District | Northeast | Type | Retail Station | ||||||||
County | Duval | Status | OPEN | ||||||||
ID | 8507008 | Latitude | 30° 25' 46.3432 | ||||||||
Name |
SQRL SERVICE STATION - JAX 6 818 DUNN AVE |
Longitude | 81° 39' 30.5187 | ||||||||
JACKSONVILLE, FL 32218-4803 | LL Method | DPHO | |||||||||
Contact | EMILY JERNIGAN | LL Status | REVIEWED | ||||||||
Phone | (501) 350-5580 | Status Date | 12/09/2003 | ||||||||
Account Owner Information | |||||||||||
Name | SQRL HOLDINGS LLC 27 RAHLING CIRCLE, SU#C Little Rock, AR 72223 |
Effective Date | 09/06/2022 | ||||||||
Contact | MATT BONAMINIO / EMILY JERNIGAN | ||||||||||
Phone | (501) 319-5315 | ||||||||||
MATT@SQRLHOLDINGS.COM | |||||||||||
Placard # / Date | 661511 - 06/20/2023 | ||||||||||
Property Owner Information | |||||||||||
Name | SQRL HOLDINGS LLC 27 RAHLING CIRCLE, SU#C Little Rock, AR 72223 |
Effective Date | 09/06/2022 | ||||||||
Contact | MATT BONAMINIO / EMILY JERNIGAN | ||||||||||
Phone | (501) 319-5315 | ||||||||||
MATT@SQRLHOLDINGS.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 15000 | Unleaded Gas (B) | 11/01/2008 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 15000 | Vehicular Diesel (D) | 11/01/2008 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (I) Double wall (L) Compartmented (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 10000 | Unleaded Gas (B) | 10/01/1984 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 10000 | Unleaded Gas (B) | 10/01/1984 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 10000 | Unleaded Gas (B) | 10/01/1984 | UNDERGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 10000 | Unleaded Gas (B) | 10/01/1984 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | CRUM & FORSTER SPECIALTY INS. CO. | ||||||||||
INSURANCE | 07/14/2023 | 07/14/2024 | LIBERTY SURPLUS INSURANCE CORPORATION | ||||||||
INSURANCE | 06/26/2021 | 06/26/2022 | CRUM & FORSTER SPECIALTY INS. CO. | ||||||||
INSURANCE | 06/26/2020 | 06/26/2021 | CRUM & FORSTER SPECIALTY INS. CO. | ||||||||
INSURANCE | 06/26/2019 | 06/26/2020 | CRUM & FORSTER SPECIALTY INS. CO. | ||||||||
INSURANCE | 08/17/2018 | 08/17/2019 | CRUM & FORSTER SPECIALTY INS. CO. | ||||||||
INSURANCE | 12/18/2017 | 12/18/2018 | CRUM & FORSTER SPECIALTY INS. CO. | ||||||||
INSURANCE | 12/18/2016 | 12/18/2017 | CRUM & FORSTER SPECIALTY INS. CO. | ||||||||
INSURANCE | 12/12/2016 | 12/12/2017 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 04/23/2014 | 04/23/2016 | CRUM & FORSTER INDEMNITY | ||||||||
INSURANCE | 04/23/2013 | 04/23/2014 | AMERICAN SAFETY | ||||||||
INSURANCE | 04/02/2012 | 04/02/2013 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 04/02/2011 | 04/02/2012 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 04/02/2010 | 04/02/2011 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 04/02/2009 | 04/02/2010 | ILLINOIS UNION | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 09/06/2005 | 09/16/2005 | IN-COMPLIANCE | TORSANKO | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 05/12/2005 | 05/13/2005 | IN-COMPLIANCE | TORSANKO | 0/3 | COMPLIANCE ASSURANCE | |||||
LTR | 02/25/2005 | 02/28/2005 | ALLEN | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes UST CLOSURE | |||||||||||
MDR | 02/24/2005 | 02/24/2005 | GRIFFIN | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes LCSR RECEIVED. | |||||||||||
CWOE | 02/21/2005 | 02/21/2005 | GRIFFIN | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes NO ENFORCEMENT FOR 1007 | |||||||||||
NCLI | 02/11/2005 | 02/11/2005 | ALLEN | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes VIOL. # 1007 | |||||||||||
LTR | 02/10/2005 | 02/15/2005 | ALLEN | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes UST CLOSURE - 10,000 GAL. | |||||||||||
LTR | 02/10/2005 | 02/11/2005 | ALLEN | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes UST CLOSURE 10,000 GAL UST. | |||||||||||
TXI | 02/08/2005 | 02/11/2005 | MINOR OUT-OF-COMPLIANCE | PAUL | 0/1 | COMPLIANCE ASSURANCE | |||||
TCI | 04/20/2004 | 04/25/2004 | IN-COMPLIANCE | HOLLOWAY | 0/4 | COMPLIANCE ASSURANCE | |||||
Completion Notes ATG & LLD TESTING DUE 7/18/04 | |||||||||||
PDNE | 03/19/2004 | 03/19/2004 | GRIFFIN_T | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCR | 12/10/2002 | 02/02/2004 | MINOR OUT-OF-COMPLIANCE | MACK_W | 0/4 | COMPLIANCE ASSURANCE | |||||
CRLE | 12/03/2002 | 12/12/2002 | GRIFFIN_T | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes FACILITY ENTERING INTO VOLUNTARY COMPLIANCE PLAN. CRLE FOR DISPOSITION. | |||||||||||
TCI | 08/30/2002 | 09/03/2002 | MINOR OUT-OF-COMPLIANCE | MACK_W | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 04/19/2002 | 04/29/2002 | IN-COMPLIANCE | HOLLOWAY_R | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 04/11/2001 | 04/17/2001 | IN-COMPLIANCE | HOLLOWAY_R | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 12/21/1999 | 01/05/2000 | IN-COMPLIANCE | HOLLOWAY_R | 0/4 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Letter | 05/05/2025 | Satisfied | VILLEGASAVILA_OE_1 | Compliance Assistance | |||||||
Site Inspection | 04/24/2025 | Minor Out of Compliance | VILLEGASAVILA_OE_1 | 0/2 | Closure | ||||||
Letter | 04/24/2025 | Satisfied | VILLEGASAVILA_OE_1 | Compliance Assistance | |||||||
Enforcement Tracking | 03/19/2025 | Closed Without Enforcement | STERLING_C | Enforcement | |||||||
Enforcement Referral | 02/14/2024 | Accepted | GAINEY_H_1 | Enforcement | |||||||
Enforcement Referral | 01/03/2024 | Accepted | GAINEY_H_1 | Enforcement | |||||||
Electronic Communication | 12/01/2023 | Satisfied | CHRISTIAN_ED_1 | Compliance Assistance | |||||||
Letter | 11/13/2023 | Satisfied | CHRISTIAN_ED_1 | Compliance Assistance | |||||||
Electronic Communication | 11/13/2023 | Satisfied | CHRISTIAN_ED_1 | Compliance Assistance | |||||||
Site Inspection | 11/13/2023 | Major Out of Compliance | CHRISTIAN_ED_1 | 0/2 | Compliance Assistance | ||||||
Electronic Communication | 10/13/2023 | Satisfied | CHRISTIAN_ED_1 | Compliance Assistance | |||||||
Site Inspection | 09/13/2023 | Major Out of Compliance | CHRISTIAN_ED_1 | 0/2 | Routine Compliance | ||||||
Letter | 09/13/2023 | Satisfied | CHRISTIAN_ED_1 | Compliance Assistance | |||||||
Electronic Communication | 08/21/2023 | Satisfied | CHRISTIAN_ED_1 | Compliance Assistance | |||||||
Incident | 12/08/2021 | Has not led to Discharge | MCARTOR_H_1 | Incident | |||||||
Letter | 12/02/2021 | Satisfied | MCARTOR_H_1 | Compliance Assistance | |||||||
Document Management | 10/29/2021 | Satisfied | MCARTOR_H_1 | Incident | |||||||
Letter | 10/29/2021 | Satisfied | MCARTOR_H_1 | Compliance Assistance | |||||||
Document Management | 10/29/2021 | Satisfied | MCARTOR_H_1 | Incident | |||||||
Incident | 10/29/2021 | Has not led to Discharge | MCARTOR_H_1 | Incident | |||||||
Site Inspection | 10/29/2021 | Major Out of Compliance | MCARTOR_H_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 10/08/2021 | Satisfied | MCARTOR_H_1 | Compliance Assistance | |||||||
Phone Conversation | 10/01/2021 | Satisfied | MCARTOR_H_1 | Compliance Assistance | |||||||
Letter | 08/12/2019 | Satisfied | MONDO_PW_1 | Routine Compliance | |||||||
Site Inspection | 08/12/2019 | In Compliance | MONDO_PW_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 07/23/2019 | Satisfied | MONDO_PW_1 | Routine Compliance | |||||||
Letter | 02/21/2019 | Satisfied | GREGORY_HM_1 | Compliance Assistance | |||||||
Site Inspection | 02/20/2019 | Minor Out of Compliance | GREGORY_HM_1 | 0/2 | Compliance Assistance | ||||||
Enforcement Tracking | 11/06/2017 | Closed Without Enforcement | OBRIEN_S | Enforcement | |||||||
Letter | 11/06/2017 | Satisfied | OBRIEN_S | Enforcement | |||||||
Electronic Communication | 10/09/2017 | Satisfied | OBRIEN_S | Enforcement | |||||||
Enforcement Referral | 09/25/2017 | Accepted | RICHARDS_JE_1 | Enforcement | |||||||
Electronic Communication | 09/21/2017 | Satisfied | DOHANEY_T | Compliance Assistance | |||||||
Electronic Communication | 09/14/2017 | Satisfied | GREGORY_HM_1 | Compliance Assistance | |||||||
Electronic Communication | 09/14/2017 | Satisfied | GREGORY_HM_1 | Compliance Assistance | |||||||
Site Inspection | 08/09/2017 | Minor Out of Compliance | GREGORY_HM_1 | 0/2 | Compliance Assistance | ||||||
Letter | 08/09/2017 | Satisfied | GREGORY_HM_1 | Compliance Assistance | |||||||
Letter | 06/26/2017 | Satisfied | RICHARDS_JE_1 | Compliance Assistance | |||||||
Letter | 03/21/2017 | Satisfied | GREGORY_HM_1 | Non-Compliance | |||||||
Site Inspection | 03/20/2017 | Minor Out of Compliance | GREGORY_HM_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 03/20/2017 | Satisfied | GREGORY_HM_1 | Routine Compliance | |||||||
Electronic Communication | 01/03/2017 | Satisfied | GREGORY_HM_1 | Routine Compliance | |||||||
Site Inspection | 06/12/2015 | In Compliance | HILL_KL_1 | 0/2 | Non-Compliance | ||||||
Electronic Communication | 06/12/2015 | Satisfied | HILL_KL_1 | Non-Compliance | |||||||
Letter | 04/27/2015 | Satisfied | HILL_KL_1 | Non-Compliance | |||||||
Electronic Communication | 04/24/2015 | Satisfied | HILL_KL_1 | Non-Compliance | |||||||
Electronic Communication | 02/19/2015 | Satisfied | HILL_KL_1 | Non-Compliance | |||||||
Letter | 02/11/2015 | Satisfied | HILL_KL_1 | Non-Compliance | |||||||
Electronic Communication | 02/06/2015 | Satisfied | HILL_KL_1 | Routine Compliance | |||||||
Site Inspection | 02/04/2015 | Minor Out of Compliance | HILL_KL_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 01/26/2015 | Satisfied | HILL_KL_1 | Routine Compliance | |||||||
Electronic Communication | 08/29/2013 | Satisfied | WILLIAMS_AK_1 | Routine Compliance | |||||||
Site Inspection | 08/22/2013 | In Compliance | WILLIAMS_AK_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 08/22/2013 | Satisfied | WILLIAMS_AK_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 10/19/2011 | Satisfied | CAIN_M_1 | Routine Compliance | |||||||
Site Inspection | 10/19/2011 | In Compliance | CAIN_M_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 09/08/2010 | In Compliance | BORISADE_KA_1 | 0/2 | Routine Compliance | ||||||
Record Document | 10/12/2009 | Satisfied | PARISH_KM_1 | Non-Compliance | |||||||
Record Document | 10/02/2009 | Satisfied | GRIFFIN_TW_1 | Non-Compliance | |||||||
Letter | 09/15/2009 | Satisfied | PARISH_KM_1 | Non-Compliance | |||||||
Site Inspection | 08/13/2009 | In Compliance | PARISH_KM_1 | 0/2 | Routine Compliance | ||||||
TCAR | 01/12/2009 | Satisfied | HOLLOWAY_RW_1 | Closure | |||||||
Letter | 01/12/2009 | Satisfied | HOLLOWAY_RW_1 | Closure | |||||||
Letter | 01/06/2009 | Satisfied | HOLLOWAY_RW_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 12/04/2008 | Satisfied | LUNN_RJ_1 | Routine Compliance | |||||||
Site Inspection | 12/04/2008 | In Compliance | LUNN_RJ_1 | 0/2 | Installation | ||||||
Site Inspection | 11/10/2008 | In Compliance | LUNN_RJ_1 | 0/4 | Closure | ||||||
Site Inspection | 07/18/2008 | In Compliance | WILLIAMS_AK_1 | 0/4 | Routine Compliance | ||||||
Emergency Preparedness Information | 07/15/2008 | Satisfied | WILLIAMS_AK_1 | Routine Compliance | |||||||
Site Inspection | 09/20/2007 | In Compliance | PARISH_KM_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 09/11/2007 | Satisfied | GRIFFIN_TW_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 02/02/2007 | Satisfied | GRIFFIN_TW_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/23/2006 | Satisfied | TORSANKO_G | Routine Compliance | |||||||
Site Inspection | 08/02/2006 | In Compliance | TORSANKO_G | 0/3 | Routine Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
04/24/2025 | 6003 | Minor | 2.2 Registration Form not submitted for a new system, change in service, closure, owner change, or discovery of unregistered facility. | The owner/operator must submit a registration update to reflect that both tanks (5 and 6) were removed from the site as soon as possible. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
12/22/1984 | ACTIVE | 61 | EARLY DETECTION INCENTIVE-ELIGIBLE | ||||||||