Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
||||||||||
Cover Page Report | |||||||||||
Report Run Date: 01/22/2025 Last Data Refresh: 01/21/2025 Report Generated from DOPPLER | |||||||||||
District | Southeast | Type | County Government | ||||||||
County | Miami-Dade | Status | OPEN | ||||||||
ID | 8504337 | Latitude | 25° 50' 57.8318 | ||||||||
Name |
PELICAN HARBOR MARINA 1275 NE 79TH ST |
Longitude | 80° 10' .1413 | ||||||||
MIAMI, FL 33147 | LL Method | DPHO | |||||||||
Contact | ABRAHAM ALENDE | LL Status | REVIEWED | ||||||||
Phone | (305) 987-4782 | Status Date | 04/13/2005 | ||||||||
Account Owner Information | |||||||||||
Name | DADE CNTY PARKS & RECREATION 275 NW 2ND ST MIAMI, FL 33128-1741 |
Effective Date | 12/07/1994 | ||||||||
Contact | TMORGAN/ MRICHARD 3053653015 / MNARDI/3057557800 | ||||||||||
Phone | (305) 755-7910 | ||||||||||
TOM.MORGAN@MIAMIDADE.GOV | |||||||||||
Placard # / Date | 699313 - 07/10/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | DADE CNTY PARKS & RECREATION 275 NW 2ND ST MIAMI, FL 33128-1741 |
Effective Date | 04/16/2019 | ||||||||
Contact | TMORGAN/ MRICHARD 3053653015 / MNARDI/3057557800 | ||||||||||
Phone | (305) 755-7910 | ||||||||||
TOM.MORGAN@MIAMIDADE.GOV | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 10000 | Unleaded Gas (B) | 08/01/1994 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket |
(F) Double wall (J) Pressurized piping system |
(2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (L) Automatic tank gauging - USTs (N) Groundwater monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 10000 | Vehicular Diesel (D) | 08/01/1994 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket |
(F) Double wall (J) Pressurized piping system |
(2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (L) Automatic tank gauging - USTs (N) Groundwater monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 10000 | Leaded Gas (A) | 01/01/1976 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass | (Y) Unknown | (Y) Unknown | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
LOCAL GOVERNMENTS - BOND RATING TEST | 02/01/2024 | 01/31/2025 | |||||||||
LOCAL GOVERNMENTS - BOND RATING TEST | 02/01/2023 | 01/31/2024 | |||||||||
LOCAL GOVERNMENTS - BOND RATING TEST | 02/01/2021 | 01/31/2022 | |||||||||
LOCAL GOVERNMENTS - BOND RATING TEST | 02/01/2020 | 01/31/2021 | |||||||||
LOCAL GOVERNMENTS - BOND RATING TEST | 02/01/2019 | 01/31/2020 | |||||||||
LOCAL GOVERNMENTS - BOND RATING TEST | 02/01/2018 | 01/31/2019 | |||||||||
LOCAL GOVERNMENTS - BOND RATING TEST | 02/01/2017 | 01/31/2018 | |||||||||
LOCAL GOVERNMENTS - BOND RATING TEST | 03/18/2016 | 03/18/2017 | |||||||||
LOCAL GOVERNMENTS - BOND RATING TEST | 05/05/2015 | 05/05/2016 | |||||||||
LOCAL GOVERNMENTS - BOND RATING TEST | 01/21/2014 | 01/21/2015 | |||||||||
LOCAL GOVERNMENTS - BOND RATING TEST | 02/05/2013 | 02/05/2014 | |||||||||
LOCAL GOVERNMENTS - BOND RATING TEST | 09/12/2011 | 09/12/2012 | |||||||||
LOCAL GOVERNMENTS - BOND RATING TEST | 07/13/2010 | 07/13/2011 | |||||||||
LOCAL GOVERNMENTS - BOND RATING TEST | 02/03/2010 | 02/02/2011 | |||||||||
LOCAL GOVERNMENTS - BOND RATING TEST | 06/25/2008 | 06/25/2009 | |||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
RRBD | 06/22/2005 | 07/01/2005 | IN-COMPLIANCE | COMPLIANCE ASSURANCE | |||||||
TCI | 11/30/2004 | 02/09/2005 | SIGNIFICANT OUT-OF-COMPLIANCE | LEFEBVRE_M | 2/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes COMPLETE INSPECTION COULD NOT BE PERFORMED SINCE PERSONNEL ONSITE COULD NOT OPEN CABINETS (NO KEY). | |||||||||||
PDNE | 03/04/2004 | 03/04/2004 | COMPLIANCE ASSURANCE | ||||||||
UTCI | 03/29/1995 | 03/29/1995 | MINOR OUT-OF-COMPLIANCE | COMPLIANCE ASSURANCE | |||||||
Completion Notes Routine, | |||||||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Meeting | 10/14/2024 | Satisfied | MAIB_R | Enforcement | |||||||
Letter | 10/14/2024 | Satisfied | MAIB_R | Enforcement | |||||||
Enforcement Referral | 09/30/2024 | Accepted | MAIB_R | Enforcement | |||||||
Site Inspection | 09/03/2024 | Major Out of Compliance | LANDFIELD_J | 0/2 | Closure | ||||||
Site Inspection | 07/30/2024 | Major Out of Compliance | MAIB_R | 0/2 | Routine Compliance | ||||||
Incident | 05/04/2022 | Has not led to Discharge | DOLAN_J | Incident | |||||||
Incident | 05/04/2022 | Has not led to Discharge | DOLAN_J | Incident | |||||||
Letter | 05/04/2022 | Satisfied | DOLAN_J | Component Closure | |||||||
Incident | 05/04/2022 | Has not led to Discharge | DOLAN_J | Incident | |||||||
Incident | 05/04/2022 | Has not led to Discharge | DOLAN_J | Incident | |||||||
TCAR | 05/04/2022 | Satisfied | DOLAN_J | Closure | |||||||
Incident | 05/04/2022 | Has not led to Discharge | DOLAN_J | Incident | |||||||
Letter | 05/04/2022 | Satisfied | DOLAN_J | Compliance Assistance | |||||||
TCAR | 05/04/2022 | Satisfied | DOLAN_J | Component Closure | |||||||
Document Management | 05/04/2022 | Satisfied | DOLAN_J | Incident | |||||||
Letter | 01/27/2022 | Satisfied | LANDFIELD_J | Compliance Assistance | |||||||
Electronic Communication | 01/27/2022 | Satisfied | LANDFIELD_J | Compliance Assistance | |||||||
Electronic Communication | 01/27/2022 | Satisfied | LANDFIELD_J | Compliance Assistance | |||||||
Electronic Communication | 01/27/2022 | Satisfied | LANDFIELD_J | Compliance Assistance | |||||||
Site Inspection | 12/06/2021 | Major Out of Compliance | LANDFIELD_J | 0/2 | Routine Compliance | ||||||
Enforcement Tracking | 06/10/2019 | Closed Without Enforcement | MALONEY_D | Enforcement | |||||||
Letter | 06/10/2019 | Satisfied | MALONEY_D | Enforcement | |||||||
Meeting | 06/07/2019 | Satisfied | MALONEY_D | Enforcement | |||||||
Record Document | 06/07/2019 | Satisfied | MALONEY_D | Compliance Assistance | |||||||
Letter | 03/20/2019 | Satisfied | MALONEY_D | Enforcement | |||||||
Enforcement Referral | 02/28/2019 | Accepted | MALONEY_D | Enforcement | |||||||
Record Document | 02/19/2019 | Satisfied | MALONEY_D | Compliance Assistance | |||||||
Letter | 11/15/2018 | Satisfied | MALONEY_D | Compliance Assistance | |||||||
Electronic Communication | 11/15/2018 | Satisfied | MALONEY_D | Routine Compliance | |||||||
Site Inspection | 11/14/2018 | Major Out of Compliance | MALONEY_D | 0/2 | Routine Compliance | ||||||
Electronic Communication | 01/04/2016 | Satisfied | DOLAN_J | Non-Compliance | |||||||
Site Inspection | 10/30/2015 | Minor Out of Compliance | BROWN_SE | 0/2 | Routine Compliance | ||||||
Electronic Communication | 10/21/2015 | Satisfied | BROWN_SE | Routine Compliance | |||||||
Electronic Communication | 03/31/2015 | Satisfied | BROWN_SE | Non-Compliance | |||||||
Site Inspection | 12/09/2014 | Minor Out of Compliance | BROWN_SE | 0/2 | Routine Compliance | ||||||
Electronic Communication | 08/26/2013 | Satisfied | BROWN_SE | Non-Compliance | |||||||
Phone Conversation | 08/20/2013 | Satisfied | BROWN_SE | Non-Compliance | |||||||
Site Inspection | 07/24/2013 | Minor Out of Compliance | BROWN_SE | 0/2 | Routine Compliance | ||||||
Site Inspection | 12/16/2011 | In Compliance | WILLIAMS_CEW | 0/2 | Routine Compliance | ||||||
Enforcement Tracking | 02/02/2011 | Closed With Enforcement | DOLAN_J | Enforcement | |||||||
Site Inspection | 01/18/2011 | In Compliance | WILLIAMS_CEW | 0/2 | Routine Compliance | ||||||
Letter | 05/18/2010 | Satisfied | JACKSON_ME | Non-Compliance | |||||||
Record Document | 05/18/2010 | Satisfied | JACKSON_ME | Routine Compliance | |||||||
Site Inspection | 04/08/2010 | Minor Out of Compliance | JACKSON_ME | 0/2 | Routine Compliance | ||||||
Record Document | 11/24/2009 | Satisfied | DOLAN_J | Routine Compliance | |||||||
Site Inspection | 11/24/2009 | In Compliance | DOLAN_J | 0/3 | Non-Compliance | ||||||
Enforcement Referral | 08/20/2009 | Accepted | DOLAN_J | Enforcement | |||||||
Meeting | 08/20/2009 | Satisfied | DOLAN_J | Enforcement | |||||||
Issue Document | 08/20/2009 | Satisfied | DOLAN_J | Enforcement | |||||||
Site Inspection | 06/17/2009 | Major Out of Compliance | DOLAN_J | 0/2 | Routine Compliance | ||||||
Site Inspection | 07/30/2007 | Major Out of Compliance | MARONEY_E | 0/3 | Routine Compliance | ||||||
Issue Document | 04/24/2007 | Satisfied | WHITE_CM | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
07/10/2024 | 6053 | Minor | 4.7 Primary overfill protection not provided, registered, or tested as required. | The 2022 and 2024 annual operability for overfill protection for the gas and diesel USTs needs to be provided to the Department. | |||||||
07/10/2024 | 6062 | Minor | 2.5 Release detection devices not tested annually. | The 2022 and 2024 annual operability for release detection needs to be provided to the Department. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
08/09/1994 | COMPLETED | ||||||||||