![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Northwest | Type | Retail Station | ||||||||
County | Bay | Status | OPEN | ||||||||
ID | 8500472 | Latitude | 30° 10' 49.5833 | ||||||||
Name |
PANAMA CITY MARATHON 4209 HWY 98 W |
Longitude | 85° 42' 54.8431 | ||||||||
PANAMA CITY, FL 32401 | LL Method | DPHO | |||||||||
Contact | MAHBUBUR RAHMAN | LL Status | REVIEWED | ||||||||
Phone | (772) 559-1753 | Status Date | 06/15/2023 | ||||||||
Account Owner Information | |||||||||||
Name | AZIZ OIL INC 605 OAKWOOD AVENUE HUNTSVILLE, AL 35811 |
Effective Date | 02/01/2024 | ||||||||
Contact | TIM WAKEFIELD / MIKE AZIZ | ||||||||||
Phone | (256) 382-0100 | ||||||||||
TIM@AZIZOIL.COM | |||||||||||
Placard # / Date | 678191 - 06/05/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | AZIZ OIL INC 605 OAKWOOD AVENUE HUNTSVILLE, AL 35811 |
Effective Date | 02/01/2024 | ||||||||
Contact | TIM WAKEFIELD / MIKE AZIZ | ||||||||||
Phone | (256) 382-0100 | ||||||||||
TIM@AZIZOIL.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 10000 | Unleaded Gas (B) | 12/01/1995 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket |
(F) Double wall (G) Pipe trench liner (J) Pressurized piping system (K) Dispenser liners (N) Approved synthetic material |
(3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (J) Monitor piping/liner space (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 10000 | Unleaded Gas (B) | 12/01/1995 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (I) Double wall (L) Compartmented (M) Spill containment bucket |
(F) Double wall (G) Pipe trench liner (J) Pressurized piping system (K) Dispenser liners (N) Approved synthetic material |
(3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (J) Monitor piping/liner space (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 10000 | Unleaded Gas (B) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (M) Spill containment bucket |
(B) Steel/galvanized metal (I) Suction piping system |
(8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 4000 | Unleaded Gas (B) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (M) Spill containment bucket |
(B) Steel/galvanized metal (I) Suction piping system |
(8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 4000 | Unleaded Gas (B) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (M) Spill containment bucket |
(B) Steel/galvanized metal (I) Suction piping system |
(8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 350 | Unknown/Not Reported (Y) | UNDERGROUND | Closed In Place (A) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 350 | Unknown/Not Reported (Y) | UNDERGROUND | Closed In Place (A) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (8) Manually sampled wells | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 08/31/2022 | 08/31/2023 | |||||||||
INSURANCE | 01/22/2020 | 01/22/2021 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 01/22/2017 | 01/22/2018 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 01/22/2015 | 01/22/2016 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 01/22/2012 | 01/22/2013 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 10/22/2010 | 10/22/2011 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 01/22/2009 | 01/22/2010 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 01/22/2008 | 01/22/2009 | COMMERCE & INDUSTRY | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 08/03/2005 | 08/09/2005 | IN-COMPLIANCE | KHAN | 0/2 | COMPLIANCE ASSURANCE | |||||
TCI | 08/17/2004 | 08/18/2004 | IN-COMPLIANCE | KHAN | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: FURON CO FLEX | |||||||||||
TCR | 08/28/2003 | 08/28/2003 | IN-COMPLIANCE | PINKOVSKY | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: FURON CO FLEX | |||||||||||
TCI | 08/20/2003 | 08/22/2003 | MINOR OUT-OF-COMPLIANCE | KHAN | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: FURON CO FLEX | |||||||||||
TCI | 08/07/2002 | 08/08/2002 | IN-COMPLIANCE | KHAN | 0/2 | COMPLIANCE ASSURANCE | |||||
TCR | 09/18/2001 | 09/18/2001 | IN-COMPLIANCE | PINKOVSKY | 0/2 | COMPLIANCE ASSURANCE | |||||
RRBD | 08/23/2001 | 08/27/2001 | PINKOVSKY | 0/2 | COMPLIANCE ASSURANCE | ||||||
TCI | 08/15/2001 | 08/20/2001 | MINOR OUT-OF-COMPLIANCE | PINKOVSKY | 0/2 | COMPLIANCE ASSURANCE | |||||
TCI | 08/25/2000 | 08/28/2000 | IN-COMPLIANCE | BRADLEY | 0/2 | COMPLIANCE ASSURANCE | |||||
TCI | 09/07/1999 | 09/09/1999 | IN-COMPLIANCE | PINKOVSKY | 0/2 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Electronic Communication | 10/10/2024 | Satisfied | PROFFITT_B | Enforcement | |||||||
Electronic Communication | 10/10/2024 | Satisfied | PROFFITT_B | Enforcement | |||||||
Electronic Communication | 10/10/2024 | Satisfied | PROFFITT_B | Enforcement | |||||||
Electronic Communication | 09/30/2024 | Satisfied | PROFFITT_B | Routine Compliance | |||||||
Letter | 09/24/2024 | Satisfied | PROFFITT_B | Enforcement | |||||||
Electronic Communication | 06/07/2024 | Satisfied | BONDS_M | Enforcement | |||||||
Electronic Communication | 06/06/2024 | Satisfied | BONDS_M | Enforcement | |||||||
Enforcement Referral | 05/08/2024 | Accepted | KHAN_MR_1 | Enforcement | |||||||
Enforcement Tracking | 03/22/2024 | Closed With Enforcement | GILLMAN_M | Enforcement | |||||||
Electronic Communication | 03/22/2024 | Satisfied | GILLMAN_M | Enforcement | |||||||
Letter | 03/22/2024 | Satisfied | GILLMAN_M | Enforcement | |||||||
Electronic Communication | 03/22/2024 | Satisfied | GILLMAN_M | Enforcement | |||||||
Site Inspection | 02/16/2024 | Major Out of Compliance | KHAN_MR_1 | 0/2 | Routine Compliance | ||||||
Phone Conversation | 02/16/2024 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Electronic Communication | 02/16/2024 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Letter | 02/16/2024 | Satisfied | KHAN_MR_1 | Compliance Assistance | |||||||
Electronic Communication | 01/23/2024 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Enforcement Tracking | 01/17/2024 | Closed Without Enforcement | GILLMAN_M | Enforcement | |||||||
Enforcement Referral | 05/13/2022 | Accepted | KHAN_MR_1 | Enforcement | |||||||
Letter | 02/25/2022 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Issue Document | 02/25/2022 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Site Inspection | 02/24/2022 | Major Out of Compliance | KHAN_MR_1 | 0/2 | Routine Compliance | ||||||
Phone Conversation | 02/24/2022 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Document Management | 10/18/2021 | Satisfied | GILLMAN_M | Enforcement | |||||||
Site Inspection | 06/29/2021 | Major Out of Compliance | GILLMAN_M | 0/2 | QA/QC | ||||||
Document Management | 04/13/2021 | Satisfied | GILLMAN_M | Enforcement | |||||||
Issue Document | 02/12/2021 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Letter | 02/12/2021 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Site Inspection | 02/12/2021 | Major Out of Compliance | KHAN_MR_1 | 0/2 | Compliance Assistance | ||||||
Letter | 09/01/2020 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Issue Document | 08/27/2020 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Site Inspection | 08/26/2020 | Minor Out of Compliance | KHAN_MR_1 | 0/2 | Installation | ||||||
Record Document | 07/20/2020 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Enforcement Referral | 07/10/2020 | Accepted | KHAN_MR_1 | Enforcement | |||||||
Record Document | 06/26/2020 | Satisfied | KHAN_MR_1 | Compliance Assistance | |||||||
Document Management | 06/09/2020 | Satisfied | WILSON_ML_1 | Closure | |||||||
TCAR | 06/09/2020 | Satisfied | PAYNE_CL_1 | Closure | |||||||
Issue Document | 06/09/2020 | Satisfied | WILSON_ML_1 | Closure | |||||||
Letter | 06/09/2020 | Satisfied | WILSON_ML_1 | Closure | |||||||
Letter | 04/06/2020 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Issue Document | 04/06/2020 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Site Inspection | 04/03/2020 | Major Out of Compliance | KHAN_MR_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 10/26/2018 | In Compliance | WILSON_ML_1 | 0/2 | Complaint | ||||||
Electronic Communication | 05/31/2017 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Letter | 03/24/2017 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Site Inspection | 03/23/2017 | Minor Out of Compliance | KHAN_MR_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 05/07/2015 | In Compliance | KHAN_MR_1 | 0/2 | Routine Compliance | ||||||
Record Document | 05/18/2012 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Letter | 04/20/2012 | Satisfied | PURDY_EM_1 | Non-Compliance | |||||||
Site Inspection | 04/18/2012 | Minor Out of Compliance | KHAN_MR_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 04/18/2012 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Phone Conversation | 11/18/2010 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Letter | 11/10/2010 | Satisfied | PIERCE_LL_1 | Non-Compliance | |||||||
Site Inspection | 10/20/2010 | Minor Out of Compliance | KHAN_MR_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 10/20/2010 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Record Document | 03/10/2010 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Letter | 11/20/2009 | Satisfied | PIERCE_LL_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 11/09/2009 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Site Inspection | 11/06/2009 | Minor Out of Compliance | KHAN_MR_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 07/17/2008 | Satisfied | BRAZILE_DO_1 | Routine Compliance | |||||||
Site Inspection | 07/17/2008 | In Compliance | BRAZILE_DO_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 07/14/2008 | In Compliance | BRAZILE_DO_1 | 0/2 | Installation | ||||||
Site Inspection | 07/01/2008 | In Compliance | BRAZILE_DO_1 | 0/2 | Closure | ||||||
Emergency Preparedness Information | 04/14/2008 | Satisfied | BRAZILE_DO_1 | Routine Compliance | |||||||
Site Inspection | 07/24/2007 | In Compliance | BRAZILE_DO_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/07/2007 | Satisfied | BRAZILE_DO_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 02/06/2007 | Satisfied | BRAZILE_DO_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/19/2006 | Satisfied | BRAZILE_DO_1 | Routine Compliance | |||||||
Site Inspection | 07/25/2006 | In Compliance | BRAZILE_DO_1 | 0/2 | Routine Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
02/16/2024 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | Please get you all entry boots fixed inside DISPENSER SUMPS -12 AND 3-4 THEY ARE ALL BUSTED POORLY., let your contractor know to contact tank program for related forms etc. for new component installation purpose, and to schedule inspector’s visit for install inspection. You might have to get soil and or ground water sampling done to determine whether a discharge has occurred to the environment. Resolution Comment: | |||||||
02/24/2022 | 6056 | SNC-B | 2.4 Release detection not tested or visually inspected once a month or problems found during the visual inspections not recorded. | provide visual inspection and Atg print out were available from April 2020 to January 2022 to this office. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
04/08/1987 | INACTIVE | 10 | EARLY DETECTION INCENTIVE-ELIGIBLE | ||||||||