District Northwest   Type    Bulk Product Terminal Facility
 
County Bay   Status    OPEN
 
ID 8500594   Latitude    30° 8' 37.2367
 
Name CWR CONTRACTING GULF COAST TERMINAL
122 S CENTER AVE
Longitude    85° 37' 49.401
  PANAMA CITY, FL 32401-4939 LL Method    DPHO
 
Contact ANTHONY OWENS   LL Status    REVIEWED
 
Phone (850) 348-7880   Status Date    10/16/2003
 
Account Owner Information
 
Name CWR CONTRACTING GULF COAST TERMINAL
122 S CENTER AVE
PANAMA CITY, FL 32401
Effective Date    08/14/2019
 
Contact ANTHONY OWENS
 
Phone (850) 348-7880
 
Email TOWENS@CWRCONTRACTING.COM
  Placard # / Date    678131 - 06/05/2024
Property Owner Information
 
Name CWR CONTRACTING GULF COAST TERMINAL
122 S CENTER AVE
PANAMA CITY, FL 32401
Effective Date    02/25/2021
 
Contact ANTHONY OWENS
 
Phone (850) 348-7880
 
Email TOWENS@CWRCONTRACTING.COM
 
 
 
 
 
 
 
 
 
Tank Tank Size Content Installed Placement Status
1 753480 Misc Petrol-Based Product (X) 11/01/1961 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(B) Internal lining
(C) Steel
(E) Fiberglass
(H) Impressed current CP
(M) Spill containment bucket
(P) Level gauges/alarms
(S) DEP approved containment
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(D) External protective coating
(E) Cathodic protection
(I) Suction piping system
(L) Bulk product system
(D) SPCC Plan
(Q) Visual inspection of ASTs
(R) Monitor tank bottom space
 
 
Tank Tank Size Content Installed Placement Status
10A 1010000 Misc Petrol-Based Product (X) 03/01/2020 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(H) Impressed current CP
(P) Level gauges/alarms
(S) DEP approved containment
(U) Field erected tank
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(E) Cathodic protection
(J) Pressurized piping system
(L) Bulk product system
(Q) Visual inspection of ASTs
(U) Annual piping pressure test
 
 
Tank Tank Size Content Installed Placement Status
11A 1010000 Misc Petrol-Based Product (X) 03/01/2020 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(H) Impressed current CP
(P) Level gauges/alarms
(S) DEP approved containment
(U) Field erected tank
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(E) Cathodic protection
(J) Pressurized piping system
(L) Bulk product system
(Q) Visual inspection of ASTs
(U) Annual piping pressure test
 
 
Tank Tank Size Content Installed Placement Status
13A 1806000 Misc Petrol-Based Product (X) 11/01/2020 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(H) Impressed current CP
(P) Level gauges/alarms
(S) DEP approved containment
(U) Field erected tank
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(E) Cathodic protection
(J) Pressurized piping system
(L) Bulk product system
(Q) Visual inspection of ASTs
(U) Annual piping pressure test
 
 
Tank Tank Size Content Installed Placement Status
2 563640 Misc Petrol-Based Product (X) 11/01/1961 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(B) Internal lining
(C) Steel
(E) Fiberglass
(H) Impressed current CP
(M) Spill containment bucket
(P) Level gauges/alarms
(S) DEP approved containment
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(D) External protective coating
(E) Cathodic protection
(I) Suction piping system
(L) Bulk product system
(D) SPCC Plan
(O) Vapor monitoring
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
29 18564 Misc Petrol-Based Product (X) 03/01/2007 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(H) Impressed current CP
(P) Level gauges/alarms
(S) DEP approved containment
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(L) Bulk product system
(Q) Visual inspection of ASTs
(U) Annual piping pressure test
 
 
Tank Tank Size Content Installed Placement Status
3 742140 Misc Petrol-Based Product (X) 11/01/1961 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(B) Internal lining
(C) Steel
(E) Fiberglass
(H) Impressed current CP
(M) Spill containment bucket
(P) Level gauges/alarms
(S) DEP approved containment
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(D) External protective coating
(E) Cathodic protection
(I) Suction piping system
(L) Bulk product system
(D) SPCC Plan
(O) Vapor monitoring
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
5 1363740 Misc Petrol-Based Product (X) 11/01/1962 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(B) Internal lining
(C) Steel
(E) Fiberglass
(H) Impressed current CP
(M) Spill containment bucket
(P) Level gauges/alarms
(S) DEP approved containment
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(D) External protective coating
(E) Cathodic protection
(I) Suction piping system
(L) Bulk product system
(D) SPCC Plan
(O) Vapor monitoring
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
6A 630000 Misc Petrol-Based Product (X) 11/01/2004 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(H) Impressed current CP
(P) Level gauges/alarms
(S) DEP approved containment
(U) Field erected tank
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(L) Bulk product system
(D) SPCC Plan
(Q) Visual inspection of ASTs
(U) Annual piping pressure test
 
 
Tank Tank Size Content Installed Placement Status
7 1997940 Misc Petrol-Based Product (X) 03/01/1990 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(B) Internal lining
(C) Steel
(E) Fiberglass
(H) Impressed current CP
(M) Spill containment bucket
(P) Level gauges/alarms
(S) DEP approved containment
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(D) External protective coating
(E) Cathodic protection
(I) Suction piping system
(L) Bulk product system
(D) SPCC Plan
(O) Vapor monitoring
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
A1 10000 Misc Petrol-Based Product (X) 09/01/2023 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(K) AST containment
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(D) External protective coating
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
A2 10000 Misc Petrol-Based Product (X) 09/01/2023 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(K) AST containment
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(D) External protective coating
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
DT1 157080 Misc Petrol-Based Product (X) 06/01/2004 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(H) Impressed current CP
(P) Level gauges/alarms
(S) DEP approved containment
(U) Field erected tank
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(L) Bulk product system
(D) SPCC Plan
(Q) Visual inspection of ASTs
(U) Annual piping pressure test
 
 
Tank Tank Size Content Installed Placement Status
DT2 157080 Misc Petrol-Based Product (X) 10/01/2006 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(H) Impressed current CP
(P) Level gauges/alarms
(S) DEP approved containment
(U) Field erected tank
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(L) Bulk product system
(D) SPCC Plan
(Q) Visual inspection of ASTs
(U) Annual piping pressure test
 
 
Tank Tank Size Content Installed Placement Status
DT3 102900 Misc Petrol-Based Product (X) 10/01/2006 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(H) Impressed current CP
(P) Level gauges/alarms
(S) DEP approved containment
(U) Field erected tank
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(L) Bulk product system
(D) SPCC Plan
(Q) Visual inspection of ASTs
(U) Annual piping pressure test
 
 
Tank Tank Size Content Installed Placement Status
DT4 102900 Misc Petrol-Based Product (X) 10/01/2006 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(H) Impressed current CP
(P) Level gauges/alarms
(S) DEP approved containment
(U) Field erected tank
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(L) Bulk product system
(D) SPCC Plan
(Q) Visual inspection of ASTs
(U) Annual piping pressure test
 
 
Tank Tank Size Content Installed Placement Status
10 4000 Petroleum Additive (W) 07/01/1988 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(B) Internal lining
(C) Steel
(E) Fiberglass
(G) Sacrificial anode CP
(H) Impressed current CP
(M) Spill containment bucket
  (D) External protective coating
(E) Cathodic protection
(I) Suction piping system
(D) SPCC Plan
 
 
Tank Tank Size Content Installed Placement Status
11 2000 Residual oils, 5&6 (V) 07/01/1986 ABOVEGROUND Deleted - Data Error (D)
 
Constructions   Pipings Monitorings
(B) Internal lining
(C) Steel
(E) Fiberglass
(H) Impressed current CP
(K) AST containment
(M) Spill containment bucket
(P) Level gauges/alarms
(S) DEP approved containment
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(D) External protective coating
(E) Cathodic protection
(I) Suction piping system
(D) SPCC Plan
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
12 1008000 Misc Petrol-Based Product (X) 11/01/2004 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(H) Impressed current CP
(P) Level gauges/alarms
(S) DEP approved containment
(U) Field erected tank
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(L) Bulk product system
(D) SPCC Plan
(Q) Visual inspection of ASTs
(U) Annual piping pressure test
 
 
Tank Tank Size Content Installed Placement Status
13 1700000 Misc Petrol-Based Product (X) 11/01/2004 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(H) Impressed current CP
(P) Level gauges/alarms
(S) DEP approved containment
(U) Field erected tank
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(L) Bulk product system
(D) SPCC Plan
(Q) Visual inspection of ASTs
(U) Annual piping pressure test
 
 
Tank Tank Size Content Installed Placement Status
14 1008000 Misc Petrol-Based Product (X) 11/01/2004 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(H) Impressed current CP
(P) Level gauges/alarms
(S) DEP approved containment
(U) Field erected tank
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(L) Bulk product system
(D) SPCC Plan
(Q) Visual inspection of ASTs
(U) Annual piping pressure test
 
 
Tank Tank Size Content Installed Placement Status
15 756000 Misc Petrol-Based Product (X) 11/01/2004 ABOVEGROUND Closed In Place (A)
 
Constructions   Pipings Monitorings
(C) Steel
(H) Impressed current CP
(P) Level gauges/alarms
(S) DEP approved containment
(U) Field erected tank
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(L) Bulk product system
(D) SPCC Plan
(Q) Visual inspection of ASTs
(U) Annual piping pressure test
 
 
Tank Tank Size Content Installed Placement Status
16 756000 Misc Petrol-Based Product (X) 11/01/2004 ABOVEGROUND Closed In Place (A)
 
Constructions   Pipings Monitorings
(C) Steel
(H) Impressed current CP
(P) Level gauges/alarms
(S) DEP approved containment
(U) Field erected tank
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(L) Bulk product system
(D) SPCC Plan
(Q) Visual inspection of ASTs
(U) Annual piping pressure test
 
 
Tank Tank Size Content Installed Placement Status
17 756000 Misc Petrol-Based Product (X) 11/01/2004 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(B) Internal lining
(C) Steel
(H) Impressed current CP
(P) Level gauges/alarms
(S) DEP approved containment
(U) Field erected tank
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(L) Bulk product system
(D) SPCC Plan
(Q) Visual inspection of ASTs
(R) Monitor tank bottom space
(U) Annual piping pressure test
 
 
Tank Tank Size Content Installed Placement Status
18 630000 Misc Petrol-Based Product (X) 11/01/2004 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(H) Impressed current CP
(P) Level gauges/alarms
(S) DEP approved containment
(U) Field erected tank
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(L) Bulk product system
(D) SPCC Plan
(Q) Visual inspection of ASTs
(U) Annual piping pressure test
 
 
Tank Tank Size Content Installed Placement Status
19 756000 Misc Petrol-Based Product (X) 11/01/2004 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(B) Internal lining
(C) Steel
(H) Impressed current CP
(P) Level gauges/alarms
(S) DEP approved containment
(U) Field erected tank
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(L) Bulk product system
(D) SPCC Plan
(Q) Visual inspection of ASTs
(R) Monitor tank bottom space
(U) Annual piping pressure test
 
 
Tank Tank Size Content Installed Placement Status
20 630000 Misc Petrol-Based Product (X) 11/01/2004 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(H) Impressed current CP
(P) Level gauges/alarms
(S) DEP approved containment
(U) Field erected tank
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(L) Bulk product system
(D) SPCC Plan
(Q) Visual inspection of ASTs
(U) Annual piping pressure test
 
 
Tank Tank Size Content Installed Placement Status
21 756000 Misc Petrol-Based Product (X) 11/01/2004 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(B) Internal lining
(C) Steel
(H) Impressed current CP
(P) Level gauges/alarms
(S) DEP approved containment
(U) Field erected tank
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(L) Bulk product system
(D) SPCC Plan
(Q) Visual inspection of ASTs
(R) Monitor tank bottom space
(U) Annual piping pressure test
 
 
Tank Tank Size Content Installed Placement Status
22 462000 Misc Petrol-Based Product (X) 11/01/2004 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(H) Impressed current CP
(P) Level gauges/alarms
(S) DEP approved containment
(U) Field erected tank
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(L) Bulk product system
(D) SPCC Plan
(Q) Visual inspection of ASTs
(U) Annual piping pressure test
 
 
Tank Tank Size Content Installed Placement Status
23 756000 Misc Petrol-Based Product (X) 11/01/2004 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(B) Internal lining
(C) Steel
(H) Impressed current CP
(P) Level gauges/alarms
(S) DEP approved containment
(U) Field erected tank
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(L) Bulk product system
(D) SPCC Plan
(Q) Visual inspection of ASTs
(R) Monitor tank bottom space
(U) Annual piping pressure test
 
 
Tank Tank Size Content Installed Placement Status
24 17976 Misc Petrol-Based Product (X) 03/01/2007 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(H) Impressed current CP
(P) Level gauges/alarms
(S) DEP approved containment
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(L) Bulk product system
(D) SPCC Plan
(Q) Visual inspection of ASTs
(U) Annual piping pressure test
 
 
Tank Tank Size Content Installed Placement Status
25 17976 Misc Petrol-Based Product (X) 03/01/2007 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(H) Impressed current CP
(P) Level gauges/alarms
(S) DEP approved containment
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(L) Bulk product system
(D) SPCC Plan
(Q) Visual inspection of ASTs
(U) Annual piping pressure test
 
 
Tank Tank Size Content Installed Placement Status
26 17976 Misc Petrol-Based Product (X) 03/01/2007 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(H) Impressed current CP
(P) Level gauges/alarms
(S) DEP approved containment
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(L) Bulk product system
(D) SPCC Plan
(Q) Visual inspection of ASTs
(U) Annual piping pressure test
 
 
Tank Tank Size Content Installed Placement Status
27 17976 Misc Petrol-Based Product (X) 03/01/2007 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(H) Impressed current CP
(P) Level gauges/alarms
(S) DEP approved containment
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(L) Bulk product system
(D) SPCC Plan
(Q) Visual inspection of ASTs
(U) Annual piping pressure test
 
 
Tank Tank Size Content Installed Placement Status
28 17976 Misc Petrol-Based Product (X) 03/01/2007 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(H) Impressed current CP
(P) Level gauges/alarms
(S) DEP approved containment
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(L) Bulk product system
(D) SPCC Plan
(Q) Visual inspection of ASTs
(U) Annual piping pressure test
 
 
Tank Tank Size Content Installed Placement Status
30 42294 Misc Petrol-Based Product (X) 03/01/2007 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(H) Impressed current CP
(P) Level gauges/alarms
(S) DEP approved containment
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(L) Bulk product system
(D) SPCC Plan
(Q) Visual inspection of ASTs
(U) Annual piping pressure test
 
 
Tank Tank Size Content Installed Placement Status
4 1293600 Leaded Gas (A) 11/01/1961 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(B) Internal lining
(C) Steel
(E) Fiberglass
(H) Impressed current CP
(M) Spill containment bucket
(P) Level gauges/alarms
  (B) Steel/galvanized metal
(D) External protective coating
(E) Cathodic protection
(I) Suction piping system
(L) Bulk product system
(D) SPCC Plan
(O) Vapor monitoring
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
4A 1008000 Misc Petrol-Based Product (X) 11/01/2004 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(H) Impressed current CP
(P) Level gauges/alarms
(S) DEP approved containment
(U) Field erected tank
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(L) Bulk product system
(D) SPCC Plan
(Q) Visual inspection of ASTs
(U) Annual piping pressure test
 
 
Tank Tank Size Content Installed Placement Status
6 630000 Vehicular Diesel (D) 11/01/1961 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(B) Internal lining
(C) Steel
(E) Fiberglass
(H) Impressed current CP
(M) Spill containment bucket
(P) Level gauges/alarms
  (B) Steel/galvanized metal
(D) External protective coating
(E) Cathodic protection
(I) Suction piping system
(L) Bulk product system
(D) SPCC Plan
(O) Vapor monitoring
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
8 10000 Misc Petrol-Based Product (X) 02/01/1991 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(B) Internal lining
(C) Steel
(E) Fiberglass
(H) Impressed current CP
(K) AST containment
(M) Spill containment bucket
(P) Level gauges/alarms
(S) DEP approved containment
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(D) External protective coating
(E) Cathodic protection
(I) Suction piping system
(L) Bulk product system
(D) SPCC Plan
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
9 3000 Misc Petrol-Based Product (X) 07/01/1986 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(B) Internal lining
(C) Steel
(E) Fiberglass
(H) Impressed current CP
(K) AST containment
(M) Spill containment bucket
(P) Level gauges/alarms
(S) DEP approved containment
  (A) Abv, no soil contact
(D) External protective coating
(E) Cathodic protection
(I) Suction piping system
(L) Bulk product system
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
P1 4000 Misc Petrol-Based Product (X) 07/01/1988 UNDERGROUND Closed In Place (A)
 
Constructions   Pipings Monitorings
(B) Internal lining
(C) Steel
(E) Fiberglass
(G) Sacrificial anode CP
(H) Impressed current CP
(M) Spill containment bucket
  (B) Steel/galvanized metal
(D) External protective coating
(E) Cathodic protection
(I) Suction piping system
(D) SPCC Plan
 
 
Tank Tank Size Content Installed Placement Status
P2 4900 Misc Petrol-Based Product (X) 07/01/1976 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(B) Internal lining
(C) Steel
(E) Fiberglass
(H) Impressed current CP
(K) AST containment
(M) Spill containment bucket
(P) Level gauges/alarms
(S) DEP approved containment
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(D) External protective coating
(E) Cathodic protection
(I) Suction piping system
(D) SPCC Plan
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
WT1 42000 Misc Petrol-Based Product (X) 04/01/1990 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(B) Internal lining
(C) Steel
(E) Fiberglass
(H) Impressed current CP
(M) Spill containment bucket
(P) Level gauges/alarms
(S) DEP approved containment
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(D) External protective coating
(E) Cathodic protection
(I) Suction piping system
(L) Bulk product system
(Q) Visual inspection of ASTs
 
 
Insurance Documents
 
FR Type   Effective Date Expiration Date Company Name
INSURANCE   02/01/2024 02/01/2027 ALLIED WORLD ASSURANCE COMPANY (US), INC.
INSURANCE   02/01/2021 02/01/2024 STEADFAST INSURANCE COMPANY
INSURANCE   03/25/2020 04/01/2015 LIBERTY SURPLUS INSURANCE CORP
INSURANCE   02/01/2018 02/01/2021 STEADFAST INSURANCE COMPANY
INSURANCE   02/01/2015 02/02/2018 STEADFAST INSURANCE COMPANY
INSURANCE   02/01/2015 02/01/2018 STEADFAST INSURANCE COMPANY
INSURANCE   02/11/2013 02/11/2014 STEADFAST
INSURANCE   02/01/2013 02/01/2014 ZURICH-AMERICAN
INSURANCE   01/10/2011 01/10/2012 STEADFAST
INSURANCE   12/31/2009 12/31/2010 CHARTIS SPECIALTY INSURANCE CO
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER   05/31/2007 08/01/2009
 
 
Legacy Compliance Activity Information
 
Activity
Code
Date
Initiated
Date
Completed
Results Inspector AST/UST
Count
Description
RRBD 05/31/2005 06/01/2005 HOLLINGSHEAD 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes PER PREVIOUS GUIDANCE (LEWIS CORNMAN AND MARSHALL MOTT-SMITH) FR NOT REQUIRED UNTIL PRODUCT IS IN TANKS
 
TCI 05/23/2005 05/27/2005 SIGNIFICANT OUT-OF-COMPLIANCE STEVENSON 10/1 COMPLIANCE ASSURANCE
 
TXI 11/17/2004 11/22/2004 IN-COMPLIANCE PINKOVSKY 2/0 COMPLIANCE ASSURANCE
 
 Completion Notes PIPING: STEEL, CLOSURE OF TANK #4 AND #6
 
TCI 05/24/2004 06/01/2004 IN-COMPLIANCE PINKOVSKY 10/1 COMPLIANCE ASSURANCE
 
 Completion Notes PIPING: STEEL
 
TCI 07/16/2002 07/16/2002 IN-COMPLIANCE PINKOVSKY 12/0 COMPLIANCE ASSURANCE
 
RRBD 08/03/2001 08/07/2001 PINKOVSKY 12/0 COMPLIANCE ASSURANCE
 
TCI 07/24/2001 07/25/2001 SIGNIFICANT OUT-OF-COMPLIANCE PINKOVSKY 12/0 COMPLIANCE ASSURANCE
 
TCI 07/19/2000 07/19/2000 IN-COMPLIANCE BRADLEY 12/0 COMPLIANCE ASSURANCE
 
TIN 04/06/2000 04/10/2000 IN-COMPLIANCE PINKOVSKY 12/0 COMPLIANCE ASSURANCE
 
TXI 09/15/1999 09/15/1999 IN-COMPLIANCE CAMPBELL/PINKOVSKY 1/0 COMPLIANCE ASSURANCE
 
TCI 07/21/1999 07/22/1999 IN-COMPLIANCE CAMPBELL 13/1 COMPLIANCE ASSURANCE
 
 
 
Compliance Activity Information
 
Activity
Code
Date
Completed
Results Inspector AST/UST
Count
Description
Document Management 11/19/2024 Satisfied MERRITT_S Closure
 
Document Management 11/19/2024 Satisfied MERRITT_S Closure
 
Document Management 11/15/2024 Satisfied MERRITT_S Closure
 
Letter 10/18/2024 Satisfied ELLIOTT_EV_1 Closure
 
TCAR 10/18/2024 Satisfied ELLIOTT_EV_1 Closure
 
Document Management 10/18/2024 Satisfied ELLIOTT_EV_1 Closure
 
Enforcement Tracking 10/14/2024 Closed Without Enforcement MERRITT_S Enforcement
 
Enforcement Referral 10/03/2024 Accepted GARTIN_D Enforcement
 
Enforcement Referral 10/03/2024 Accepted GARTIN_D Enforcement
 
Electronic Communication 10/03/2024 Satisfied PROFFITT_B Routine Compliance
 
Letter 06/21/2024 Satisfied KHAN_MR_1 Compliance Assistance
 
Site Inspection 06/21/2024 Major Out of Compliance KHAN_MR_1 23/1 Closure
 
Site Inspection 06/03/2024 Major Out of Compliance KHAN_MR_1 26/1 Closure
 
Letter 06/03/2024 Satisfied KHAN_MR_1 Compliance Assistance
 
Site Inspection 05/31/2024 Major Out of Compliance KHAN_MR_1 26/1 Routine Compliance
 
Letter 05/31/2024 Satisfied KHAN_MR_1 Compliance Assistance
 
Phone Conversation 05/30/2024 Satisfied KHAN_MR_1 Routine Compliance
 
Letter 06/29/2022 Satisfied WILSON_ML_1 Routine Compliance
 
Phone Conversation 05/26/2022 Satisfied KHAN_MR_1 Routine Compliance
 
Site Inspection 05/26/2022 In Compliance KHAN_MR_1 22/1 Routine Compliance
 
Enforcement Tracking 08/05/2020 Closed Without Enforcement MERRITT_S Enforcement
 
Electronic Communication 06/15/2020 Satisfied DECKER_K Enforcement
 
Enforcement Referral 06/08/2020 Accepted KHAN_MR_1 Enforcement
 
Phone Conversation 06/04/2020 Satisfied WILSON_ML_1 Compliance Assistance
 
Issue Document 03/06/2020 Satisfied WILSON_ML_1 Compliance Assistance
 
Letter 03/06/2020 Satisfied KHAN_MR_1 Compliance Assistance
 
Site Inspection 03/05/2020 Minor Out of Compliance KHAN_MR_1 23/1 Routine Compliance
 
Phone Conversation 03/05/2020 Satisfied KHAN_MR_1 Routine Compliance
 
Issue Document 02/27/2020 Satisfied WILSON_ML_1 Closure
 
Letter 02/27/2020 Satisfied WILSON_ML_1 Closure
 
Site Inspection 02/26/2020 In Compliance KHAN_MR_1 13/1 Closure
 
Issue Document 10/19/2017 Satisfied WILSON_ML_1 Compliance Assistance
 
Phone Conversation 09/29/2017 Satisfied KHAN_MR_1 Routine Compliance
 
Site Inspection 09/29/2017 In Compliance KHAN_MR_1 35/1 Routine Compliance
 
Site Inspection 11/19/2015 In Compliance KHAN_MR_1 35/1 Routine Compliance
 
Record Document 11/18/2015 Satisfied KHAN_MR_1 Routine Compliance
 
Site Inspection 12/31/2013 In Compliance KHAN_MR_1 35/1 Routine Compliance
 
Site Inspection 07/20/2011 In Compliance KHAN_MR_1 35/1 Routine Compliance
 
Site Inspection 02/16/2011 In Compliance KHAN_MR_1 35/1 Routine Compliance
 
Engineering Request 03/31/2010 Satisfied KHAN_MR_1 Routine Compliance
 
Site Inspection 03/18/2010 In Compliance KHAN_MR_1 35/1 Routine Compliance
 
Site Inspection 05/05/2009 In Compliance KHAN_MR_1 34/1 Routine Compliance
 
Site Inspection 04/28/2008 In Compliance BRAZILE_DO_1 25/0 Routine Compliance
 
Emergency Preparedness Information 04/24/2008 Satisfied BRAZILE_DO_1 Routine Compliance
 
Site Inspection 05/15/2007 In Compliance KHAN_MR_1 25/0 Routine Compliance
 
Emergency Preparedness Information 02/20/2007 Satisfied BRAZILE_DO_1 Routine Compliance
 
Site Inspection 05/18/2006 In Compliance BRAZILE_DO_1 25/0 Routine Compliance
 
 
 
No Open AOCs Found
 
 
Open Violations
 
Insp Date Vio # Significance Violation Text Corrective Action
05/30/2024 7085 Minor 3.11 Cathodic protection not inspected, tested and evaluated within six months of installation or repair, and at least yearly. Factory installed cathodic protection not tested, inspected or evaluated every 3 years. Provide current Cathodic surveys for 1,2,3,5,6A,7,8,9,10A,11A,13A,29WT1, DT1, DT2, DT3 and DT4 to this office for review to clear the violation. Email: Muhammad.Khan@FLHealth.gov
 
 
 
Discharge Information
 
Discharge
Date
  Clean Up
Status
Score Eligibility Info Site Manager Phone
06/09/1988   COMPLETED
 
03/01/1985   ACTIVE 10 EARLY DETECTION INCENTIVE-PARTIAL