisfied | LUBINSKI_D | Discharge | |||||||
Emergency Preparedness Information | 02/16/2007 | Satisfied | MCNEIL_AP_1 | Routine Compliance | |||||||
Site Inspection | 11/28/2006 | In Compliance | MCNEIL_AP_1 | 0/1 | Routine Compliance | ||||||
Emergency Preparedness Information | 09/28/2006 | Satisfied | MCNEIL_AP_1 | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
04/03/2025 | 6057 | SNC-B | 4.7 Release detection not installed, operated, and maintained per manufacturer's instructions and standards. | The responsible party must repair/replace the sensor in the regular STP Sump and ensure the operation per the manufacturer's instructions and standards. After repair/replacement, resolution documentation and proof of the sensor operation must be provided. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
09/23/2005 | COMPLETED | 91 | |||||||||