![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Northeast | Type | Retail Station | ||||||||
County | Clay | Status | OPEN | ||||||||
ID | 8503289 | Latitude | 30° 4' 21.2158 | ||||||||
Name |
S & N OF FLORIDA INC 2476 BLANDING BLVD |
Longitude | 81° 51' 54.2472 | ||||||||
MIDDLEBURG, FL 32068-5162 | LL Method | DGPS | |||||||||
Contact | STEVE TRAN | LL Status | REVIEWED | ||||||||
Phone | (508) 344-4384 | Status Date | 11/05/2003 | ||||||||
Account Owner Information | |||||||||||
Name | S & N OF FLORIDA LLC 2476 BLANDING BLVD MIDDLEBURG, FL 32068 |
Effective Date | 04/21/2014 | ||||||||
Contact | STEVE TRAN | ||||||||||
Phone | (508) 344-4384 | ||||||||||
STATIONTEXACO@YAHOO.COM | |||||||||||
Placard # / Date | 693807 - 06/24/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | S & N OF FLORIDA LLC 2476 BLANDING BLVD MIDDLEBURG, FL 32068 |
Effective Date | 04/21/2014 | ||||||||
Contact | STEVE TRAN | ||||||||||
Phone | (508) 344-4384 | ||||||||||
STATIONTEXACO@YAHOO.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 12000 | Unleaded Gas (B) | 04/01/1998 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (I) Double wall (L) Compartmented (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
8 | 12000 | Unleaded Gas (B) | 04/01/1998 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (I) Double wall (L) Compartmented (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 10000 | Unleaded Gas (B) | 11/01/1981 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel (M) Spill containment bucket |
(C) Fiberglass | (T) Annual tightness test/Inventory | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 10000 | Unleaded Gas (B) | 11/01/1981 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel (M) Spill containment bucket |
(C) Fiberglass | (T) Annual tightness test/Inventory | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 10000 | Unleaded Gas (B) | 11/01/1981 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel (M) Spill containment bucket |
(C) Fiberglass | (T) Annual tightness test/Inventory | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 4000 | Vehicular Diesel (D) | 11/01/1981 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel (M) Spill containment bucket |
(C) Fiberglass | (T) Annual tightness test/Inventory | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 3000 | Vehicular Diesel (D) | 11/01/1981 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel (M) Spill containment bucket |
(C) Fiberglass | (T) Annual tightness test/Inventory | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 3000 | Kerosene (K) | 11/01/1981 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel (M) Spill containment bucket |
(C) Fiberglass | (T) Annual tightness test/Inventory | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 06/08/2021 | 06/08/2023 | COMMERCE AND INDUSTRY INSURANCE COMPANY | ||||||||
INSURANCE | 06/08/2020 | 06/08/2021 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 04/16/2017 | 04/16/2018 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 04/16/2016 | 04/16/2017 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 04/16/2015 | 04/16/2016 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 04/16/2014 | 04/16/2015 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 09/01/2011 | 09/01/2012 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 09/01/2010 | 09/01/2011 | COMMERCIAL INSURANCE | ||||||||
INSURANCE | 09/07/2009 | 09/07/2010 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 09/07/2008 | 09/07/2009 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 06/19/1992 | 08/01/1996 | FPLIPA | ||||||||
INSURANCE | 08/31/1989 | 11/01/1991 | FPLIPA | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
RRBD | 08/22/2005 | 08/22/2005 | COMPLIANCE ASSURANCE | ||||||||
TCI | 04/18/2005 | 05/02/2005 | MINOR OUT-OF-COMPLIANCE | BARNETT_P | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes LD TEST 2/15/05 4/4 PASS ANNUAL OPERABILITY 2/15/05 PASS | |||||||||||
RRBD | 03/31/2004 | 04/06/2004 | COMPLIANCE ASSURANCE | ||||||||
RRBD | 03/30/2004 | 03/31/2004 | COMPLIANCE ASSURANCE | ||||||||
TCI | 03/15/2004 | 03/29/2004 | MINOR OUT-OF-COMPLIANCE | BARNETT_P | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes LD TEST 2/17/04 4/4 PASS | |||||||||||
PDNE | 06/24/2003 | 06/24/2003 | COMPLIANCE ASSURANCE | ||||||||
TCI | 01/14/2003 | 01/23/2003 | MINOR OUT-OF-COMPLIANCE | BARNETT_P | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes LEAK DETECTOR TEST 1/8/03 4/4 PASS MONTHLY VISUAL CHECKS INCLUDING INTERSTICE | |||||||||||
TCI | 12/17/2001 | 12/17/2001 | MINOR OUT-OF-COMPLIANCE | BARNETT_P | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes MANUALLY CHECKED INTERSTICE / COAXIAL FILLS HAVE FLOW SHUTOFF / LEAK DETECTOR TEST 12/3/01 4/4 PASS | |||||||||||
RRBD | 12/15/2000 | 12/18/2000 | COMPLIANCE ASSURANCE | ||||||||
TCI | 11/13/2000 | 11/27/2000 | MINOR OUT-OF-COMPLIANCE | BARNETT_P | 0/2 | COMPLIANCE ASSURANCE | |||||
RRBD | 12/01/1999 | 12/01/1999 | BARNETT_P | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 09/13/1999 | 09/16/1999 | MINOR OUT-OF-COMPLIANCE | BARNETT_P | 0/2 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Letter | 02/25/2025 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Electronic Communication | 02/25/2025 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Site Inspection | 02/24/2025 | Major Out of Compliance | HARRINGTON_RD_1 | 0/2 | Routine Compliance | ||||||
Phone Conversation | 01/31/2024 | Satisfied | MILLS_MM | Enforcement | |||||||
Phone Conversation | 01/12/2024 | Satisfied | MILLS_MM | Enforcement | |||||||
Phone Conversation | 12/06/2023 | Satisfied | MILLS_MM | Enforcement | |||||||
Letter | 11/02/2023 | Satisfied | MILLS_MM | Enforcement | |||||||
Electronic Communication | 05/29/2023 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Letter | 05/29/2023 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Site Inspection | 05/26/2023 | Major Out of Compliance | HARRINGTON_RD_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 05/07/2023 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Meeting | 05/07/2023 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Enforcement Referral | 09/08/2022 | Accepted | MACK_BT | Enforcement | |||||||
Enforcement Tracking | 09/08/2022 | Closed Without Enforcement | SACCHITELLO_E | Enforcement | |||||||
Enforcement Tracking | 04/22/2021 | Closed Without Enforcement | HILL_K | Enforcement | |||||||
Letter | 02/07/2021 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Meeting | 02/07/2021 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Site Inspection | 02/07/2021 | Major Out of Compliance | HARRINGTON_RD_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 02/07/2021 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Enforcement Referral | 06/23/2020 | Accepted | HARRINGTON_RD_1 | Enforcement | |||||||
Electronic Communication | 06/19/2020 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Letter | 03/18/2018 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Site Inspection | 03/05/2018 | Minor Out of Compliance | HARRINGTON_RD_1 | 0/2 | Routine Compliance | ||||||
Letter | 09/29/2017 | Satisfied | OBRIEN_S | Compliance Assistance | |||||||
Letter | 09/26/2017 | Satisfied | OBRIEN_S | Compliance Assistance | |||||||
Letter | 06/30/2017 | Satisfied | HILL_K | Enforcement | |||||||
Site Inspection | 06/26/2017 | Minor Out of Compliance | OBRIEN_S | 0/2 | Enforcement | ||||||
Electronic Communication | 06/26/2017 | Satisfied | OBRIEN_S | Enforcement | |||||||
Phone Conversation | 06/26/2017 | Satisfied | OBRIEN_S | Enforcement | |||||||
Phone Conversation | 05/24/2017 | Satisfied | OBRIEN_S | Enforcement | |||||||
Electronic Communication | 05/24/2017 | Satisfied | OBRIEN_S | Enforcement | |||||||
Phone Conversation | 05/24/2017 | Satisfied | OBRIEN_S | Enforcement | |||||||
Phone Conversation | 05/24/2017 | Satisfied | OBRIEN_S | Enforcement | |||||||
Phone Conversation | 05/24/2017 | Satisfied | OBRIEN_S | Enforcement | |||||||
Phone Conversation | 05/24/2017 | Satisfied | OBRIEN_S | Enforcement | |||||||
Phone Conversation | 05/24/2017 | Satisfied | OBRIEN_S | Enforcement | |||||||
Electronic Communication | 05/18/2017 | Satisfied | OBRIEN_S | Enforcement | |||||||
Phone Conversation | 05/10/2017 | Satisfied | OBRIEN_S | Enforcement | |||||||
Electronic Communication | 04/28/2017 | Satisfied | OBRIEN_S | Enforcement | |||||||
Phone Conversation | 04/19/2017 | Satisfied | OBRIEN_S | Enforcement | |||||||
Electronic Communication | 04/10/2017 | Satisfied | OBRIEN_S | Enforcement | |||||||
Phone Conversation | 03/13/2017 | Satisfied | DEFALCO_L | Enforcement | |||||||
Electronic Communication | 02/27/2017 | Satisfied | DEFALCO_L | Enforcement | |||||||
Phone Conversation | 02/27/2017 | Satisfied | DEFALCO_L | Enforcement | |||||||
Enforcement Referral | 12/29/2016 | Accepted | HARRINGTON_RD_1 | Enforcement | |||||||
Letter | 10/10/2016 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Electronic Communication | 05/18/2016 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Letter | 05/18/2016 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Site Inspection | 05/18/2016 | Minor Out of Compliance | HARRINGTON_RD_1 | 0/2 | Routine Compliance | ||||||
Phone Conversation | 09/22/2014 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Letter | 04/25/2014 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Site Inspection | 04/25/2014 | Minor Out of Compliance | HARRINGTON_RD_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 04/25/2014 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Site Inspection | 03/22/2012 | In Compliance | HARRINGTON_RD_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 03/22/2012 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Record Document | 07/05/2011 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Letter | 06/21/2011 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Letter | 04/01/2011 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Site Inspection | 04/01/2011 | Minor Out of Compliance | HARRINGTON_RD_1 | 0/2 | Routine Compliance | ||||||
Record Document | 07/12/2010 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Letter | 03/09/2010 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Site Inspection | 03/09/2010 | Minor Out of Compliance | HARRINGTON_RD_1 | 0/2 | Routine Compliance | ||||||
Record Document | 12/01/2009 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Letter | 10/13/2009 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Record Document | 04/30/2009 | Satisfied | BARNETT_PC_1 | Non-Compliance | |||||||
Letter | 04/30/2009 | Satisfied | BARNETT_PC_1 | Non-Compliance | |||||||
Site Inspection | 04/30/2009 | Minor Out of Compliance | BARNETT_PC_1 | 0/2 | Routine Compliance | ||||||
Record Document | 04/30/2009 | Satisfied | BARNETT_PC_1 | Non-Compliance | |||||||
Letter | 05/30/2008 | Satisfied | BARNETT_PC_1 | Non-Compliance | |||||||
Site Inspection | 05/30/2008 | Minor Out of Compliance | BARNETT_PC_1 | 0/2 | Routine Compliance | ||||||
Record Document | 01/11/2008 | Satisfied | BARNETT_PC_1 | Non-Compliance | |||||||
Letter | 11/29/2007 | Satisfied | BARNETT_PC_1 | Non-Compliance | |||||||
Letter | 06/27/2007 | Satisfied | BARNETT_PC_1 | Non-Compliance | |||||||
Site Inspection | 06/27/2007 | Minor Out of Compliance | BARNETT_PC_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/13/2007 | Satisfied | BARNETT_PC_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/20/2006 | Satisfied | BARNETT_PC_1 | Routine Compliance | |||||||
Record Document | 06/16/2006 | Satisfied | BARNETT_PC_1 | Non-Compliance | |||||||
Letter | 06/02/2006 | Satisfied | BARNETT_PC_1 | Non-Compliance | |||||||
Site Inspection | 06/02/2006 | Minor Out of Compliance | BARNETT_PC_1 | 0/2 | Routine Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
02/24/2025 | 6066 | Minor | 4.4 Not repaired per applicable standards. | Repair the damaged entry boot. Provide post-repair hydrostatic test of the sump. | |||||||
02/24/2025 | 6011 | SNC-B | 2.8 No financial responsibility instrument or expired instrument for < 180 days. | Provide Storage Tank Financial Responsibility policy and facility-completed CFR. The CFR form will be sent to the facility with this report. | |||||||
02/07/2021 | 4076 | Minor | 4.11 Failure to conduct required periodic containment and interstitial integrity testing. | Provide integrity test results as listed above. | |||||||
02/07/2021 | 4001 | Minor | 2.2 Operator certification requirements not met. | Provide verification of Tank Operator Certifications as required by the UST rule. | |||||||
02/07/2021 | 4068 | Minor | 4.3 Storage tank system has a not repaired component which has or could cause a release or discharge. | Address the 93 sump corrosion. Provide documentation. Alternately the tanks can be placed out of service or be closed. | |||||||
02/07/2021 | 4077 | Minor | 4.12 Spill containment, sumps, and interstices not accessible. Water/regulated substances not timely removed. Petroleum contact water not properly managed. | Remove the water from the 87 tank interstice. Monitor for on-going water intrusion. A tank tightness test may be required if the issue persists. | |||||||
02/07/2021 | 4015 | Minor | 2.10 Incomplete documentation demonstrating financial responsibility. | Complete and provide the CFR Form (required to be maintained with Tank Insurance). | |||||||
02/07/2021 | 4059 | SNC-B | 4.1 Release detection, including visual inspections not being conducted monthly (not to exceed 35 days.) For electronically monitored sumps, visual inspections not conducted every 6 months. This violation may lead to Placard Revocation and Delivery Prohibition. | Conduct monthly tank inspections and document. Alternately, the tanks may be placed out of service or closed. | |||||||
03/05/2018 | 4076 | Minor | 4.11 Failure to conduct required periodic containment and interstitial integrity testing. | Have the spill buckets hydro tested by a third party. Provide documentation of results. | |||||||
03/05/2018 | 4057 | Minor | 4.31 Overfill protection devices not registered or tested annually. | Have the overfill prevention devices tested. Provide documentation of results. * For tank compartments that have both ball check valves and flappers for the same product, one of the devices must be removed, preferably the ball check valves. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
11/28/1988 | COMPLETED | 55 | EARLY DETECTION INCENTIVE-ELIGIBLE | ||||||||