DEP Logo Florida Department of
Environmental Protection


Bob Martinez Center
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
Storage Tanks &
Contamination
Monitoring Information
 
Cover Page Report
Report Run Date: 05/09/2025        Last Data Refresh: 05/08/2025        Report Generated from DOPPLER
 
District Northwest   Type    Retail Station
 
County Bay   Status    OPEN
 
ID 8500472   Latitude    30° 10' 49.5833
 
Name PANAMA CITY MARATHON
4209 HWY 98 W
Longitude    85° 42' 54.8431
  PANAMA CITY, FL 32401 LL Method    DPHO
 
Contact MAHBUBUR RAHMAN   LL Status    REVIEWED
 
Phone (772) 559-1753   Status Date    06/15/2023
 
Account Owner Information
 
Name AZIZ OIL INC
605 OAKWOOD AVENUE
HUNTSVILLE, AL 35811
Effective Date    02/01/2024
 
Contact TIM WAKEFIELD / MIKE AZIZ
 
Phone (256) 382-0100
 
Email TIM@AZIZOIL.COM
  Placard # / Date    678191 - 06/05/2024
Property Owner Information
 
Name AZIZ OIL INC
605 OAKWOOD AVENUE
HUNTSVILLE, AL 35811
Effective Date    02/01/2024
 
Contact TIM WAKEFIELD / MIKE AZIZ
 
Phone (256) 382-0100
 
Email TIM@AZIZOIL.COM
 
 
 
 
 
 
 
 
 
Tank Tank Size Content Installed Placement Status
4 10000 Unleaded Gas (B) 12/01/1995 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(F) Fiberglass clad steel
(I) Double wall
(M) Spill containment bucket
  (F) Double wall
(G) Pipe trench liner
(J) Pressurized piping system
(K) Dispenser liners
(N) Approved synthetic material
(3) Electronic monitor pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(J) Monitor piping/liner space
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
5 10000 Unleaded Gas (B) 12/01/1995 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(F) Fiberglass clad steel
(I) Double wall
(L) Compartmented
(M) Spill containment bucket
  (F) Double wall
(G) Pipe trench liner
(J) Pressurized piping system
(K) Dispenser liners
(N) Approved synthetic material
(3) Electronic monitor pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(J) Monitor piping/liner space
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
1 10000 Unleaded Gas (B) UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(M) Spill containment bucket
  (B) Steel/galvanized metal
(I) Suction piping system
(8) Manually sampled wells
 
 
Tank Tank Size Content Installed Placement Status
2 4000 Unleaded Gas (B) UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(M) Spill containment bucket
  (B) Steel/galvanized metal
(I) Suction piping system
(8) Manually sampled wells
 
 
Tank Tank Size Content Installed Placement Status
3 4000 Unleaded Gas (B) UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(M) Spill containment bucket
  (B) Steel/galvanized metal
(I) Suction piping system
(8) Manually sampled wells
 
 
Tank Tank Size Content Installed Placement Status
6 350 Unknown/Not Reported (Y) UNDERGROUND Closed In Place (A)
 
Constructions   Pipings Monitorings
(C) Steel   (B) Steel/galvanized metal (8) Manually sampled wells
 
 
Tank Tank Size Content Installed Placement Status
7 350 Unknown/Not Reported (Y) UNDERGROUND Closed In Place (A)
 
Constructions   Pipings Monitorings
(C) Steel   (B) Steel/galvanized metal (8) Manually sampled wells
 
 
Insurance Documents
 
FR Type   Effective Date Expiration Date Company Name
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER   08/31/2022 08/31/2023
INSURANCE   01/22/2020 01/22/2021 COMMERCE & INDUSTRY INSURANCE CO
INSURANCE   01/22/2017 01/22/2018 COMMERCE & INDUSTRY
INSURANCE   01/22/2015 01/22/2016 COMMERCE & INDUSTRY
INSURANCE   01/22/2012 01/22/2013 COMMERCE & INDUSTRY
INSURANCE   10/22/2010 10/22/2011 COMMERCE & INDUSTRY
INSURANCE   01/22/2009 01/22/2010 COMMERCE & INDUSTRY
INSURANCE   01/22/2008 01/22/2009 COMMERCE & INDUSTRY
 
 
Legacy Compliance Activity Information
 
Activity
Code
Date
Initiated
Date
Completed
Results Inspector AST/UST
Count
Description
TCI 08/03/2005 08/09/2005 IN-COMPLIANCE KHAN 0/2 COMPLIANCE ASSURANCE
 
TCI 08/17/2004 08/18/2004 IN-COMPLIANCE KHAN 0/2 COMPLIANCE ASSURANCE
 
 Completion Notes PIPING: FURON CO FLEX
 
TCR 08/28/2003 08/28/2003 IN-COMPLIANCE PINKOVSKY 0/2 COMPLIANCE ASSURANCE
 
 Completion Notes PIPING: FURON CO FLEX
 
TCI 08/20/2003 08/22/2003 MINOR OUT-OF-COMPLIANCE KHAN 0/2 COMPLIANCE ASSURANCE
 
 Completion Notes PIPING: FURON CO FLEX
 
TCI 08/07/2002 08/08/2002 IN-COMPLIANCE KHAN 0/2 COMPLIANCE ASSURANCE
 
TCR 09/18/2001 09/18/2001 IN-COMPLIANCE PINKOVSKY 0/2 COMPLIANCE ASSURANCE
 
RRBD 08/23/2001 08/27/2001 PINKOVSKY 0/2 COMPLIANCE ASSURANCE
 
TCI 08/15/2001 08/20/2001 MINOR OUT-OF-COMPLIANCE PINKOVSKY 0/2 COMPLIANCE ASSURANCE
 
TCI 08/25/2000 08/28/2000 IN-COMPLIANCE BRADLEY 0/2 COMPLIANCE ASSURANCE
 
TCI 09/07/1999 09/09/1999 IN-COMPLIANCE PINKOVSKY 0/2 COMPLIANCE ASSURANCE
 
 
 
Compliance Activity Information
 
Activity
Code
Date
Completed
Results Inspector AST/UST
Count
Description
Electronic Communication 10/10/2024 Satisfied PROFFITT_B Enforcement
 
Electronic Communication 10/10/2024 Satisfied PROFFITT_B Enforcement
 
Electronic Communication 10/10/2024 Satisfied PROFFITT_B Enforcement
 
Electronic Communication 09/30/2024 Satisfied PROFFITT_B Routine Compliance
 
Letter 09/24/2024 Satisfied PROFFITT_B Enforcement
 
Electronic Communication 06/07/2024 Satisfied BONDS_M Enforcement
 
Electronic Communication 06/06/2024 Satisfied BONDS_M Enforcement
 
Enforcement Referral 05/08/2024 Accepted KHAN_MR_1 Enforcement
 
Enforcement Tracking 03/22/2024 Closed With Enforcement GILLMAN_M Enforcement
 
Electronic Communication 03/22/2024 Satisfied GILLMAN_M Enforcement
 
Letter 03/22/2024 Satisfied GILLMAN_M Enforcement
 
Electronic Communication 03/22/2024 Satisfied GILLMAN_M Enforcement
 
Site Inspection 02/16/2024 Major Out of Compliance KHAN_MR_1 0/2 Routine Compliance
 
Phone Conversation 02/16/2024 Satisfied KHAN_MR_1 Routine Compliance
 
Electronic Communication 02/16/2024 Satisfied KHAN_MR_1 Routine Compliance
 
Letter 02/16/2024 Satisfied KHAN_MR_1 Compliance Assistance
 
Electronic Communication 01/23/2024 Satisfied KHAN_MR_1 Routine Compliance
 
Enforcement Tracking 01/17/2024 Closed Without Enforcement GILLMAN_M Enforcement
 
Enforcement Referral 05/13/2022 Accepted KHAN_MR_1 Enforcement
 
Letter 02/25/2022 Satisfied WILSON_ML_1 Compliance Assistance
 
Issue Document 02/25/2022 Satisfied WILSON_ML_1 Compliance Assistance
 
Site Inspection 02/24/2022 Major Out of Compliance KHAN_MR_1 0/2 Routine Compliance
 
Phone Conversation 02/24/2022 Satisfied KHAN_MR_1 Routine Compliance
 
Document Management 10/18/2021 Satisfied GILLMAN_M Enforcement
 
Site Inspection 06/29/2021 Major Out of Compliance GILLMAN_M 0/2 QA/QC
 
Document Management 04/13/2021 Satisfied GILLMAN_M Enforcement
 
Issue Document 02/12/2021 Satisfied WILSON_ML_1 Compliance Assistance
 
Letter 02/12/2021 Satisfied WILSON_ML_1 Compliance Assistance
 
Site Inspection 02/12/2021 Major Out of Compliance KHAN_MR_1 0/2 Compliance Assistance
 
Letter 09/01/2020 Satisfied WILSON_ML_1 Compliance Assistance
 
Issue Document 08/27/2020 Satisfied WILSON_ML_1 Compliance Assistance
 
Site Inspection 08/26/2020 Minor Out of Compliance KHAN_MR_1 0/2 Installation
 
Record Document 07/20/2020 Satisfied WILSON_ML_1 Compliance Assistance
 
Enforcement Referral 07/10/2020 Accepted KHAN_MR_1 Enforcement
 
Record Document 06/26/2020 Satisfied KHAN_MR_1 Compliance Assistance
 
Document Management 06/09/2020 Satisfied WILSON_ML_1 Closure
 
TCAR 06/09/2020 Satisfied PAYNE_CL_1 Closure
 
Issue Document 06/09/2020 Satisfied WILSON_ML_1 Closure
 
Letter 06/09/2020 Satisfied WILSON_ML_1 Closure
 
Letter 04/06/2020 Satisfied WILSON_ML_1 Compliance Assistance
 
Issue Document 04/06/2020 Satisfied WILSON_ML_1 Compliance Assistance
 
Site Inspection 04/03/2020 Major Out of Compliance KHAN_MR_1 0/2 Routine Compliance
 
Site Inspection 10/26/2018 In Compliance WILSON_ML_1 0/2 Complaint
 
Electronic Communication 05/31/2017 Satisfied KHAN_MR_1 Non-Compliance
 
Letter 03/24/2017 Satisfied KHAN_MR_1 Non-Compliance
 
Site Inspection 03/23/2017 Minor Out of Compliance KHAN_MR_1 0/2 Routine Compliance
 
Site Inspection 05/07/2015 In Compliance KHAN_MR_1 0/2 Routine Compliance
 
Record Document 05/18/2012 Satisfied KHAN_MR_1 Non-Compliance
 
Letter 04/20/2012 Satisfied PURDY_EM_1 Non-Compliance
 
Site Inspection 04/18/2012 Minor Out of Compliance KHAN_MR_1 0/2 Routine Compliance
 
Emergency Preparedness Information 04/18/2012 Satisfied KHAN_MR_1 Routine Compliance
 
Phone Conversation 11/18/2010 Satisfied KHAN_MR_1 Non-Compliance
 
Letter 11/10/2010 Satisfied PIERCE_LL_1 Non-Compliance
 
Site Inspection 10/20/2010 Minor Out of Compliance KHAN_MR_1 0/2 Routine Compliance
 
Emergency Preparedness Information 10/20/2010 Satisfied KHAN_MR_1 Routine Compliance
 
Record Document 03/10/2010 Satisfied KHAN_MR_1 Non-Compliance
 
Letter 11/20/2009 Satisfied PIERCE_LL_1 Non-Compliance
 
Emergency Preparedness Information 11/09/2009 Satisfied KHAN_MR_1 Routine Compliance
 
Site Inspection 11/06/2009 Minor Out of Compliance KHAN_MR_1 0/2 Routine Compliance
 
Emergency Preparedness Information 07/17/2008 Satisfied BRAZILE_DO_1 Routine Compliance
 
Site Inspection 07/17/2008 In Compliance BRAZILE_DO_1 0/2 Routine Compliance
 
Site Inspection 07/14/2008 In Compliance BRAZILE_DO_1 0/2 Installation
 
Site Inspection 07/01/2008 In Compliance BRAZILE_DO_1 0/2 Closure
 
Emergency Preparedness Information 04/14/2008 Satisfied BRAZILE_DO_1 Routine Compliance
 
Site Inspection 07/24/2007 In Compliance BRAZILE_DO_1 0/2 Routine Compliance
 
Emergency Preparedness Information 02/07/2007 Satisfied BRAZILE_DO_1 Routine Compliance
 
Emergency Preparedness Information 02/06/2007 Satisfied BRAZILE_DO_1 Routine Compliance
 
Emergency Preparedness Information 09/19/2006 Satisfied BRAZILE_DO_1 Routine Compliance
 
Site Inspection 07/25/2006 In Compliance BRAZILE_DO_1 0/2 Routine Compliance
 
 
 
No Open AOCs Found
 
 
Open Violations
 
Insp Date Vio # Significance Violation Text Corrective Action
02/16/2024 6063 SNC-B 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. Please get you all entry boots fixed inside DISPENSER SUMPS -12 AND 3-4 THEY ARE ALL BUSTED POORLY., let your contractor know to contact tank program for related forms etc. for new component installation purpose, and to schedule inspector’s visit for install inspection. You might have to get soil and or ground water sampling done to determine whether a discharge has occurred to the environment. Resolution Comment:
 
02/24/2022 6056 SNC-B 2.4 Release detection not tested or visually inspected once a month or problems found during the visual inspections not recorded. provide visual inspection and Atg print out were available from April 2020 to January 2022 to this office.
 
 
 
Discharge Information
 
Discharge
Date
  Clean Up
Status
Score Eligibility Info Site Manager Phone
04/08/1987   INACTIVE 10 EARLY DETECTION INCENTIVE-ELIGIBLE