![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/17/2025 Last Data Refresh: 05/16/2025 Report Generated from DOPPLER | |||||||||||
District | Northeast | Type | Retail Station | ||||||||
County | Dixie | Status | OPEN | ||||||||
ID | 8506546 | Latitude | 29° 38' 10.2973 | ||||||||
Name |
JIFFY FOOD MART #1550 16194 SE HWY US 19 |
Longitude | 83° 7' 53.0414 | ||||||||
CROSS CITY, FL 32628 | LL Method | DPHO | |||||||||
Contact | DENNIS BRADLEY | LL Status | REVIEWED | ||||||||
Phone | (352) 498-2285 | Status Date | 07/15/2010 | ||||||||
Account Owner Information | |||||||||||
Name | HUDSON FOOD STORES INC PO BOX 2298 Chiefland, FL 32644 |
Effective Date | 04/28/2011 | ||||||||
Contact | WHITNEY S SMITH | DENNIS BRADLEY (352-210-1978) | ||||||||||
Phone | (352) 493-4292 | ||||||||||
TPARKER@SVIC.NET | |||||||||||
Placard # / Date | 685863 - 06/10/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | HUDSON FOOD STORES INC PO BOX 2298 CHIEFLAND, FL 32628 |
Effective Date | 04/16/2002 | ||||||||
Contact | STONEY SMITH | ||||||||||
Phone | (352) 493-4292 | ||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 4000 | Vehicular Diesel (D) | 07/01/1998 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (M) Spill containment bucket |
(C) Fiberglass (F) Double wall (I) Suction piping system (K) Dispenser liners |
(4) Visual inspect dispenser liners (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
8 | 20000 | Unleaded Gas (B) | 08/01/2009 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (L) Compartmented (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms |
(B) Steel/galvanized metal (C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (Q) Visual inspection of ASTs (R) Monitor tank bottom space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 10000 | Unleaded Gas (B) | 01/01/1984 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (F) Double wall | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 10000 | Unleaded Gas (B) | 01/01/1984 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 4000 | Unleaded Gas (B) | 01/01/1984 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 4000 | Vehicular Diesel (D) | 01/01/1984 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 15000 | Unleaded Gas (B) | 07/01/1998 | UNDERGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (L) Compartmented (M) Spill containment bucket (N) Flow shut-Off |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 10000 | Vehicular Diesel (D) | 07/01/1998 | UNDERGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 09/25/2021 | 09/25/2022 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 09/25/2018 | 09/25/2019 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 09/25/2017 | 09/25/2018 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 09/25/2016 | 09/25/2017 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 09/25/2015 | 09/25/2016 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 09/25/2014 | 09/25/2015 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 09/25/2013 | 09/25/2014 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 09/25/2011 | 09/25/2012 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 09/25/2010 | 09/25/2011 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 09/25/2009 | 09/25/2010 | ZURICH-AMERICAN | ||||||||
INSURANCE | 09/25/2008 | 09/25/2009 | ZURICH-AMERICAN | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
RRBD | 09/21/2005 | 10/18/2005 | DEFALCO_L | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes REC'D VERIFICATION OF DROP TUBE INSTALL AND SUPMS PUMPED BY UNITED FUELS IN JULY. | |||||||||||
RRBD | 09/16/2005 | 09/16/2005 | DEFALCO_L | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes REC'D L L D TEST RESULTS 5/5 PASSED, STILL NEED DOC OF OVERFILL REPAIR/REPLACEMENT | |||||||||||
RRBD | 08/29/2005 | 08/22/2005 | DEFALCO_L | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes LETTER OF RESPONSE TO 8/22/05 DISTRICT LETTER FOR COMPLIANCE. RESPONSE IS INCOMPLETE. MESG. LSFT FOR MR. SMITH TO PROVIDE DOCUMENTATION OF TEST RESULTS TO THIS OFFICE. | |||||||||||
TCI | 06/10/2005 | 06/15/2005 | MINOR OUT-OF-COMPLIANCE | SHEFFIELD_C | 0/2 | COMPLIANCE ASSURANCE | |||||
RRBD | 06/25/2004 | 06/25/2004 | SHEFFIELD_C | 1/2 | COMPLIANCE ASSURANCE | ||||||
Completion Notes REC'D A COPY OF 2004-2005 PLACARD | |||||||||||
RRBD | 06/24/2004 | 06/24/2004 | SHEFFIELD_C | 1/2 | COMPLIANCE ASSURANCE | ||||||
Completion Notes REC'D NOTIFICATION THAT THE AST CONTAINMENT DRAIN IS CAPPED. | |||||||||||
TCI | 05/26/2004 | 06/01/2004 | MINOR OUT-OF-COMPLIANCE | SHEFFIELD_C | 1/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes LEAK DET CHECKED 5-25-04 | |||||||||||
TCR | 06/17/2003 | 06/19/2003 | IN-COMPLIANCE | COMPLIANCE ASSURANCE | |||||||
CALL | 06/03/2003 | 06/19/2003 | SHEFFIELD_C | 1/2 | COMPLIANCE ASSURANCE | ||||||
Completion Notes WATER EMPTIED FROM SPILL, ANTISIPHON INSTALLED | |||||||||||
TCI | 04/30/2003 | 05/01/2003 | MINOR OUT-OF-COMPLIANCE | SHEFFIELD_C | 1/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes D/W FIBERGLASS PIPING, D/W USTS, SINGLEWALL AST IN CONCRETE CONTAINMENT. LEAK DET. DUE 4-14-04 | |||||||||||
TCR | 05/06/2002 | 05/07/2002 | IN-COMPLIANCE | SHEFFIELD_C | 1/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes FLAPPER INSTALLED IN DIESEL FILL, FILL LIDS PAINTED, VISUAL INSP. BEING PERFORMED. | |||||||||||
RRBD | 04/22/2002 | 04/24/2002 | SHEFFIELD_C | 1/2 | COMPLIANCE ASSURANCE | ||||||
Completion Notes REC'D COPY OF NEW PLACARD | |||||||||||
RRBD | 04/09/2002 | 04/15/2002 | SHEFFIELD_C | 1/2 | COMPLIANCE ASSURANCE | ||||||
Completion Notes REC'D COPY OF LEAK DETECTOR ANNUAL CHECK 4-9-02 | |||||||||||
RRBD | 04/08/2002 | 04/15/2002 | SHEFFIELD_C | 1/2 | COMPLIANCE ASSURANCE | ||||||
Completion Notes REC'D COPY OF THE S.T. REGISTRATION FORM CHANGING OWNERSHIP | |||||||||||
NCLI | 04/02/2002 | 04/15/2002 | SHEFFIELD_C | 1/2 | COMPLIANCE ASSURANCE | ||||||
TCI | 03/27/2002 | 04/15/2002 | SIGNIFICANT OUT-OF-COMPLIANCE | SHEFFIELD_C | 1/2 | COMPLIANCE ASSURANCE | |||||
TCR | 05/24/2001 | 06/06/2001 | IN-COMPLIANCE | SHEFFIELD_C | 1/2 | COMPLIANCE ASSURANCE | |||||
TCI | 04/18/2001 | 04/19/2001 | SIGNIFICANT OUT-OF-COMPLIANCE | SHEFFIELD_C | 1/2 | COMPLIANCE ASSURANCE | |||||
TCR | 09/22/2000 | 10/02/2000 | IN-COMPLIANCE | SHEFFIELD_C | 1/2 | COMPLIANCE ASSURANCE | |||||
TCR | 06/16/2000 | 07/18/2000 | SIGNIFICANT OUT-OF-COMPLIANCE | SHEFFIELD_C | 1/2 | COMPLIANCE ASSURANCE | |||||
TCR | 05/04/2000 | 06/12/2000 | SIGNIFICANT OUT-OF-COMPLIANCE | SHEFFIELD_C | 1/2 | COMPLIANCE ASSURANCE | |||||
TCI | 03/14/2000 | 03/21/2000 | SIGNIFICANT OUT-OF-COMPLIANCE | SHEFFIELD_C | 1/2 | COMPLIANCE ASSURANCE | |||||
TCI | 05/07/1999 | 05/07/1999 | IN-COMPLIANCE | J.A.FROSS | 1/2 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Electronic Communication | 09/24/2024 | Satisfied | MCNEIL_A | Enforcement | |||||||
Letter | 09/16/2024 | Satisfied | MCNEIL_A | Enforcement | |||||||
Enforcement Referral | 08/08/2024 | Accepted | ZIMMERMAN_RA_2 | Enforcement | |||||||
Enforcement Referral | 08/07/2024 | Accepted | ZIMMERMAN_RA_2 | Enforcement | |||||||
Letter | 02/16/2022 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Site Inspection | 02/16/2022 | Major Out of Compliance | ZIMMERMAN_RA_2 | 2/0 | Routine Compliance | ||||||
Electronic Communication | 02/16/2022 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Phone Conversation | 01/25/2022 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Electronic Communication | 07/08/2021 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Letter | 02/12/2019 | Satisfied | KEIM_MJ_1 | Compliance Assistance | |||||||
Record Document | 02/12/2019 | Satisfied | KEIM_MJ_1 | Compliance Assistance | |||||||
Electronic Communication | 02/12/2019 | Satisfied | KEIM_MJ_1 | Routine Compliance | |||||||
Site Inspection | 02/12/2019 | Major Out of Compliance | KEIM_MJ_1 | 2/0 | Routine Compliance | ||||||
Electronic Communication | 02/12/2019 | Satisfied | KEIM_MJ_1 | Routine Compliance | |||||||
Letter | 09/07/2017 | Satisfied | TOWLE_M | Enforcement | |||||||
Record Document | 06/06/2016 | Satisfied | TOWLE_M | Enforcement | |||||||
Enforcement Tracking | 06/06/2016 | Closed Without Enforcement | TOWLE_M | Enforcement | |||||||
Phone Conversation | 05/20/2016 | Satisfied | TOWLE_M | Enforcement | |||||||
Issue Document | 05/20/2016 | Satisfied | TOWLE_M | Enforcement | |||||||
Enforcement Referral | 04/14/2016 | Accepted | TOWLE_M | Enforcement | |||||||
Letter | 04/06/2016 | Satisfied | GRAHAM_DL_1 | Non-Compliance | |||||||
Site Inspection | 04/06/2016 | Minor Out of Compliance | GRAHAM_DL_1 | 2/0 | Non-Compliance | ||||||
Meeting | 03/14/2016 | Satisfied | GRAHAM_DL_1 | Non-Compliance | |||||||
Letter | 11/19/2015 | Satisfied | GRAHAM_DL_1 | Non-Compliance | |||||||
Site Inspection | 09/30/2015 | Major Out of Compliance | GRAHAM_DL_1 | 2/0 | Routine Compliance | ||||||
Letter | 09/30/2015 | Satisfied | GRAHAM_DL_1 | Non-Compliance | |||||||
Phone Conversation | 09/11/2015 | Satisfied | GRAHAM_DL_1 | Routine Compliance | |||||||
Record Document | 08/14/2014 | Satisfied | GRAHAM_DL_1 | Non-Compliance | |||||||
Letter | 05/08/2014 | Satisfied | GRAHAM_DL_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 12/23/2013 | Satisfied | GRAHAM_DL_1 | Routine Compliance | |||||||
Site Inspection | 12/23/2013 | Minor Out of Compliance | GRAHAM_DL_1 | 2/0 | Routine Compliance | ||||||
Letter | 12/23/2013 | Satisfied | GRAHAM_DL_1 | Non-Compliance | |||||||
Enforcement Tracking | 08/15/2012 | Closed With Enforcement | LUBINSKI_D | Enforcement | |||||||
Issue Document | 08/15/2012 | Satisfied | LUBINSKI_D | Enforcement | |||||||
Emergency Preparedness Information | 12/12/2011 | Satisfied | SNIPES_SR_1 | Routine Compliance | |||||||
Issue Document | 12/12/2011 | Satisfied | SNIPES_SR_1 | Routine Compliance | |||||||
Issue Document | 12/12/2011 | Satisfied | SNIPES_SR_1 | Routine Compliance | |||||||
Site Inspection | 12/12/2011 | In Compliance | SNIPES_SR_1 | 2/0 | Routine Compliance | ||||||
Issue Document | 11/29/2011 | Satisfied | SNIPES_SR_1 | Routine Compliance | |||||||
Record Document | 06/09/2011 | Satisfied | SNIPES_SR_1 | Non-Compliance | |||||||
Issue Document | 06/09/2011 | Satisfied | SNIPES_SR_1 | Non-Compliance | |||||||
Letter | 06/07/2011 | Satisfied | SNIPES_SR_1 | Non-Compliance | |||||||
Record Document | 06/06/2011 | Satisfied | SNIPES_SR_1 | Closure | |||||||
Emergency Preparedness Information | 04/26/2011 | Satisfied | SNIPES_SR_1 | Routine Compliance | |||||||
Letter | 04/21/2011 | Satisfied | SNIPES_SR_1 | Non-Compliance | |||||||
Site Inspection | 04/21/2011 | Minor Out of Compliance | SNIPES_SR_1 | 2/0 | Routine Compliance | ||||||
Issue Document | 04/04/2011 | Satisfied | SNIPES_SR_1 | Routine Compliance | |||||||
Enforcement Referral | 01/05/2011 | Accepted | LUBINSKI_D | Enforcement | |||||||
Enforcement Tracking | 10/21/2010 | Closed With Enforcement | LUBINSKI_D | Enforcement | |||||||
Issue Document | 06/01/2010 | Satisfied | SNIPES_SR_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 06/01/2010 | Satisfied | SNIPES_SR_1 | Routine Compliance | |||||||
Site Inspection | 06/01/2010 | In Compliance | SNIPES_SR_1 | 2/0 | Routine Compliance | ||||||
Issue Document | 05/21/2010 | Satisfied | LUBINSKI_D | Closure | |||||||
TCAR | 05/21/2010 | Incomplete | LUBINSKI_D | Closure | |||||||
Issue Document | 05/07/2010 | Satisfied | SNIPES_SR_1 | Routine Compliance | |||||||
Issue Document | 04/15/2010 | Satisfied | LUBINSKI_D | Discharge | |||||||
Discharge Reporting | 04/15/2010 | Satisfied | MACK_BT | Discharge | |||||||
Issue Document | 02/15/2010 | Satisfied | SNIPES_SR_1 | Installation | |||||||
Site Inspection | 02/15/2010 | In Compliance | SNIPES_SR_1 | 2/0 | Installation | ||||||
Emergency Preparedness Information | 02/15/2010 | Satisfied | SNIPES_SR_1 | Installation | |||||||
Issue Document | 01/15/2010 | Major Out of Compliance | LUBINSKI_D | Enforcement | |||||||
Issue Document | 12/09/2009 | Satisfied | SNIPES_SR_1 | Closure | |||||||
Issue Document | 12/09/2009 | Satisfied | SNIPES_SR_1 | Closure | |||||||
Phone Conversation | 11/17/2009 | Satisfied | SNIPES_SR_1 | Closure | |||||||
Site Inspection | 11/13/2009 | In Compliance | SNIPES_SR_1 | 1/2 | Closure | ||||||
Issue Document | 11/13/2009 | Satisfied | SNIPES_SR_1 | Closure | |||||||
Site Inspection | 07/24/2009 | Minor Out of Compliance | LUBINSKI_D | 0/2 | Enforcement | ||||||
Issue Document | 07/15/2009 | Satisfied | LUBINSKI_D | Enforcement | |||||||
Enforcement Referral | 07/09/2009 | Accepted | LUBINSKI_D | Enforcement | |||||||
Site Inspection | 04/29/2009 | Minor Out of Compliance | SNIPES_SR_1 | 1/2 | Routine Compliance | ||||||
Record Document | 04/29/2009 | Satisfied | SNIPES_SR_1 | Non-Compliance | |||||||
Record Document | 04/29/2009 | Satisfied | SNIPES_SR_1 | Non-Compliance | |||||||
Issue Document | 04/29/2009 | Satisfied | SNIPES_SR_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 04/29/2009 | Satisfied | SNIPES_SR_1 | Routine Compliance | |||||||
Record Document | 04/29/2009 | Satisfied | SNIPES_SR_1 | Non-Compliance | |||||||
Record Document | 04/13/2009 | Satisfied | SNIPES_SR_1 | Routine Compliance | |||||||
Letter | 03/18/2009 | Satisfied | SNIPES_SR_1 | Non-Compliance | |||||||
Issue Document | 02/24/2009 | Satisfied | LUBINSKI_D | Enforcement | |||||||
Enforcement Tracking | 02/24/2009 | Closed Without Enforcement | LUBINSKI_D | Enforcement | |||||||
Enforcement Referral | 11/03/2008 | Accepted | LUBINSKI_D | Enforcement | |||||||
Record Document | 10/29/2008 | Satisfied | SNIPES_SR_1 | Non-Compliance | |||||||
Record Document | 10/29/2008 | Satisfied | SNIPES_SR_1 | Non-Compliance | |||||||
Letter | 08/28/2008 | Satisfied | SNIPES_SR_1 | Non-Compliance | |||||||
Site Inspection | 08/28/2008 | Minor Out of Compliance | SNIPES_SR_1 | 1/2 | Non-Compliance | ||||||
Phone Conversation | 07/24/2008 | Satisfied | SNIPES_SR_1 | Routine Compliance | |||||||
Phone Conversation | 07/10/2008 | Satisfied | SNIPES_SR_1 | Routine Compliance | |||||||
Site Inspection | 03/26/2008 | Minor Out of Compliance | CUBINSKI_K | 1/2 | Routine Compliance | ||||||
Letter | 03/26/2008 | Satisfied | SNIPES_SR_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 03/26/2008 | Satisfied | SNIPES_SR_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 05/23/2007 | Satisfied | SNIPES_SR_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 02/15/2007 | Satisfied | SNIPES_SR_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/26/2006 | Satisfied | SNIPES_SR_1 | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
02/16/2022 | 7089 | Minor | 1.11 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Have all of the under dispenser containment sumps containment integrity evaluation tested and certified; email passing test certification to DEP-NED. | |||||||
02/16/2022 | 7009 | SNC-B | 1.7 No financial responsibility instrument or expired instrument for < 180 days. | Email current Financial Responsibility including correctly filled out storage tanks financial responsibility forms part “P” and “C” or “D” to DEP-NED. | |||||||
02/16/2022 | 7075 | SNC-B | 3.1 Not repaired component or piping which has not caused a discharge or release. | Have shear valve mounting bracket bolts installed and rigidly installed in dispenser UDC 3/4 – email proof of violation resolution to DEP-NED; work order and pictures after shear valve has been installed. | |||||||
02/16/2022 | 6053 | Minor | 4.7 Primary overfill protection not provided, registered, or tested as required. | Email 2020 – 2021 overfill protection device testing certification to DEP-NED. | |||||||
02/16/2022 | 7072 | Minor | 1.8 Annual operability testing of release detection systems not completed. | Have Tank 8 electronic release detection system operability tested and certified; email passing test certification to DEP-NED.. | |||||||
02/16/2022 | 7072 | Minor | 1.8 Annual operability testing of release detection systems not completed. | Email 2020 – 2021 electronic release detection system operability test certification to DEP-NED. | |||||||
02/16/2022 | 7072 | Minor | 1.8 Annual operability testing of release detection systems not completed. | Email 2020 – 2021 line leak detector testing certification to DEP-NED. | |||||||
02/12/2019 | 5114 | Minor | 3.4 Shop fabricated storage tank system has a not repaired component which has or could cause a release or discharge. | Replace the cross bracket and treat the corroded brace holding the bracket on dispenser liner #3-4 then add the missing bolt to the shear valve. Contact the inspector to address the violation. | |||||||
02/12/2019 | 5042 | SNC-B | 3.22 Failure to provide approved overfill protection for shop fabricated tank systems. | Update the overfill prevention device and forward test results to the inspector to address this violation | |||||||
02/12/2019 | 5057 | SNC-B | 3.5 Pressurized small diameter piping not installed with line leak detectors and meeting requirements. | Have line leak detectors installed for under ground piping and forward test results to the inspector to address this violation. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
08/18/1998 | INACTIVE | 30 | PETROLEUM LIABILITY AND RESTORATION INSURANCE PROGRAM-ELIGIBLE | ||||||||