![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Northwest | Type | Retail Station | ||||||||
County | Bay | Status | OPEN | ||||||||
ID | 8500403 | Latitude | 30° 10' 30.665 | ||||||||
Name |
ST ANDREWS MINI MART LLC 2025 W 15TH ST |
Longitude | 85° 41' 30.369 | ||||||||
PANAMA CITY, FL 32401-1751 | LL Method | DPHO | |||||||||
Contact | JUNAID IBRAHIM | LL Status | REVIEWED | ||||||||
Phone | (850) 533-3700 | Status Date | 06/15/2023 | ||||||||
Account Owner Information | |||||||||||
Name | aqsa ahil llc 2025 w 15th st Panama City, FL 32401 |
Effective Date | 05/27/2021 | ||||||||
Contact | junaid ibrahim | ||||||||||
Phone | (850) 533-3700 | ||||||||||
juni_1983@hotmail.com | |||||||||||
Placard # / Date | 688426 - 06/17/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | CONVENIENT LLC PO BOX 70 DOUGLASVILLE, GA 30133 |
Effective Date | 06/01/2021 | ||||||||
Contact | GEORGE KINGSTON/ CELIA WHITE- PROP MGR | ||||||||||
Phone | (770) 719-1344 | ||||||||||
CELIA@CONCISEPROPERTIES.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 12000 | Unleaded Gas (B) | 03/01/2009 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (M) Spill containment bucket (P) Level gauges/alarms (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 12000 | Unleaded Gas (B) | 07/01/1981 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (E) Cathodic protection (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 12000 | Unleaded Gas (B) | 07/01/1981 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (E) Cathodic protection (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 05/17/2024 | 05/17/2025 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 05/17/2022 | 05/17/2023 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 01/27/2016 | 01/27/2017 | ACE | ||||||||
INSURANCE | 05/29/2014 | 05/29/2015 | ACE | ||||||||
INSURANCE | 05/29/2014 | 05/29/2015 | ACE | ||||||||
INSURANCE | 11/01/2011 | 11/30/2012 | ZURICH-AMERICAN | ||||||||
INSURANCE | 11/02/2010 | 11/02/2011 | ZURICH-AMERICAN | ||||||||
INSURANCE | 09/15/2008 | 09/15/2009 | ZURICH-AMERICAN | ||||||||
INSURANCE | 04/23/1994 | 04/23/1995 | PLUS | ||||||||
INSURANCE | 04/23/1993 | 04/23/1994 | FPLIPA | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
RRBD | 12/28/2005 | 01/06/2006 | COMPLIANCE ASSURANCE | ||||||||
TCI | 08/19/2005 | 08/31/2005 | SIGNIFICANT OUT-OF-COMPLIANCE | KHAN | 0/2 | COMPLIANCE ASSURANCE | |||||
RRBD | 11/08/2004 | 11/09/2004 | PINKOVSKY | 0/0 | COMPLIANCE ASSURANCE | ||||||
RRBD | 10/04/2004 | 10/08/2004 | PINKOVSKY | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 09/21/2004 | 09/23/2004 | SIGNIFICANT OUT-OF-COMPLIANCE | KHAN | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: UNKNOWN FIBERGLASS | |||||||||||
TCR | 05/14/2004 | 05/17/2004 | IN-COMPLIANCE | KHAN | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: UNKNOWN FIBERGLASS | |||||||||||
RRBD | 04/07/2004 | 04/08/2004 | PINKOVSKY | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCR | 03/25/2004 | 03/29/2004 | MINOR OUT-OF-COMPLIANCE | PINKOVSKY | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: UNKNOWN FIBERGLASS | |||||||||||
TIN | 02/06/2004 | 02/09/2004 | IN-COMPLIANCE | PINKOVSKY | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: UNKNOWN FIBERGLASS, INSTALL OF ANODES FOR CATHODIC PROTECTION OF FLEX CONNECTORS | |||||||||||
TCI | 09/19/2003 | 09/22/2003 | MINOR OUT-OF-COMPLIANCE | KHAN | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: FIBERGLASS UNKNOWN | |||||||||||
CRDE | 11/18/2002 | 11/18/2002 | PINKOVSKY | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes PER NWD REQUEST, COMPANY BANKRUPTCY | |||||||||||
TCI | 09/04/2002 | 09/06/2002 | MINOR OUT-OF-COMPLIANCE | KHAN | 0/2 | COMPLIANCE ASSURANCE | |||||
RRBD | 10/09/2001 | 10/12/2001 | PINKOVSKY | 0/2 | COMPLIANCE ASSURANCE | ||||||
TCI | 09/05/2001 | 09/06/2001 | MINOR OUT-OF-COMPLIANCE | PINKOVSKY | 0/2 | COMPLIANCE ASSURANCE | |||||
TCI | 09/12/2000 | 09/14/2000 | IN-COMPLIANCE | BRADLEY | 0/2 | COMPLIANCE ASSURANCE | |||||
TCR | 01/20/2000 | 01/21/2000 | IN-COMPLIANCE | PINKOVSKY | 0/2 | COMPLIANCE ASSURANCE | |||||
RRBD | 12/09/1999 | 12/20/1999 | PINKOVSKY | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 09/21/1999 | 09/22/1999 | MINOR OUT-OF-COMPLIANCE | PINKOVSKY | 0/2 | COMPLIANCE ASSURANCE | |||||
TIN | 04/12/1999 | 04/19/1999 | IN-COMPLIANCE | PINKOVSKY | 0/2 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Enforcement Referral | 01/15/2025 | Accepted | GARTIN_D | Enforcement | |||||||
Electronic Communication | 01/07/2025 | Satisfied | GARTIN_D | Compliance Assistance | |||||||
Letter | 10/17/2024 | Satisfied | GARTIN_D | Compliance Assistance | |||||||
Site Inspection | 10/17/2024 | Minor Out of Compliance | GARTIN_D | 0/1 | Routine Compliance | ||||||
Electronic Communication | 10/08/2024 | Satisfied | GARTIN_D | Routine Compliance | |||||||
Electronic Communication | 10/08/2024 | Satisfied | GARTIN_D | Routine Compliance | |||||||
Letter | 12/08/2022 | Satisfied | BRISTOL_S | Compliance Assistance | |||||||
Enforcement Tracking | 12/06/2022 | Closed Without Enforcement | BRISTOL_S | Enforcement | |||||||
Enforcement Referral | 11/09/2022 | Accepted | KHAN_MR_1 | Enforcement | |||||||
Record Document | 11/01/2022 | Satisfied | KHAN_MR_1 | Compliance Assistance | |||||||
Record Document | 11/01/2022 | Satisfied | KHAN_MR_1 | Compliance Assistance | |||||||
Letter | 09/16/2022 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Site Inspection | 08/22/2022 | Major Out of Compliance | KHAN_MR_1 | 0/1 | Routine Compliance | ||||||
Phone Conversation | 08/22/2022 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Letter | 06/14/2021 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Issue Document | 06/14/2021 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Record Document | 06/04/2021 | Satisfied | KHAN_MR_1 | Compliance Assistance | |||||||
Record Document | 06/04/2021 | Satisfied | KHAN_MR_1 | Compliance Assistance | |||||||
Record Document | 06/04/2021 | Satisfied | KHAN_MR_1 | Compliance Assistance | |||||||
Issue Document | 03/15/2021 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Letter | 03/15/2021 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Site Inspection | 03/10/2021 | Major Out of Compliance | KHAN_MR_1 | 0/1 | Routine Compliance | ||||||
Phone Conversation | 03/10/2021 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Site Inspection | 02/08/2019 | In Compliance | KHAN_MR_1 | 0/1 | Routine Compliance | ||||||
Phone Conversation | 02/08/2019 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Site Inspection | 10/22/2018 | In Compliance | BROCK_SN_1 | 0/1 | Complaint | ||||||
Site Inspection | 05/27/2016 | In Compliance | KHAN_MR_1 | 0/1 | Routine Compliance | ||||||
Record Document | 12/07/2015 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Record Document | 12/07/2015 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Site Inspection | 06/04/2014 | In Compliance | KHAN_MR_1 | 0/1 | Non-Compliance | ||||||
Emergency Preparedness Information | 05/19/2014 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Site Inspection | 05/06/2014 | Major Out of Compliance | KHAN_MR_1 | 0/1 | Routine Compliance | ||||||
Letter | 05/06/2014 | Satisfied | DAURIA_KL_1 | Non-Compliance | |||||||
Site Inspection | 08/21/2012 | In Compliance | KHAN_MR_1 | 0/1 | Non-Compliance | ||||||
Electronic Communication | 08/13/2012 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Letter | 08/10/2012 | Satisfied | DAURIA_KL_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 08/09/2012 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Site Inspection | 08/09/2012 | Major Out of Compliance | KHAN_MR_1 | 0/1 | Routine Compliance | ||||||
Site Inspection | 01/09/2012 | In Compliance | KHAN_MR_1 | 0/1 | Routine Compliance | ||||||
Letter | 06/15/2011 | Satisfied | PURDY_EM_1 | Non-Compliance | |||||||
Site Inspection | 06/14/2011 | Minor Out of Compliance | KHAN_MR_1 | 0/1 | Non-Compliance | ||||||
Emergency Preparedness Information | 06/14/2011 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Letter | 06/07/2011 | Satisfied | PURDY_EM_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 01/31/2011 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 01/31/2011 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Site Inspection | 12/30/2010 | Minor Out of Compliance | KHAN_MR_1 | 0/1 | Routine Compliance | ||||||
Site Inspection | 06/16/2010 | In Compliance | BRAZILE_DO_1 | 0/2 | Non-Compliance | ||||||
Record Document | 12/17/2009 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Record Document | 11/17/2009 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Letter | 11/05/2009 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Site Inspection | 10/30/2009 | Major Out of Compliance | KHAN_MR_1 | 0/1 | Routine Compliance | ||||||
TCAR | 04/28/2009 | Satisfied | BRAZILE_DO_1 | Closure | |||||||
Site Inspection | 03/26/2009 | In Compliance | BRAZILE_DO_1 | 0/1 | Installation | ||||||
Site Inspection | 03/16/2009 | In Compliance | BRAZILE_DO_1 | 0/2 | Closure | ||||||
Site Inspection | 10/20/2008 | In Compliance | KHAN_MR_1 | 0/2 | Non-Compliance | ||||||
Record Document | 09/17/2008 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Letter | 08/25/2008 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Site Inspection | 08/20/2008 | Major Out of Compliance | KHAN_MR_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 04/14/2008 | Satisfied | BRAZILE_DO_1 | Routine Compliance | |||||||
Phone Conversation | 02/27/2008 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Letter | 08/16/2007 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Site Inspection | 08/10/2007 | Minor Out of Compliance | KHAN_MR_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/07/2007 | Satisfied | BRAZILE_DO_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 02/07/2007 | Satisfied | BRAZILE_DO_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/21/2006 | Satisfied | BRAZILE_DO_1 | Routine Compliance | |||||||
Letter | 07/23/2006 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Site Inspection | 07/23/2006 | Minor Out of Compliance | BRAZILE_DO_1 | 0/2 | Non-Compliance | ||||||
Site Inspection | 07/19/2006 | Minor Out of Compliance | BRAZILE_DO_1 | 0/2 | Routine Compliance | ||||||
Letter | 07/19/2006 | Satisfied | BRAZILE_DO_1 | Non-Compliance | |||||||
Site Inspection | 06/15/2006 | In Compliance | BRAZILE_DO_1 | 0/2 | Non-Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
10/17/2024 | 6003 | Minor | 2.2 Registration Form not submitted for a new system, change in service, closure, owner change, or discovery of unregistered facility. | Have the facility's registration information updated from Ball check valve to the proper listing of (N) Flow shut-off. The fuel will need the content code (8) listed for blends of 10% ethanol fuel. Lastly, confirm if the tank is steel and inform Daniel.Gartin@flhealth.gov if it is composed double wall steel UST. If the tank is not a steel system, update the construction information of the tank to the associated composite which the tank is fabricated of. When submitting associated update, provide Daniel.Gartin@flhealth.gov information that shows these registration issues has been addressed to resolve the violation. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
11/12/1987 | COMPLETED | 10 | EARLY DETECTION INCENTIVE-ELIGIBLE | ||||||||
10/01/1986 | COMPLETED | 10 | EARLY DETECTION INCENTIVE-ELIGIBLE | ||||||||