DEP Logo Florida Department of
Environmental Protection


Bob Martinez Center
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
Storage Tanks &
Contamination
Monitoring Information
 
Cover Page Report
Report Run Date: 05/09/2025        Last Data Refresh: 05/08/2025        Report Generated from DOPPLER
 
District Northeast   Type    Retail Station
 
County Clay   Status    OPEN
 
ID 8503213   Latitude    30° 10' 44.9875
 
Name FRESH STOP 1402
158 BLANDING BLVD
Longitude    81° 44' 29.0785
  ORANGE PARK, FL 32073-2622 LL Method    DPHO
 
Contact JOSE SAMORA   LL Status    REVIEWED
 
Phone (386) 215-9346   Status Date    11/10/2003
 
Account Owner Information
 
Name CAMERON SQRL ORANGE PARK LLC
4064 COLONY RD STE 315
CHARLOTTE, NC 28211
Effective Date    02/01/2024
 
Contact SCOTT BURCHFIELD / NICOLE MAJKOWICZ 312-506-4180
 
Phone (813) 599-5793
 
Email NICOLE@INCONVENIENCEINC.COM
  Placard # / Date    705221 - 02/21/2025
Property Owner Information
 
Name CAMERON SQRL ORANGE PARK LLC
4064 COLONY RD STE 315
CHARLOTTE, NC 28211
Effective Date    01/26/2024
 
Contact SCOTT BURCHFIELD / NICOLE MAJKOWICZ 312-506-4180
 
Phone (813) 599-5793
 
Email NICOLE@INCONVENIENCEINC.COM
 
 
 
 
 
 
 
 
 
Tank Tank Size Content Installed Placement Status
1R1 12000 Kerosene (K) 11/01/2007 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(F) Fiberglass clad steel
(I) Double wall
(M) Spill containment bucket
(O) Tight fill
(P) Level gauges/alarms
  (C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(3) Electronic monitor pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
2R1 12000 Unleaded Gas (B) 11/01/2007 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(F) Fiberglass clad steel
(I) Double wall
(L) Compartmented
(M) Spill containment bucket
(O) Tight fill
(P) Level gauges/alarms
  (C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(3) Electronic monitor pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
1 8000 Unleaded Gas (B) UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(B) Internal lining
(C) Steel
(H) Impressed current CP
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
  (J) Pressurized piping system
(K) Dispenser liners
(M) Double wall - pipe jacket
(N) Approved synthetic material
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
2 8000 Unleaded Gas (B) UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(B) Internal lining
(C) Steel
(H) Impressed current CP
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
  (J) Pressurized piping system
(K) Dispenser liners
(M) Double wall - pipe jacket
(N) Approved synthetic material
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
4 6000 Vehicular Diesel (D) UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(B) Internal lining
(C) Steel
(H) Impressed current CP
(M) Spill containment bucket
(N) Flow shut-Off
  (J) Pressurized piping system
(K) Dispenser liners
(M) Double wall - pipe jacket
(N) Approved synthetic material
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
5 3000 Kerosene (K) UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(B) Internal lining
(C) Steel
(H) Impressed current CP
(M) Spill containment bucket
(N) Flow shut-Off
  (J) Pressurized piping system
(K) Dispenser liners
(M) Double wall - pipe jacket
(N) Approved synthetic material
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
H 8000 Unleaded Gas (B) UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(B) Internal lining
(C) Steel
(H) Impressed current CP
(M) Spill containment bucket
(N) Flow shut-Off
  (J) Pressurized piping system
(K) Dispenser liners
(M) Double wall - pipe jacket
(N) Approved synthetic material
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
 
 
Insurance Documents
 
FR Type   Effective Date Expiration Date Company Name
INSURANCE   05/22/2021 05/22/2022 CRUM & FORSTER SPECIALTY INS. CO.
INSURANCE   05/22/2017 05/22/2020 CRUM & FORSTER SPECIALTY INS. CO.
INSURANCE   05/22/2015 05/22/2017 CRUM & FORSTER SPECIALTY INS. CO.
INSURANCE   05/22/2014 05/22/2015 CRUM & FORSTER INDEMNITY
INSURANCE   05/22/2012 05/22/2013 ZURICH-AMERICAN
INSURANCE   05/22/2010 05/22/2011 ZURICH-AMERICAN
INSURANCE   05/22/2009 05/22/2010 ZURICH-AMERICAN
INSURANCE   05/22/2008 05/22/2009 ZURICH-AMERICAN
INSURANCE   04/03/1992 04/03/1996 FPLIPA
 
 
Legacy Compliance Activity Information
 
Activity
Code
Date
Initiated
Date
Completed
Results Inspector AST/UST
Count
Description
RRBD 08/20/2005 08/22/2005 COMPLIANCE ASSURANCE
 
RRBD 05/14/2005 06/10/2005 BARNETT_P 0/5 COMPLIANCE ASSURANCE
 
 Completion Notes LD TEST 8/23/04 4/5 TESTED AND PASSED.
 
TCI 04/18/2005 05/02/2005 SIGNIFICANT OUT-OF-COMPLIANCE BARNETT_P 0/5 COMPLIANCE ASSURANCE
 
 Completion Notes LD 3/21/05 4/4 PASS CP SURVEY 8/24/04 5/5 PASS
 
RRBD 03/31/2004 04/06/2004 COMPLIANCE ASSURANCE
 
TCI 03/15/2004 03/29/2004 SIGNIFICANT OUT-OF-COMPLIANCE BARNETT_P 0/5 COMPLIANCE ASSURANCE
 
 Completion Notes TANK TEST 2/4/03 4/5 PASS AND TANK TEST 3/5/03 REMAINING TANK PASS LD TEST 2/4/03 4/4 PASS
 
PDNE 03/11/2003 03/11/2003 BARNETT_P 0/5 COMPLIANCE ASSURANCE
 
 Completion Notes CP SURVEY 11/23/02
 
RRBD 03/10/2003 03/10/2003 BARNETT_P 0/5 COMPLIANCE ASSURANCE
 
 Completion Notes 4/5 TANKS/LINE/LD TESTED 2/24/03 4/4 PASS 5TH TANK TESTED 2/4/03 PASS
 
TCI 01/31/2003 02/06/2003 MINOR OUT-OF-COMPLIANCE BARNETT_P 0/5 COMPLIANCE ASSURANCE
 
 Completion Notes CP SURVEY 11/23/02 TANK/LINES/LD TEST 1/29/02 5/5 PASS
 
TCI 01/23/2002 02/05/2002 MINOR OUT-OF-COMPLIANCE BARNETT_P 0/5 COMPLIANCE ASSURANCE
 
 Completion Notes TANK/LINE/LD TEST 11/7/00 5/5 PASS CP INSTALLED 2/2001
 
RRBD 02/28/2001 03/01/2001 COMPLIANCE ASSURANCE
 
RRBD 11/10/2000 11/27/2000 COMPLIANCE ASSURANCE
 
TCI 11/09/2000 11/27/2000 MINOR OUT-OF-COMPLIANCE BARNETT_P 0/5 COMPLIANCE ASSURANCE
 
TCI 10/07/1999 10/11/1999 IN-COMPLIANCE BARNETT_P 0/5 COMPLIANCE ASSURANCE
 
 
 
Compliance Activity Information
 
Activity
Code
Date
Completed
Results Inspector AST/UST
Count
Description
Letter 11/07/2024 Satisfied MCNEIL_A Enforcement
 
Enforcement Referral 09/11/2024 Accepted HARRINGTON_RD_1 Enforcement
 
Letter 06/09/2024 Satisfied HARRINGTON_RD_1 Compliance Assistance
 
Electronic Communication 06/09/2024 Satisfied HARRINGTON_RD_1 Routine Compliance
 
Electronic Communication 06/09/2024 Satisfied HARRINGTON_RD_1 Compliance Assistance
 
Site Inspection 06/09/2024 Major Out of Compliance HARRINGTON_RD_1 0/2 Routine Compliance
 
Electronic Communication 05/06/2024 Satisfied HARRINGTON_RD_1 Compliance Assistance
 
Enforcement Tracking 06/28/2022 Closed Without Enforcement QUICK_V Enforcement
 
Letter 06/28/2022 Satisfied QUICK_V Enforcement
 
Document Management 06/14/2022 Satisfied QUICK_V Enforcement
 
Letter 06/13/2022 Satisfied QUICK_V Enforcement
 
Electronic Communication 12/31/2021 Satisfied HARRINGTON_RD_1 Routine Compliance
 
Letter 12/31/2021 Satisfied HARRINGTON_RD_1 Compliance Assistance
 
Site Inspection 12/26/2021 Major Out of Compliance HARRINGTON_RD_1 0/2 Routine Compliance
 
Enforcement Referral 10/15/2021 Accepted COLE_K Enforcement
 
Record Document 04/19/2020 Satisfied HARRINGTON_RD_1 Compliance Assistance
 
Electronic Communication 02/02/2020 Satisfied HARRINGTON_RD_1 Routine Compliance
 
Electronic Communication 02/02/2020 Satisfied HARRINGTON_RD_1 Compliance Assistance
 
Letter 02/02/2020 Satisfied HARRINGTON_RD_1 Compliance Assistance
 
Site Inspection 02/02/2020 Major Out of Compliance HARRINGTON_RD_1 0/2 Routine Compliance
 
Discharge Reporting 01/09/2020 Satisfied HARRINGTON_RD_1 Discharge
 
Issue Document 10/04/2017 Satisfied OBRIEN_S Discharge
 
Electronic Communication 07/03/2017 Satisfied HILL_K Discharge
 
Issue Document 06/19/2017 Satisfied HILL_K Discharge
 
Record Document 06/16/2017 Satisfied HILL_K Discharge
 
Site Inspection 05/25/2017 In Compliance HARRINGTON_RD_1 0/2 Non-Compliance
 
Electronic Communication 05/15/2017 Satisfied HILL_K Discharge
 
Electronic Communication 05/15/2017 Satisfied HILL_K Discharge
 
Letter 03/28/2017 Satisfied HARRINGTON_RD_1 Non-Compliance
 
Site Inspection 03/28/2017 Minor Out of Compliance HARRINGTON_RD_1 0/2 Routine Compliance
 
Electronic Communication 02/28/2017 Satisfied DEFALCO_L Discharge
 
Record Document 01/26/2017 Satisfied DEFALCO_L Discharge
 
Issue Document 01/26/2017 Satisfied DEFALCO_L Discharge
 
Record Document 12/30/2016 Satisfied DEFALCO_L Discharge
 
Issue Document 12/30/2016 Satisfied DEFALCO_L Discharge
 
Record Document 10/04/2016 Satisfied DEFALCO_L Discharge
 
Issue Document 10/04/2016 Satisfied DEFALCO_L Discharge
 
Record Document 09/22/2016 Satisfied DEFALCO_L Discharge
 
Issue Document 09/22/2016 Satisfied DEFALCO_L Discharge
 
Issue Document 09/08/2016 Satisfied DEFALCO_L Discharge
 
Record Document 09/08/2016 Satisfied DEFALCO_L Discharge
 
Issue Document 09/08/2016 Satisfied DEFALCO_L Discharge
 
Record Document 09/08/2016 Satisfied DEFALCO_L Discharge
 
Electronic Communication 09/08/2016 Satisfied DEFALCO_L Discharge
 
Issue Document 08/10/2016 Satisfied DEFALCO_L Discharge
 
Record Document 08/10/2016 Satisfied DEFALCO_L Discharge
 
Issue Document 06/24/2016 Satisfied DEFALCO_L Discharge
 
Record Document 06/24/2016 Satisfied DEFALCO_L Discharge
 
Issue Document 06/03/2016 Satisfied DEFALCO_L Discharge
 
Record Document 06/03/2016 Satisfied DEFALCO_L Discharge
 
Record Document 04/26/2016 Satisfied DEFALCO_L Discharge
 
Issue Document 04/26/2016 Satisfied DEFALCO_L Discharge
 
Record Document 03/07/2016 Satisfied DEFALCO_L Discharge
 
Issue Document 03/07/2016 Satisfied DEFALCO_L Discharge
 
Record Document 02/22/2016 Satisfied DEFALCO_L Discharge
 
Issue Document 02/22/2016 Satisfied DEFALCO_L Discharge
 
Record Document 01/25/2016 Satisfied DEFALCO_L Discharge
 
Issue Document 01/25/2016 Satisfied DEFALCO_L Discharge
 
Issue Document 11/12/2015 Satisfied DEFALCO_L Discharge
 
Record Document 11/12/2015 Satisfied DEFALCO_L Discharge
 
Issue Document 07/30/2015 Satisfied KENNEDY_G Discharge
 
Record Document 07/30/2015 Satisfied KENNEDY_G Discharge
 
Electronic Communication 05/27/2015 Satisfied HARRINGTON_RD_1 Routine Compliance
 
Issue Document 05/18/2015 Satisfied DEFALCO_L Discharge
 
Record Document 05/18/2015 Satisfied DEFALCO_L Discharge
 
Letter 04/28/2015 Satisfied HARRINGTON_RD_1 Non-Compliance
 
Electronic Communication 04/24/2015 Satisfied DEFALCO_L Discharge
 
Record Document 04/09/2015 Satisfied HARRINGTON_RD_1 Non-Compliance
 
Emergency Preparedness Information 03/24/2015 Satisfied HARRINGTON_RD_1 Routine Compliance
 
Site Inspection 03/24/2015 Minor Out of Compliance HARRINGTON_RD_1 0/2 Routine Compliance
 
Electronic Communication 03/24/2015 Satisfied HARRINGTON_RD_1 Routine Compliance
 
Record Document 03/19/2015 Satisfied DEFALCO_L Discharge
 
Issue Document 03/19/2015 Satisfied DEFALCO_L Discharge
 
Record Document 01/21/2015 Satisfied DEFALCO_L Discharge
 
Issue Document 01/21/2015 Satisfied DEFALCO_L Discharge
 
Issue Document 01/15/2015 Satisfied DEFALCO_L Discharge
 
Record Document 01/15/2015 Satisfied DEFALCO_L Discharge
 
Issue Document 04/23/2013 Satisfied HARRINGTON_RD_1 Installation
 
Issue Document 04/23/2013 Satisfied HARRINGTON_RD_1 Routine Compliance
 
Issue Document 04/23/2013 Satisfied HARRINGTON_RD_1 Closure
 
Emergency Preparedness Information 04/22/2013 Satisfied HARRINGTON_RD_1 Routine Compliance
 
Site Inspection 04/12/2013 In Compliance HARRINGTON_RD_1 0/2 Installation
 
Electronic Communication 04/10/2013 Satisfied HARRINGTON_RD_1 Closure
 
Site Inspection 04/10/2013 In Compliance HARRINGTON_RD_1 0/2 Closure
 
Site Inspection 03/29/2013 In Compliance HARRINGTON_RD_1 0/2 Routine Compliance
 
Issue Document 02/04/2013 Satisfied DEFALCO_L Discharge
 
Site Inspection 12/27/2012 In Compliance HARRINGTON_RD_1 0/2 Discharge
 
Document Management 12/27/2012 Complete RAMSEY_TH_1 Discharge
 
Record Document 12/26/2012 Satisfied HARRINGTON_RD_1 Discharge
 
Record Document 07/01/2011 Satisfied HARRINGTON_RD_1 Non-Compliance
 
Record Document 03/24/2011 Satisfied HARRINGTON_RD_1 Non-Compliance
 
Letter 03/09/2011 Satisfied HARRINGTON_RD_1 Non-Compliance
 
Site Inspection 03/09/2011 Minor Out of Compliance HARRINGTON_RD_1 0/2 Routine Compliance
 
Record Document 03/15/2010 Satisfied HARRINGTON_RD_1 Non-Compliance
 
Record Document 03/09/2010 Satisfied HARRINGTON_RD_1 Non-Compliance
 
Record Document 03/04/2010 Satisfied HARRINGTON_RD_1 Non-Compliance
 
Site Inspection 03/01/2010 Minor Out of Compliance HARRINGTON_RD_1 0/2 Routine Compliance
 
Letter 03/01/2010 Satisfied HARRINGTON_RD_1 Non-Compliance
 
Record Document 11/02/2009 Satisfied HARRINGTON_RD_1 Non-Compliance
 
Record Document 11/02/2009 Satisfied HARRINGTON_RD_1 Non-Compliance
 
Letter 10/13/2009 Satisfied HARRINGTON_RD_1 Non-Compliance
 
Letter 04/29/2009 Satisfied BARNETT_PC_1 Non-Compliance
 
Site Inspection 04/29/2009 Minor Out of Compliance BARNETT_PC_1 0/2 Routine Compliance
 
Record Document 02/18/2009 Satisfied BARNETT_PC_1 Non-Compliance
 
Site Inspection 05/29/2008 Minor Out of Compliance BARNETT_PC_1 0/2 Routine Compliance
 
Letter 05/29/2008 Satisfied BARNETT_PC_1 Non-Compliance
 
TCAR 03/19/2008 Satisfied BARNETT_PC_1 Closure
 
Site Inspection 12/21/2007 In Compliance BARNETT_PC_1 0/2 Installation
 
Site Inspection 11/30/2007 In Compliance BARNETT_PC_1 0/7 Closure
 
Record Document 07/16/2007 Satisfied BARNETT_PC_1 Non-Compliance
 
Site Inspection 06/28/2007 Minor Out of Compliance BARNETT_PC_1 0/5 Routine Compliance
 
Letter 06/28/2007 Satisfied BARNETT_PC_1 Non-Compliance
 
Emergency Preparedness Information 05/22/2007 Satisfied HARRINGTON_RD_1 Routine Compliance
 
Emergency Preparedness Information 02/09/2007 Satisfied BARNETT_PC_1 Routine Compliance
 
Emergency Preparedness Information 09/21/2006 Satisfied BARNETT_PC_1 Routine Compliance
 
Site Inspection 05/30/2006 In Compliance BARNETT_PC_1 0/5 Routine Compliance
 
 
 
No Open AOCs Found
 
 
Open Violations
 
Insp Date Vio # Significance Violation Text Corrective Action
06/09/2024 6001 Minor 2.1 No reasonable access provided. Please contact inspector to schedule re-inspection and to discuss records that are needed for the tanks.
 
06/09/2024 6011 SNC-B 2.8 No financial responsibility instrument or expired instrument for < 180 days. Please provide current Storage Tank Financial Responsibility - policy and CFR. (The CFR Form will be sent to the facility with this report).
 
 
 
Discharge Information
 
Discharge
Date
  Clean Up
Status
Score Eligibility Info Site Manager Phone
12/12/2012   INACTIVE
 
11/01/1987   ACTIVE 57 EARLY DETECTION INCENTIVE-ELIGIBLE