Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
||||||||||
Cover Page Report | |||||||||||
Report Run Date: 02/02/2025 Last Data Refresh: 02/01/2025 Report Generated from DOPPLER | |||||||||||
District | Northwest | Type | Retail Station | ||||||||
County | Bay | Status | OPEN | ||||||||
ID | 8500479 | Latitude | 30° 12' 1.3233 | ||||||||
Name |
DU OIL & GAS CO STATION 2926 TRANSMITTER RD |
Longitude | 85° 36' 27.0707 | ||||||||
PANAMA CITY, FL 32404-3165 | LL Method | DPHO | |||||||||
Contact | CONSTANTINO C. DU | LL Status | REVIEWED | ||||||||
Phone | (850) 785-6822 | Status Date | 10/22/2003 | ||||||||
Account Owner Information | |||||||||||
Name | DU, CONSTANTINO C SR 2926 TRANSMITTER RD PANAMA CITY, FL 32404-3165 |
Effective Date | 07/01/1985 | ||||||||
Contact | CONSTANTINO C DU SR | ||||||||||
Phone | (850) 785-6822 | ||||||||||
Placard # / Date | 634821 - 06/16/2022 | ||||||||||
Property Owner Information | |||||||||||
Name | DU, PURIFICACION & CHRISTOPHER 2926 TRANSMITTER RD PANAMA CITY, FL 32404 |
Effective Date | 04/09/2004 | ||||||||
Contact | CHRISTOPHER DU | ||||||||||
Phone | (850) 872-0272 | ||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 5000 | Leaded Gas (A) | 07/01/1979 | UNDERGROUND | Out of Service (T) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel (O) Tight fill |
(C) Fiberglass (D) External protective coating (E) Cathodic protection |
(8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 50003 | Leaded Gas (A) | 07/01/1979 | UNDERGROUND | Out of Service (T) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel (O) Tight fill |
(C) Fiberglass (D) External protective coating (E) Cathodic protection |
(8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 4000 | Unleaded Gas (B) | 07/01/1978 | UNDERGROUND | Out of Service (T) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel (O) Tight fill |
(C) Fiberglass (D) External protective coating (E) Cathodic protection |
(8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 2000 | Gasohol (C) | 07/01/1978 | UNDERGROUND | Out of Service (T) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel (O) Tight fill |
(C) Fiberglass (D) External protective coating (E) Cathodic protection |
(8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 4000 | Vehicular Diesel (D) | 07/01/1978 | UNDERGROUND | Out of Service (T) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel (O) Tight fill |
(C) Fiberglass (D) External protective coating (E) Cathodic protection |
(8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 4000 | Vehicular Diesel (D) | 07/01/1979 | UNDERGROUND | Out of Service (T) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel (O) Tight fill |
(C) Fiberglass (D) External protective coating (E) Cathodic protection |
(8) Manually sampled wells | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
NONE | |||||||||||
NONE | 08/31/2006 | 08/31/2006 | |||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 10/05/2005 | 10/10/2005 | SIGNIFICANT OUT-OF-COMPLIANCE | BRAZILE | 0/5 | COMPLIANCE ASSURANCE | |||||
CRDE | 10/05/2005 | 10/10/2005 | BRAZILE | 0/6 | COMPLIANCE ASSURANCE | ||||||
TCI | 03/28/2005 | 04/04/2005 | MINOR OUT-OF-COMPLIANCE | KHAN | 0/6 | COMPLIANCE ASSURANCE | |||||
TCI | 04/12/2004 | 04/13/2004 | MINOR OUT-OF-COMPLIANCE | KHAN | 0/6 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: STEEL | |||||||||||
CRDE | 04/18/2003 | 04/18/2003 | PINKOVSKY | 0/6 | COMPLIANCE ASSURANCE | ||||||
TCI | 04/18/2003 | 04/18/2003 | MINOR OUT-OF-COMPLIANCE | KHAN | 0/6 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: STEEL | |||||||||||
CRDE | 05/10/2002 | 05/13/2002 | PINKOVSKY | 0/5 | COMPLIANCE ASSURANCE | ||||||
Completion Notes TANKS NOT CLOSED | |||||||||||
TCI | 05/10/2002 | 05/13/2002 | MINOR OUT-OF-COMPLIANCE | PINKOVSKY | 0/5 | COMPLIANCE ASSURANCE | |||||
TCI | 05/18/2001 | 05/23/2001 | MINOR OUT-OF-COMPLIANCE | BRADLEY | 0/6 | COMPLIANCE ASSURANCE | |||||
TCI | 05/30/2000 | 06/02/2000 | SIGNIFICANT OUT-OF-COMPLIANCE | BRADLEY | 0/6 | COMPLIANCE ASSURANCE | |||||
CRDE | 05/30/2000 | 06/02/2000 | GILLMAN_M | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 06/21/1999 | 06/22/1999 | SIGNIFICANT OUT-OF-COMPLIANCE | CAMPBELL | 0/6 | COMPLIANCE ASSURANCE | |||||
UTCI | 04/13/1998 | 04/15/1998 | SIGNIFICANT OUT-OF-COMPLIANCE | GILLMAN_M | 0/0 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Issue Document | 11/25/2024 | Satisfied | GILLMAN_M | Enforcement | |||||||
Enforcement Referral | 08/23/2024 | Accepted | KHAN_MR_1 | Enforcement | |||||||
Letter | 05/24/2024 | Satisfied | KHAN_MR_1 | Compliance Assistance | |||||||
Site Inspection | 05/22/2024 | Major Out of Compliance | KHAN_MR_1 | 0/6 | Routine Compliance | ||||||
Letter | 05/02/2022 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Enforcement Referral | 03/30/2022 | Accepted | KHAN_MR_1 | Enforcement | |||||||
Site Inspection | 03/04/2022 | Major Out of Compliance | KHAN_MR_1 | 0/6 | Routine Compliance | ||||||
Phone Conversation | 03/04/2022 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Enforcement Referral | 03/16/2020 | Accepted | KHAN_MR_1 | Enforcement | |||||||
Issue Document | 12/11/2019 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Letter | 12/11/2019 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Site Inspection | 12/11/2019 | Major Out of Compliance | KHAN_MR_1 | 0/6 | Routine Compliance | ||||||
Phone Conversation | 12/03/2019 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Site Inspection | 10/25/2018 | Major Out of Compliance | WILSON_ML_1 | 0/6 | Complaint | ||||||
Letter | 10/30/2017 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Site Inspection | 10/26/2017 | Major Out of Compliance | KHAN_MR_1 | 0/6 | Routine Compliance | ||||||
Phone Conversation | 10/26/2017 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Site Inspection | 11/24/2015 | Major Out of Compliance | KHAN_MR_1 | 0/6 | Routine Compliance | ||||||
Letter | 11/24/2015 | Satisfied | WILSON_ML_1 | Non-Compliance | |||||||
Record Document | 11/24/2015 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Letter | 06/12/2014 | Satisfied | DAURIA_KL_1 | Non-Compliance | |||||||
Site Inspection | 06/11/2014 | Major Out of Compliance | KHAN_MR_1 | 0/6 | Routine Compliance | ||||||
Letter | 07/29/2011 | Satisfied | RHOADS_KM_1 | Non-Compliance | |||||||
Site Inspection | 07/28/2011 | Major Out of Compliance | KHAN_MR_1 | 0/6 | Routine Compliance | ||||||
Letter | 08/20/2010 | Satisfied | PIERCE_LL_1 | Non-Compliance | |||||||
Site Inspection | 08/04/2010 | Major Out of Compliance | BRAZILE_DO_1 | 0/6 | Routine Compliance | ||||||
Letter | 09/14/2009 | Satisfied | BRAZILE_DO_1 | Non-Compliance | |||||||
Site Inspection | 09/04/2009 | Major Out of Compliance | BRAZILE_DO_1 | 0/6 | Routine Compliance | ||||||
Letter | 09/12/2008 | Satisfied | BRAZILE_DO_1 | Non-Compliance | |||||||
Site Inspection | 09/10/2008 | Major Out of Compliance | BRAZILE_DO_1 | 0/6 | Routine Compliance | ||||||
Letter | 10/09/2007 | Satisfied | BRAZILE_DO_1 | Non-Compliance | |||||||
Site Inspection | 10/08/2007 | Major Out of Compliance | BRAZILE_DO_1 | 0/6 | Routine Compliance | ||||||
Enforcement Referral | 07/02/2007 | Accepted | GILLMAN_M | Enforcement | |||||||
Letter | 02/16/2007 | Satisfied | BRAZILE_DO_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 02/14/2007 | Satisfied | BRAZILE_DO_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 10/02/2006 | Satisfied | BRAZILE_DO_1 | Routine Compliance | |||||||
Site Inspection | 09/01/2006 | Major Out of Compliance | BRAZILE_DO_1 | 0/6 | Routine Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
05/22/2024 | 6079 | SNC-B | 4.10 USTs not closed with 90 days of discovery, or not meeting requirements, unable to be repaired or no FR. | close the six (6) unmaintained storage tanks and notify our office for closure inspection. | |||||||
05/22/2024 | 6068 | SNC-B | 4.6 Storage tank system not closed within 90 days in accordance with subsection. | 6068 | |||||||
03/04/2022 | 6079 | SNC-B | 4.10 USTs not closed with 90 days of discovery, or not meeting requirements, unable to be repaired or no FR. | Properly close the six (6) unmaintained storage tanks and notify our office for closure inspection. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
12/14/1988 | INACTIVE | 41 | EARLY DETECTION INCENTIVE-ELIGIBLE | ||||||||