![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Northwest | Type | Retail Station | ||||||||
County | Bay | Status | OPEN | ||||||||
ID | 8500587 | Latitude | 30° 9' 24.3316 | ||||||||
Name |
FOOD STORE #4420 6924 THOMAS DR |
Longitude | 85° 46' 19.0314 | ||||||||
PANAMA CITY, FL 32408-6141 | LL Method | DPHO | |||||||||
Contact | PAUL BAISCH | LL Status | REVIEWED | ||||||||
Phone | (850) 774-5172 | Status Date | 10/15/2018 | ||||||||
Account Owner Information | |||||||||||
Name | PANHANDLE COMMERCIAL PROPERTIES LLC PO BOX 1565 Lawrenceville, GA 30046 |
Effective Date | 07/28/2003 | ||||||||
Contact | SCOTT MOON / JUAN VALENCIA | ||||||||||
Phone | (679) 994-0632 | ||||||||||
SCOTT@MAJORSMGMT.COM | |||||||||||
Placard # / Date | 681608 - 06/05/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | PANHANDLE COMMERCIAL PROPERTIES LLC PO BOX 1565 Lawrenceville, GA 30046 |
Effective Date | 07/28/2003 | ||||||||
Contact | SCOTT MOON / JUAN VALENCIA | ||||||||||
Phone | (679) 994-0632 | ||||||||||
SCOTT@MAJORSMGMT.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 8068 | Unleaded Gas (B) | 07/01/1982 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (H) Impressed current CP (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (S) DEP approved containment |
(B) Steel/galvanized metal (E) Cathodic protection (J) Pressurized piping system (K) Dispenser liners |
(H) Mechanical line leak detector | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 8068 | Unleaded Gas (B) | 07/01/1982 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (H) Impressed current CP (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (S) DEP approved containment |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 8068 | Unleaded Gas (B) | 07/01/1982 | UNDERGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (H) Impressed current CP (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 12/31/2023 | 12/31/2024 | TOKIO MARINE SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 12/31/2021 | 12/30/2022 | TOKIO MARINE SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 12/31/2018 | 12/31/2019 | TOKIO MARINE SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 12/31/2017 | 12/31/2018 | TOKIO MARINE SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 12/31/2016 | 12/31/2017 | TOKIO MARINE SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 12/31/2013 | 12/31/2014 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 12/31/2012 | 12/31/2013 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 04/15/2011 | 04/15/2012 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 04/15/2010 | 04/15/2011 | ARCH INSURANCE COMPANY | ||||||||
INSURANCE | 04/15/2010 | 04/15/2011 | ZURICH-AMERICAN | ||||||||
INSURANCE | 04/15/2010 | 04/15/2011 | ZURICH-AMERICAN | ||||||||
INSURANCE | 04/15/2009 | 04/15/2010 | ZURICH-AMERICAN | ||||||||
INSURANCE | 01/01/2002 | 01/01/2003 | AMERICAN INTERNATIONAL SPECIALTY LINES | ||||||||
INSURANCE | 04/23/1993 | 04/23/1994 | FPLIPA | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
RRBD | 12/16/2005 | 12/19/2005 | COMPLIANCE ASSURANCE | ||||||||
RRBD | 10/06/2005 | 10/13/2005 | COMPLIANCE ASSURANCE | ||||||||
TCI | 08/30/2005 | 09/02/2005 | MINOR OUT-OF-COMPLIANCE | KHAN | 0/2 | COMPLIANCE ASSURANCE | |||||
RRBD | 05/20/2005 | 05/25/2005 | COMPLIANCE ASSURANCE | ||||||||
TCI | 08/31/2004 | 09/01/2004 | MINOR OUT-OF-COMPLIANCE | KHAN | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: AMERON DUALOY 3000 LCX | |||||||||||
RRBD | 06/25/2004 | 07/01/2004 | PINKOVSKY | 0/0 | COMPLIANCE ASSURANCE | ||||||
TIN | 06/22/2004 | 06/25/2004 | IN-COMPLIANCE | PINKOVSKY | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: AMERON DUALOY 3000 LCX DW | |||||||||||
TXI | 05/10/2004 | 05/12/2004 | IN-COMPLIANCE | PINKOVSKY | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: OLD BEIGN REMOVED: IRON; NEW DW AMERON FIBERGLASS; CLOSURE OF IRON PIPING & OLD DISPENSERS | |||||||||||
DCCR | 05/04/2004 | 05/10/2004 | PINKOVSKY | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes DURING PIPING CLOSURE/UPGRADE, SOIL CONTAMINATION WAS FOUND. | |||||||||||
RRBD | 11/13/2003 | 12/02/2003 | PINKOVSKY | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes OCTOBER SIR RECEIVED | |||||||||||
RRBD | 09/30/2003 | 11/12/2003 | PINKOVSKY | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 09/08/2003 | 09/18/2003 | SIGNIFICANT OUT-OF-COMPLIANCE | KHAN | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: STEEL | |||||||||||
CRDE | 11/18/2002 | 11/18/2002 | PINKOVSKY | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes PER NWD REQUEST, COMPANY BANKRUPTCY | |||||||||||
TCI | 09/19/2002 | 09/25/2002 | MINOR OUT-OF-COMPLIANCE | KHAN | 0/3 | COMPLIANCE ASSURANCE | |||||
TCR | 10/24/2001 | 10/25/2001 | IN-COMPLIANCE | PINKOVSKY | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 10/19/2001 | 10/25/2001 | PINKOVSKY | 0/3 | COMPLIANCE ASSURANCE | ||||||
TCI | 09/20/2001 | 09/25/2001 | MINOR OUT-OF-COMPLIANCE | PINKOVSKY | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 10/20/2000 | 10/23/2000 | PINKOVSKY | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 09/21/2000 | 10/02/2000 | MINOR OUT-OF-COMPLIANCE | BRADLEY | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 03/20/2000 | 03/22/2000 | PINKOVSKY | 0/0 | COMPLIANCE ASSURANCE | ||||||
TDI | 02/24/2000 | 02/29/2000 | MINOR OUT-OF-COMPLIANCE | PINKOVSKY | 0/3 | DISCHARGE PROJECT | |||||
RRBD | 10/19/1999 | 10/25/1999 | PINKOVSKY | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 09/29/1999 | 10/01/1999 | MINOR OUT-OF-COMPLIANCE | PINKOVSKY | 0/3 | COMPLIANCE ASSURANCE | |||||
TIN | 04/12/1999 | 04/26/1999 | IN-COMPLIANCE | PINKOVSKY | 0/3 | COMPLIANCE ASSURANCE | |||||
NCLI | 09/17/1998 | 09/21/1998 | PINKOVSKY | 0/0 | COMPLIANCE ASSURANCE | ||||||
UTCI | 09/17/1998 | 09/21/1998 | MINOR OUT-OF-COMPLIANCE | COMPLIANCE ASSURANCE | |||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Letter | 10/01/2024 | Satisfied | MERRITT_S | Enforcement | |||||||
Electronic Communication | 09/30/2024 | Satisfied | MERRITT_S | Enforcement | |||||||
Enforcement Referral | 08/20/2024 | Accepted | KHAN_MR_1 | Enforcement | |||||||
Letter | 05/15/2024 | Satisfied | KHAN_MR_1 | Compliance Assistance | |||||||
Site Inspection | 05/13/2024 | Major Out of Compliance | KHAN_MR_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 04/27/2024 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Incident | 09/27/2022 | Has not led to Discharge | KHAN_MR_1 | Incident | |||||||
Letter | 09/27/2022 | Satisfied | MERRITT_S | Compliance Assistance | |||||||
Enforcement Tracking | 09/26/2022 | Closed Without Enforcement | MERRITT_S | Enforcement | |||||||
Letter | 09/26/2022 | Satisfied | MERRITT_S | Enforcement | |||||||
Enforcement Referral | 09/02/2022 | Accepted | KHAN_MR_1 | Enforcement | |||||||
Electronic Communication | 09/02/2022 | Satisfied | MERRITT_S | Enforcement | |||||||
Letter | 06/13/2022 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Site Inspection | 06/09/2022 | Minor Out of Compliance | KHAN_MR_1 | 0/2 | Routine Compliance | ||||||
Phone Conversation | 05/19/2022 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Letter | 03/07/2022 | Satisfied | WILSON_ML_1 | Component Installation | |||||||
Document Management | 03/07/2022 | Satisfied | WILSON_ML_1 | Component Closure | |||||||
Issue Document | 03/07/2022 | Satisfied | WILSON_ML_1 | Component Closure | |||||||
Letter | 03/07/2022 | Satisfied | WILSON_ML_1 | Component Closure | |||||||
TCAR | 03/07/2022 | Satisfied | WILSON_ML_1 | Component Closure | |||||||
Issue Document | 03/07/2022 | Satisfied | WILSON_ML_1 | Component Installation | |||||||
Site Inspection | 02/25/2022 | In Compliance | KHAN_MR_1 | 0/2 | Component Installation | ||||||
Record Document | 04/17/2020 | Satisfied | KHAN_MR_1 | Installation | |||||||
Letter | 03/03/2020 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Issue Document | 03/03/2020 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Record Document | 03/02/2020 | Satisfied | KHAN_MR_1 | Compliance Assistance | |||||||
Record Document | 03/02/2020 | Satisfied | KHAN_MR_1 | Compliance Assistance | |||||||
Issue Document | 12/23/2019 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Letter | 12/23/2019 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Site Inspection | 12/20/2019 | Minor Out of Compliance | KHAN_MR_1 | 0/2 | Routine Compliance | ||||||
Phone Conversation | 12/19/2019 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Site Inspection | 10/25/2018 | In Compliance | WILSON_ML_1 | 0/2 | Complaint | ||||||
Issue Document | 06/27/2018 | Satisfied | WILSON_ML_1 | Closure | |||||||
Document Management | 06/27/2018 | Satisfied | WILSON_ML_1 | Closure | |||||||
Letter | 06/27/2018 | Satisfied | WILSON_ML_1 | Closure | |||||||
TCAR | 06/27/2018 | Satisfied | WILSON_ML_1 | Closure | |||||||
Document Management | 06/27/2018 | Satisfied | WILSON_ML_1 | Closure | |||||||
Site Inspection | 06/20/2018 | In Compliance | KHAN_MR_1 | 0/2 | Closure | ||||||
Letter | 06/19/2018 | Satisfied | WILSON_ML_1 | Closure | |||||||
Issue Document | 06/19/2018 | Satisfied | WILSON_ML_1 | Closure | |||||||
Letter | 06/19/2018 | Satisfied | WILSON_ML_1 | Closure | |||||||
Issue Document | 06/19/2018 | Satisfied | WILSON_ML_1 | Closure | |||||||
Site Inspection | 06/07/2018 | In Compliance | KHAN_MR_1 | 0/2 | Installation | ||||||
Document Management | 05/07/2018 | Satisfied | WILSON_ML_1 | Closure | |||||||
Site Inspection | 03/30/2017 | In Compliance | KHAN_MR_1 | 0/2 | Routine Compliance | ||||||
Record Document | 11/10/2014 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Record Document | 10/21/2014 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Letter | 08/26/2014 | Satisfied | DAURIA_KL_1 | Non-Compliance | |||||||
Site Inspection | 08/25/2014 | Minor Out of Compliance | KHAN_MR_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 08/21/2014 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Electronic Communication | 07/29/2013 | Satisfied | MERRITT_S | Enforcement | |||||||
Electronic Communication | 07/29/2013 | Satisfied | MERRITT_S | Enforcement | |||||||
Enforcement Tracking | 07/29/2013 | Closed Without Enforcement | MERRITT_S | Enforcement | |||||||
Electronic Communication | 07/29/2013 | Satisfied | MERRITT_S | Enforcement | |||||||
Electronic Communication | 07/29/2013 | Satisfied | MERRITT_S | Enforcement | |||||||
Electronic Communication | 07/29/2013 | Satisfied | MERRITT_S | Enforcement | |||||||
Phone Conversation | 07/29/2013 | Satisfied | MERRITT_S | Enforcement | |||||||
Record Document | 06/11/2013 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Phone Conversation | 05/07/2013 | Satisfied | MERRITT_S | Enforcement | |||||||
Letter | 01/29/2013 | Satisfied | DAURIA_KL_1 | Non-Compliance | |||||||
Site Inspection | 01/29/2013 | Minor Out of Compliance | KHAN_MR_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 01/28/2013 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Site Inspection | 01/09/2013 | Minor Out of Compliance | KHAN_MR_1 | 0/2 | Non-Compliance | ||||||
Enforcement Referral | 01/08/2013 | Accepted | BRISTOL_S | Enforcement | |||||||
Letter | 07/29/2011 | Satisfied | RHOADS_KM_1 | Non-Compliance | |||||||
Site Inspection | 07/28/2011 | Minor Out of Compliance | KHAN_MR_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 07/26/2011 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Record Document | 01/18/2011 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Letter | 10/08/2010 | Satisfied | PIERCE_LL_1 | Non-Compliance | |||||||
Site Inspection | 09/28/2010 | Minor Out of Compliance | KHAN_MR_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 09/28/2010 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Site Inspection | 05/19/2010 | In Compliance | BRAZILE_DO_1 | 0/1 | Closure | ||||||
Emergency Preparedness Information | 05/19/2010 | Satisfied | BRAZILE_DO_1 | Routine Compliance | |||||||
TCAR | 04/16/2010 | Satisfied | BRAZILE_DO_1 | Closure | |||||||
Letter | 04/16/2010 | Satisfied | PIERCE_LL_1 | Closure | |||||||
Record Document | 04/15/2010 | Satisfied | BRAZILE_DO_1 | Closure | |||||||
Letter | 03/17/2010 | Satisfied | PIERCE_LL_1 | Non-Compliance | |||||||
Site Inspection | 03/16/2010 | Major Out of Compliance | KHAN_MR_1 | 0/3 | Non-Compliance | ||||||
Letter | 02/15/2010 | Satisfied | PIERCE_LL_1 | Non-Compliance | |||||||
Site Inspection | 02/12/2010 | Major Out of Compliance | BRAZILE_DO_1 | 0/2 | Installation | ||||||
Emergency Preparedness Information | 10/12/2009 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Site Inspection | 10/09/2009 | In Compliance | KHAN_MR_1 | 0/3 | Routine Compliance | ||||||
Meeting | 10/08/2009 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Record Document | 10/17/2008 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Letter | 09/08/2008 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Site Inspection | 09/05/2008 | Minor Out of Compliance | KHAN_MR_1 | 0/3 | Routine Compliance | ||||||
Phone Conversation | 05/27/2008 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Letter | 09/20/2007 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Site Inspection | 09/17/2007 | Minor Out of Compliance | KHAN_MR_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/13/2007 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/21/2006 | Satisfied | BRAZILE_DO_1 | Routine Compliance | |||||||
Site Inspection | 07/21/2006 | In Compliance | KHAN_MR_1 | 0/1 | Routine Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
05/13/2024 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | Fix the Rectifier to be operational, send picture showing its watts and volt meters and reading is working,(reading was 400296) | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
04/22/2004 | COMPLETED | 6 | |||||||||
02/22/2000 | COMPLETED | 6 | |||||||||