DEP Logo Florida Department of
Environmental Protection


Bob Martinez Center
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
Storage Tanks &
Contamination
Monitoring Information
 
Cover Page Report
Report Run Date: 04/19/2025        Last Data Refresh: 04/18/2025        Report Generated from DOPPLER
 
District Southeast   Type    Retail Station
 
County Miami-Dade   Status    OPEN
 
ID 8504238   Latitude    25° 45' 25.6531
 
Name SUNSHINE #132
1601 SW 37TH AVE
Longitude    80° 15' 16.2326
  MIAMI, FL 33145-1743 LL Method    DPHO
 
Contact MAXIMO ALVAREZ   LL Status    REVIEWED
 
Phone (305) 477-5800   Status Date    09/23/2003
 
Account Owner Information
 
Name SUNSHINE GASOLINE DISTRIBUTORS INC
1650 NW 87TH AVE
Doral, FL 33172-2614
Effective Date    04/17/2009
 
Contact MARIO ZAMORA / VANESSA PALACIOS/BARBIE RUIZ
 
Phone (786) 606-0917
 
Email MZAMORA@SUNSHINEGASOLINE.COM
  Placard # / Date    694388 - 06/25/2024
Property Owner Information
 
Name SUNSHINE GASOLINE DISTRIBUTORS INC
1650 NW 87TH AVE
Doral, FL 33172-2614
Effective Date    04/17/2009
 
Contact MARIO ZAMORA / VANESSA PALACIOS/BARBIE RUIZ
 
Phone (786) 606-0917
 
Email MZAMORA@SUNSHINEGASOLINE.COM
 
 
 
 
 
 
 
 
 
Tank Tank Size Content Installed Placement Status
5 12000 Ethanol E10 (8) 11/01/2004 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(E) Fiberglass
(I) Double wall
(M) Spill containment bucket
  (C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(G) Electronic line leak detector
(N) Groundwater monitoring
 
 
Tank Tank Size Content Installed Placement Status
6 12000 Ethanol E10 (8) 11/01/2004 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(E) Fiberglass
(I) Double wall
(M) Spill containment bucket
  (C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(G) Electronic line leak detector
(N) Groundwater monitoring
 
 
Tank Tank Size Content Installed Placement Status
7 12000 Ethanol E10 (8) 11/01/2004 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(E) Fiberglass
(I) Double wall
(M) Spill containment bucket
  (C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(G) Electronic line leak detector
(N) Groundwater monitoring
 
 
Tank Tank Size Content Installed Placement Status
1 10000 Unleaded Gas (B) 07/01/1983 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(G) Sacrificial anode CP   (C) Fiberglass (8) Manually sampled wells
(H) Mechanical line leak detector
 
 
Tank Tank Size Content Installed Placement Status
1R1 10000 Unleaded Gas (B) 07/01/1987 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(C) Steel
(H) Impressed current CP
(M) Spill containment bucket
  (B) Steel/galvanized metal
(E) Cathodic protection
(J) Pressurized piping system
(K) Dispenser liners
(8) Manually sampled wells
(H) Mechanical line leak detector
 
 
Tank Tank Size Content Installed Placement Status
2 10000 Unleaded Gas (B) 07/01/1983 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(G) Sacrificial anode CP   (C) Fiberglass (8) Manually sampled wells
(H) Mechanical line leak detector
 
 
Tank Tank Size Content Installed Placement Status
2R1 10000 Unleaded Gas (B) 07/01/1987 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(C) Steel
(H) Impressed current CP
(M) Spill containment bucket
  (B) Steel/galvanized metal
(E) Cathodic protection
(J) Pressurized piping system
(K) Dispenser liners
(8) Manually sampled wells
(H) Mechanical line leak detector
 
 
Tank Tank Size Content Installed Placement Status
3 10000 Leaded Gas (A) 07/01/1983 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(G) Sacrificial anode CP   (C) Fiberglass (8) Manually sampled wells
(H) Mechanical line leak detector
 
 
Tank Tank Size Content Installed Placement Status
3R1 10000 Unleaded Gas (B) 07/01/1987 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(C) Steel
(H) Impressed current CP
(M) Spill containment bucket
  (B) Steel/galvanized metal
(E) Cathodic protection
(J) Pressurized piping system
(K) Dispenser liners
(8) Manually sampled wells
(H) Mechanical line leak detector
 
 
Tank Tank Size Content Installed Placement Status
4 6000 Unleaded Gas (B) 07/01/1987 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(H) Impressed current CP
(M) Spill containment bucket
  (B) Steel/galvanized metal
(E) Cathodic protection
(K) Dispenser liners
(8) Manually sampled wells
(H) Mechanical line leak detector
 
 
Insurance Documents
 
FR Type   Effective Date Expiration Date Company Name
INSURANCE   09/25/2023 09/25/2024 NAUTILUS INSURANCE COMPANY
INSURANCE   09/25/2021 09/25/2022 NAUTILUS INSURANCE COMPANY
INSURANCE   09/25/2018 09/25/2019 NAUTILUS INSURANCE COMPANY
INSURANCE   09/25/2017 09/25/2018 NAUTILUS INSURANCE COMPANY
INSURANCE   09/25/2016 09/25/2017 NAUTILUS INSURANCE COMPANY
INSURANCE   09/25/2015 09/25/2016 LIBERTY SURPLUS INSURANCE CORP
INSURANCE   09/25/2014 09/25/2015 LIBERTY SURPLUS INSURANCE CORP
INSURANCE   09/25/2012 09/25/2013 LIBERTY SURPLUS INSURANCE CORP
INSURANCE   09/25/2011 09/25/2012 LIBERTY SURPLUS INSURANCE CORP
INSURANCE   09/25/2010 09/25/2011 LIBERTY SURPLUS INSURANCE CORP
INSURANCE   09/25/2008 09/25/2009 ZURICH-AMERICAN
 
 
Legacy Compliance Activity Information
 
Activity
Code
Date
Initiated
Date
Completed
Results Inspector AST/UST
Count
Description
TCR 03/29/2006 03/31/2006 IN-COMPLIANCE PALERMO, C 0/3 COMPLIANCE ASSURANCE
 
TCI 03/06/2006 03/22/2006 MINOR OUT-OF-COMPLIANCE PALERMO, C 0/3 COMPLIANCE ASSURANCE
 
TIN 11/19/2004 11/30/2004 IN-COMPLIANCE ROMAN, A 0/3 COMPLIANCE ASSURANCE
 
TIN 11/05/2004 11/10/2004 IN-COMPLIANCE ROMAN, A 0/3 COMPLIANCE ASSURANCE
 
TIN 10/20/2004 10/29/2004 IN-COMPLIANCE ROMAN, A 0/3 COMPLIANCE ASSURANCE
 
TXI 10/13/2004 10/20/2004 IN-COMPLIANCE ROMAN, A 0/4 COMPLIANCE ASSURANCE
 
TCR 10/13/2004 10/20/2004 IN-COMPLIANCE ROMAN, A 0/4 COMPLIANCE ASSURANCE
 
TCR 08/19/2004 08/25/2004 MINOR OUT-OF-COMPLIANCE ROMAN, A 0/4 COMPLIANCE ASSURANCE
 
RRBD 07/22/2004 07/29/2004 ROMAN, A 0/1 COMPLIANCE ASSURANCE
 
TCI 07/08/2004 07/19/2004 MINOR OUT-OF-COMPLIANCE ROMAN, A 0/4 COMPLIANCE ASSURANCE
 
TCI 05/13/2004 05/19/2004 MINOR OUT-OF-COMPLIANCE ROMAN, A 0/4 COMPLIANCE ASSURANCE
 
TCR 04/24/2003 04/25/2003 IN-COMPLIANCE O'DANIEL, J 0/4 COMPLIANCE ASSURANCE
 
TCR 03/28/2003 03/31/2003 MINOR OUT-OF-COMPLIANCE O'DANIEL, J 0/4 COMPLIANCE ASSURANCE
 
TCR 02/21/2003 02/27/2003 MINOR OUT-OF-COMPLIANCE O'DANIEL, J 0/3 COMPLIANCE ASSURANCE
 
TCQA 02/20/2003 04/01/2003 MINOR OUT-OF-COMPLIANCE TERESA RAHRIG/NICOLE KUEHLE 0/4 COMPLIANCE ASSURANCE
 
RRBD 02/07/2003 02/12/2003 O'DANIEL, J 0/4 COMPLIANCE ASSURANCE
 
TCI 01/30/2003 02/03/2003 MINOR OUT-OF-COMPLIANCE O'DANIEL, J 0/4 COMPLIANCE ASSURANCE
 
TCR 11/14/2001 11/28/2001 IN-COMPLIANCE SMITH, C 0/1 COMPLIANCE ASSURANCE
 
TCI 08/30/2001 09/05/2001 MINOR OUT-OF-COMPLIANCE SMITH, C 0/4 COMPLIANCE ASSURANCE
 
TCI 12/07/2000 12/14/2000 IN-COMPLIANCE PORCELLI, M 0/4 COMPLIANCE ASSURANCE
 
RRBD 12/06/1999 01/19/2000 LAMOLA, S 0/0 COMPLIANCE ASSURANCE
 
TCI 11/03/1999 11/29/1999 MINOR OUT-OF-COMPLIANCE LAMOLA, S 0/4 COMPLIANCE ASSURANCE
 
TCR 01/29/1999 04/21/1999 IN-COMPLIANCE LAMOLA, S 0/4 COMPLIANCE ASSURANCE
 
UTCI 12/15/1998 01/06/1999 MINOR OUT-OF-COMPLIANCE COMPLIANCE ASSURANCE
 
 
 
Compliance Activity Information
 
Activity
Code
Date
Completed
Results Inspector AST/UST
Count
Description
Letter 10/16/2023 Satisfied MATUTERODRIGUEZ_MA_1 Compliance Assistance
 
Site Inspection 10/13/2023 Major Out of Compliance MATUTERODRIGUEZ_MA_1 0/3 Routine Compliance
 
Electronic Communication 10/12/2023 Satisfied MATUTERODRIGUEZ_MA_1 Routine Compliance
 
Letter 12/28/2021 Satisfied GRIMALDO_JN_1 Routine Compliance
 
Site Inspection 12/23/2021 In Compliance GRIMALDO_JN_1 0/3 Routine Compliance
 
Electronic Communication 12/22/2021 Satisfied GRIMALDO_JN_1 Routine Compliance
 
Electronic Communication 09/23/2019 Satisfied DASHTAKI_K_1 Compliance Assistance
 
Letter 09/23/2019 Satisfied DASHTAKI_K_1 Compliance Assistance
 
Phone Conversation 07/30/2019 Satisfied DEZAYAS_A_1 Routine Compliance
 
Site Inspection 07/30/2019 Minor Out of Compliance DEZAYAS_A_1 0/3 Routine Compliance
 
Letter 07/30/2019 Satisfied DEZAYAS_A_1 Compliance Assistance
 
Electronic Communication 07/30/2019 Satisfied DEZAYAS_A_1 Routine Compliance
 
Electronic Communication 07/30/2019 Satisfied DEZAYAS_A_1 Routine Compliance
 
Document Management 01/11/2017 Satisfied FERNANDEZBANGO_CE_1 Incident
 
Letter 01/11/2017 Satisfied FERNANDEZBANGO_CE_1 Non-Compliance
 
Incident 01/11/2017 Has not led to Discharge FERNANDEZBANGO_CE_1 Incident
 
Incident 01/11/2017 Has not led to Discharge FERNANDEZBANGO_CE_1 Incident
 
Document Management 01/11/2017 Satisfied FERNANDEZBANGO_CE_1 Incident
 
Site Inspection 01/10/2017 In Compliance FERNANDEZBANGO_CE_1 0/3 Non-Compliance
 
Letter 12/23/2016 Satisfied FERNANDEZBANGO_CE_1 Non-Compliance
 
Site Inspection 12/22/2016 Minor Out of Compliance FERNANDEZBANGO_CE_1 0/3 Routine Compliance
 
Site Inspection 09/13/2016 Minor Out of Compliance FERNANDEZBANGO_CE_1 0/3 Non-Compliance
 
Electronic Communication 09/13/2016 Satisfied FERNANDEZBANGO_CE_1 Non-Compliance
 
Electronic Communication 09/13/2016 Satisfied FERNANDEZBANGO_CE_1 Non-Compliance
 
Electronic Communication 09/13/2016 Satisfied FERNANDEZBANGO_CE_1 Non-Compliance
 
Electronic Communication 09/13/2016 Satisfied FERNANDEZBANGO_CE_1 Non-Compliance
 
Electronic Communication 09/13/2016 Satisfied FERNANDEZBANGO_CE_1 Non-Compliance
 
Electronic Communication 09/13/2016 Satisfied FERNANDEZBANGO_CE_1 Non-Compliance
 
Electronic Communication 09/13/2016 Satisfied FERNANDEZBANGO_CE_1 Non-Compliance
 
Electronic Communication 09/13/2016 Satisfied FERNANDEZBANGO_CE_1 Non-Compliance
 
Electronic Communication 01/07/2016 Satisfied FERNANDEZBANGO_CE_1 Non-Compliance
 
Emergency Preparedness Information 11/13/2014 Satisfied FERNANDEZBANGO_CE_1 Routine Compliance
 
Phone Conversation 11/13/2014 Satisfied FERNANDEZBANGO_CE_1 Routine Compliance
 
Site Inspection 11/13/2014 Minor Out of Compliance FERNANDEZBANGO_CE_1 0/3 Routine Compliance
 
Letter 11/13/2014 Satisfied FERNANDEZBANGO_CE_1 Non-Compliance
 
Enforcement Tracking 04/30/2014 Closed Without Enforcement SYKORA_JJ_1 Enforcement
 
Site Inspection 11/07/2012 In Compliance LINCHETA_CR_1 0/3 Non-Compliance
 
Letter 10/22/2012 Satisfied LINCHETA_CR_1 Non-Compliance
 
Site Inspection 10/22/2012 Minor Out of Compliance LINCHETA_CR_1 0/3 Routine Compliance
 
Phone Conversation 10/22/2012 Satisfied LINCHETA_CR_1 Routine Compliance
 
Emergency Preparedness Information 10/22/2012 Satisfied LINCHETA_CR_1 Routine Compliance
 
Site Inspection 03/25/2011 In Compliance REID_MT_1 0/3 Non-Compliance
 
Site Inspection 03/01/2011 Minor Out of Compliance REID_MT_1 0/3 Non-Compliance
 
Emergency Preparedness Information 01/19/2011 Satisfied REID_MT_1 Routine Compliance
 
Site Inspection 01/19/2011 Minor Out of Compliance REID_MT_1 0/3 Non-Compliance
 
Site Inspection 12/28/2010 Minor Out of Compliance REID_MT_1 0/3 Non-Compliance
 
Site Inspection 12/20/2010 Minor Out of Compliance REID_MT_1 0/3 Routine Compliance
 
Incident 12/20/2010 Has not led to Discharge REID_MT_1 Incident
 
Site Inspection 11/10/2010 Minor Out of Compliance REID_MT_1 0/3 Routine Compliance
 
Letter 11/10/2010 Satisfied REID_MT_1 Non-Compliance
 
Enforcement Referral 08/24/2009 Accepted SYKORA_JJ_1 Enforcement
 
Issue Document 08/24/2009 Satisfied SYKORA_JJ_1 Enforcement
 
Enforcement Tracking 08/24/2009 Closed Without Enforcement SYKORA_JJ_1 Enforcement
 
Letter 08/24/2009 Satisfied SYKORA_JJ_1 Non-Compliance
 
Site Inspection 08/24/2009 Minor Out of Compliance SYKORA_JJ_1 0/3 Routine Compliance
 
Site Inspection 12/23/2008 Minor Out of Compliance SYKORA_JJ_1 0/3 Routine Compliance
 
Enforcement Referral 12/23/2008 Accepted SYKORA_JJ_1 Enforcement
 
Issue Document 12/23/2008 Satisfied SYKORA_JJ_1 Enforcement
 
Site Inspection 06/19/2008 In Compliance GONZALEZ_EX 0/3 Non-Compliance
 
Letter 06/18/2008 Satisfied GONZALEZ_EX Non-Compliance
 
Site Inspection 06/18/2008 Minor Out of Compliance GONZALEZ_EX 0/3 Non-Compliance
 
Letter 04/18/2008 Satisfied GONZALEZ_EX Non-Compliance
 
Site Inspection 04/18/2008 Minor Out of Compliance GONZALEZ_EX 0/3 Routine Compliance
 
Emergency Preparedness Information 02/16/2007 Satisfied SHER_RC_1 Routine Compliance
 
Site Inspection 01/09/2007 In Compliance CAMACHO_D 0/3 Routine Compliance
 
Emergency Preparedness Information 09/27/2006 Satisfied LOPEZ_X Routine Compliance
 
 
 
No Open AOCs Found
 
 
Open Violations
 
Insp Date Vio # Significance Violation Text Corrective Action
10/12/2023 6057 SNC-B 4.7 Release detection not installed, operated, and maintained per manufacturer's instructions and standards. Make appropriate repairs to the Veeder Root TLS-350R to properly monitor all required sensors. Provide a liquid status report with all sensors and functions normal when complete.
 
10/12/2023 6062 Minor 2.5 Release detection devices not tested annually. Provide a current and passing test of the release detection device (Veeder Root TLS-350R)
 
10/12/2023 6063 SNC-B 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. Remove corrosion and reapply exterior coating to all the STPs and sump components.
 
 
 
Discharge Information
 
Discharge
Date
  Clean Up
Status
Score Eligibility Info Site Manager Phone
05/18/1993   COMPLETED 11
 
12/06/1988   ACTIVE 10 EARLY DETECTION INCENTIVE-ELIGIBLE