![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Northeast | Type | Retail Station | ||||||||
County | Duval | Status | OPEN | ||||||||
ID | 8506757 | Latitude | 30° 16' 56.7802 | ||||||||
Name |
IBEX FOOD MART 5407 SAN JUAN AVE |
Longitude | 81° 44' 18.0059 | ||||||||
JACKSONVILLE, FL 32210-3143 | LL Method | DPHO | |||||||||
Contact | YONAS HAILEMARIAN | LL Status | REVIEWED | ||||||||
Phone | (904) 387-2100 | Status Date | 02/07/2024 | ||||||||
Account Owner Information | |||||||||||
Name | IBEX FOOD MART 5407 SAN JUAN AVE JACKSONVILLE, FL 32210 |
Effective Date | 01/06/2006 | ||||||||
Contact | HAILEMARIAN, YONAS | ||||||||||
Phone | (904) 434-4789 | ||||||||||
IBEX1693@YAHOO.COM | |||||||||||
Placard # / Date | 699041 - 07/08/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | IBEX FOOD MART 5407 SAN JUAN AVE JACKSONVILLE, FL 32210 |
Effective Date | 04/08/2008 | ||||||||
Contact | HAILEMARIAN, YONAS | ||||||||||
Phone | (904) 434-4789 | ||||||||||
IBEX1693@YAHOO.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 16000 | Unleaded Gas (B) | 09/01/2010 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (L) Compartmented (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 3000 | Leaded Gas (A) | 12/01/1969 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(C) Fiberglass | (8) Manually sampled wells (D) SPCC Plan |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1R1 | 6000 | Unleaded Gas (B) | 12/01/1988 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off |
(C) Fiberglass (E) Cathodic protection (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 3000 | Leaded Gas (A) | 12/01/1969 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(C) Fiberglass | (8) Manually sampled wells (D) SPCC Plan |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2R1 | 8000 | Unleaded Gas (B) | 12/01/1988 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off |
(C) Fiberglass (E) Cathodic protection (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 3000 | Gasohol (C) | 12/01/1969 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(C) Fiberglass | (8) Manually sampled wells (D) SPCC Plan |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3R1 | 10000 | Unleaded Gas (B) | 12/01/1988 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off |
(C) Fiberglass (E) Cathodic protection (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
EXEMPT-NOT REQUIRED | |||||||||||
INSURANCE | 09/24/2023 | 09/24/2024 | COMMERCE AND INDUSTRY INSURANCE COMPANY | ||||||||
INSURANCE | 09/24/2022 | 09/24/2023 | COMMERCE AND INDUSTRY INSURANCE COMPANY | ||||||||
INSURANCE | 09/24/2021 | 09/24/2022 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 09/24/2020 | 09/24/2021 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 09/24/2019 | 09/24/2020 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 09/24/2018 | 09/24/2019 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 09/24/2017 | 09/24/2018 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 09/24/2016 | 09/24/2017 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 09/24/2015 | 09/24/2016 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 09/24/2014 | 09/24/2015 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 09/24/2013 | 09/24/2014 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 09/24/2012 | 09/24/2013 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 09/24/2011 | 09/24/2012 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 09/24/2010 | 09/24/2011 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 09/24/2010 | 09/24/2011 | ACE | ||||||||
INSURANCE | 12/07/2007 | 12/07/2008 | ACE | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 08/23/2005 | 08/23/2005 | IN-COMPLIANCE | BORISADE | 0/3 | COMPLIANCE ASSURANCE | |||||
TCR | 11/15/2004 | 11/22/2004 | IN-COMPLIANCE | BORISADE | 3/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes VIOL 1105 CORR | |||||||||||
RRBD | 11/02/2004 | 11/03/2004 | MINOR OUT-OF-COMPLIANCE | BORISADE | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 10/28/2004 | 11/03/2004 | CARROLL | 1/0 | COMPLIANCE ASSURANCE | ||||||
NCLI | 10/20/2004 | 10/21/2004 | ALLEN | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes NCLI, VIO. # 1103 & 1105. | |||||||||||
TCI | 10/19/2004 | 10/20/2004 | MINOR OUT-OF-COMPLIANCE | BORISADE | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 02/12/2004 | 02/18/2004 | IN-COMPLIANCE | YATES_R | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 12/11/2003 | 12/16/2003 | MINOR OUT-OF-COMPLIANCE | TOWNSEND_C | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 04/07/2003 | 04/11/2003 | IN-COMPLIANCE | BORISADE_C | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 03/28/2003 | 03/28/2003 | TORSANKO_G | 0/1 | DISCHARGE PROJECT | ||||||
Completion Notes CALLED FACILITY HOME OFFICE, REQUESTED RETRACTION LETTER. REC'D RESPONSE. STORE PERSONNEL NOT STICKING TANKS CORRECTLY. | |||||||||||
TCI | 04/25/2002 | 05/01/2002 | IN-COMPLIANCE | HOLLOWAY_R | 0/3 | COMPLIANCE ASSURANCE | |||||
IRFR | 04/10/2002 | 09/07/2002 | TORSANKO_G | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes REG TANK SIR-FAIL - STICK READINGS | |||||||||||
TCR | 09/11/2001 | 10/01/2001 | IN-COMPLIANCE | HOLLOWAY_R | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 08/15/2001 | 09/16/2002 | TORSANKO_G | 0/3 | DISCHARGE PROJECT | ||||||
Completion Notes EXPLAINED THE PROBLEM TO BE A NEW STICK USED FOR READINGS | |||||||||||
RRBD | 08/15/2001 | 09/16/2002 | TORSANKO_G | 0/3 | DISCHARGE PROJECT | ||||||
Completion Notes EXPLAINED ON 8-15-01 INF REC'D THAT BOTH WERE DUE TO NEW STICK USED FOR READINGS | |||||||||||
IRFR | 08/15/2001 | 09/16/2002 | TORSANKO_G | 0/3 | DISCHARGE PROJECT | ||||||
Completion Notes REG, MID AND PREM ARE INCON. DUE TO NEW STICK FOR READINGS | |||||||||||
IRFR | 07/11/2001 | 11/28/2001 | TORSANKO_G | 0/3 | DISCHARGE PROJECT | ||||||
Completion Notes REG,MID AND PREM. SIR FAILURE | |||||||||||
TCI | 05/24/2001 | 05/30/2001 | SIGNIFICANT OUT-OF-COMPLIANCE | HOLLOWAY_R | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes SEE VIOLATIONS | |||||||||||
TCI | 03/15/2000 | 03/20/2000 | IN-COMPLIANCE | HOLLOWAY_R | 0/3 | COMPLIANCE ASSURANCE | |||||
CWOE | 06/03/1999 | 06/07/1999 | HOFFMAN_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
WLI | 05/25/1999 | 09/27/1999 | HOFFMAN_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 04/16/1999 | 05/06/1999 | SIGNIFICANT OUT-OF-COMPLIANCE | CARROLL_A | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes INSURANCE RUNNING OUT | |||||||||||
NCLI | 04/16/1999 | 05/06/1999 | CARROLL_A | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes .400(3) | |||||||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Enforcement Tracking | 04/02/2025 | Closed Without Enforcement | JACKSON_SM | Enforcement | |||||||
Letter | 04/02/2025 | Satisfied | JACKSON_SM | Enforcement | |||||||
Letter | 01/16/2025 | Satisfied | JACKSON_SM | Enforcement | |||||||
Enforcement Referral | 05/03/2024 | Accepted | GAINEY_H_1 | Enforcement | |||||||
Electronic Communication | 04/04/2024 | Satisfied | MCARTOR_H_1 | Compliance Assistance | |||||||
Electronic Communication | 03/18/2024 | Satisfied | MCARTOR_H_1 | Compliance Assistance | |||||||
Electronic Communication | 03/18/2024 | Satisfied | MCARTOR_H_1 | Compliance Assistance | |||||||
Electronic Communication | 02/16/2024 | Satisfied | MCARTOR_H_1 | Compliance Assistance | |||||||
Letter | 01/18/2024 | Satisfied | WATSON_MS_3 | Compliance Assistance | |||||||
Site Inspection | 01/18/2024 | Major Out of Compliance | WATSON_MS_3 | 0/1 | Routine Compliance | ||||||
Electronic Communication | 01/11/2024 | Satisfied | WATSON_MS_3 | Compliance Assistance | |||||||
Letter | 03/28/2022 | Satisfied | MCARTOR_H_1 | Compliance Assistance | |||||||
Electronic Communication | 03/25/2022 | Satisfied | MCARTOR_H_1 | Compliance Assistance | |||||||
Letter | 02/22/2022 | Satisfied | MCARTOR_H_1 | Compliance Assistance | |||||||
Site Inspection | 02/18/2022 | Minor Out of Compliance | MCARTOR_H_1 | 0/1 | Routine Compliance | ||||||
Electronic Communication | 01/27/2022 | Satisfied | MCARTOR_H_1 | Compliance Assistance | |||||||
Phone Conversation | 01/27/2022 | Satisfied | MCARTOR_H_1 | Compliance Assistance | |||||||
Electronic Communication | 11/17/2021 | Satisfied | MCARTOR_H_1 | Compliance Assistance | |||||||
Meeting | 11/17/2021 | Satisfied | MCARTOR_H_1 | Compliance Assistance | |||||||
Phone Conversation | 11/10/2021 | Satisfied | MCARTOR_H_1 | Compliance Assistance | |||||||
Phone Conversation | 11/10/2021 | Satisfied | MCARTOR_H_1 | Compliance Assistance | |||||||
Enforcement Tracking | 10/10/2019 | Closed Without Enforcement | SOLTIS_C | Enforcement | |||||||
Letter | 10/08/2019 | Satisfied | SOLTIS_C | Enforcement | |||||||
Letter | 10/08/2019 | Satisfied | SOLTIS_C | Enforcement | |||||||
Enforcement Referral | 08/19/2019 | Accepted | GREGORY_HM_1 | Enforcement | |||||||
Electronic Communication | 05/29/2019 | Satisfied | VERMILLION_KN_1 | Compliance Assistance | |||||||
Letter | 05/17/2019 | Satisfied | VERMILLION_KN_1 | Compliance Assistance | |||||||
Site Inspection | 05/17/2019 | Major Out of Compliance | VERMILLION_KN_1 | 0/1 | Routine Compliance | ||||||
Electronic Communication | 04/17/2019 | Satisfied | VERMILLION_KN_1 | Routine Compliance | |||||||
Phone Conversation | 08/03/2017 | Satisfied | GREGORY_HM_1 | Compliance Assistance | |||||||
Electronic Communication | 09/29/2016 | Satisfied | GREGORY_HM_1 | Non-Compliance | |||||||
Letter | 09/22/2016 | Satisfied | GREGORY_HM_1 | Non-Compliance | |||||||
Electronic Communication | 09/21/2016 | Satisfied | GREGORY_HM_1 | Routine Compliance | |||||||
Record Document | 09/21/2016 | Satisfied | GREGORY_HM_1 | Routine Compliance | |||||||
Electronic Communication | 09/20/2016 | Satisfied | GREGORY_HM_1 | Routine Compliance | |||||||
Site Inspection | 09/20/2016 | Minor Out of Compliance | GREGORY_HM_1 | 0/1 | Routine Compliance | ||||||
Electronic Communication | 09/08/2016 | Satisfied | GREGORY_HM_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 11/06/2014 | Satisfied | LUNN_RJ_1 | Routine Compliance | |||||||
Site Inspection | 10/30/2014 | In Compliance | LUNN_RJ_1 | 0/1 | Routine Compliance | ||||||
Electronic Communication | 10/30/2014 | Satisfied | LUNN_RJ_1 | Routine Compliance | |||||||
Electronic Communication | 10/10/2012 | Satisfied | KOROUS_E_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 10/09/2012 | Satisfied | KOROUS_E_1 | Routine Compliance | |||||||
Site Inspection | 10/09/2012 | In Compliance | KOROUS_E_1 | 0/1 | Routine Compliance | ||||||
Site Inspection | 03/16/2012 | In Compliance | LUNN_RJ_1 | 0/1 | Installation | ||||||
Site Inspection | 03/16/2012 | In Compliance | LUNN_RJ_1 | 0/1 | Closure | ||||||
Record Document | 06/20/2011 | Satisfied | TOWLE_M | QA/QC | |||||||
Issue Document | 06/15/2011 | Satisfied | TOWLE_M | QA/QC | |||||||
Issue Document | 06/15/2011 | Satisfied | TOWLE_M | QA/QC | |||||||
Site Inspection | 06/07/2011 | In Compliance | TOWLE_M | 0/1 | QA/QC | ||||||
Issue Document | 05/18/2011 | Satisfied | TOWLE_M | QA/QC | |||||||
Site Inspection | 04/25/2011 | In Compliance | LUNN_RJ_1 | 0/1 | Routine Compliance | ||||||
Emergency Preparedness Information | 04/25/2011 | Satisfied | LUNN_RJ_1 | Routine Compliance | |||||||
Letter | 01/31/2011 | Satisfied | HOLLOWAY_RW_1 | Closure | |||||||
TCAR | 01/24/2011 | Satisfied | HOLLOWAY_RW_1 | Closure | |||||||
Letter | 01/06/2011 | Satisfied | HOLLOWAY_RW_1 | Closure | |||||||
TCAR | 01/05/2011 | Incomplete | HOLLOWAY_RW_1 | Closure | |||||||
Letter | 12/16/2010 | Satisfied | HOLLOWAY_RW_1 | Non-Compliance | |||||||
Site Inspection | 10/01/2010 | In Compliance | LUNN_RJ_1 | 0/1 | Installation | ||||||
Site Inspection | 08/27/2010 | In Compliance | LUNN_RJ_1 | 0/3 | Closure | ||||||
Electronic Communication | 08/19/2010 | Satisfied | LUNN_RJ_1 | Installation | |||||||
Electronic Communication | 08/13/2010 | Satisfied | LUNN_RJ_1 | Closure | |||||||
Site Inspection | 05/06/2010 | In Compliance | SPEARS_CV_1 | 0/3 | Routine Compliance | ||||||
Enforcement Tracking | 08/24/2009 | Closed Without Enforcement | TOWLE_M | Enforcement | |||||||
Record Document | 08/21/2009 | Satisfied | TOWLE_M | Enforcement | |||||||
Issue Document | 08/20/2009 | Satisfied | TOWLE_M | Enforcement | |||||||
Record Document | 08/19/2009 | Satisfied | TOWLE_M | Enforcement | |||||||
Phone Conversation | 08/18/2009 | Satisfied | TOWLE_M | Enforcement | |||||||
Record Document | 08/12/2009 | Satisfied | TOWLE_M | Enforcement | |||||||
Issue Document | 05/06/2009 | Satisfied | TOWLE_M | Enforcement | |||||||
Enforcement Referral | 04/07/2009 | Accepted | TOWLE_M | Enforcement | |||||||
Issue Document | 02/19/2009 | Satisfied | TOWLE_M | Non-Compliance | |||||||
Record Document | 02/16/2009 | Satisfied | TOWLE_M | Non-Compliance | |||||||
Site Inspection | 11/13/2008 | In Compliance | SPEARS_CV_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 01/25/2008 | In Compliance | SPEARS_CV_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 01/25/2008 | Satisfied | SPEARS_CV_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 02/12/2007 | Satisfied | BORISADE_KA_1 | Routine Compliance | |||||||
Site Inspection | 02/12/2007 | In Compliance | BORISADE_KA_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/09/2007 | Satisfied | BORISADE_KA_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/25/2006 | Satisfied | CARROLL_A | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
No Open Violations Found | |||||||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
10/01/1987 | INACTIVE | 51 | EARLY DETECTION INCENTIVE-ELIGIBLE | ||||||||