![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 04/19/2025 Last Data Refresh: 04/18/2025 Report Generated from DOPPLER | |||||||||||
District | Southeast | Type | Retail Station | ||||||||
County | Miami-Dade | Status | OPEN | ||||||||
ID | 8505170 | Latitude | 25° 53' 53.8973 | ||||||||
Name |
ORION GAS STATION 1540 W 84TH ST |
Longitude | 80° 18' 54.9733 | ||||||||
HIALEAH, FL 33014-3364 | LL Method | DPHO | |||||||||
Contact | DAVE LINGSLEY | LL Status | REVIEWED | ||||||||
Phone | (561) 254-8040 | Status Date | 03/21/2025 | ||||||||
Account Owner Information | |||||||||||
Name | MACMILLAN REAL ESTATE LLC 7950 NW 58TH ST Miami, FL 33166 |
Effective Date | 07/17/2017 | ||||||||
Contact | LAURA RODRIGUEZ | ||||||||||
Phone | (305) 691-7814 | ||||||||||
LAURA@MACMILLANOIL.COM | |||||||||||
Placard # / Date | 685791 - 06/10/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | MACMILLAN REAL ESTATE LLC 7950 NW 58TH ST Miami, FL 33166 |
Effective Date | 07/17/2017 | ||||||||
Contact | LAURA RODRIGUEZ | ||||||||||
Phone | (305) 691-7814 | ||||||||||
LAURA@MACMILLANOIL.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 15000 | Ethanol E10 (8) | 05/01/2010 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (I) Double wall (L) Compartmented (N) Flow shut-Off |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 10000 | Unleaded Gas (B) | 07/01/1983 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(8) Manually sampled wells (H) Mechanical line leak detector (N) Groundwater monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 10000 | Unleaded Gas (B) | 07/01/1983 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(8) Manually sampled wells (N) Groundwater monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 10000 | Unleaded Gas (B) | 07/01/1983 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(8) Manually sampled wells (H) Mechanical line leak detector (N) Groundwater monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 1000 | Waste Oil (L) | 07/01/1983 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (M) Spill containment bucket |
(C) Fiberglass | (8) Manually sampled wells | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
EXEMPT-NOT REQUIRED | |||||||||||
INSURANCE | 06/01/2024 | 06/01/2025 | CRUM & FORSTER SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 06/01/2023 | 06/01/2024 | LIBERTY SURPLUS INSURANCE CORPORATION | ||||||||
INSURANCE | 06/01/2021 | 06/01/2022 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 01/01/2019 | 01/01/2020 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 01/01/2018 | 01/01/2019 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 01/01/2017 | 01/01/2018 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 07/30/2012 | 01/22/2015 | ENDURANCE AMERICAN SPECIALTY INS CO | ||||||||
INSURANCE | 07/15/2012 | 07/15/2013 | ACE | ||||||||
INSURANCE | 07/15/2011 | 07/15/2012 | ACE | ||||||||
INSURANCE | 05/03/2009 | 07/15/2011 | ACE | ||||||||
INSURANCE | 05/03/2008 | 05/03/2009 | ACE | ||||||||
INSURANCE | 05/03/2008 | 05/03/2009 | ACE | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 05/17/2006 | 05/18/2006 | MINOR OUT-OF-COMPLIANCE | DASHTAKI, K | 0/4 | COMPLIANCE ASSURANCE | |||||
TCR | 07/29/2005 | 07/29/2005 | IN-COMPLIANCE | DASHTAKI, K | 0/4 | COMPLIANCE ASSURANCE | |||||
RRBD | 06/27/2005 | 06/29/2005 | COMPLIANCE ASSURANCE | ||||||||
TCI | 06/13/2005 | 06/20/2005 | MINOR OUT-OF-COMPLIANCE | DASHTAKI, K | 0/4 | COMPLIANCE ASSURANCE | |||||
TCR | 01/13/2004 | 01/21/2004 | IN-COMPLIANCE | DASHTAKI, K | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 01/06/2004 | 01/13/2004 | SIGNIFICANT OUT-OF-COMPLIANCE | DASHTAKI, K | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 01/29/2003 | 01/30/2003 | IN-COMPLIANCE | DASHTAKI, K | 0/4 | COMPLIANCE ASSURANCE | |||||
TCR | 04/23/2002 | 04/30/2002 | IN-COMPLIANCE | DASHTAKI, K | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 03/26/2002 | 04/02/2002 | MINOR OUT-OF-COMPLIANCE | DASHTAKI, K | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 02/21/2001 | 03/06/2001 | IN-COMPLIANCE | DASHTAKI, K | 0/4 | COMPLIANCE ASSURANCE | |||||
TCR | 06/12/2000 | 06/29/2000 | IN-COMPLIANCE | DASHTAKI, K | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 05/11/2000 | 06/13/2000 | MINOR OUT-OF-COMPLIANCE | DASHTAKI, K | 0/4 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Letter | 03/25/2025 | Satisfied | JACQUET_F_1 | Compliance Assistance | |||||||
Electronic Communication | 03/25/2025 | Satisfied | JACQUET_F_1 | Compliance Assistance | |||||||
Site Inspection | 03/21/2025 | Major Out of Compliance | JACQUET_F_1 | 0/1 | Routine Compliance | ||||||
Electronic Communication | 03/05/2025 | Satisfied | JACQUET_F_1 | Routine Compliance | |||||||
Electronic Communication | 05/30/2024 | Satisfied | JACQUET_F_1 | Component Installation | |||||||
Site Inspection | 05/30/2024 | In Compliance | JACQUET_F_1 | 0/1 | Component Installation | ||||||
Electronic Communication | 05/30/2024 | Satisfied | JACQUET_F_1 | Compliance Assistance | |||||||
Site Inspection | 05/29/2024 | In Compliance | JACQUET_F_1 | 0/1 | Compliance Assistance | ||||||
Site Inspection | 05/29/2024 | In Compliance | JACQUET_F_1 | 0/1 | Component Closure | ||||||
Letter | 05/29/2024 | Satisfied | JACQUET_F_1 | Compliance Assistance | |||||||
Incident | 04/22/2024 | Has not led to Discharge | JACQUET_F_1 | Incident | |||||||
Document Management | 04/22/2024 | Satisfied | JACQUET_F_1 | Incident | |||||||
Site Inspection | 12/05/2023 | Major Out of Compliance | RODRIGUEZ_F | 0/1 | Compliance Assistance | ||||||
Electronic Communication | 12/05/2023 | Satisfied | RODRIGUEZ_F | Compliance Assistance | |||||||
Letter | 04/29/2022 | Satisfied | RODRIGUEZ_F | Compliance Assistance | |||||||
Site Inspection | 04/29/2022 | Major Out of Compliance | RODRIGUEZ_F | 0/1 | Routine Compliance | ||||||
Electronic Communication | 04/06/2022 | Satisfied | RODRIGUEZ_F | Routine Compliance | |||||||
Electronic Communication | 02/07/2019 | Satisfied | DEZAYAS_A_1 | Compliance Assistance | |||||||
Letter | 02/07/2019 | Satisfied | DEZAYAS_A_1 | Compliance Assistance | |||||||
Site Inspection | 02/07/2019 | In Compliance | DEZAYAS_A_1 | 0/1 | Compliance Assistance | ||||||
Electronic Communication | 01/30/2019 | Satisfied | DEZAYAS_A_1 | Routine Compliance | |||||||
Letter | 01/30/2019 | Satisfied | DEZAYAS_A_1 | Compliance Assistance | |||||||
Site Inspection | 01/30/2019 | Major Out of Compliance | DEZAYAS_A_1 | 0/1 | Routine Compliance | ||||||
Electronic Communication | 01/02/2019 | Satisfied | DEZAYAS_A_1 | Routine Compliance | |||||||
Phone Conversation | 01/02/2019 | Satisfied | DEZAYAS_A_1 | Routine Compliance | |||||||
Site Inspection | 06/29/2017 | In Compliance | DEZAYAS_A_1 | 0/1 | Compliance Assistance | ||||||
Electronic Communication | 09/12/2016 | Satisfied | DEZAYAS_A_1 | Routine Compliance | |||||||
Electronic Communication | 09/12/2016 | Satisfied | DEZAYAS_A_1 | Routine Compliance | |||||||
Letter | 08/30/2016 | Satisfied | DEZAYAS_A_1 | Non-Compliance | |||||||
Site Inspection | 08/30/2016 | Major Out of Compliance | DEZAYAS_A_1 | 0/1 | Routine Compliance | ||||||
Phone Conversation | 08/11/2016 | Satisfied | DEZAYAS_A_1 | Routine Compliance | |||||||
Site Inspection | 12/19/2014 | In Compliance | DASHTAKI_K_1 | 0/1 | Non-Compliance | ||||||
Phone Conversation | 09/18/2014 | Satisfied | DASHTAKI_K_1 | Routine Compliance | |||||||
Site Inspection | 09/18/2014 | Minor Out of Compliance | DASHTAKI_K_1 | 0/1 | Routine Compliance | ||||||
Emergency Preparedness Information | 09/18/2014 | Satisfied | DASHTAKI_K_1 | Routine Compliance | |||||||
Letter | 09/18/2014 | Satisfied | DASHTAKI_K_1 | Non-Compliance | |||||||
Electronic Communication | 08/09/2012 | Satisfied | DASHTAKI_K_1 | Routine Compliance | |||||||
Site Inspection | 08/06/2012 | In Compliance | DASHTAKI_K_1 | 0/1 | Routine Compliance | ||||||
Emergency Preparedness Information | 07/31/2012 | Satisfied | DASHTAKI_K_1 | Routine Compliance | |||||||
Enforcement Tracking | 07/24/2012 | Closed Without Enforcement | CHIRINO_AM_1 | Enforcement | |||||||
Site Inspection | 03/01/2012 | In Compliance | DASHTAKI_K_1 | 0/1 | Non-Compliance | ||||||
Site Inspection | 02/27/2012 | Minor Out of Compliance | DASHTAKI_K_1 | 0/1 | Non-Compliance | ||||||
Emergency Preparedness Information | 01/06/2012 | Satisfied | DASHTAKI_K_1 | Routine Compliance | |||||||
Letter | 11/29/2011 | Satisfied | DASHTAKI_K_1 | Non-Compliance | |||||||
Site Inspection | 11/29/2011 | Major Out of Compliance | DASHTAKI_K_1 | 0/1 | Routine Compliance | ||||||
TCAR | 09/06/2011 | Satisfied | MAS_JR_1 | Closure | |||||||
Document Management | 07/11/2011 | Complete | CHIRINO_AM_1 | Enforcement | |||||||
Enforcement Referral | 07/11/2011 | Accepted | CHIRINO_AM_1 | Enforcement | |||||||
Document Management | 07/11/2011 | Complete | CHIRINO_AM_1 | Enforcement | |||||||
Electronic Communication | 05/10/2011 | Satisfied | CHIRINO_AM_1 | Closure | |||||||
TCAR | 12/02/2010 | Satisfied | MAS_JR_1 | Closure | |||||||
Enforcement Tracking | 10/26/2010 | Closed Without Enforcement | KONG_TE_1 | Enforcement | |||||||
Enforcement Tracking | 10/26/2010 | Closed With Enforcement | DASHTAKI_K_1 | Enforcement | |||||||
TCAR | 10/01/2010 | Incomplete | MAS_JR_1 | Closure | |||||||
Site Inspection | 08/13/2010 | In Compliance | PADRON_JE_1 | 0/1 | Non-Compliance | ||||||
Letter | 07/07/2010 | Satisfied | PADRON_JE_1 | Non-Compliance | |||||||
Site Inspection | 07/07/2010 | Major Out of Compliance | PADRON_JE_1 | 0/1 | Routine Compliance | ||||||
Site Inspection | 06/28/2010 | In Compliance | PADRON_JE_1 | 0/0 | Installation | ||||||
Site Inspection | 06/18/2010 | In Compliance | PADRON_JE_1 | 0/1 | Closure | ||||||
Site Inspection | 06/04/2010 | In Compliance | REYES_D_1 | 0/1 | Installation | ||||||
Site Inspection | 06/04/2010 | In Compliance | REYES_D_1 | 0/1 | Installation | ||||||
Document Management | 05/26/2010 | Complete | KONG_TE_1 | Enforcement | |||||||
Enforcement Referral | 05/26/2010 | Accepted | KONG_TE_1 | Enforcement | |||||||
Site Inspection | 05/18/2010 | In Compliance | PADRON_JE_1 | 0/4 | Installation | ||||||
Site Inspection | 05/06/2010 | In Compliance | PADRON_JE_1 | 0/4 | Closure | ||||||
Document Management | 02/04/2010 | Complete | CORREA_LI_1 | Routine Compliance | |||||||
Meeting | 01/05/2010 | Satisfied | DASHTAKI_K_1 | Routine Compliance | |||||||
Enforcement Referral | 08/10/2009 | Accepted | DASHTAKI_K_1 | Enforcement | |||||||
Issue Document | 08/10/2009 | Satisfied | DASHTAKI_K_1 | Enforcement | |||||||
Site Inspection | 08/10/2009 | Major Out of Compliance | DASHTAKI_K_1 | 0/4 | Routine Compliance | ||||||
Letter | 08/10/2009 | Satisfied | DASHTAKI_K_1 | Non-Compliance | |||||||
Site Inspection | 11/26/2008 | In Compliance | DASHTAKI_K_1 | 0/4 | Non-Compliance | ||||||
Enforcement Tracking | 11/26/2008 | Closed Without Enforcement | DASHTAKI_K_1 | Enforcement | |||||||
Letter | 11/24/2008 | Satisfied | DASHTAKI_K_1 | Non-Compliance | |||||||
Site Inspection | 11/24/2008 | Minor Out of Compliance | DASHTAKI_K_1 | 0/4 | Non-Compliance | ||||||
Issue Document | 11/10/2008 | Satisfied | DASHTAKI_K_1 | Enforcement | |||||||
Enforcement Referral | 11/10/2008 | Accepted | DASHTAKI_K_1 | Enforcement | |||||||
Site Inspection | 11/06/2008 | Major Out of Compliance | DASHTAKI_K_1 | 0/4 | Routine Compliance | ||||||
Letter | 11/06/2008 | Satisfied | DASHTAKI_K_1 | Non-Compliance | |||||||
Site Inspection | 07/01/2008 | In Compliance | DASHTAKI_K_1 | 0/4 | Non-Compliance | ||||||
Site Inspection | 01/15/2008 | Minor Out of Compliance | DASHTAKI_K_1 | 0/4 | Non-Compliance | ||||||
Letter | 12/26/2007 | Satisfied | DASHTAKI_K_1 | Non-Compliance | |||||||
Site Inspection | 12/26/2007 | Minor Out of Compliance | DASHTAKI_K_1 | 0/4 | Routine Compliance | ||||||
Site Inspection | 02/28/2007 | In Compliance | DASHTAKI_K_1 | 0/4 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/13/2007 | Satisfied | DASHTAKI_K_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/19/2006 | Satisfied | DASHTAKI_K_1 | Routine Compliance | |||||||
Site Inspection | 07/07/2006 | In Compliance | DASHTAKI_K_1 | 0/4 | Non-Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
03/21/2025 | 6002 | Minor | 2.1 Operator Training records not available. | Provide Class A/B and C operator training certificates. | |||||||
03/21/2025 | 6074 | Minor | 2.8 Improper maintenance of records. Records requiring to be maintained for 3 years or for the life of the system not kept by facility. Records not provided within 5 business days. | Provide three (3) years’ worth of monthly visual inspection and electronic release detection logs. | |||||||
03/21/2025 | 6053 | Minor | 4.7 Primary overfill protection not provided, registered, or tested as required. | Provide a current and passing annual operability test for two (2) overfill protection devices. | |||||||
03/21/2025 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | Confirm if the vent risers have pressure-vacuum caps. If they do not have them, install them. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
10/28/1988 | COMPLETED | 10 | EARLY DETECTION INCENTIVE-ELIGIBLE | ||||||||