Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
||||||||||
Cover Page Report | |||||||||||
Report Run Date: 02/02/2025 Last Data Refresh: 02/01/2025 Report Generated from DOPPLER | |||||||||||
District | Northeast | Type | Retail Station | ||||||||
County | Duval | Status | OPEN | ||||||||
ID | 8507168 | Latitude | 30° 17' 5.6249 | ||||||||
Name |
LANE AVE SUNOCO 1879 LANE AVE S |
Longitude | 81° 45' 17.6101 | ||||||||
JACKSONVILLE, FL 32210-1251 | LL Method | DPHO | |||||||||
Contact | JAY SEEWALD | LL Status | REVIEWED | ||||||||
Phone | (954) 573-7117 | Status Date | 10/09/2003 | ||||||||
Account Owner Information | |||||||||||
Name | FLORIDA PETROLEUM LLC 4911 LYONS TECHNOLOGY PKWY, SU#27 Pompano Beach, FL 33073 |
Effective Date | 09/23/2020 | ||||||||
Contact | JAY SEEWALD | ||||||||||
Phone | (954) 573-7117 | ||||||||||
JAY@ONTHEMOVEGAS.COM | |||||||||||
Placard # / Date | 703196 - 10/28/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | FLORIDA PETROLEUM LLC 4911 LYONS TECHNOLOGY PKWY, SU#27 Pompano Beach, FL 33073 |
Effective Date | 09/23/2020 | ||||||||
Contact | JAY SEEWALD | ||||||||||
Phone | (954) 573-7117 | ||||||||||
JAY@ONTHEMOVEGAS.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 6000 | Vehicular Diesel (D) | 04/01/1969 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(D) External protective coating | (8) Manually sampled wells (H) Mechanical line leak detector |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 6000 | Unleaded Gas (B) | 04/01/1969 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(D) External protective coating | (8) Manually sampled wells (H) Mechanical line leak detector |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 6000 | Leaded Gas (A) | 04/01/1969 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(D) External protective coating | (8) Manually sampled wells (H) Mechanical line leak detector |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 6000 | Unleaded Gas (B) | 04/01/1969 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(D) External protective coating | (8) Manually sampled wells (H) Mechanical line leak detector |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 550 | Fuel Oil - Onsite Heat (M) | 12/01/1987 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (I) Not required | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 10000 | Unleaded Gas (B) | 12/01/1988 | UNDERGROUND | Out of Service (T) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 10000 | Unleaded Gas (B) | 12/01/1988 | UNDERGROUND | Out of Service (T) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
8 | 10000 | Unleaded Gas (B) | 12/01/1988 | UNDERGROUND | Out of Service (T) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
9 | 10000 | Kerosene (K) | 12/01/1988 | UNDERGROUND | Out of Service (T) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | LIBERTY SURPLUS INSURANCE CORP | ||||||||||
LETTER OF CREDIT | 05/31/2020 | 01/31/2025 | |||||||||
LETTER OF CREDIT | 05/31/2019 | 05/31/2020 | |||||||||
INSURANCE | 12/31/2015 | 12/31/2016 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 04/30/2013 | 04/29/2014 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 04/30/2012 | 04/29/2013 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 04/29/2011 | 04/30/2012 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 04/28/2010 | 04/30/2011 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 04/30/2009 | 04/29/2010 | |||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 10/24/2005 | 11/03/2005 | IN-COMPLIANCE | TORSANKO | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 03/29/2005 | 03/30/2005 | IN-COMPLIANCE | TORSANKO | 0/4 | COMPLIANCE ASSURANCE | |||||
TCR | 04/24/2004 | 04/28/2004 | IN-COMPLIANCE | BORISADE_C | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 03/11/2004 | 03/16/2004 | MINOR OUT-OF-COMPLIANCE | BORISADE_C | 0/4 | COMPLIANCE ASSURANCE | |||||
CFFE | 03/05/2004 | 03/05/2004 | LOEFFLER_K | 0/0 | COMPLIANCE ASSURANCE | ||||||
CALL | 03/05/2004 | 03/05/2004 | LOEFFLER_K | 0/0 | COMPLIANCE ASSURANCE | ||||||
IKPC | 02/26/2004 | 03/05/2004 | LOEFFLER_K | 0/0 | COMPLIANCE ASSURANCE | ||||||
PR | 02/24/2004 | 03/05/2004 | LOEFFLER_K | 0/0 | COMPLIANCE ASSURANCE | ||||||
CALL | 02/04/2004 | 05/14/2004 | GRIFFIN_G | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes REPLACING SPILL CONTAINMENTS | |||||||||||
SCOE | 12/09/2003 | 03/05/2004 | LOEFFLER_K | 0/0 | COMPLIANCE ASSURANCE | ||||||
DCOI | 11/13/2003 | 03/05/2004 | LOEFFLER_K | 0/0 | COMPLIANCE ASSURANCE | ||||||
IKPA | 11/12/2003 | 03/05/2004 | LOEFFLER_K | 0/0 | COMPLIANCE ASSURANCE | ||||||
IKPP | 10/30/2003 | 03/05/2004 | LOEFFLER_K | 0/0 | COMPLIANCE ASSURANCE | ||||||
RRBD | 10/07/2003 | 10/08/2003 | IN-COMPLIANCE | TORSANKO_G | 0/0 | DISCHARGE PROJECT | |||||
Completion Notes CONTACTSSTATES THERE HAS BEEN NO RELEASE. | |||||||||||
IRFR | 09/17/2003 | 10/08/2003 | TORSANKO_G | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes ALL STP SUMPS FAILED STP SUMP HYDROSTATIC TEST. | |||||||||||
MEET | 08/26/2003 | 03/05/2004 | LOEFFLER_K | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCR | 08/13/2003 | 08/24/2003 | IN-COMPLIANCE | MACK_W | 0/4 | COMPLIANCE ASSURANCE | |||||
CALL | 07/21/2003 | 03/05/2004 | LOEFFLER_K | 0/0 | COMPLIANCE ASSURANCE | ||||||
CALL | 07/18/2003 | 03/05/2004 | LOEFFLER_K | 0/0 | COMPLIANCE ASSURANCE | ||||||
IRFR | 06/09/2003 | 06/11/2003 | TORSANKO_G | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes SHEEN PRESENT IN STP SUMP | |||||||||||
TCI | 06/09/2003 | 06/12/2003 | MINOR OUT-OF-COMPLIANCE | MACK_W | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 03/27/2002 | 04/01/2002 | IN-COMPLIANCE | HOLLOWAY_R | 0/4 | COMPLIANCE ASSURANCE | |||||
CWOE | 07/11/2001 | 07/12/2001 | HOLLOWAY_R | 0/4 | COMPLIANCE ASSURANCE | ||||||
RRBD | 07/11/2001 | 07/12/2001 | HOLLOWAY_R | 0/4 | COMPLIANCE ASSURANCE | ||||||
TCI | 06/04/2001 | 06/05/2001 | MINOR OUT-OF-COMPLIANCE | HOLLOWAY_R | 0/4 | COMPLIANCE ASSURANCE | |||||
Completion Notes SEE VIOLATIONS | |||||||||||
TIN | 12/08/2000 | 05/14/2001 | IN-COMPLIANCE | HOLLOWAY_R | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 11/17/1999 | 12/09/1999 | IN-COMPLIANCE | HOLLOWAY_R | 0/4 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Enforcement Tracking | 09/11/2024 | Closed Without Enforcement | PAUL_JK | Enforcement | |||||||
Enforcement Tracking | 09/11/2024 | Closed Without Enforcement | MACK_BT | Enforcement | |||||||
Document Management | 06/03/2024 | Satisfied | ROBBINS_JL_1 | Incident | |||||||
Electronic Communication | 06/03/2024 | Satisfied | ROBBINS_JL_1 | Routine Compliance | |||||||
Enforcement Referral | 05/30/2024 | Accepted | GAINEY_H_1 | Enforcement | |||||||
Electronic Communication | 05/20/2024 | Satisfied | ROBBINS_JL_1 | Compliance Assistance | |||||||
Electronic Communication | 05/06/2024 | Satisfied | ROBBINS_JL_1 | Compliance Assistance | |||||||
Electronic Communication | 04/02/2024 | Satisfied | ROBBINS_JL_1 | Compliance Assistance | |||||||
Letter | 03/05/2024 | Satisfied | ROBBINS_JL_1 | Compliance Assistance | |||||||
Site Inspection | 03/05/2024 | Major Out of Compliance | ROBBINS_JL_1 | 0/4 | Compliance Assistance | ||||||
Enforcement Referral | 12/14/2023 | Accepted | GAINEY_H_1 | Enforcement | |||||||
Letter | 12/12/2023 | Satisfied | BRANCH_BL_1 | Compliance Assistance | |||||||
Site Inspection | 12/12/2023 | Major Out of Compliance | BRANCH_BL_1 | 0/4 | Routine Compliance | ||||||
Letter | 08/11/2022 | Satisfied | QUICK_V | Enforcement | |||||||
Enforcement Referral | 10/28/2021 | Accepted | GAINEY_H_1 | Enforcement | |||||||
Letter | 10/19/2021 | Satisfied | MCKINLEY_DN_1 | Non-Compliance | |||||||
Site Inspection | 10/19/2021 | Major Out of Compliance | MCKINLEY_DN_1 | 0/4 | Routine Compliance | ||||||
Electronic Communication | 08/23/2021 | Satisfied | MCKINLEY_DN_1 | Compliance Assistance | |||||||
Meeting | 08/23/2021 | Satisfied | MCKINLEY_DN_1 | Compliance Assistance | |||||||
Letter | 04/27/2020 | Satisfied | OLIVA_L | Enforcement | |||||||
Enforcement Tracking | 04/27/2020 | Closed Without Enforcement | OLIVA_L | Enforcement | |||||||
Electronic Communication | 09/20/2019 | Satisfied | LUNN_RJ_1 | Compliance Assistance | |||||||
Site Inspection | 09/13/2019 | Minor Out of Compliance | LUNN_RJ_1 | 0/4 | Compliance Assistance | ||||||
Enforcement Referral | 08/23/2019 | Accepted | GREGORY_HM_1 | Enforcement | |||||||
Electronic Communication | 07/16/2019 | Satisfied | LUNN_RJ_1 | Compliance Assistance | |||||||
Record Document | 07/16/2019 | Satisfied | LUNN_RJ_1 | Compliance Assistance | |||||||
Site Inspection | 05/06/2019 | Major Out of Compliance | LUNN_RJ_1 | 0/4 | Routine Compliance | ||||||
Letter | 05/06/2019 | Satisfied | LUNN_RJ_1 | Compliance Assistance | |||||||
Electronic Communication | 04/15/2016 | Satisfied | LUNN_RJ_1 | Routine Compliance | |||||||
Site Inspection | 04/14/2016 | In Compliance | LUNN_RJ_1 | 0/4 | Routine Compliance | ||||||
Electronic Communication | 10/12/2015 | Satisfied | LUNN_RJ_1 | Routine Compliance | |||||||
Electronic Communication | 03/04/2014 | Satisfied | WILLIAMS_AK_1 | Non-Compliance | |||||||
Letter | 01/02/2014 | Satisfied | WILLIAMS_AK_1 | Non-Compliance | |||||||
Electronic Communication | 12/31/2013 | Satisfied | WILLIAMS_AK_1 | Routine Compliance | |||||||
Site Inspection | 12/31/2013 | Minor Out of Compliance | WILLIAMS_AK_1 | 0/4 | Routine Compliance | ||||||
Emergency Preparedness Information | 12/18/2013 | Satisfied | WILLIAMS_AK_1 | Routine Compliance | |||||||
Record Document | 02/02/2012 | Satisfied | CAIN_M_1 | Non-Compliance | |||||||
Site Inspection | 02/01/2012 | In Compliance | CAIN_M_1 | 0/4 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/01/2012 | Satisfied | CAIN_M_1 | Routine Compliance | |||||||
Site Inspection | 09/09/2010 | In Compliance | HOLLOWAY_RW_1 | 0/4 | Routine Compliance | ||||||
Electronic Communication | 09/05/2010 | Satisfied | HOLLOWAY_RW_1 | Routine Compliance | |||||||
Issue Document | 02/10/2010 | Satisfied | WILLIAMS_EM_1 | Closure | |||||||
Site Inspection | 09/17/2009 | In Compliance | HOLLOWAY_RW_1 | 0/4 | Routine Compliance | ||||||
Site Inspection | 08/28/2008 | In Compliance | WILLIAMS_AK_1 | 0/4 | Routine Compliance | ||||||
Letter | 02/29/2008 | Satisfied | HOLLOWAY_RW_1 | Closure | |||||||
TCAR | 02/29/2008 | Satisfied | HOLLOWAY_RW_1 | Closure | |||||||
TCAR | 02/25/2008 | Incomplete | HOLLOWAY_RW_1 | Closure | |||||||
Site Inspection | 02/25/2008 | In Compliance | LUNN_RJ_1 | 0/4 | Installation | ||||||
Site Inspection | 02/25/2008 | In Compliance | LUNN_RJ_1 | 0/4 | Closure | ||||||
Site Inspection | 09/06/2007 | In Compliance | WILLIAMS_AK_1 | 0/4 | Routine Compliance | ||||||
Emergency Preparedness Information | 08/27/2007 | Satisfied | WILLIAMS_AK_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 02/15/2007 | Satisfied | GRIFFIN_TW_1 | Routine Compliance | |||||||
Site Inspection | 10/26/2006 | In Compliance | TORSANKO_G | 0/4 | Routine Compliance | ||||||
Emergency Preparedness Information | 09/28/2006 | Satisfied | GRIFFIN_TW_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/25/2006 | Satisfied | CARROLL_A | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
03/05/2024 | 6015 | Minor | 4.3 Incident investigation not completed within 14 days, and/or no DRF or written confirmation received at the end of the 14-day investigation period. | Investigate issue to determine if a discharge has occurred. | |||||||
03/05/2024 | 6060 | SNC-B | 4.11 Release detection methods do not meet monitoring requirements. | Responsible Party must determine where the brine liquid from tanks 6,7, and 8 went. Determine if a discharge to the environment occurred or not. Incident investigation documentation must be provided. Integrity testing and Sampling may be required. | |||||||
03/05/2024 | 6014 | SNC-B | 4.2 Incident investigation not initiated within 24-hours (or by next business day) to determine if discharge occurred. | Investigate issue. | |||||||
03/05/2024 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | repair and or replace broken lid on tank #6. Repair and or replace the STP interior caps on Regular 2, Premium and Kerosene. | |||||||
12/12/2023 | 6001 | Minor | 2.1 No reasonable access provided. | Schedule an inspection in order to provide access to the storage tank system and all system components. | |||||||
10/19/2021 | 6001 | Minor | 2.1 No reasonable access provided. | Site access to the facility and individual storage tank systems or system components, subject to safety considerations, shall be provided for compliance inspections conducted at reasonable times and with notice by phone or email. The facility owner or operator shall provide an authorized facility representative to unlock and open any covers, manways, and release detection equipment associated with the storage tank system or system component and demonstrate operational functionality of electronic equipment. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
05/02/1984 | COMPLETED | 66 | EARLY DETECTION INCENTIVE-ELIGIBLE | ||||||||