![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Northeast | Type | Retail Station | ||||||||
County | Duval | Status | OPEN | ||||||||
ID | 8507147 | Latitude | 30° 15' 42.7465 | ||||||||
Name |
SUNRISE FOOD MART #21 4354 BLANDING BLVD |
Longitude | 81° 44' 26.4275 | ||||||||
JACKSONVILLE, FL 32210-7372 | LL Method | DPHO | |||||||||
Contact | AET COMPLIANCE | EXT 146 | LL Status | REVIEWED | ||||||||
Phone | (800) 989-8292 | Status Date | 02/05/2024 | ||||||||
Account Owner Information | |||||||||||
Name | TRISTAR INVESCO INC 380 COMMERCE PKWY ROCKLEDGE, FL 32955 |
Effective Date | 06/20/2007 | ||||||||
Contact | RAJENDRA SHAH | ||||||||||
Phone | (321) 690-0807 | ||||||||||
STORE8@KARSPETRO.COM | |||||||||||
Placard # / Date | 688170 - 06/17/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | AMERICAN PETRO INVESTMENTS INC 380 COMMERCE PKWY ROCKLEDGE, FL 32955-4208 |
Effective Date | 02/17/2000 | ||||||||
Contact | RAJ SHAH | ||||||||||
Phone | (321) 288-7717 | ||||||||||
PAULA@KARSPETRO.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4R1 | 16000 | Unleaded Gas (B) | 07/01/2006 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5R1 | 12000 | Unleaded Gas (B) | 07/01/2006 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (L) Compartmented (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 3000 | Leaded Gas (A) | 07/01/1962 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(E) Cathodic protection | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1R1 | 12000 | Unleaded Gas (B) | 09/01/1989 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket (O) Tight fill |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (N) Approved synthetic material |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 3000 | Unleaded Gas (B) | 07/01/1962 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(E) Cathodic protection | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2R1 | 12000 | Unleaded Gas (B) | 09/01/1989 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket (O) Tight fill |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (N) Approved synthetic material |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 3000 | Unleaded Gas (B) | 07/01/1962 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(E) Cathodic protection | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3R1 | 12000 | Unleaded Gas (B) | 09/01/1989 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket (O) Tight fill |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (N) Approved synthetic material |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 3000 | Unleaded Gas (B) | 07/01/1962 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(E) Cathodic protection | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 4000 | Unleaded Gas (B) | 07/01/1962 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(E) Cathodic protection | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 550 | Waste Oil (L) | 07/01/1962 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (E) Cathodic protection | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 550 | Kerosene (K) | 07/01/1962 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (E) Cathodic protection | (8) Manually sampled wells | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 09/01/2023 | 09/01/2024 | COMMERCE AND INDUSTRY INSURANCE COMPANY | ||||||||
INSURANCE | 09/01/2022 | 09/01/2023 | COMMERCE AND INDUSTRY INSURANCE COMPANY | ||||||||
INSURANCE | 09/01/2021 | 09/01/2022 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 09/01/2020 | 09/01/2021 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 09/01/2019 | 09/01/2020 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 09/01/2018 | 09/01/2019 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 09/01/2017 | 09/01/2018 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 09/01/2016 | 09/01/2017 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 09/01/2015 | 09/01/2016 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 09/01/2014 | 09/01/2015 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 09/01/2013 | 09/01/2014 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 09/01/2012 | 09/01/2013 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 09/01/2010 | 09/01/2011 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 02/01/2009 | 02/01/2010 | ZURICH-AMERICAN | ||||||||
INSURANCE | 02/01/2008 | 02/01/2009 | ZURICH-AMERICAN | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
NCLI | 02/22/2006 | 02/23/2006 | ALLEN | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes VIOL # 1117, 1062. | |||||||||||
TCI | 02/21/2006 | 02/21/2006 | SIGNIFICANT OUT-OF-COMPLIANCE | TORSANKO | 0/3 | COMPLIANCE ASSURANCE | |||||
CNLI | 08/29/2005 | 08/29/2005 | ALLEN | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes DISCHARGE, REPORTED 8/25/05. | |||||||||||
LTR | 08/29/2005 | 08/29/2005 | ALLEN | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes DISCHARGE, RECEIVED 8/25/05. | |||||||||||
FR | 08/27/2005 | 08/27/2005 | GRIFFIN | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes FILE REVIEW FOR LEAK AUTOPSY | |||||||||||
DCCR | 08/27/2005 | 08/27/2005 | GRIFFIN | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes CONFIRMED THROUGH ANALYTICAL RESULTS. | |||||||||||
TR | 08/27/2005 | 08/27/2005 | GRIFFIN | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes ANALYTICAL RESULTS SHOW A NEW RELEASE HAS OCCURRED. REC'VD FROM ECT. | |||||||||||
DRFR | 08/25/2005 | 08/27/2005 | GRIFFIN | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes ANALYTICAL RESULTS SHOW A NEW RELEASE. MID GRADE TANK & SUMP. | |||||||||||
IRFR | 08/09/2005 | 08/11/2005 | GRIFFIN | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes MID GRADE UST SUMP HAD FREE PRODUCT WHICH OVERFLOWED. TANK REMOVED FROM SERVICE, SOIL SAMPLE COLLECTED. | |||||||||||
RRBD | 06/08/2005 | 06/08/2005 | IN-COMPLIANCE | HOLLOWAY | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes MTHLY LEAK RATE TESTS ARE NOW BEING KEPT, VIOL. 1099 CORRECTED. | |||||||||||
RRBD | 06/07/2005 | 06/07/2005 | MINOR OUT-OF-COMPLIANCE | HOLLOWAY | 0/3 | COMPLIANCE ASSURANCE | |||||
NCLI | 04/27/2005 | 04/28/2005 | ALLEN | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes VIOL. # 1099. | |||||||||||
TCI | 04/25/2005 | 04/26/2005 | MINOR OUT-OF-COMPLIANCE | HOLLOWAY | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 02/17/2004 | 02/18/2004 | IN-COMPLIANCE | BORISADE_C | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 03/17/2003 | 03/19/2003 | IN-COMPLIANCE | BORISADE_C | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 10/24/2002 | 10/28/2002 | HOLLOWAY_R | 0/3 | COMPLIANCE ASSURANCE | ||||||
RRBD | 09/12/2002 | 09/12/2002 | HOLLOWAY_R | 0/3 | COMPLIANCE ASSURANCE | ||||||
Completion Notes TURNED OVER TO CRLE | |||||||||||
TCI | 06/17/2002 | 06/19/2002 | SIGNIFICANT OUT-OF-COMPLIANCE | HOLLOWAY_R | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 02/12/2001 | 02/15/2001 | IN-COMPLIANCE | TORSANKO_G | 0/2 | COMPLIANCE ASSURANCE | |||||
TCI | 03/01/2000 | 03/06/2000 | IN-COMPLIANCE | HOLLOWAY_R | 0/3 | COMPLIANCE ASSURANCE | |||||
CWOE | 03/30/1999 | 08/17/1999 | HOFFMAN_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
UTCI | 06/25/1998 | 07/01/1998 | MINOR OUT-OF-COMPLIANCE | COMPLIANCE ASSURANCE | |||||||
NCLI | 06/25/1998 | 08/17/1999 | ASSIDY_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Letter | 05/01/2025 | Satisfied | MCNEIL_A | Compliance Assistance | |||||||
Enforcement Tracking | 04/30/2025 | Closed Without Enforcement | MCNEIL_A | Enforcement | |||||||
Incident | 10/15/2024 | Has not led to Discharge | WESTERMAN_ML_1 | Incident | |||||||
Incident | 10/15/2024 | Has not led to Discharge | WESTERMAN_ML_1 | Incident | |||||||
Incident | 08/15/2024 | Has not led to Discharge | PAUL_JK | Incident | |||||||
Enforcement Tracking | 07/10/2024 | Closed Without Enforcement | MONFORT_V | Enforcement | |||||||
Enforcement Referral | 06/19/2024 | Accepted | GAINEY_H_1 | Enforcement | |||||||
Electronic Communication | 06/06/2024 | Satisfied | WESTERMAN_ML_1 | Compliance Assistance | |||||||
Document Management | 06/06/2024 | Satisfied | WESTERMAN_ML_1 | Incident | |||||||
Electronic Communication | 05/23/2024 | Satisfied | WESTERMAN_ML_1 | Compliance Assistance | |||||||
Electronic Communication | 04/22/2024 | Satisfied | WESTERMAN_ML_1 | Compliance Assistance | |||||||
Letter | 03/18/2024 | Satisfied | WESTERMAN_ML_1 | Compliance Assistance | |||||||
Site Inspection | 03/18/2024 | Major Out of Compliance | WESTERMAN_ML_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 03/05/2024 | Satisfied | WESTERMAN_ML_1 | Compliance Assistance | |||||||
Letter | 08/21/2023 | Satisfied | MONFORT_V | Enforcement | |||||||
Enforcement Tracking | 07/10/2023 | Closed Without Enforcement | MCKINLEY_D | Enforcement | |||||||
Enforcement Referral | 06/09/2023 | Accepted | GAINEY_H_1 | Enforcement | |||||||
Electronic Communication | 09/21/2022 | Satisfied | ROBBINS_JL_1 | Compliance Assistance | |||||||
Electronic Communication | 09/06/2022 | Satisfied | ROBBINS_JL_1 | Compliance Assistance | |||||||
Electronic Communication | 08/05/2022 | Satisfied | ROBBINS_JL_1 | Compliance Assistance | |||||||
Electronic Communication | 07/20/2022 | Satisfied | ROBBINS_JL_1 | Compliance Assistance | |||||||
Letter | 07/05/2022 | Satisfied | ROBBINS_JL_1 | Compliance Assistance | |||||||
Site Inspection | 06/30/2022 | Major Out of Compliance | ROBBINS_JL_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 06/02/2022 | Satisfied | ROBBINS_JL_1 | Compliance Assistance | |||||||
Enforcement Referral | 10/27/2021 | Accepted | COLE_K | Enforcement | |||||||
Enforcement Tracking | 10/26/2021 | Closed Without Enforcement | COLLINS_MR | Enforcement | |||||||
Enforcement Referral | 10/20/2020 | Accepted | GAINEY_H_1 | Enforcement | |||||||
Electronic Communication | 10/12/2020 | Satisfied | MACK_B_1 | Compliance Assistance | |||||||
Electronic Communication | 10/12/2020 | Satisfied | MACK_B_1 | Routine Compliance | |||||||
Electronic Communication | 10/12/2020 | Satisfied | MACK_B_1 | Routine Compliance | |||||||
Electronic Communication | 10/12/2020 | Satisfied | MACK_B_1 | Routine Compliance | |||||||
Electronic Communication | 10/12/2020 | Satisfied | MACK_B_1 | Compliance Assistance | |||||||
Electronic Communication | 10/12/2020 | Satisfied | MACK_B_1 | Routine Compliance | |||||||
Electronic Communication | 10/12/2020 | Satisfied | MACK_B_1 | Compliance Assistance | |||||||
Electronic Communication | 09/25/2020 | Satisfied | MACK_B_1 | Compliance Assistance | |||||||
Letter | 08/28/2020 | Satisfied | MACK_B_1 | Compliance Assistance | |||||||
Site Inspection | 08/27/2020 | Major Out of Compliance | MACK_B_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 01/14/2020 | Satisfied | WESTERMAN_ML_1 | Routine Compliance | |||||||
Letter | 10/08/2018 | Satisfied | OLIVA_L | Enforcement | |||||||
Enforcement Tracking | 10/08/2018 | Closed With Enforcement | OLIVA_L | Enforcement | |||||||
Letter | 10/08/2018 | Satisfied | HARRIS_MJ | Enforcement | |||||||
Incident | 07/18/2018 | Has not led to Discharge | RICHARDS_JE_1 | Incident | |||||||
Document Management | 12/15/2017 | Satisfied | TOWLE_M | Incident | |||||||
Issue Document | 12/14/2017 | Satisfied | TOWLE_M | Enforcement | |||||||
Record Document | 12/14/2017 | Satisfied | TOWLE_M | Enforcement | |||||||
Issue Document | 12/04/2017 | Satisfied | TOWLE_M | Enforcement | |||||||
Record Document | 10/19/2017 | Satisfied | TOWLE_M | Enforcement | |||||||
Enforcement Referral | 10/09/2017 | Accepted | RICHARDS_JE_1 | Enforcement | |||||||
Site Inspection | 10/02/2017 | Major Out of Compliance | MONDO_PW_1 | 0/2 | Installation | ||||||
Site Inspection | 10/02/2017 | Major Out of Compliance | MONDO_PW_1 | 0/2 | Closure | ||||||
Letter | 10/02/2017 | Satisfied | MONDO_PW_1 | Compliance Assistance | |||||||
Letter | 07/10/2017 | Satisfied | RICHARDS_JE_1 | Compliance Assistance | |||||||
Site Inspection | 06/02/2017 | Major Out of Compliance | SPIRKO_LS_1 | 0/2 | Routine Compliance | ||||||
Letter | 06/02/2017 | Satisfied | SPIRKO_LS_1 | Non-Compliance | |||||||
Electronic Communication | 06/02/2017 | Satisfied | SPIRKO_LS_1 | Routine Compliance | |||||||
Electronic Communication | 05/24/2017 | Satisfied | SPIRKO_LS_1 | Non-Compliance | |||||||
Electronic Communication | 03/06/2017 | Satisfied | SPIRKO_LS_1 | Routine Compliance | |||||||
Electronic Communication | 10/19/2015 | Satisfied | LUNN_RJ_1 | Non-Compliance | |||||||
Letter | 09/25/2015 | Satisfied | RICHARDS_JE_1 | Non-Compliance | |||||||
Letter | 07/01/2015 | Satisfied | LUNN_RJ_1 | Non-Compliance | |||||||
Electronic Communication | 06/29/2015 | Satisfied | LUNN_RJ_1 | Routine Compliance | |||||||
Site Inspection | 06/26/2015 | Minor Out of Compliance | LUNN_RJ_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 12/03/2012 | Satisfied | WILLIAMS_AK_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 11/30/2012 | Satisfied | WILLIAMS_AK_1 | Routine Compliance | |||||||
Site Inspection | 11/30/2012 | In Compliance | WILLIAMS_AK_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 05/25/2011 | In Compliance | BORISADE_KA_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 05/24/2011 | Satisfied | BORISADE_KA_1 | Routine Compliance | |||||||
Site Inspection | 01/21/2010 | In Compliance | SPEARS_CV_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 01/22/2009 | In Compliance | SPEARS_CV_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 01/13/2009 | Satisfied | SPEARS_CV_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 01/22/2008 | Satisfied | GRIFFIN_TW_1 | Routine Compliance | |||||||
Site Inspection | 01/22/2008 | In Compliance | SPEARS_CV_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 06/18/2007 | In Compliance | SPEARS_CV_1 | 0/2 | Non-Compliance | ||||||
Letter | 04/30/2007 | Satisfied | SPEARS_CV_1 | Non-Compliance | |||||||
Site Inspection | 04/30/2007 | Minor Out of Compliance | SPEARS_CV_1 | 0/2 | Routine Compliance | ||||||
Letter | 04/27/2007 | Satisfied | DOHANEY_T | Non-Compliance | |||||||
Site Inspection | 04/26/2007 | Minor Out of Compliance | DOHANEY_T | 0/2 | QA/QC | ||||||
TCAR | 02/21/2007 | Satisfied | HOLLOWAY_RW_1 | Closure | |||||||
Emergency Preparedness Information | 02/15/2007 | Satisfied | GRIFFIN_TW_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 02/06/2007 | Satisfied | GRIFFIN_TW_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 02/06/2007 | Satisfied | GRIFFIN_TW_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/25/2006 | Satisfied | CARROLL_A | Routine Compliance | |||||||
Site Inspection | 09/19/2006 | In Compliance | LUNN_RJ_1 | 0/10 | Installation | ||||||
Site Inspection | 09/19/2006 | In Compliance | LUNN_RJ_1 | 0/10 | Closure | ||||||
Site Inspection | 06/14/2006 | Minor Out of Compliance | TORSANKO_G | 0/3 | Non-Compliance | ||||||
Site Inspection | 06/14/2006 | In Compliance | TORSANKO_G | 0/3 | Non-Compliance | ||||||
No Open AOCs Found | |||||||||||
No Open Violations Found | |||||||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
08/25/2005 | ACTIVE | 47 | |||||||||
12/12/1988 | COMPLETED | 63 | |||||||||
09/09/1988 | COMPLETED | 63 | EARLY DETECTION INCENTIVE-PARTIAL | ||||||||
05/04/1988 | COMPLETED | 63 | EARLY DETECTION INCENTIVE-PARTIAL | ||||||||