![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 03/14/2025 Last Data Refresh: 03/13/2025 Report Generated from DOPPLER | |||||||||||
District | Northwest | Type | Bulk Product Terminal Facility | ||||||||
County | Bay | Status | OPEN | ||||||||
ID | 8500594 | Latitude | 30° 8' 37.2367 | ||||||||
Name |
CWR CONTRACTING GULF COAST TERMINAL 122 S CENTER AVE |
Longitude | 85° 37' 49.401 | ||||||||
PANAMA CITY, FL 32401-4939 | LL Method | DPHO | |||||||||
Contact | ANTHONY OWENS | LL Status | REVIEWED | ||||||||
Phone | (850) 348-7880 | Status Date | 10/16/2003 | ||||||||
Account Owner Information | |||||||||||
Name | CWR CONTRACTING GULF COAST TERMINAL 122 S CENTER AVE PANAMA CITY, FL 32401 |
Effective Date | 08/14/2019 | ||||||||
Contact | ANTHONY OWENS | ||||||||||
Phone | (850) 348-7880 | ||||||||||
TOWENS@CWRCONTRACTING.COM | |||||||||||
Placard # / Date | 678131 - 06/05/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | CWR CONTRACTING GULF COAST TERMINAL 122 S CENTER AVE PANAMA CITY, FL 32401 |
Effective Date | 02/25/2021 | ||||||||
Contact | ANTHONY OWENS | ||||||||||
Phone | (850) 348-7880 | ||||||||||
TOWENS@CWRCONTRACTING.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 753480 | Misc Petrol-Based Product (X) | 11/01/1961 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel (E) Fiberglass (H) Impressed current CP (M) Spill containment bucket (P) Level gauges/alarms (S) DEP approved containment |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating (E) Cathodic protection (I) Suction piping system (L) Bulk product system |
(D) SPCC Plan (Q) Visual inspection of ASTs (R) Monitor tank bottom space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
10A | 1010000 | Misc Petrol-Based Product (X) | 03/01/2020 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (H) Impressed current CP (P) Level gauges/alarms (S) DEP approved containment (U) Field erected tank |
(A) Abv, no soil contact (B) Steel/galvanized metal (E) Cathodic protection (J) Pressurized piping system (L) Bulk product system |
(Q) Visual inspection of ASTs (U) Annual piping pressure test |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
11A | 1010000 | Misc Petrol-Based Product (X) | 03/01/2020 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (H) Impressed current CP (P) Level gauges/alarms (S) DEP approved containment (U) Field erected tank |
(A) Abv, no soil contact (B) Steel/galvanized metal (E) Cathodic protection (J) Pressurized piping system (L) Bulk product system |
(Q) Visual inspection of ASTs (U) Annual piping pressure test |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
13A | 1806000 | Misc Petrol-Based Product (X) | 11/01/2020 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (H) Impressed current CP (P) Level gauges/alarms (S) DEP approved containment (U) Field erected tank |
(A) Abv, no soil contact (B) Steel/galvanized metal (E) Cathodic protection (J) Pressurized piping system (L) Bulk product system |
(Q) Visual inspection of ASTs (U) Annual piping pressure test |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 563640 | Misc Petrol-Based Product (X) | 11/01/1961 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel (E) Fiberglass (H) Impressed current CP (M) Spill containment bucket (P) Level gauges/alarms (S) DEP approved containment |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating (E) Cathodic protection (I) Suction piping system (L) Bulk product system |
(D) SPCC Plan (O) Vapor monitoring (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
29 | 18564 | Misc Petrol-Based Product (X) | 03/01/2007 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (H) Impressed current CP (P) Level gauges/alarms (S) DEP approved containment |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system (L) Bulk product system |
(Q) Visual inspection of ASTs (U) Annual piping pressure test |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 742140 | Misc Petrol-Based Product (X) | 11/01/1961 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel (E) Fiberglass (H) Impressed current CP (M) Spill containment bucket (P) Level gauges/alarms (S) DEP approved containment |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating (E) Cathodic protection (I) Suction piping system (L) Bulk product system |
(D) SPCC Plan (O) Vapor monitoring (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 1363740 | Misc Petrol-Based Product (X) | 11/01/1962 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel (E) Fiberglass (H) Impressed current CP (M) Spill containment bucket (P) Level gauges/alarms (S) DEP approved containment |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating (E) Cathodic protection (I) Suction piping system (L) Bulk product system |
(D) SPCC Plan (O) Vapor monitoring (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6A | 630000 | Misc Petrol-Based Product (X) | 11/01/2004 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (H) Impressed current CP (P) Level gauges/alarms (S) DEP approved containment (U) Field erected tank |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system (L) Bulk product system |
(D) SPCC Plan (Q) Visual inspection of ASTs (U) Annual piping pressure test |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 1997940 | Misc Petrol-Based Product (X) | 03/01/1990 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel (E) Fiberglass (H) Impressed current CP (M) Spill containment bucket (P) Level gauges/alarms (S) DEP approved containment |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating (E) Cathodic protection (I) Suction piping system (L) Bulk product system |
(D) SPCC Plan (O) Vapor monitoring (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
A1 | 10000 | Misc Petrol-Based Product (X) | 09/01/2023 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating |
(Q) Visual inspection of ASTs | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
A2 | 10000 | Misc Petrol-Based Product (X) | 09/01/2023 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating |
(Q) Visual inspection of ASTs | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
DT1 | 157080 | Misc Petrol-Based Product (X) | 06/01/2004 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (H) Impressed current CP (P) Level gauges/alarms (S) DEP approved containment (U) Field erected tank |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system (L) Bulk product system |
(D) SPCC Plan (Q) Visual inspection of ASTs (U) Annual piping pressure test |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
DT2 | 157080 | Misc Petrol-Based Product (X) | 10/01/2006 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (H) Impressed current CP (P) Level gauges/alarms (S) DEP approved containment (U) Field erected tank |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system (L) Bulk product system |
(D) SPCC Plan (Q) Visual inspection of ASTs (U) Annual piping pressure test |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
DT3 | 102900 | Misc Petrol-Based Product (X) | 10/01/2006 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (H) Impressed current CP (P) Level gauges/alarms (S) DEP approved containment (U) Field erected tank |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system (L) Bulk product system |
(D) SPCC Plan (Q) Visual inspection of ASTs (U) Annual piping pressure test |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
DT4 | 102900 | Misc Petrol-Based Product (X) | 10/01/2006 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (H) Impressed current CP (P) Level gauges/alarms (S) DEP approved containment (U) Field erected tank |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system (L) Bulk product system |
(D) SPCC Plan (Q) Visual inspection of ASTs (U) Annual piping pressure test |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
10 | 4000 | Petroleum Additive (W) | 07/01/1988 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel (E) Fiberglass (G) Sacrificial anode CP (H) Impressed current CP (M) Spill containment bucket |
(D) External protective coating (E) Cathodic protection (I) Suction piping system |
(D) SPCC Plan | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
11 | 2000 | Residual oils, 5&6 (V) | 07/01/1986 | ABOVEGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel (E) Fiberglass (H) Impressed current CP (K) AST containment (M) Spill containment bucket (P) Level gauges/alarms (S) DEP approved containment |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating (E) Cathodic protection (I) Suction piping system |
(D) SPCC Plan (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
12 | 1008000 | Misc Petrol-Based Product (X) | 11/01/2004 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (H) Impressed current CP (P) Level gauges/alarms (S) DEP approved containment (U) Field erected tank |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system (L) Bulk product system |
(D) SPCC Plan (Q) Visual inspection of ASTs (U) Annual piping pressure test |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
13 | 1700000 | Misc Petrol-Based Product (X) | 11/01/2004 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (H) Impressed current CP (P) Level gauges/alarms (S) DEP approved containment (U) Field erected tank |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system (L) Bulk product system |
(D) SPCC Plan (Q) Visual inspection of ASTs (U) Annual piping pressure test |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
14 | 1008000 | Misc Petrol-Based Product (X) | 11/01/2004 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (H) Impressed current CP (P) Level gauges/alarms (S) DEP approved containment (U) Field erected tank |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system (L) Bulk product system |
(D) SPCC Plan (Q) Visual inspection of ASTs (U) Annual piping pressure test |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
15 | 756000 | Misc Petrol-Based Product (X) | 11/01/2004 | ABOVEGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (H) Impressed current CP (P) Level gauges/alarms (S) DEP approved containment (U) Field erected tank |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system (L) Bulk product system |
(D) SPCC Plan (Q) Visual inspection of ASTs (U) Annual piping pressure test |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
16 | 756000 | Misc Petrol-Based Product (X) | 11/01/2004 | ABOVEGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (H) Impressed current CP (P) Level gauges/alarms (S) DEP approved containment (U) Field erected tank |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system (L) Bulk product system |
(D) SPCC Plan (Q) Visual inspection of ASTs (U) Annual piping pressure test |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
17 | 756000 | Misc Petrol-Based Product (X) | 11/01/2004 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel (H) Impressed current CP (P) Level gauges/alarms (S) DEP approved containment (U) Field erected tank |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system (L) Bulk product system |
(D) SPCC Plan (Q) Visual inspection of ASTs (R) Monitor tank bottom space (U) Annual piping pressure test |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
18 | 630000 | Misc Petrol-Based Product (X) | 11/01/2004 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (H) Impressed current CP (P) Level gauges/alarms (S) DEP approved containment (U) Field erected tank |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system (L) Bulk product system |
(D) SPCC Plan (Q) Visual inspection of ASTs (U) Annual piping pressure test |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
19 | 756000 | Misc Petrol-Based Product (X) | 11/01/2004 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel (H) Impressed current CP (P) Level gauges/alarms (S) DEP approved containment (U) Field erected tank |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system (L) Bulk product system |
(D) SPCC Plan (Q) Visual inspection of ASTs (R) Monitor tank bottom space (U) Annual piping pressure test |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
20 | 630000 | Misc Petrol-Based Product (X) | 11/01/2004 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (H) Impressed current CP (P) Level gauges/alarms (S) DEP approved containment (U) Field erected tank |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system (L) Bulk product system |
(D) SPCC Plan (Q) Visual inspection of ASTs (U) Annual piping pressure test |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
21 | 756000 | Misc Petrol-Based Product (X) | 11/01/2004 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel (H) Impressed current CP (P) Level gauges/alarms (S) DEP approved containment (U) Field erected tank |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system (L) Bulk product system |
(D) SPCC Plan (Q) Visual inspection of ASTs (R) Monitor tank bottom space (U) Annual piping pressure test |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
22 | 462000 | Misc Petrol-Based Product (X) | 11/01/2004 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (H) Impressed current CP (P) Level gauges/alarms (S) DEP approved containment (U) Field erected tank |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system (L) Bulk product system |
(D) SPCC Plan (Q) Visual inspection of ASTs (U) Annual piping pressure test |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
23 | 756000 | Misc Petrol-Based Product (X) | 11/01/2004 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel (H) Impressed current CP (P) Level gauges/alarms (S) DEP approved containment (U) Field erected tank |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system (L) Bulk product system |
(D) SPCC Plan (Q) Visual inspection of ASTs (R) Monitor tank bottom space (U) Annual piping pressure test |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
24 | 17976 | Misc Petrol-Based Product (X) | 03/01/2007 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (H) Impressed current CP (P) Level gauges/alarms (S) DEP approved containment |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system (L) Bulk product system |
(D) SPCC Plan (Q) Visual inspection of ASTs (U) Annual piping pressure test |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
25 | 17976 | Misc Petrol-Based Product (X) | 03/01/2007 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (H) Impressed current CP (P) Level gauges/alarms (S) DEP approved containment |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system (L) Bulk product system |
(D) SPCC Plan (Q) Visual inspection of ASTs (U) Annual piping pressure test |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
26 | 17976 | Misc Petrol-Based Product (X) | 03/01/2007 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (H) Impressed current CP (P) Level gauges/alarms (S) DEP approved containment |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system (L) Bulk product system |
(D) SPCC Plan (Q) Visual inspection of ASTs (U) Annual piping pressure test |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
27 | 17976 | Misc Petrol-Based Product (X) | 03/01/2007 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (H) Impressed current CP (P) Level gauges/alarms (S) DEP approved containment |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system (L) Bulk product system |
(D) SPCC Plan (Q) Visual inspection of ASTs (U) Annual piping pressure test |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
28 | 17976 | Misc Petrol-Based Product (X) | 03/01/2007 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (H) Impressed current CP (P) Level gauges/alarms (S) DEP approved containment |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system (L) Bulk product system |
(D) SPCC Plan (Q) Visual inspection of ASTs (U) Annual piping pressure test |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
30 | 42294 | Misc Petrol-Based Product (X) | 03/01/2007 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (H) Impressed current CP (P) Level gauges/alarms (S) DEP approved containment |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system (L) Bulk product system |
(D) SPCC Plan (Q) Visual inspection of ASTs (U) Annual piping pressure test |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 1293600 | Leaded Gas (A) | 11/01/1961 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel (E) Fiberglass (H) Impressed current CP (M) Spill containment bucket (P) Level gauges/alarms |
(B) Steel/galvanized metal (D) External protective coating (E) Cathodic protection (I) Suction piping system (L) Bulk product system |
(D) SPCC Plan (O) Vapor monitoring (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4A | 1008000 | Misc Petrol-Based Product (X) | 11/01/2004 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (H) Impressed current CP (P) Level gauges/alarms (S) DEP approved containment (U) Field erected tank |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system (L) Bulk product system |
(D) SPCC Plan (Q) Visual inspection of ASTs (U) Annual piping pressure test |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 630000 | Vehicular Diesel (D) | 11/01/1961 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel (E) Fiberglass (H) Impressed current CP (M) Spill containment bucket (P) Level gauges/alarms |
(B) Steel/galvanized metal (D) External protective coating (E) Cathodic protection (I) Suction piping system (L) Bulk product system |
(D) SPCC Plan (O) Vapor monitoring (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
8 | 10000 | Misc Petrol-Based Product (X) | 02/01/1991 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel (E) Fiberglass (H) Impressed current CP (K) AST containment (M) Spill containment bucket (P) Level gauges/alarms (S) DEP approved containment |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating (E) Cathodic protection (I) Suction piping system (L) Bulk product system |
(D) SPCC Plan (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
9 | 3000 | Misc Petrol-Based Product (X) | 07/01/1986 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel (E) Fiberglass (H) Impressed current CP (K) AST containment (M) Spill containment bucket (P) Level gauges/alarms (S) DEP approved containment |
(A) Abv, no soil contact (D) External protective coating (E) Cathodic protection (I) Suction piping system (L) Bulk product system |
(Q) Visual inspection of ASTs | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
P1 | 4000 | Misc Petrol-Based Product (X) | 07/01/1988 | UNDERGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel (E) Fiberglass (G) Sacrificial anode CP (H) Impressed current CP (M) Spill containment bucket |
(B) Steel/galvanized metal (D) External protective coating (E) Cathodic protection (I) Suction piping system |
(D) SPCC Plan | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
P2 | 4900 | Misc Petrol-Based Product (X) | 07/01/1976 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel (E) Fiberglass (H) Impressed current CP (K) AST containment (M) Spill containment bucket (P) Level gauges/alarms (S) DEP approved containment |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating (E) Cathodic protection (I) Suction piping system |
(D) SPCC Plan (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
WT1 | 42000 | Misc Petrol-Based Product (X) | 04/01/1990 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel (E) Fiberglass (H) Impressed current CP (M) Spill containment bucket (P) Level gauges/alarms (S) DEP approved containment |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating (E) Cathodic protection (I) Suction piping system (L) Bulk product system |
(Q) Visual inspection of ASTs | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 02/01/2024 | 02/01/2027 | ALLIED WORLD ASSURANCE COMPANY (US), INC. | ||||||||
INSURANCE | 02/01/2021 | 02/01/2024 | STEADFAST INSURANCE COMPANY | ||||||||
INSURANCE | 03/25/2020 | 04/01/2015 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 02/01/2018 | 02/01/2021 | STEADFAST INSURANCE COMPANY | ||||||||
INSURANCE | 02/01/2015 | 02/02/2018 | STEADFAST INSURANCE COMPANY | ||||||||
INSURANCE | 02/01/2015 | 02/01/2018 | STEADFAST INSURANCE COMPANY | ||||||||
INSURANCE | 02/11/2013 | 02/11/2014 | STEADFAST | ||||||||
INSURANCE | 02/01/2013 | 02/01/2014 | ZURICH-AMERICAN | ||||||||
INSURANCE | 01/10/2011 | 01/10/2012 | STEADFAST | ||||||||
INSURANCE | 12/31/2009 | 12/31/2010 | CHARTIS SPECIALTY INSURANCE CO | ||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/31/2007 | 08/01/2009 | |||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
RRBD | 05/31/2005 | 06/01/2005 | HOLLINGSHEAD | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes PER PREVIOUS GUIDANCE (LEWIS CORNMAN AND MARSHALL MOTT-SMITH) FR NOT REQUIRED UNTIL PRODUCT IS IN TANKS | |||||||||||
TCI | 05/23/2005 | 05/27/2005 | SIGNIFICANT OUT-OF-COMPLIANCE | STEVENSON | 10/1 | COMPLIANCE ASSURANCE | |||||
TXI | 11/17/2004 | 11/22/2004 | IN-COMPLIANCE | PINKOVSKY | 2/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: STEEL, CLOSURE OF TANK #4 AND #6 | |||||||||||
TCI | 05/24/2004 | 06/01/2004 | IN-COMPLIANCE | PINKOVSKY | 10/1 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: STEEL | |||||||||||
TCI | 07/16/2002 | 07/16/2002 | IN-COMPLIANCE | PINKOVSKY | 12/0 | COMPLIANCE ASSURANCE | |||||
RRBD | 08/03/2001 | 08/07/2001 | PINKOVSKY | 12/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 07/24/2001 | 07/25/2001 | SIGNIFICANT OUT-OF-COMPLIANCE | PINKOVSKY | 12/0 | COMPLIANCE ASSURANCE | |||||
TCI | 07/19/2000 | 07/19/2000 | IN-COMPLIANCE | BRADLEY | 12/0 | COMPLIANCE ASSURANCE | |||||
TIN | 04/06/2000 | 04/10/2000 | IN-COMPLIANCE | PINKOVSKY | 12/0 | COMPLIANCE ASSURANCE | |||||
TXI | 09/15/1999 | 09/15/1999 | IN-COMPLIANCE | CAMPBELL/PINKOVSKY | 1/0 | COMPLIANCE ASSURANCE | |||||
TCI | 07/21/1999 | 07/22/1999 | IN-COMPLIANCE | CAMPBELL | 13/1 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Document Management | 11/19/2024 | Satisfied | MERRITT_S | Closure | |||||||
Document Management | 11/19/2024 | Satisfied | MERRITT_S | Closure | |||||||
Document Management | 11/15/2024 | Satisfied | MERRITT_S | Closure | |||||||
Letter | 10/18/2024 | Satisfied | ELLIOTT_EV_1 | Closure | |||||||
TCAR | 10/18/2024 | Satisfied | ELLIOTT_EV_1 | Closure | |||||||
Document Management | 10/18/2024 | Satisfied | ELLIOTT_EV_1 | Closure | |||||||
Enforcement Tracking | 10/14/2024 | Closed Without Enforcement | MERRITT_S | Enforcement | |||||||
Enforcement Referral | 10/03/2024 | Accepted | GARTIN_D | Enforcement | |||||||
Enforcement Referral | 10/03/2024 | Accepted | GARTIN_D | Enforcement | |||||||
Electronic Communication | 10/03/2024 | Satisfied | PROFFITT_B | Routine Compliance | |||||||
Letter | 06/21/2024 | Satisfied | KHAN_MR_1 | Compliance Assistance | |||||||
Site Inspection | 06/21/2024 | Major Out of Compliance | KHAN_MR_1 | 23/1 | Closure | ||||||
Site Inspection | 06/03/2024 | Major Out of Compliance | KHAN_MR_1 | 26/1 | Closure | ||||||
Letter | 06/03/2024 | Satisfied | KHAN_MR_1 | Compliance Assistance | |||||||
Site Inspection | 05/31/2024 | Major Out of Compliance | KHAN_MR_1 | 26/1 | Routine Compliance | ||||||
Letter | 05/31/2024 | Satisfied | KHAN_MR_1 | Compliance Assistance | |||||||
Phone Conversation | 05/30/2024 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Letter | 06/29/2022 | Satisfied | WILSON_ML_1 | Routine Compliance | |||||||
Phone Conversation | 05/26/2022 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Site Inspection | 05/26/2022 | In Compliance | KHAN_MR_1 | 22/1 | Routine Compliance | ||||||
Enforcement Tracking | 08/05/2020 | Closed Without Enforcement | MERRITT_S | Enforcement | |||||||
Electronic Communication | 06/15/2020 | Satisfied | DECKER_K | Enforcement | |||||||
Enforcement Referral | 06/08/2020 | Accepted | KHAN_MR_1 | Enforcement | |||||||
Phone Conversation | 06/04/2020 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Issue Document | 03/06/2020 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Letter | 03/06/2020 | Satisfied | KHAN_MR_1 | Compliance Assistance | |||||||
Site Inspection | 03/05/2020 | Minor Out of Compliance | KHAN_MR_1 | 23/1 | Routine Compliance | ||||||
Phone Conversation | 03/05/2020 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Issue Document | 02/27/2020 | Satisfied | WILSON_ML_1 | Closure | |||||||
Letter | 02/27/2020 | Satisfied | WILSON_ML_1 | Closure | |||||||
Site Inspection | 02/26/2020 | In Compliance | KHAN_MR_1 | 13/1 | Closure | ||||||
Issue Document | 10/19/2017 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Phone Conversation | 09/29/2017 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Site Inspection | 09/29/2017 | In Compliance | KHAN_MR_1 | 35/1 | Routine Compliance | ||||||
Site Inspection | 11/19/2015 | In Compliance | KHAN_MR_1 | 35/1 | Routine Compliance | ||||||
Record Document | 11/18/2015 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Site Inspection | 12/31/2013 | In Compliance | KHAN_MR_1 | 35/1 | Routine Compliance | ||||||
Site Inspection | 07/20/2011 | In Compliance | KHAN_MR_1 | 35/1 | Routine Compliance | ||||||
Site Inspection | 02/16/2011 | In Compliance | KHAN_MR_1 | 35/1 | Routine Compliance | ||||||
Engineering Request | 03/31/2010 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Site Inspection | 03/18/2010 | In Compliance | KHAN_MR_1 | 35/1 | Routine Compliance | ||||||
Site Inspection | 05/05/2009 | In Compliance | KHAN_MR_1 | 34/1 | Routine Compliance | ||||||
Site Inspection | 04/28/2008 | In Compliance | BRAZILE_DO_1 | 25/0 | Routine Compliance | ||||||
Emergency Preparedness Information | 04/24/2008 | Satisfied | BRAZILE_DO_1 | Routine Compliance | |||||||
Site Inspection | 05/15/2007 | In Compliance | KHAN_MR_1 | 25/0 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/20/2007 | Satisfied | BRAZILE_DO_1 | Routine Compliance | |||||||
Site Inspection | 05/18/2006 | In Compliance | BRAZILE_DO_1 | 25/0 | Routine Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
05/30/2024 | 7085 | Minor | 3.11 Cathodic protection not inspected, tested and evaluated within six months of installation or repair, and at least yearly. Factory installed cathodic protection not tested, inspected or evaluated every 3 years. | Provide current Cathodic surveys for 1,2,3,5,6A,7,8,9,10A,11A,13A,29WT1, DT1, DT2, DT3 and DT4 to this office for review to clear the violation. Email: Muhammad.Khan@FLHealth.gov | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
06/09/1988 | COMPLETED | ||||||||||
03/01/1985 | ACTIVE | 10 | EARLY DETECTION INCENTIVE-PARTIAL | ||||||||