Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
||||||||||
Cover Page Report | |||||||||||
Report Run Date: 01/22/2025 Last Data Refresh: 01/21/2025 Report Generated from DOPPLER | |||||||||||
District | Northeast | Type | Retail Station | ||||||||
County | Clay | Status | OPEN | ||||||||
ID | 8503272 | Latitude | 30° 7' 14.0367 | ||||||||
Name |
SAFEWAY OF FLEMING ISLAND 4305 US 17 N |
Longitude | 81° 42' 15.1871 | ||||||||
FLEMING ISLAND, FL 32003 | LL Method | DPHO | |||||||||
Contact | HANIR SAFAR | LL Status | REVIEWED | ||||||||
Phone | (904) 294-5955 | Status Date | 11/07/2003 | ||||||||
Account Owner Information | |||||||||||
Name | SAFEWAY OF FLEMING ISLAND 8509 HUNTERS CREEK DR N JACKSONVILLE, FL 32256 |
Effective Date | 01/26/2021 | ||||||||
Contact | HANI SAFAR | ||||||||||
Phone | (904) 294-5955 | ||||||||||
ZAIDALMAN@AOL.COM | |||||||||||
Placard # / Date | 686211 - 06/10/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | 4305 LHM PROPERTY 8509 HUNTERS CREEK DR N JACKSONVILLE, FL 32256 |
Effective Date | 01/26/2021 | ||||||||
Contact | HANI SAFAR | ||||||||||
Phone | (904) 294-5955 | ||||||||||
ZAIDALMAN@AOL.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 15000 | Unleaded Gas (B) | 03/01/2006 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (O) Tight fill |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 15000 | Unleaded Gas (B) | 03/01/2006 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (I) Double wall (L) Compartmented (M) Spill containment bucket (O) Tight fill |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 8000 | Unleaded Gas (B) | 06/01/1977 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (B) Internal lining (C) Steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 8000 | Unleaded Gas (B) | 06/01/1977 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (B) Internal lining (C) Steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 6000 | Unleaded Gas (B) | 02/01/1989 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 10/28/2022 | 10/28/2023 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 02/02/2021 | 02/02/2022 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 12/01/2016 | 12/01/2018 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2015 | 12/01/2016 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 11/01/2014 | 11/01/2015 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 11/01/2013 | 11/01/2014 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 11/01/2012 | 11/01/2013 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 11/01/2011 | 11/01/2012 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 11/01/2010 | 11/01/2011 | ENDURANCE AMERICAN SPECIALTY INS CO | ||||||||
INSURANCE | 11/01/2009 | 11/01/2010 | ENDURANCE AMERICAN SPECIALTY INS CO | ||||||||
INSURANCE | 11/01/2007 | 11/01/2008 | HUDSON SPECIALTY INSURANCE COMPANY | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TIN | 02/13/2006 | 03/09/2006 | IN-COMPLIANCE | BARNETT_P | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes INSTALLATION OF TWO DOUBLEWALL TANKS | |||||||||||
TXI | 02/08/2006 | 03/09/2006 | IN-COMPLIANCE | BARNETT_P | /3 | COMPLIANCE ASSURANCE | |||||
Completion Notes CLOSED IN PLACE WITH FOAM | |||||||||||
RRBD | 05/05/2005 | 05/06/2005 | COMPLIANCE ASSURANCE | ||||||||
TCI | 03/24/2005 | 04/12/2005 | MINOR OUT-OF-COMPLIANCE | BARNETT_P | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes TANK TEST 2/6/04 3/3 PASS LDD TEST 2/18/05 3/3 PASS | |||||||||||
TCI | 03/11/2004 | 03/29/2004 | IN-COMPLIANCE | BARNETT_P | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes LD 7/8/03 3/3 PASS TANK TEST 5/8/02 3/3 PASS | |||||||||||
TCI | 03/27/2003 | 04/04/2003 | IN-COMPLIANCE | BARNETT_P | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes TANK/LINE/LD TEST 5/8/02 3/3 PASS | |||||||||||
TCI | 03/11/2002 | 04/05/2002 | IN-COMPLIANCE | BARNETT_P | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 03/14/2001 | 04/05/2002 | IN-COMPLIANCE | BARNETT_P | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 03/14/2000 | 03/31/2000 | IN-COMPLIANCE | BARNETT_P | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 05/03/1999 | 05/21/1999 | BARNETT_P | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 04/06/1999 | 04/09/1999 | MINOR OUT-OF-COMPLIANCE | BARNETT_P | 0/3 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Letter | 11/14/2024 | Satisfied | STERLING_C | Enforcement | |||||||
Enforcement Referral | 10/03/2024 | Accepted | HARRINGTON_RD_1 | Enforcement | |||||||
Electronic Communication | 03/19/2023 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Letter | 03/19/2023 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Site Inspection | 03/10/2023 | Major Out of Compliance | HARRINGTON_RD_1 | 0/2 | Compliance Assistance | ||||||
Electronic Communication | 01/15/2023 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Electronic Communication | 10/30/2022 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Electronic Communication | 10/30/2022 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Letter | 10/30/2022 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Site Inspection | 10/28/2022 | Major Out of Compliance | HARRINGTON_RD_1 | 0/2 | Routine Compliance | ||||||
Letter | 02/08/2022 | Satisfied | QUICK_V | Enforcement | |||||||
Enforcement Tracking | 02/08/2022 | Closed Without Enforcement | QUICK_V | Enforcement | |||||||
Document Management | 01/27/2022 | Satisfied | QUICK_V | Enforcement | |||||||
Enforcement Referral | 09/14/2021 | Accepted | HARRINGTON_RD_1 | Enforcement | |||||||
Electronic Communication | 07/13/2021 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Phone Conversation | 06/08/2021 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Phone Conversation | 06/08/2021 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Meeting | 06/08/2021 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Electronic Communication | 04/06/2021 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Letter | 04/06/2021 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Site Inspection | 04/02/2021 | Major Out of Compliance | HARRINGTON_RD_1 | 0/2 | Routine Compliance | ||||||
Letter | 07/15/2018 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Record Document | 07/15/2018 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Electronic Communication | 02/06/2018 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Letter | 02/06/2018 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Site Inspection | 02/06/2018 | Minor Out of Compliance | HARRINGTON_RD_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 02/06/2018 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Phone Conversation | 04/22/2016 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Electronic Communication | 04/22/2016 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Site Inspection | 04/22/2016 | In Compliance | HARRINGTON_RD_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 08/25/2014 | Satisfied | HARRINGTON_RD_1 | Installation | |||||||
Record Document | 08/25/2014 | Satisfied | HARRINGTON_RD_1 | Installation | |||||||
Record Document | 08/25/2014 | Satisfied | HARRINGTON_RD_1 | Closure | |||||||
Site Inspection | 08/25/2014 | In Compliance | HARRINGTON_RD_1 | 0/2 | Installation | ||||||
Site Inspection | 08/25/2014 | In Compliance | HARRINGTON_RD_1 | 0/2 | Closure | ||||||
Electronic Communication | 08/25/2014 | Satisfied | HARRINGTON_RD_1 | Closure | |||||||
Electronic Communication | 05/30/2014 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Site Inspection | 05/30/2014 | In Compliance | HARRINGTON_RD_1 | 0/2 | Routine Compliance | ||||||
Meeting | 01/23/2014 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Site Inspection | 04/10/2012 | In Compliance | HARRINGTON_RD_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 04/10/2012 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Site Inspection | 04/11/2011 | In Compliance | HARRINGTON_RD_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 11/18/2010 | In Compliance | BARNETT_PC_1 | 0/2 | Installation | ||||||
Site Inspection | 11/24/2009 | In Compliance | HARRINGTON_RD_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 03/14/2008 | In Compliance | BARNETT_PC_1 | 0/2 | Routine Compliance | ||||||
Letter | 05/01/2007 | Satisfied | BARNETT_PC_1 | Non-Compliance | |||||||
Site Inspection | 03/23/2007 | In Compliance | BARNETT_PC_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/07/2007 | Satisfied | BARNETT_PC_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/19/2006 | Satisfied | BARNETT_PC_1 | Routine Compliance | |||||||
Record Document | 08/08/2006 | Satisfied | BARNETT_PC_1 | Non-Compliance | |||||||
Site Inspection | 04/11/2006 | Minor Out of Compliance | BARNETT_PC_1 | 0/2 | Routine Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
03/10/2023 | 6002 | Minor | 2.1 Operator Training records not available. | Please provide C Level Tank Operator Certificates. | |||||||
03/10/2023 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Provide current STP sump Integrity test result documentation. | |||||||
03/10/2023 | 6013 | Minor | 2.10 Appropriate paperwork for financial responsibility improperly completed or maintained. | Please provide the current CFR. | |||||||
03/10/2023 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | Please address the corrosion issue in the 87 stp sump. Provide verification. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
07/31/1991 | COMPLETED | 46 | PETROLEUM LIABILITY AND RESTORATION INSURANCE PROGRAM-ELIGIBLE | ||||||||