![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 03/19/2025 Last Data Refresh: 03/18/2025 Report Generated from DOPPLER | |||||||||||
District | Northeast | Type | Retail Station | ||||||||
County | Duval | Status | OPEN | ||||||||
ID | 8506757 | Latitude | 30° 16' 56.7802 | ||||||||
Name |
IBEX FOOD MART 5407 SAN JUAN AVE |
Longitude | 81° 44' 18.0059 | ||||||||
JACKSONVILLE, FL 32210-3143 | LL Method | DPHO | |||||||||
Contact | YONAS HAILEMARIAN | LL Status | REVIEWED | ||||||||
Phone | (904) 387-2100 | Status Date | 02/07/2024 | ||||||||
Account Owner Information | |||||||||||
Name | IBEX FOOD MART 5407 SAN JUAN AVE JACKSONVILLE, FL 32210 |
Effective Date | 01/06/2006 | ||||||||
Contact | HAILEMARIAN, YONAS | ||||||||||
Phone | (904) 434-4789 | ||||||||||
IBEX1693@YAHOO.COM | |||||||||||
Placard # / Date | 699041 - 07/08/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | IBEX FOOD MART 5407 SAN JUAN AVE JACKSONVILLE, FL 32210 |
Effective Date | 04/08/2008 | ||||||||
Contact | HAILEMARIAN, YONAS | ||||||||||
Phone | (904) 434-4789 | ||||||||||
IBEX1693@YAHOO.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 16000 | Unleaded Gas (B) | 09/01/2010 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (L) Compartmented (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 3000 | Leaded Gas (A) | 12/01/1969 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(C) Fiberglass | (8) Manually sampled wells (D) SPCC Plan |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1R1 | 6000 | Unleaded Gas (B) | 12/01/1988 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off |
(C) Fiberglass (E) Cathodic protection (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 3000 | Leaded Gas (A) | 12/01/1969 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(C) Fiberglass | (8) Manually sampled wells (D) SPCC Plan |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2R1 | 8000 | Unleaded Gas (B) | 12/01/1988 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off |
(C) Fiberglass (E) Cathodic protection (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 3000 | Gasohol (C) | 12/01/1969 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(C) Fiberglass | (8) Manually sampled wells (D) SPCC Plan |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3R1 | 10000 | Unleaded Gas (B) | 12/01/1988 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off |
(C) Fiberglass (E) Cathodic protection (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
EXEMPT-NOT REQUIRED | |||||||||||
INSURANCE | 09/24/2023 | 09/24/2024 | COMMERCE AND INDUSTRY INSURANCE COMPANY | ||||||||
INSURANCE | 09/24/2022 | 09/24/2023 | COMMERCE AND INDUSTRY INSURANCE COMPANY | ||||||||
INSURANCE | 09/24/2021 | 09/24/2022 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 09/24/2020 | 09/24/2021 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 09/24/2019 | 09/24/2020 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 09/24/2018 | 09/24/2019 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 09/24/2017 | 09/24/2018 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 09/24/2016 | 09/24/2017 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 09/24/2015 | 09/24/2016 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 09/24/2014 | 09/24/2015 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 09/24/2013 | 09/24/2014 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 09/24/2012 | 09/24/2013 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 09/24/2011 | 09/24/2012 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 09/24/2010 | 09/24/2011 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 09/24/2010 | 09/24/2011 | ACE | ||||||||
INSURANCE | 12/07/2007 | 12/07/2008 | ACE | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 08/23/2005 | 08/23/2005 | IN-COMPLIANCE | BORISADE | 0/3 | COMPLIANCE ASSURANCE | |||||
TCR | 11/15/2004 | 11/22/2004 | IN-COMPLIANCE | BORISADE | 3/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes VIOL 1105 CORR | |||||||||||
RRBD | 11/02/2004 | 11/03/2004 | MINOR OUT-OF-COMPLIANCE | BORISADE | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 10/28/2004 | 11/03/2004 | CARROLL | 1/0 | COMPLIANCE ASSURANCE | ||||||
NCLI | 10/20/2004 | 10/21/2004 | ALLEN | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes NCLI, VIO. # 1103 & 1105. | |||||||||||
TCI | 10/19/2004 | 10/20/2004 | MINOR OUT-OF-COMPLIANCE | BORISADE | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 02/12/2004 | 02/18/2004 | IN-COMPLIANCE | YATES_R | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 12/11/2003 | 12/16/2003 | MINOR OUT-OF-COMPLIANCE | TOWNSEND_C | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 04/07/2003 | 04/11/2003 | IN-COMPLIANCE | BORISADE_C | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 03/28/2003 | 03/28/2003 | TORSANKO_G | 0/1 | DISCHARGE PROJECT | ||||||
Completion Notes CALLED FACILITY HOME OFFICE, REQUESTED RETRACTION LETTER. REC'D RESPONSE. STORE PERSONNEL NOT STICKING TANKS CORRECTLY. | |||||||||||
TCI | 04/25/2002 | 05/01/2002 | IN-COMPLIANCE | HOLLOWAY_R | 0/3 | COMPLIANCE ASSURANCE | |||||
IRFR | 04/10/2002 | 09/07/2002 | TORSANKO_G | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes REG TANK SIR-FAIL - STICK READINGS | |||||||||||
TCR | 09/11/2001 | 10/01/2001 | IN-COMPLIANCE | HOLLOWAY_R | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 08/15/2001 | 09/16/2002 | TORSANKO_G | 0/3 | DISCHARGE PROJECT | ||||||
Completion Notes EXPLAINED ON 8-15-01 INF REC'D THAT BOTH WERE DUE TO NEW STICK USED FOR READINGS | |||||||||||
IRFR | 08/15/2001 | 09/16/2002 | TORSANKO_G | 0/3 | DISCHARGE PROJECT | ||||||
Completion Notes REG, MID AND PREM ARE INCON. DUE TO NEW STICK FOR READINGS | |||||||||||
RRBD | 08/15/2001 | 09/16/2002 | TORSANKO_G | 0/3 | DISCHARGE PROJECT | ||||||
Completion Notes EXPLAINED THE PROBLEM TO BE A NEW STICK USED FOR READINGS | |||||||||||
IRFR | 07/11/2001 | 11/28/2001 | TORSANKO_G | 0/3 | DISCHARGE PROJECT | ||||||
Completion Notes REG,MID AND PREM. SIR FAILURE | |||||||||||
TCI | 05/24/2001 | 05/30/2001 | SIGNIFICANT OUT-OF-COMPLIANCE | HOLLOWAY_R | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes SEE VIOLATIONS | |||||||||||
TCI | 03/15/2000 | 03/20/2000 | IN-COMPLIANCE | HOLLOWAY_R | 0/3 | COMPLIANCE ASSURANCE | |||||
CWOE | 06/03/1999 | 06/07/1999 | HOFFMAN_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
WLI | 05/25/1999 | 09/27/1999 | HOFFMAN_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 04/16/1999 | 05/06/1999 | SIGNIFICANT OUT-OF-COMPLIANCE | CARROLL_A | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes INSURANCE RUNNING OUT | |||||||||||
NCLI | 04/16/1999 | 05/06/1999 | CARROLL_A | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes .400(3) | |||||||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Letter | 01/16/2025 | Satisfied | JACKSON_SM | Enforcement | |||||||
Enforcement Referral | 05/03/2024 | Accepted | GAINEY_H_1 | Enforcement | |||||||
Electronic Communication | 04/04/2024 | Satisfied | MCARTOR_H_1 | Compliance Assistance | |||||||
Electronic Communication | 03/18/2024 | Satisfied | MCARTOR_H_1 | Compliance Assistance | |||||||
Electronic Communication | 03/18/2024 | Satisfied | MCARTOR_H_1 | Compliance Assistance | |||||||
Electronic Communication | 02/16/2024 | Satisfied | MCARTOR_H_1 | Compliance Assistance | |||||||
Site Inspection | 01/18/2024 | Major Out of Compliance | WATSON_MS_3 | 0/1 | Routine Compliance | ||||||
Letter | 01/18/2024 | Satisfied | WATSON_MS_3 | Compliance Assistance | |||||||
Electronic Communication | 01/11/2024 | Satisfied | WATSON_MS_3 | Compliance Assistance | |||||||
Letter | 03/28/2022 | Satisfied | MCARTOR_H_1 | Compliance Assistance | |||||||
Electronic Communication | 03/25/2022 | Satisfied | MCARTOR_H_1 | Compliance Assistance | |||||||
Letter | 02/22/2022 | Satisfied | MCARTOR_H_1 | Compliance Assistance | |||||||
Site Inspection | 02/18/2022 | Minor Out of Compliance | MCARTOR_H_1 | 0/1 | Routine Compliance | ||||||
Phone Conversation | 01/27/2022 | Satisfied | MCARTOR_H_1 | Compliance Assistance | |||||||
Electronic Communication | 01/27/2022 | Satisfied | MCARTOR_H_1 | Compliance Assistance | |||||||
Electronic Communication | 11/17/2021 | Satisfied | MCARTOR_H_1 | Compliance Assistance | |||||||
Meeting | 11/17/2021 | Satisfied | MCARTOR_H_1 | Compliance Assistance | |||||||
Phone Conversation | 11/10/2021 | Satisfied | MCARTOR_H_1 | Compliance Assistance | |||||||
Phone Conversation | 11/10/2021 | Satisfied | MCARTOR_H_1 | Compliance Assistance | |||||||
Enforcement Tracking | 10/10/2019 | Closed Without Enforcement | SOLTIS_C | Enforcement | |||||||
Letter | 10/08/2019 | Satisfied | SOLTIS_C | Enforcement | |||||||
Letter | 10/08/2019 | Satisfied | SOLTIS_C | Enforcement | |||||||
Enforcement Referral | 08/19/2019 | Accepted | GREGORY_HM_1 | Enforcement | |||||||
Electronic Communication | 05/29/2019 | Satisfied | VERMILLION_KN_1 | Compliance Assistance | |||||||
Site Inspection | 05/17/2019 | Major Out of Compliance | VERMILLION_KN_1 | 0/1 | Routine Compliance | ||||||
Letter | 05/17/2019 | Satisfied | VERMILLION_KN_1 | Compliance Assistance | |||||||
Electronic Communication | 04/17/2019 | Satisfied | VERMILLION_KN_1 | Routine Compliance | |||||||
Phone Conversation | 08/03/2017 | Satisfied | GREGORY_HM_1 | Compliance Assistance | |||||||
Electronic Communication | 09/29/2016 | Satisfied | GREGORY_HM_1 | Non-Compliance | |||||||
Letter | 09/22/2016 | Satisfied | GREGORY_HM_1 | Non-Compliance | |||||||
Electronic Communication | 09/21/2016 | Satisfied | GREGORY_HM_1 | Routine Compliance | |||||||
Record Document | 09/21/2016 | Satisfied | GREGORY_HM_1 | Routine Compliance | |||||||
Site Inspection | 09/20/2016 | Minor Out of Compliance | GREGORY_HM_1 | 0/1 | Routine Compliance | ||||||
Electronic Communication | 09/20/2016 | Satisfied | GREGORY_HM_1 | Routine Compliance | |||||||
Electronic Communication | 09/08/2016 | Satisfied | GREGORY_HM_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 11/06/2014 | Satisfied | LUNN_RJ_1 | Routine Compliance | |||||||
Site Inspection | 10/30/2014 | In Compliance | LUNN_RJ_1 | 0/1 | Routine Compliance | ||||||
Electronic Communication | 10/30/2014 | Satisfied | LUNN_RJ_1 | Routine Compliance | |||||||
Electronic Communication | 10/10/2012 | Satisfied | KOROUS_E_1 | Routine Compliance | |||||||
Site Inspection | 10/09/2012 | In Compliance | KOROUS_E_1 | 0/1 | Routine Compliance | ||||||
Emergency Preparedness Information | 10/09/2012 | Satisfied | KOROUS_E_1 | Routine Compliance | |||||||
Site Inspection | 03/16/2012 | In Compliance | LUNN_RJ_1 | 0/1 | Installation | ||||||
Site Inspection | 03/16/2012 | In Compliance | LUNN_RJ_1 | 0/1 | Closure | ||||||
Record Document | 06/20/2011 | Satisfied | TOWLE_M | QA/QC | |||||||
Issue Document | 06/15/2011 | Satisfied | TOWLE_M | QA/QC | |||||||
Issue Document | 06/15/2011 | Satisfied | TOWLE_M | QA/QC | |||||||
Site Inspection | 06/07/2011 | In Compliance | TOWLE_M | 0/1 | QA/QC | ||||||
Issue Document | 05/18/2011 | Satisfied | TOWLE_M | QA/QC | |||||||
Site Inspection | 04/25/2011 | In Compliance | LUNN_RJ_1 | 0/1 | Routine Compliance | ||||||
Emergency Preparedness Information | 04/25/2011 | Satisfied | LUNN_RJ_1 | Routine Compliance | |||||||
Letter | 01/31/2011 | Satisfied | HOLLOWAY_RW_1 | Closure | |||||||
TCAR | 01/24/2011 | Satisfied | HOLLOWAY_RW_1 | Closure | |||||||
Letter | 01/06/2011 | Satisfied | HOLLOWAY_RW_1 | Closure | |||||||
TCAR | 01/05/2011 | Incomplete | HOLLOWAY_RW_1 | Closure | |||||||
Letter | 12/16/2010 | Satisfied | HOLLOWAY_RW_1 | Non-Compliance | |||||||
Site Inspection | 10/01/2010 | In Compliance | LUNN_RJ_1 | 0/1 | Installation | ||||||
Site Inspection | 08/27/2010 | In Compliance | LUNN_RJ_1 | 0/3 | Closure | ||||||
Electronic Communication | 08/19/2010 | Satisfied | LUNN_RJ_1 | Installation | |||||||
Electronic Communication | 08/13/2010 | Satisfied | LUNN_RJ_1 | Closure | |||||||
Site Inspection | 05/06/2010 | In Compliance | SPEARS_CV_1 | 0/3 | Routine Compliance | ||||||
Enforcement Tracking | 08/24/2009 | Closed Without Enforcement | TOWLE_M | Enforcement | |||||||
Record Document | 08/21/2009 | Satisfied | TOWLE_M | Enforcement | |||||||
Issue Document | 08/20/2009 | Satisfied | TOWLE_M | Enforcement | |||||||
Record Document | 08/19/2009 | Satisfied | TOWLE_M | Enforcement | |||||||
Phone Conversation | 08/18/2009 | Satisfied | TOWLE_M | Enforcement | |||||||
Record Document | 08/12/2009 | Satisfied | TOWLE_M | Enforcement | |||||||
Issue Document | 05/06/2009 | Satisfied | TOWLE_M | Enforcement | |||||||
Enforcement Referral | 04/07/2009 | Accepted | TOWLE_M | Enforcement | |||||||
Issue Document | 02/19/2009 | Satisfied | TOWLE_M | Non-Compliance | |||||||
Record Document | 02/16/2009 | Satisfied | TOWLE_M | Non-Compliance | |||||||
Site Inspection | 11/13/2008 | In Compliance | SPEARS_CV_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 01/25/2008 | Satisfied | SPEARS_CV_1 | Routine Compliance | |||||||
Site Inspection | 01/25/2008 | In Compliance | SPEARS_CV_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 02/12/2007 | In Compliance | BORISADE_KA_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/12/2007 | Satisfied | BORISADE_KA_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 02/09/2007 | Satisfied | BORISADE_KA_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/25/2006 | Satisfied | CARROLL_A | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
01/18/2024 | 6001 | Minor | 2.1 No reasonable access provided. | Facility must provide photographs/documentation of status of the interstitial space of the Regular and Premium double walled spill buckets and if the interstitial spaces are clean and dry or not. Additionally, Facility must determine and report to inspector what the release detection monitoring method is for the interstitial spaces of the double walled spill buckets. | |||||||
01/18/2024 | 6060 | SNC-B | 4.11 Release detection methods do not meet monitoring requirements. | Facility most demonstrate that piping interstices in STP sumps are open to interstitial monitoring. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
10/01/1987 | INACTIVE | 51 | EARLY DETECTION INCENTIVE-ELIGIBLE | PARENTE, PAUL K. | 9042557140 | ||||||