DEP Logo Florida Department of
Environmental Protection


Bob Martinez Center
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
Storage Tanks &
Contamination
Monitoring Information
 
Cover Page Report
Report Run Date: 05/09/2025        Last Data Refresh: 05/08/2025        Report Generated from DOPPLER
 
District Northeast   Type    Retail Station
 
County Duval   Status    OPEN
 
ID 8506649   Latitude    30° 25' 45.9485
 
Name DUNN AVE SUNOCO
1052 DUNN AVE
Longitude    81° 39' 44.8079
  JACKSONVILLE, FL 32218-4830 LL Method    DPHO
 
Contact JAY SEEWALD   LL Status    REVIEWED
 
Phone (954) 573-7117   Status Date    02/05/2024
 
Account Owner Information
 
Name FLORIDA PETROLEUM LLC
4911 LYONS TECHNOLOGY PKWY, SU#27
Pompano Beach, FL 33073
Effective Date    09/23/2020
 
Contact JAY SEEWALD
 
Phone (954) 573-7117
 
Email JAY@ONTHEMOVEGAS.COM
  Placard # / Date    703194 - 10/28/2024
Property Owner Information
 
Name FLORIDA PETROLEUM LLC
4911 LYONS TECHNOLOGY PKWY, SU#27
Pompano Beach, FL 33073
Effective Date    09/23/2020
 
Contact JAY SEEWALD
 
Phone (954) 573-7117
 
Email JAY@ONTHEMOVEGAS.COM
 
 
 
 
 
 
 
 
 
Tank Tank Size Content Installed Placement Status
1 10000 Vehicular Diesel (D) 05/01/1969 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(E) Fiberglass
  (B) Steel/galvanized metal (8) Manually sampled wells
 
 
Tank Tank Size Content Installed Placement Status
2 10000 Unleaded Gas (B) 05/01/1969 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(E) Fiberglass
  (B) Steel/galvanized metal (8) Manually sampled wells
 
 
Tank Tank Size Content Installed Placement Status
3 10000 Leaded Gas (A) 05/01/1969 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(E) Fiberglass
  (B) Steel/galvanized metal (8) Manually sampled wells
 
 
Tank Tank Size Content Installed Placement Status
4 10000 Unleaded Gas (B) 05/01/1969 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(E) Fiberglass
  (B) Steel/galvanized metal (8) Manually sampled wells
 
 
Tank Tank Size Content Installed Placement Status
5 10000 Kerosene (K) 06/01/1989 UNDERGROUND Out of Service (T)
 
Constructions   Pipings Monitorings
(E) Fiberglass
(I) Double wall
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
  (C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(1) Continuous electronic sensing
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
 
 
Tank Tank Size Content Installed Placement Status
6 10000 Unleaded Gas (B) 06/01/1989 UNDERGROUND Out of Service (T)
 
Constructions   Pipings Monitorings
(E) Fiberglass
(I) Double wall
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
  (C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(1) Continuous electronic sensing
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
 
 
Tank Tank Size Content Installed Placement Status
7 10000 Unleaded Gas (B) 06/01/1989 UNDERGROUND Out of Service (T)
 
Constructions   Pipings Monitorings
(E) Fiberglass
(I) Double wall
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
  (C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(1) Continuous electronic sensing
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
 
 
Tank Tank Size Content Installed Placement Status
8 10000 Unleaded Gas (B) 06/01/1989 UNDERGROUND Out of Service (T)
 
Constructions   Pipings Monitorings
(E) Fiberglass
(I) Double wall
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
  (C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(1) Continuous electronic sensing
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
 
 
Insurance Documents
 
FR Type   Effective Date Expiration Date Company Name
INSURANCE   LIBERTY SURPLUS INSURANCE CORP
LETTER OF CREDIT   09/24/2020 01/31/2025
INSURANCE   05/31/2018 09/24/2020
LETTER OF CREDIT   05/31/2018 09/23/2020
INSURANCE   12/31/2017 12/31/2018 SCOTTSDALE INSURANCE COMPANY
INSURANCE   12/31/2016 12/31/2017 LIBERTY SURPLUS INSURANCE CORP
INSURANCE   12/31/2015 12/31/2016 LIBERTY SURPLUS INSURANCE CORP
INSURANCE   06/20/2013 12/31/2015 LIBERTY SURPLUS INSURANCE CORP
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER   04/30/2013 04/29/2014
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER   04/30/2012 04/29/2013
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER   04/29/2011 04/30/2012
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER   04/28/2010 04/30/2011
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER   04/30/2009 04/29/2010
 
 
Legacy Compliance Activity Information
 
Activity
Code
Date
Initiated
Date
Completed
Results Inspector AST/UST
Count
Description
TCI 10/26/2005 IN-COMPLIANCE TORSANKO 0/4 COMPLIANCE ASSURANCE
 
TCI 03/31/2005 04/08/2005 IN-COMPLIANCE TORSANKO 0/4 COMPLIANCE ASSURANCE
 
TCI 03/16/2004 03/18/2004 IN-COMPLIANCE BORISADE_C 0/4 COMPLIANCE ASSURANCE
 
CWOE 01/20/2004 01/20/2004 TORSANKO_G 0/3 COMPLIANCE ASSURANCE
 
PDNE 01/20/2004 01/20/2004 TORSANKO_G /3 COMPLIANCE ASSURANCE
 
 Completion Notes INSPECTOR FOR TCI NO LONGER WITH ERMD. TIME FOR TASK 7 TCI.
 
TCR 08/13/2003 12/01/2003 MINOR OUT-OF-COMPLIANCE MACK 0/4 COMPLIANCE ASSURANCE
 
 Completion Notes VIOLATION 9, 81, 157, & 118 CORRECTED. VIOL 82 STILL OPEN.
 
RRBD 07/10/2003 03/02/2004 IN-COMPLIANCE TORSANKO_G 0/0 DISCHARGE PROJECT
 
 Completion Notes BOOT AND CLAMP CAUSED PIPE TO FAIL TIGHTNESS TEST. TANKNOLOGY REPAIRED AND RE-TESTED. PASSED.
 
IRFR 06/27/2003 06/30/2003 TORSANKO_G 0/0 DISCHARGE PROJECT
 
 Completion Notes REPAIR & TEST RESULTS TO BE FORWARDED TANK TIGHTNESS TEST FAILURE.
 
TCI 06/10/2003 08/25/2003 MINOR OUT-OF-COMPLIANCE MACK_W 0/4 COMPLIANCE ASSURANCE
 
TCI 03/26/2002 03/27/2002 IN-COMPLIANCE HOLLOWAY_R 0/4 COMPLIANCE ASSURANCE
 
TCI 02/21/2001 02/22/2001 IN-COMPLIANCE HOLLOWAY_R 0/4 COMPLIANCE ASSURANCE
 
TCI 11/17/1999 12/08/1999 IN-COMPLIANCE HOLLOWAY_R 0/4 COMPLIANCE ASSURANCE
 
 
 
Compliance Activity Information
 
Activity
Code
Date
Completed
Results Inspector AST/UST
Count
Description
Letter 05/05/2025 Satisfied VILLEGASAVILA_OE_1 Compliance Assistance
 
Site Inspection 05/05/2025 Major Out of Compliance VILLEGASAVILA_OE_1 0/4 Routine Compliance
 
Enforcement Tracking 10/24/2024 Closed Without Enforcement MACK_BT Enforcement
 
Electronic Communication 08/22/2024 Satisfied CHRISTIAN_ED_1 Compliance Assistance
 
Document Management 06/03/2024 Satisfied ROBBINS_JL_1 Incident
 
Electronic Communication 06/03/2024 Satisfied ROBBINS_JL_1 Compliance Assistance
 
Document Management 06/03/2024 Satisfied ROBBINS_JL_1 Incident
 
Enforcement Referral 05/30/2024 Accepted GAINEY_H_1 Enforcement
 
Electronic Communication 05/20/2024 Satisfied ROBBINS_JL_1 Compliance Assistance
 
Electronic Communication 05/06/2024 Satisfied ROBBINS_JL_1 Compliance Assistance
 
Electronic Communication 04/02/2024 Satisfied ROBBINS_JL_1 Compliance Assistance
 
Electronic Communication 03/07/2024 Satisfied ROBBINS_JL_1 Compliance Assistance
 
Site Inspection 03/05/2024 Major Out of Compliance ROBBINS_JL_1 0/4 Compliance Assistance
 
Letter 03/05/2024 Satisfied ROBBINS_JL_1 Compliance Assistance
 
Enforcement Tracking 12/09/2022 Closed With Enforcement MACK_BT Enforcement
 
Electronic Communication 10/14/2022 Satisfied ROBBINS_JL_1 Compliance Assistance
 
Electronic Communication 10/07/2022 Satisfied ROBBINS_JL_1 Compliance Assistance
 
Enforcement Referral 09/14/2022 Accepted GAINEY_H_1 Enforcement
 
Electronic Communication 09/14/2022 Satisfied ROBBINS_JL_1 Compliance Assistance
 
Letter 08/11/2022 Satisfied ROBBINS_JL_1 Compliance Assistance
 
Site Inspection 08/11/2022 Major Out of Compliance ROBBINS_JL_1 0/4 Routine Compliance
 
Electronic Communication 08/08/2022 Satisfied ROBBINS_JL_1 Compliance Assistance
 
Enforcement Referral 10/15/2021 Accepted COLE_K Enforcement
 
Letter 10/11/2021 Satisfied CHRISTIAN_E Enforcement
 
Enforcement Tracking 10/11/2021 Closed Without Enforcement CHRISTIAN_E Enforcement
 
Enforcement Referral 01/11/2021 Accepted GAINEY_H_1 Enforcement
 
Electronic Communication 01/08/2021 Satisfied MACK_B_1 Routine Compliance
 
Electronic Communication 01/08/2021 Satisfied MACK_B_1 Compliance Assistance
 
Electronic Communication 01/08/2021 Satisfied MACK_B_1 Compliance Assistance
 
Electronic Communication 01/08/2021 Satisfied MACK_B_1 Compliance Assistance
 
Electronic Communication 01/08/2021 Satisfied MACK_B_1 Compliance Assistance
 
Electronic Communication 01/08/2021 Satisfied MACK_B_1 Compliance Assistance
 
Electronic Communication 01/08/2021 Satisfied MACK_B_1 Routine Compliance
 
Electronic Communication 01/08/2021 Satisfied MACK_B_1 Routine Compliance
 
Electronic Communication 01/08/2021 Satisfied MACK_B_1 Routine Compliance
 
Electronic Communication 01/08/2021 Satisfied MACK_B_1 Compliance Assistance
 
Electronic Communication 12/15/2020 Satisfied MACK_B_1 Compliance Assistance
 
Letter 10/21/2020 Satisfied MACK_B_1 Compliance Assistance
 
Site Inspection 10/20/2020 Major Out of Compliance MACK_B_1 0/4 Routine Compliance
 
Enforcement Tracking 06/25/2019 Closed Without Enforcement OBRIEN_S Enforcement
 
Letter 06/25/2019 Satisfied OBRIEN_S Enforcement
 
Letter 04/01/2019 Satisfied OBRIEN_S Enforcement
 
Enforcement Referral 07/31/2018 Accepted RICHARDS_JE_1 Enforcement
 
Electronic Communication 07/03/2018 Satisfied MONDO_PW_1 Compliance Assistance
 
Electronic Communication 07/03/2018 Satisfied MONDO_PW_1 Compliance Assistance
 
Letter 04/06/2018 Satisfied MONDO_PW_1 Compliance Assistance
 
Electronic Communication 04/06/2018 Satisfied MONDO_PW_1 Routine Compliance
 
Site Inspection 04/06/2018 Major Out of Compliance MONDO_PW_1 0/4 Routine Compliance
 
Electronic Communication 03/13/2018 Satisfied MONDO_PW_1 Routine Compliance
 
Incident 09/07/2017 Has not led to Discharge TOWLE_M Incident
 
Site Inspection 11/03/2016 In Compliance LUNN_RJ_1 0/4 Installation
 
Electronic Communication 11/03/2016 Satisfied LUNN_RJ_1 Installation
 
Letter 10/28/2016 Satisfied RICHARDS_JE_1 Closure
 
TCAR 10/27/2016 Satisfied RICHARDS_JE_1 Closure
 
Letter 10/25/2016 Satisfied TOWLE_M Enforcement
 
Meeting 10/25/2016 Satisfied TOWLE_M Enforcement
 
Enforcement Tracking 10/25/2016 Closed Without Enforcement TOWLE_M Enforcement
 
Issue Document 10/25/2016 Satisfied TOWLE_M Enforcement
 
Electronic Communication 10/13/2016 Satisfied LUNN_RJ_1 Closure
 
Site Inspection 10/13/2016 In Compliance LUNN_RJ_1 0/4 Closure
 
Record Document 10/03/2016 Satisfied TOWLE_M Enforcement
 
Issue Document 08/30/2016 Satisfied TOWLE_M Enforcement
 
Record Document 08/12/2016 Satisfied TOWLE_M Enforcement
 
Phone Conversation 08/09/2016 Satisfied TOWLE_M Enforcement
 
Document Management 08/05/2016 Satisfied TOWLE_M Incident
 
Phone Conversation 08/04/2016 Satisfied TOWLE_M Enforcement
 
Phone Conversation 08/04/2016 Satisfied TOWLE_M Enforcement
 
Issue Document 08/04/2016 Satisfied TOWLE_M Enforcement
 
Phone Conversation 06/03/2016 Satisfied TOWLE_M Enforcement
 
Phone Conversation 05/20/2016 Satisfied TOWLE_M Enforcement
 
Enforcement Referral 05/19/2016 Accepted TOWLE_M Enforcement
 
Electronic Communication 05/18/2016 Satisfied RICHARDS_JE_1 Non-Compliance
 
Letter 02/19/2016 Satisfied RICHARDS_JE_1 Non-Compliance
 
Electronic Communication 01/13/2016 Satisfied LUNN_RJ_1 Non-Compliance
 
Letter 11/30/2015 Satisfied LUNN_RJ_1 Non-Compliance
 
Site Inspection 11/24/2015 Minor Out of Compliance LUNN_RJ_1 0/4 Routine Compliance
 
Electronic Communication 11/24/2015 Satisfied LUNN_RJ_1 Routine Compliance
 
Electronic Communication 10/12/2015 Satisfied LUNN_RJ_1 Routine Compliance
 
Electronic Communication 12/27/2013 Satisfied WILLIAMS_AK_1 Routine Compliance
 
Site Inspection 12/26/2013 In Compliance WILLIAMS_AK_1 0/4 Routine Compliance
 
Emergency Preparedness Information 12/18/2013 Satisfied WILLIAMS_AK_1 Routine Compliance
 
Site Inspection 02/02/2012 In Compliance CAIN_M_1 0/4 Routine Compliance
 
Record Document 02/02/2012 Satisfied CAIN_M_1 Non-Compliance
 
Site Inspection 09/10/2010 In Compliance HOLLOWAY_RW_1 0/4 Routine Compliance
 
Electronic Communication 09/05/2010 Satisfied HOLLOWAY_RW_1 Routine Compliance
 
Site Inspection 09/16/2009 In Compliance HOLLOWAY_RW_1 0/4 Routine Compliance
 
Record Document 01/14/2009 Satisfied GRIFFIN_TW_1 Routine Compliance
 
Record Document 09/26/2008 Satisfied WILLIAMS_AK_1 Non-Compliance
 
Record Document 09/11/2008 Satisfied WILLIAMS_EM_1 Non-Compliance
 
Letter 08/28/2008 Satisfied WILLIAMS_AK_1 Non-Compliance
 
Site Inspection 08/28/2008 Minor Out of Compliance WILLIAMS_AK_1 0/4 Routine Compliance
 
Letter 09/06/2007 Satisfied WILLIAMS_AK_1 Non-Compliance
 
Site Inspection 09/06/2007 In Compliance GRIFFIN_TW_1 0/4 Routine Compliance
 
Emergency Preparedness Information 08/28/2007 Satisfied GRIFFIN_TW_1 Routine Compliance
 
Emergency Preparedness Information 02/15/2007 Satisfied GRIFFIN_TW_1 Routine Compliance
 
Site Inspection 12/15/2006 In Compliance WILLIAMS_AK_1 0/4 Non-Compliance
 
Site Inspection 12/13/2006 In Compliance WILLIAMS_AK_1 0/4 Non-Compliance
 
Site Inspection 10/26/2006 Minor Out of Compliance WILLIAMS_AK_1 0/4 Routine Compliance
 
Site Inspection 10/24/2006 Minor Out of Compliance TORSANKO_G 0/4 Routine Compliance
 
Emergency Preparedness Information 09/24/2006 Satisfied GRIFFIN_TW_1 Routine Compliance
 
 
 
No Open AOCs Found
 
 
Open Violations
 
Insp Date Vio # Significance Violation Text Corrective Action
05/05/2025 6077 Minor 4.8 Out of service storage tank systems not tested annually for operability or interstice and liquid level not monitored annually. The facility must provide annual visual inspection records of the tank components from 2022 to the current; according to Rule 62-761 FAC.
 
05/05/2025 6013 Minor 2.10 Appropriate paperwork for financial responsibility improperly completed or maintained. The facility must provide the Part F (STORAGE TANK IRREVOCABLE STANDBY LETTER OF CREDIT) for the period of coverage shown in Part P.
 
03/07/2024 6015 Minor 4.3 Incident investigation not completed within 14 days, and/or no DRF or written confirmation received at the end of the 14-day investigation period. Investigate issue to determine if a discharge has occurred.
 
03/07/2024 6014 SNC-B 4.2 Incident investigation not initiated within 24-hours (or by next business day) to determine if discharge occurred. Investigate issue.
 
03/05/2024 6014 SNC-B 4.2 Incident investigation not initiated within 24-hours (or by next business day) to determine if discharge occurred. Investigate issue.
 
03/05/2024 6015 Minor 4.3 Incident investigation not completed within 14 days, and/or no DRF or written confirmation received at the end of the 14-day investigation period. Investigate issue to determine if a discharge has occurred.
 
08/09/2022 6001 Minor 2.1 No reasonable access provided. Contact the EQD to schedule an inspection with a facility representative present.
 
08/09/2022 6063 SNC-B 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. Repair damaged Regular fill area and provide documentation of repair/replacement.
 
 
 
No Discharges Found