![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 02/23/2025 Last Data Refresh: 02/22/2025 Report Generated from DOPPLER | |||||||||||
District | Northwest | Type | Retail Station | ||||||||
County | Bay | Status | OPEN | ||||||||
ID | 8500405 | Latitude | 30° 9' 9.5976 | ||||||||
Name |
MURPHY EXPRESS #8875 280 TYNDALL PKWY N |
Longitude | 85° 35' 26.8944 | ||||||||
PANAMA CITY, FL 32404 | LL Method | DPHO | |||||||||
Contact | BRAD WEINISCHKE | LL Status | REVIEWED | ||||||||
Phone | (870) 875-7741 | Status Date | 01/26/2009 | ||||||||
Account Owner Information | |||||||||||
Name | MURPHY OIL USA INC 200 PEACH ST El Dorado, AR 71730 |
Effective Date | 05/22/2019 | ||||||||
Contact | KRYSTAL TERRELL /JENNIFER BRIDGES /BRAD WEINISCHKE | ||||||||||
Phone | (870) 677-6116 | ||||||||||
KRYSTAL.TERRELL@MURPHYUSA.COM | |||||||||||
Placard # / Date | 679900 - 06/05/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | MURPHY OIL USA INC 200 PEACH ST El Dorado, AR 71730 |
Effective Date | 05/22/2019 | ||||||||
Contact | KRYSTAL TERRELL /JENNIFER BRIDGES /BRAD WEINISCHKE | ||||||||||
Phone | (870) 677-6116 | ||||||||||
KRYSTAL.TERRELL@MURPHYUSA.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 25000 | Unleaded Gas (B) | 06/01/2019 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(3) Electronic monitor pipe sumps (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 26000 | Vehicular Diesel (D) | 06/01/2019 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(3) Electronic monitor pipe sumps (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 11763 | Unleaded Gas (B) | 03/01/1983 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass | (C) Fiberglass (J) Pressurized piping system |
(8) Manually sampled wells (M) Manual tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 11763 | Unleaded Gas (B) | 03/01/1983 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass | (C) Fiberglass (J) Pressurized piping system |
(8) Manually sampled wells (M) Manual tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 11763 | Unleaded Gas (B) | 03/01/1983 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass | (C) Fiberglass (J) Pressurized piping system |
(8) Manually sampled wells (M) Manual tank gauging - USTs |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 01/01/2024 | 04/30/2025 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 01/01/2022 | 04/30/2023 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 01/01/2020 | 04/30/2021 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2019 | 04/30/2020 | |||||||||
INSURANCE | 04/23/1993 | 04/23/1994 | FPLIPA | ||||||||
No Legacy Data Found | |||||||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Enforcement Referral | 02/19/2025 | Accepted | GARTIN_D | Enforcement | |||||||
Electronic Communication | 01/08/2025 | Satisfied | GARTIN_D | Compliance Assistance | |||||||
Letter | 10/24/2024 | Satisfied | GARTIN_D | Compliance Assistance | |||||||
Electronic Communication | 10/22/2024 | Satisfied | GARTIN_D | Routine Compliance | |||||||
Site Inspection | 10/22/2024 | Minor Out of Compliance | GARTIN_D | 0/2 | Routine Compliance | ||||||
Electronic Communication | 10/22/2024 | Satisfied | GARTIN_D | Routine Compliance | |||||||
Letter | 01/25/2023 | Satisfied | WILSON_ML_1 | Routine Compliance | |||||||
Site Inspection | 01/20/2023 | In Compliance | KHAN_MR_1 | 0/2 | Routine Compliance | ||||||
Enforcement Tracking | 08/18/2021 | Closed Without Enforcement | GILLMAN_M | Enforcement | |||||||
Letter | 05/20/2021 | Satisfied | GILLMAN_M | Enforcement | |||||||
Enforcement Referral | 04/28/2021 | Accepted | KHAN_MR_1 | Enforcement | |||||||
Issue Document | 01/27/2021 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Letter | 01/27/2021 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Site Inspection | 01/26/2021 | Major Out of Compliance | KHAN_MR_1 | 0/2 | Routine Compliance | ||||||
Phone Conversation | 01/25/2021 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Site Inspection | 01/02/2020 | In Compliance | KHAN_MR_1 | 0/2 | Installation | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
10/22/2024 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Have a certified contractor conduct the integrity test for the dispenser sumps and STP sumps if needed. Forward documentation of the integrity testing results to Daniel.Gartin@flhealth.gov. If any components are damaged, a certified contractor will need to conduct repairs or replaces to the dispenser sumps. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
12/13/1987 | COMBINED | 30 | EARLY DETECTION INCENTIVE-ELIGIBLE | ||||||||
10/08/1986 | ACTIVE | 30 | EARLY DETECTION INCENTIVE-ELIGIBLE | ||||||||