![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Northwest | Type | Retail Station | ||||||||
County | Bay | Status | OPEN | ||||||||
ID | 8500457 | Latitude | 30° 10' 42.404 | ||||||||
Name |
SHARATH INC. 3000 W HIGHWAY 98 |
Longitude | 85° 42' 5.981 | ||||||||
PANAMA CITY, FL 32401-1250 | LL Method | DPHO | |||||||||
Contact | VIJAY VINJAMARA | LL Status | REVIEWED | ||||||||
Phone | (850) 769-5727 | Status Date | 04/13/2020 | ||||||||
Account Owner Information | |||||||||||
Name | SHARATH INC. 3000 W.HWY 98 PANAMA CITY, FL 32401-1250 |
Effective Date | 02/02/2021 | ||||||||
Contact | VIJAY VINJMARA | ||||||||||
Phone | (850) 769-5727 | ||||||||||
SHARATH.SPEEDWAY@GMAIL.COM | |||||||||||
Placard # / Date | 701751 - 10/03/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | SHARATH INC. 3000 W.HWY 98 PANAMA CITY, FL 32401-1250 |
Effective Date | 02/02/2021 | ||||||||
Contact | VIJAY VINJMARA | ||||||||||
Phone | (850) 769-5727 | ||||||||||
SHARATH.SPEEDWAY@GMAIL.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 12000 | Unleaded Gas (B) | 01/01/2010 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (F) Fiberglass clad steel (L) Compartmented (M) Spill containment bucket (N) Flow shut-Off (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (6) External piping monitoring (F) Monitor dbl wall tank space (H) Mechanical line leak detector |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 8000 | Leaded Gas (A) | 07/01/1968 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (H) Mechanical line leak detector | ||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 2000 | Unleaded Gas (B) | 07/01/1968 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (H) Impressed current CP |
(E) Cathodic protection | (8) Manually sampled wells (H) Mechanical line leak detector |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 6000 | Unleaded Gas (B) | 07/01/1968 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (H) Impressed current CP |
(E) Cathodic protection | (8) Manually sampled wells (H) Mechanical line leak detector |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 8000 | Unleaded Gas (B) | 01/01/1988 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (G) Sacrificial anode CP (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (N) Approved synthetic material |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 8000 | Unleaded Gas (B) | 01/01/1988 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (G) Sacrificial anode CP (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (N) Approved synthetic material |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 8000 | Unleaded Gas (B) | 01/01/1988 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (G) Sacrificial anode CP (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (N) Approved synthetic material |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (L) Automatic tank gauging - USTs |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 02/14/2024 | 02/14/2025 | COMMERCE AND INDUSTRY INSURANCE COMPANY | ||||||||
INSURANCE | 02/14/2020 | 02/14/2021 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 02/14/2019 | 02/14/2020 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 02/14/2016 | 02/14/2017 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 02/14/2015 | 02/14/2016 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 01/28/2012 | 01/28/2012 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 01/28/2012 | 01/28/2013 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 01/28/2011 | 01/28/2012 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 01/28/2010 | 01/28/2011 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 01/28/2010 | 01/28/2010 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 01/28/2010 | 01/28/2011 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 12/24/2008 | 12/24/2009 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 07/27/1989 | 10/04/1996 | FPLIPA | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCR | 02/20/2006 | 02/21/2006 | IN-COMPLIANCE | KHAN | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 02/01/2006 | 02/03/2006 | MINOR OUT-OF-COMPLIANCE | KHAN | 0/3 | COMPLIANCE ASSURANCE | |||||
TCR | 02/17/2005 | 02/23/2005 | IN-COMPLIANCE | KHAN | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: ENVIRON | |||||||||||
TCI | 02/10/2005 | 02/14/2005 | MINOR OUT-OF-COMPLIANCE | KHAN | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: ENVIRON | |||||||||||
TCR | 02/11/2004 | 02/16/2004 | IN-COMPLIANCE | PINKOVSKY | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: ENVIRON | |||||||||||
TCI | 02/10/2004 | 02/11/2004 | MINOR OUT-OF-COMPLIANCE | PINKOVSKY | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: ENVIRON | |||||||||||
TCR | 08/04/2003 | 08/07/2003 | IN-COMPLIANCE | KHAN | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: ENVIRON | |||||||||||
TCI | 02/10/2003 | 02/11/2003 | MINOR OUT-OF-COMPLIANCE | KHAN | 0/3 | COMPLIANCE ASSURANCE | |||||
TCR | 04/08/2002 | 04/09/2002 | IN-COMPLIANCE | PINKOVSKY | 0/3 | COMPLIANCE ASSURANCE | |||||
TIN | 03/18/2002 | 03/18/2002 | IN-COMPLIANCE | PINKOVSKY | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 02/11/2002 | 03/18/2002 | PINKOVSKY | 0/3 | COMPLIANCE ASSURANCE | ||||||
DSNR | 02/11/2002 | 02/28/2002 | PINKOVSKY, DREW | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes PASSING LINE TEST RESULTS | |||||||||||
IRFR | 02/01/2002 | 02/04/2002 | DREW PINKOVSKY | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes FUEL SEEN IN REGULAR UNLEAD PIPING/TANK SUMP | |||||||||||
TCI | 02/01/2002 | 02/07/2002 | MINOR OUT-OF-COMPLIANCE | KAHN | 0/3 | COMPLIANCE ASSURANCE | |||||
TCR | 04/25/2001 | 05/01/2001 | IN-COMPLIANCE | BRADLEY | 0/3 | COMPLIANCE ASSURANCE | |||||
TCR | 04/18/2001 | 04/20/2001 | MINOR OUT-OF-COMPLIANCE | BRADLEY | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 02/28/2001 | 02/28/2001 | PINKOVSKY | 0/3 | DISCHARGE PROJECT | ||||||
TCI | 02/07/2001 | 02/14/2001 | SIGNIFICANT OUT-OF-COMPLIANCE | BRADLEY | 0/3 | COMPLIANCE ASSURANCE | |||||
TCR | 05/31/2000 | 06/01/2000 | IN-COMPLIANCE | BRADLEY | 0/0 | COMPLIANCE ASSURANCE | |||||
TCR | 05/08/2000 | 05/12/2000 | MINOR OUT-OF-COMPLIANCE | BRADLEY | 0/0 | COMPLIANCE ASSURANCE | |||||
TCI | 02/22/2000 | 03/01/2000 | SIGNIFICANT OUT-OF-COMPLIANCE | BRADLEY | 0/3 | COMPLIANCE ASSURANCE | |||||
TXI | 02/26/1999 | 03/17/1999 | IN-COMPLIANCE | PINKOVSKY | 0/3 | COMPLIANCE ASSURANCE | |||||
TIN | 02/19/1999 | 03/17/1999 | IN-COMPLIANCE | PINKOVSKY | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 02/02/1999 | 03/16/1999 | IN-COMPLIANCE | CAMPBELL | 0/3 | COMPLIANCE ASSURANCE | |||||
NCLI | 05/08/1998 | 05/11/1998 | PINKOVSKY | 0/0 | COMPLIANCE ASSURANCE | ||||||
UTCI | 05/06/1998 | 05/11/1998 | MINOR OUT-OF-COMPLIANCE | PINKOVSKY | 0/0 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Enforcement Tracking | 04/30/2025 | Closed With Enforcement | GILLMAN_M | Enforcement | |||||||
Letter | 04/30/2025 | Satisfied | GILLMAN_M | Enforcement | |||||||
Document Management | 04/29/2025 | Satisfied | GILLMAN_M | Enforcement | |||||||
Document Management | 04/08/2025 | Satisfied | GILLMAN_M | Enforcement | |||||||
Electronic Communication | 03/07/2025 | Satisfied | GILLMAN_M | Enforcement | |||||||
Electronic Communication | 03/04/2025 | Satisfied | GILLMAN_M | Enforcement | |||||||
Document Management | 02/24/2025 | Satisfied | GILLMAN_M | Enforcement | |||||||
Letter | 01/30/2025 | Satisfied | ELLIOTT_EV_1 | Component Closure | |||||||
Document Management | 01/29/2025 | Satisfied | ELLIOTT_EV_1 | Component Closure | |||||||
TCAR | 01/29/2025 | Satisfied | ELLIOTT_EV_1 | Component Closure | |||||||
Electronic Communication | 10/31/2024 | Satisfied | GILLMAN_M | Enforcement | |||||||
Electronic Communication | 10/31/2024 | Satisfied | GILLMAN_M | Enforcement | |||||||
Letter | 10/02/2024 | Satisfied | PROFFITT_B | Enforcement | |||||||
Electronic Communication | 09/24/2024 | Satisfied | PROFFITT_B | Enforcement | |||||||
Electronic Communication | 09/10/2024 | Satisfied | PROFFITT_B | Enforcement | |||||||
Electronic Communication | 09/10/2024 | Satisfied | PROFFITT_B | Enforcement | |||||||
Electronic Communication | 09/06/2024 | Satisfied | PROFFITT_B | Incident | |||||||
Document Management | 09/06/2024 | Satisfied | PROFFITT_B | Incident | |||||||
Electronic Communication | 09/04/2024 | Satisfied | PROFFITT_B | Enforcement | |||||||
Enforcement Referral | 08/27/2024 | Accepted | KHAN_MR_1 | Enforcement | |||||||
Letter | 05/16/2024 | Satisfied | KHAN_MR_1 | Compliance Assistance | |||||||
Record Document | 05/16/2024 | Satisfied | KHAN_MR_1 | Compliance Assistance | |||||||
Record Document | 05/03/2024 | Satisfied | KHAN_MR_1 | Compliance Assistance | |||||||
Letter | 02/19/2024 | Satisfied | KHAN_MR_1 | Compliance Assistance | |||||||
Phone Conversation | 02/19/2024 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Site Inspection | 02/19/2024 | Major Out of Compliance | KHAN_MR_1 | 0/1 | Routine Compliance | ||||||
Enforcement Tracking | 10/18/2022 | Closed Without Enforcement | TOMAS_M | Enforcement | |||||||
Letter | 08/03/2022 | Satisfied | TOMAS_M | Enforcement | |||||||
Enforcement Referral | 07/22/2022 | Accepted | KHAN_MR_1 | Enforcement | |||||||
Record Document | 07/19/2022 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Issue Document | 04/22/2022 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Letter | 04/22/2022 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Site Inspection | 04/19/2022 | Major Out of Compliance | KHAN_MR_1 | 0/1 | Routine Compliance | ||||||
Phone Conversation | 04/19/2022 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Enforcement Tracking | 07/07/2020 | Closed Without Enforcement | GILLMAN_M | Enforcement | |||||||
Issue Document | 06/19/2020 | Satisfied | WILSON_ML_1 | Installation | |||||||
Site Inspection | 06/19/2020 | In Compliance | KHAN_MR_1 | 0/1 | Installation | ||||||
Letter | 06/19/2020 | Satisfied | WILSON_ML_1 | Installation | |||||||
Site Inspection | 05/08/2020 | Minor Out of Compliance | KHAN_MR_1 | 0/1 | Closure | ||||||
Letter | 05/04/2020 | Satisfied | DECKER_K | Enforcement | |||||||
Electronic Communication | 02/24/2020 | Satisfied | DECKER_K | Enforcement | |||||||
Enforcement Referral | 09/16/2019 | Accepted | KHAN_MR_1 | Enforcement | |||||||
Record Document | 07/08/2019 | Satisfied | KHAN_MR_1 | Compliance Assistance | |||||||
Site Inspection | 04/02/2019 | Major Out of Compliance | KHAN_MR_1 | 0/1 | Routine Compliance | ||||||
Letter | 04/02/2019 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Issue Document | 04/02/2019 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Phone Conversation | 04/01/2019 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Site Inspection | 10/22/2018 | In Compliance | BROCK_SN_1 | 0/1 | Complaint | ||||||
Record Document | 02/03/2017 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Letter | 01/05/2017 | Satisfied | WILSON_ML_1 | Non-Compliance | |||||||
Site Inspection | 12/23/2016 | Minor Out of Compliance | KHAN_MR_1 | 0/1 | Routine Compliance | ||||||
Site Inspection | 06/05/2015 | In Compliance | KHAN_MR_1 | 0/1 | Non-Compliance | ||||||
Record Document | 05/14/2015 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Record Document | 05/14/2015 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Record Document | 05/13/2015 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Letter | 04/08/2015 | Satisfied | WILSON_ML_1 | Non-Compliance | |||||||
Site Inspection | 04/07/2015 | Minor Out of Compliance | KHAN_MR_1 | 0/1 | Routine Compliance | ||||||
Emergency Preparedness Information | 04/07/2015 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 11/16/2012 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Site Inspection | 11/15/2012 | In Compliance | KHAN_MR_1 | 0/1 | Routine Compliance | ||||||
Site Inspection | 02/28/2012 | In Compliance | BRAZILE_DO_1 | 0/1 | Closure | ||||||
Site Inspection | 02/28/2012 | In Compliance | BRAZILE_DO_1 | 0/1 | Installation | ||||||
Site Inspection | 01/24/2012 | In Compliance | KHAN_MR_1 | 0/1 | Routine Compliance | ||||||
Site Inspection | 11/21/2010 | In Compliance | KHAN_MR_1 | 0/1 | Routine Compliance | ||||||
Letter | 02/10/2010 | Satisfied | PIERCE_LL_1 | Closure | |||||||
Site Inspection | 02/08/2010 | In Compliance | BRAZILE_DO_1 | 0/1 | Installation | ||||||
TCAR | 01/29/2010 | Satisfied | BRAZILE_DO_1 | Closure | |||||||
Site Inspection | 01/22/2010 | In Compliance | BRAZILE_DO_1 | 0/3 | Closure | ||||||
Site Inspection | 07/09/2009 | In Compliance | KHAN_MR_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 07/09/2009 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Site Inspection | 12/22/2008 | In Compliance | KHAN_MR_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 12/19/2008 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 04/14/2008 | Satisfied | BRAZILE_DO_1 | Routine Compliance | |||||||
Site Inspection | 12/20/2007 | In Compliance | KHAN_MR_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 02/27/2007 | In Compliance | KHAN_MR_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/07/2007 | Satisfied | BRAZILE_DO_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 02/07/2007 | Satisfied | BRAZILE_DO_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/19/2006 | Satisfied | BRAZILE_DO_1 | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
No Open Violations Found | |||||||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
11/30/1988 | COMPLETED | 10 | EARLY DETECTION INCENTIVE-ELIGIBLE | ||||||||