![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Northeast | Type | Retail Station | ||||||||
County | Duval | Status | OPEN | ||||||||
ID | 8507001 | Latitude | 30° 19' 26.2987 | ||||||||
Name |
ATLANTIC SHELL 10716 ATLANTIC BLVD |
Longitude | 81° 31' 21.3431 | ||||||||
JACKSONVILLE, FL 32225-2926 | LL Method | DPHO | |||||||||
Contact | ABBAS JAFERI | LL Status | REVIEWED | ||||||||
Phone | (561) 774-8077 | Status Date | 02/06/2024 | ||||||||
Account Owner Information | |||||||||||
Name | BOCA GAS COMPANY HOLDINGS 2 LLC 6971 FEDERAL HWY #102 BOCA RATON, FL 33487 |
Effective Date | 01/08/2020 | ||||||||
Contact | ABBAS JAFERI / MASBAH CHOWDHURY | ||||||||||
Phone | (561) 774-8077 | ||||||||||
ABBAS@BOCAGAS.COM | |||||||||||
Placard # / Date | 697188 - 06/28/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | BOCA GAS COMPANY HOLDINGS 2 LLC 6971 FEDERAL HWY #102 BOCA RATON, FL 33487 |
Effective Date | 01/08/2020 | ||||||||
Contact | ABBAS JAFERI / MASBAH CHOWDHURY | ||||||||||
Phone | (561) 774-8077 | ||||||||||
ABBAS@BOCAGAS.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 10000 | Unleaded Gas (B) | 02/01/2008 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 12000 | Unleaded Gas (B) | 02/01/2008 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 10000 | Leaded Gas (A) | 05/01/1984 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass |
(C) Fiberglass | (8) Manually sampled wells (H) Mechanical line leak detector |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1R1 | 10000 | Unleaded Gas (B) | 12/01/1988 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 10000 | Unleaded Gas (B) | 05/01/1984 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass |
(C) Fiberglass | (8) Manually sampled wells (H) Mechanical line leak detector |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2R1 | 10000 | Unleaded Gas (B) | 12/01/1988 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 10000 | Unleaded Gas (B) | 05/01/1984 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass |
(C) Fiberglass | (8) Manually sampled wells (H) Mechanical line leak detector |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3R1 | 10000 | Unleaded Gas (B) | 12/01/1988 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 550 | Other Non Regulated (Z) | 11/01/1988 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass | (C) Fiberglass | (I) Not required | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 11/22/2023 | 11/22/2026 | NAVIGATORS SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 11/22/2022 | 11/22/2023 | NAVIGATORS SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 11/22/2021 | 11/22/2022 | NAVIGATORS SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 04/23/2018 | 04/23/2020 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 04/23/2018 | 10/29/2019 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 04/23/2016 | 04/23/2018 | CRUM & FORSTER SPECIALTY INS. CO. | ||||||||
INSURANCE | 04/23/2014 | 04/23/2016 | CRUM & FORSTER INDEMNITY | ||||||||
INSURANCE | 04/23/2013 | 04/23/2014 | AMERICAN SAFETY INDEMNITY CO | ||||||||
INSURANCE | 04/02/2012 | 04/02/2013 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 04/02/2011 | 04/02/2012 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 04/02/2010 | 04/02/2011 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 04/02/2009 | 04/02/2010 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 10/18/2005 | 10/19/2005 | IN-COMPLIANCE | BORISADE | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 03/22/2005 | 03/23/2005 | IN-COMPLIANCE | BORISADE | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 04/06/2004 | 11/23/2004 | IN-COMPLIANCE | HOLLOWAY | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes LL DET AND ATG CERTIFICATION DUE 9/22/04 | |||||||||||
PDNE | 03/19/2004 | 03/19/2004 | GRIFFIN_T | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCR | 12/10/2002 | 02/02/2004 | MINOR OUT-OF-COMPLIANCE | MACK_W | 0/3 | COMPLIANCE ASSURANCE | |||||
CRLE | 12/03/2002 | 12/12/2002 | GRIFFIN_T | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes FACILITY ENTERING INTO VOLUNTARY COMPLIANCE PLAN. CRLE FOR DISPOSITION | |||||||||||
TCI | 09/04/2002 | 09/12/2002 | MINOR OUT-OF-COMPLIANCE | MACK_W | 0/3 | COMPLIANCE ASSURANCE | |||||
IRFR | 06/25/2002 | 09/07/2002 | TORSANKO_G | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes PIPE CUT DURING BORINGS. | |||||||||||
TCI | 07/24/2001 | 07/26/2001 | IN-COMPLIANCE | HOLLOWAY_R | 0/3 | COMPLIANCE ASSURANCE | |||||
TCR | 11/14/2000 | 11/15/2000 | IN-COMPLIANCE | HOLLOWAY_R | 0/3 | COMPLIANCE ASSURANCE | |||||
NCLI | 10/17/2000 | 10/17/2000 | CUMMINGS_C | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 10/10/2000 | 10/16/2000 | MINOR OUT-OF-COMPLIANCE | HOLLOWAY_R | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes SHEAR VALVE ANCHORS NOT VISIBLE | |||||||||||
TCI | 09/22/1999 | 10/07/1999 | IN-COMPLIANCE | HOLLOWAY_R | 0/3 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Enforcement Referral | 04/24/2024 | Accepted | GAINEY_H_1 | Enforcement | |||||||
Electronic Communication | 04/08/2024 | Satisfied | CHRISTIAN_ED_1 | Compliance Assistance | |||||||
Document Management | 04/05/2024 | Satisfied | CHRISTIAN_ED_1 | Incident | |||||||
Electronic Communication | 03/21/2024 | Satisfied | CHRISTIAN_ED_1 | Compliance Assistance | |||||||
Electronic Communication | 02/20/2024 | Satisfied | CHRISTIAN_ED_1 | Compliance Assistance | |||||||
Site Inspection | 01/16/2024 | Major Out of Compliance | CHRISTIAN_ED_1 | 0/2 | Routine Compliance | ||||||
Letter | 01/16/2024 | Satisfied | CHRISTIAN_ED_1 | Compliance Assistance | |||||||
Electronic Communication | 01/02/2024 | Satisfied | CHRISTIAN_ED_1 | Compliance Assistance | |||||||
Phone Conversation | 01/02/2024 | Satisfied | CHRISTIAN_ED_1 | Compliance Assistance | |||||||
Site Inspection | 01/27/2022 | In Compliance | MCKINLEY_DN_1 | 0/2 | Routine Compliance | ||||||
Letter | 01/27/2022 | Satisfied | MCKINLEY_DN_1 | Routine Compliance | |||||||
Electronic Communication | 11/15/2019 | Satisfied | LUNN_RJ_1 | Routine Compliance | |||||||
Site Inspection | 11/07/2019 | In Compliance | LUNN_RJ_1 | 0/2 | Routine Compliance | ||||||
Letter | 11/07/2019 | Satisfied | LUNN_RJ_1 | Routine Compliance | |||||||
Electronic Communication | 02/10/2017 | Satisfied | GREGORY_HM_1 | Routine Compliance | |||||||
Letter | 02/10/2017 | Satisfied | GREGORY_HM_1 | Non-Compliance | |||||||
Site Inspection | 02/09/2017 | Minor Out of Compliance | GREGORY_HM_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 01/30/2017 | Satisfied | GREGORY_HM_1 | Routine Compliance | |||||||
Electronic Communication | 04/23/2015 | Satisfied | HILL_KL_1 | Non-Compliance | |||||||
Electronic Communication | 02/19/2015 | Satisfied | HILL_KL_1 | Non-Compliance | |||||||
Letter | 01/26/2015 | Satisfied | HILL_KL_1 | Non-Compliance | |||||||
Site Inspection | 01/22/2015 | Minor Out of Compliance | HILL_KL_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 01/22/2015 | Satisfied | HILL_KL_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 01/15/2015 | Satisfied | HILL_KL_1 | Routine Compliance | |||||||
Electronic Communication | 08/29/2013 | Satisfied | WILLIAMS_AK_1 | Routine Compliance | |||||||
Site Inspection | 08/19/2013 | In Compliance | WILLIAMS_AK_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 08/19/2013 | Satisfied | WILLIAMS_AK_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 10/14/2011 | Satisfied | CAIN_M_1 | Routine Compliance | |||||||
Site Inspection | 10/14/2011 | In Compliance | CAIN_M_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 10/13/2011 | Satisfied | CAIN_M_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 08/26/2010 | Satisfied | BORISADE_KA_1 | Routine Compliance | |||||||
Site Inspection | 08/24/2010 | In Compliance | BORISADE_KA_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 08/24/2010 | Satisfied | BORISADE_KA_1 | Routine Compliance | |||||||
Issue Document | 02/10/2010 | Satisfied | WILLIAMS_EM_1 | Closure | |||||||
Record Document | 10/12/2009 | Satisfied | PARISH_KM_1 | Non-Compliance | |||||||
Record Document | 10/02/2009 | Satisfied | GRIFFIN_TW_1 | Non-Compliance | |||||||
Site Inspection | 09/08/2009 | Minor Out of Compliance | PARISH_KM_1 | 0/2 | Routine Compliance | ||||||
Letter | 09/08/2009 | Satisfied | PARISH_KM_1 | Non-Compliance | |||||||
Site Inspection | 07/02/2008 | In Compliance | PARISH_KM_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 07/02/2008 | Satisfied | PARISH_KM_1 | Routine Compliance | |||||||
Issue Document | 04/24/2008 | Satisfied | WILLIAMS_EM_1 | Closure | |||||||
TCAR | 04/21/2008 | Satisfied | HOLLOWAY_RW_1 | Closure | |||||||
Letter | 04/21/2008 | Satisfied | HOLLOWAY_RW_1 | Closure | |||||||
Site Inspection | 04/15/2008 | In Compliance | LUNN_RJ_1 | 0/2 | Installation | ||||||
Site Inspection | 02/22/2008 | In Compliance | LUNN_RJ_1 | 0/3 | Closure | ||||||
Emergency Preparedness Information | 01/09/2008 | Satisfied | BORISADE_KA_1 | Routine Compliance | |||||||
Site Inspection | 09/05/2007 | In Compliance | BORISADE_KA_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 05/23/2007 | Satisfied | GRIFFIN_TW_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 05/22/2007 | Satisfied | GRIFFIN_TW_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 02/12/2007 | Satisfied | BORISADE_KA_1 | Routine Compliance | |||||||
Site Inspection | 10/14/2006 | In Compliance | BORISADE_KA_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 09/24/2006 | Satisfied | CARROLL_A | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
01/16/2024 | 6001 | Minor | 2.1 No reasonable access provided. | Facility must report when Dispensers 5 and 6 were placed out of service and provide photos of the condition of the Dispenser sumps and piping to the inspector. | |||||||
01/16/2024 | 6014 | SNC-B | 4.2 Incident investigation not initiated within 24-hours (or by next business day) to determine if discharge occurred. | Investigate the issue. | |||||||
01/16/2024 | 6073 | Minor | 4.9 Spill containment, dispenser liners, and piping sumps not accessible. Water or regulated substances not removed. | Facility must remove liquid from Dispenser sump 3 and 4 and dispose of liquid properly. Responsible party must determine the source of the liquid and determine if a discharge to the environment occurred or not. Incident investigation and resolution documentation must be provided. Post liquid removal integrity testing may be required. Sampling may be required. | |||||||
01/16/2024 | 6015 | Minor | 4.3 Incident investigation not completed within 14 days, and/or no DRF or written confirmation received at the end of the 14-day investigation period. | Investigate the issue to determine if a discharge has occurred. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
04/26/1984 | COMPLETED | 56 | EARLY DETECTION INCENTIVE-ELIGIBLE | ||||||||