![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Northeast | Type | Retail Station | ||||||||
County | Clay | Status | OPEN | ||||||||
ID | 8503247 | Latitude | 30° 10' .6446 | ||||||||
Name |
JACKSONVILLE 76 PETROLEUM LLC 364 BLANDING 364 BLANDING BLVD |
Longitude | 81° 44' 53.7073 | ||||||||
ORANGE PARK, FL 32073-4323 | LL Method | DPHO | |||||||||
Contact | HANI BASKARON | LL Status | REVIEWED | ||||||||
Phone | (714) 794-7630 | Status Date | 11/10/2003 | ||||||||
Account Owner Information | |||||||||||
Name | JACKSONVILLE 76 PETROLEUM LLC 780 E RAMSEY ST BANNING, CA 92220 |
Effective Date | 12/15/2020 | ||||||||
Contact | HANI BASKARON | ||||||||||
Phone | (714) 794-7630 | ||||||||||
HSBPETRO@YAHOO.COM | |||||||||||
Placard # / Date | 694756 - 06/25/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | PLAZA STREET PARTNERS (FUND 115 LLC) 2400 W 75TH ST ,SU#220 PRAIRIE VILLAGE, KS 66208 |
Effective Date | 12/15/2020 | ||||||||
Contact | BRET ELLIOT | ||||||||||
Phone | (913) 683-9459 | ||||||||||
BELLIOTT@PLAZASTREETPARTNERS.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
8 | 12000 | Unleaded Gas (B) | 10/01/2009 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
9 | 12000 | Unleaded Gas (B) | 10/01/2009 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (F) Fiberglass clad steel (I) Double wall (L) Compartmented (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 10000 | Leaded Gas (A) | 12/01/1982 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(B) Steel/galvanized metal | (8) Manually sampled wells (H) Mechanical line leak detector |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 10000 | Unleaded Gas (B) | 06/01/1976 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(B) Steel/galvanized metal | (8) Manually sampled wells (H) Mechanical line leak detector |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 10000 | Unleaded Gas (B) | 06/01/1976 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(B) Steel/galvanized metal | (8) Manually sampled wells (H) Mechanical line leak detector |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 10000 | Vehicular Diesel (D) | 06/01/1976 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(B) Steel/galvanized metal | (8) Manually sampled wells (H) Mechanical line leak detector |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 10000 | Unleaded Gas (B) | 01/01/1987 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 10000 | Unleaded Gas (B) | 01/01/1987 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 10000 | Unleaded Gas (B) | 01/01/1987 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | CRUM & FORSTER SPECIALTY INS. CO. | ||||||||||
INSURANCE | 11/13/2022 | 11/13/2023 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 11/13/2021 | 11/13/2022 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 11/13/2020 | 11/13/2021 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 08/29/2020 | 08/29/2021 | CRUM & FORSTER SPECIALTY INS. CO. | ||||||||
INSURANCE | 08/29/2019 | 08/29/2020 | CRUM & FORSTER SPECIALTY INS. CO. | ||||||||
INSURANCE | 08/17/2018 | 08/17/2019 | CRUM & FORSTER SPECIALTY INS. CO. | ||||||||
INSURANCE | 12/18/2016 | 12/18/2017 | UNITED SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 12/18/2016 | 12/18/2017 | CRUM & FORSTER SPECIALTY INS. CO. | ||||||||
INSURANCE | 12/18/2015 | 12/18/2016 | CRUM & FORSTER SPECIALTY INS. CO. | ||||||||
INSURANCE | 04/23/2013 | 04/23/2014 | AMERICAN SAFETY INDEMNITY CO | ||||||||
INSURANCE | 04/02/2012 | 04/02/2013 | HUDSON SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 04/02/2011 | 04/02/2012 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 04/02/2010 | 04/02/2011 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 04/02/2010 | 04/02/2011 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 04/02/2009 | 04/02/2010 | ZURICH-AMERICAN | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 05/10/2005 | 05/27/2005 | IN-COMPLIANCE | BARNETT_P | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes ANNUAL OPERABILITY 5/27/04 LD TEST 5/27/04 3/3 PASS | |||||||||||
TCI | 05/27/2004 | 06/09/2004 | IN-COMPLIANCE | BARNETT_P | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes LINE/LD TEST 5/27/04 | |||||||||||
RRBD | 06/10/2003 | 06/11/2003 | COMPLIANCE ASSURANCE | ||||||||
TCI | 04/18/2003 | 05/02/2003 | MINOR OUT-OF-COMPLIANCE | BARNETT_P | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes PLLD FOR PIPING - ATG CERTIFICATION 4/16/03 | |||||||||||
TCI | 03/22/2002 | 03/28/2002 | IN-COMPLIANCE | BARNETT_P | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 03/30/2001 | 04/02/2001 | IN-COMPLIANCE | BARNETT_P | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 03/29/2000 | 03/31/2000 | IN-COMPLIANCE | BARNETT_P | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 04/15/1999 | 04/19/1999 | BARNETT_P | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 03/31/1999 | 04/05/1999 | MINOR OUT-OF-COMPLIANCE | BARNETT_P | 0/3 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Enforcement Referral | 01/30/2024 | Accepted | HARRINGTON_RD_1 | Enforcement | |||||||
Electronic Communication | 01/28/2024 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Electronic Communication | 11/12/2023 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Letter | 11/12/2023 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Electronic Communication | 11/12/2023 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Site Inspection | 11/03/2023 | Minor Out of Compliance | HARRINGTON_RD_1 | 0/2 | Routine Compliance | ||||||
Letter | 12/30/2021 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Record Document | 12/30/2021 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Letter | 11/28/2021 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Electronic Communication | 11/28/2021 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Electronic Communication | 11/28/2021 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Site Inspection | 11/22/2021 | Minor Out of Compliance | HARRINGTON_RD_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 11/18/2019 | In Compliance | HARRINGTON_RD_1 | 0/2 | Routine Compliance | ||||||
Letter | 11/18/2019 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Electronic Communication | 11/18/2019 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Electronic Communication | 11/18/2019 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Site Inspection | 11/17/2017 | In Compliance | HARRINGTON_RD_1 | 0/2 | Routine Compliance | ||||||
Issue Document | 11/17/2017 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Electronic Communication | 11/17/2017 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Electronic Communication | 10/24/2017 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Electronic Communication | 10/24/2017 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Record Document | 05/31/2016 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Site Inspection | 05/31/2016 | In Compliance | HARRINGTON_RD_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 05/31/2016 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Phone Conversation | 05/13/2016 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 11/22/2013 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Electronic Communication | 11/22/2013 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Site Inspection | 11/22/2013 | In Compliance | HARRINGTON_RD_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 01/12/2012 | In Compliance | HARRINGTON_RD_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 01/12/2012 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 02/01/2011 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Site Inspection | 02/01/2011 | In Compliance | HARRINGTON_RD_1 | 0/2 | Routine Compliance | ||||||
Letter | 10/15/2010 | Satisfied | BARNETT_PC_1 | Closure | |||||||
TCAR | 10/15/2010 | Satisfied | BARNETT_PC_1 | Closure | |||||||
Site Inspection | 04/16/2010 | In Compliance | HARRINGTON_RD_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 12/14/2009 | In Compliance | HARRINGTON_RD_1 | 0/2 | Installation | ||||||
Site Inspection | 12/11/2009 | In Compliance | BARNETT_PC_1 | 0/3 | Closure | ||||||
TCAR | 08/12/2009 | Satisfied | BARNETT_PC_1 | Closure | |||||||
Letter | 08/12/2009 | Satisfied | BARNETT_PC_1 | Closure | |||||||
Site Inspection | 07/12/2009 | In Compliance | BARNETT_PC_1 | 0/3 | Closure | ||||||
Site Inspection | 07/12/2009 | In Compliance | BARNETT_PC_1 | 0/3 | Installation | ||||||
Site Inspection | 03/18/2009 | In Compliance | BARNETT_PC_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 04/09/2008 | In Compliance | BROWN_JZ | 0/3 | Routine Compliance | ||||||
Site Inspection | 04/20/2007 | In Compliance | BARNETT_PC_1 | 0/7 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/09/2007 | Satisfied | BARNETT_PC_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/21/2006 | Satisfied | BARNETT_PC_1 | Routine Compliance | |||||||
Record Document | 08/10/2006 | Satisfied | BARNETT_PC_1 | Non-Compliance | |||||||
Letter | 05/18/2006 | Satisfied | BARNETT_PC_1 | Non-Compliance | |||||||
Site Inspection | 04/28/2006 | Minor Out of Compliance | BARNETT_PC_1 | 0/3 | Routine Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
11/03/2023 | 6053 | Minor | 4.7 Primary overfill protection not provided, registered, or tested as required. | Provide current overfill prevention function test result documentation. | |||||||
11/03/2023 | 6062 | Minor | 2.5 Release detection devices not tested annually. | Provide current sensor and line leak detector function test result documentation. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
01/24/1990 | INACTIVE | 6 | PETROLEUM LIABILITY AND RESTORATION INSURANCE PROGRAM-ELIGIBLE | ||||||||