DEP Logo Florida Department of
Environmental Protection


Bob Martinez Center
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
Storage Tanks &
Contamination
Monitoring Information
 
Cover Page Report
Report Run Date: 05/09/2025        Last Data Refresh: 05/08/2025        Report Generated from DOPPLER
 
District Northeast   Type    Retail Station
 
County Duval   Status    OPEN
 
ID 8507210   Latitude    30° 20' 19.687
 
Name QUICK STOP-MAIN ST
1255 N MAIN ST
Longitude    81° 39' 15.8628
  JACKSONVILLE, FL 32206-4919 LL Method    DPHO
 
Contact CHRIS KHAZAL   LL Status    REVIEWED
 
Phone (904) 568-9521   Status Date    12/08/2003
 
Account Owner Information
 
Name QUICK STOP INC
1255 N MAIN ST
JACKSONVILLE, FL 32206
Effective Date    09/28/2004
 
Contact SAMIR KHAZAL
 
Phone (904) 568-9521
 
Email KHAZALESSA@BELLSOUTH.NET
  Placard # / Date    684618 - 06/06/2024
Property Owner Information
 
Name SAN MARCO INVESTMENTS OF JACKSONVILLE INC
7167 CRANE AVE
JACKSONVILLE, FL 32216
Effective Date    04/26/2017
 
Contact SAMIR KHAZAL
 
Phone (904) 568-9521
 
Email
 
 
 
 
 
 
 
 
 
Tank Tank Size Content Installed Placement Status
3 10000 Unleaded Gas (B) 05/01/1995 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(E) Fiberglass
(I) Double wall
(M) Spill containment bucket
(O) Tight fill
  (J) Pressurized piping system
(K) Dispenser liners
(M) Double wall - pipe jacket
(N) Approved synthetic material
(1) Continuous electronic sensing
(3) Electronic monitor pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
4 8000 Unleaded Gas (B) 05/01/1995 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(E) Fiberglass
(I) Double wall
(M) Spill containment bucket
(O) Tight fill
  (J) Pressurized piping system
(K) Dispenser liners
(M) Double wall - pipe jacket
(N) Approved synthetic material
(1) Continuous electronic sensing
(3) Electronic monitor pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
T1 8000 Unleaded Gas (B) 11/01/1980 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(C) Steel
  (C) Fiberglass (Y) Unknown
 
 
Tank Tank Size Content Installed Placement Status
T2 8000 Unleaded Gas (B) 11/01/1980 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(C) Steel
  (C) Fiberglass (Y) Unknown
 
 
Insurance Documents
 
FR Type   Effective Date Expiration Date Company Name
INSURANCE   11/29/2022 11/29/2023 CRUM & FORSTER SPECIALTY INSURANCE COMPANY
INSURANCE   11/10/2021 11/10/2022 CRUM & FORSTER SPECIALTY INS. CO.
INSURANCE   10/18/2019 10/18/2021 CRUM & FORSTER SPECIALTY INS. CO.
INSURANCE   10/18/2017 10/18/2018 CRUM & FORSTER SPECIALTY INS. CO.
INSURANCE   10/18/2016 10/18/2017 COMMERCE & INDUSTRY
INSURANCE   10/18/2014 10/18/2015 COMMERCE & INDUSTRY
INSURANCE   10/18/2013 10/18/2014 COMMERCE & INDUSTRY
INSURANCE   10/18/2012 10/18/2013 COMMERCE & INDUSTRY
INSURANCE   10/18/2010 10/18/2011 COMMERCE & INDUSTRY
INSURANCE   09/16/2008 09/16/2009 ZURICH-AMERICAN
 
 
Legacy Compliance Activity Information
 
Activity
Code
Date
Initiated
Date
Completed
Results Inspector AST/UST
Count
Description
RRBD 02/22/2006 02/23/2006 BORISADE 0/2 COMPLIANCE ASSURANCE
 
 Completion Notes VIOLATIONS CORRECTED - 1002, 1003, 1082, 1123, 1062.
 
NCLI 01/31/2006 02/01/2006 ALLEN 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes VIOL #1002, 1003, 1062, 1123, & 1082.
 
TCI 01/26/2006 01/30/2006 SIGNIFICANT OUT-OF-COMPLIANCE BORISADE 0/2 COMPLIANCE ASSURANCE
 
LTR 02/25/2005 03/26/2005 GRIFFIN 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes COPY OF UPDATED REGISTRATION FORM SUBMITTED TO TALLAHASSEE
 
TCI 07/14/2004 07/22/2004 IN-COMPLIANCE BORISADE_C 0/2 COMPLIANCE ASSURANCE
 
TCI 08/06/2003 08/09/2003 IN-COMPLIANCE MACK_W 0/2 COMPLIANCE ASSURANCE
 
 Completion Notes RD - INTERSTITIAL & VISUAL, LLD TEST DUE 2-27-04, PROBE CERT DUE 6-18-04
 
TCI 11/07/2002 11/19/2002 IN-COMPLIANCE CARROLL_A 0/2 COMPLIANCE ASSURANCE
 
TCI 10/25/2001 11/05/2001 IN-COMPLIANCE HOLLOWAY_R 0/2 COMPLIANCE ASSURANCE
 
TCI 08/28/2000 08/31/2000 IN-COMPLIANCE CARROLL_A 0/2 COMPLIANCE ASSURANCE
 
TCI 08/10/1999 11/01/1999 IN-COMPLIANCE ASSIDY_J 0/2 COMPLIANCE ASSURANCE
 
 
 
Compliance Activity Information
 
Activity
Code
Date
Completed
Results Inspector AST/UST
Count
Description
Enforcement Tracking 12/04/2024 Closed Without Enforcement MCKINLEY_D Enforcement
 
Enforcement Referral 12/04/2024 Accepted AMES_J Enforcement
 
Document Management 12/03/2024 Satisfied ROBBINS_JL_1 Incident
 
Letter 12/03/2024 Satisfied ROBBINS_JL_1 Compliance Assistance
 
Incident 12/03/2024 Has not led to Discharge ROBBINS_JL_1 Incident
 
Document Management 12/03/2024 Satisfied ROBBINS_JL_1 Incident
 
Site Inspection 12/03/2024 Major Out of Compliance ROBBINS_JL_1 0/2 Routine Compliance
 
Electronic Communication 10/30/2024 Satisfied ROBBINS_JL_1 Compliance Assistance
 
Electronic Communication 12/06/2022 Satisfied MCKINLEY_D Enforcement
 
Electronic Communication 11/07/2022 Satisfied ROBBINS_JL_1 Compliance Assistance
 
Letter 11/07/2022 Satisfied MCKINLEY_D Enforcement
 
Electronic Communication 11/03/2022 Satisfied MCKINLEY_D Enforcement
 
Electronic Communication 10/07/2022 Satisfied ROBBINS_JL_1 Compliance Assistance
 
Letter 09/14/2022 Satisfied CHRISTIAN_E Enforcement
 
Enforcement Tracking 09/14/2022 Closed Without Enforcement MCKINLEY_D Enforcement
 
Enforcement Referral 09/14/2022 Accepted GAINEY_H_1 Enforcement
 
Letter 09/09/2022 Satisfied ROBBINS_JL_1 Compliance Assistance
 
Site Inspection 09/09/2022 Major Out of Compliance ROBBINS_JL_1 0/2 Routine Compliance
 
Electronic Communication 08/10/2022 Satisfied ROBBINS_JL_1 Compliance Assistance
 
Enforcement Referral 01/26/2021 Accepted GAINEY_H_1 Enforcement
 
Electronic Communication 01/19/2021 Satisfied MCKINLEY_DN_1 Compliance Assistance
 
Letter 11/06/2020 Satisfied MCKINLEY_DN_1 Compliance Assistance
 
Site Inspection 10/30/2020 Major Out of Compliance MCKINLEY_DN_1 0/2 Routine Compliance
 
Electronic Communication 10/08/2020 Satisfied MCKINLEY_DN_1 Routine Compliance
 
Electronic Communication 05/12/2020 Satisfied MONDO_PW_1 Routine Compliance
 
Enforcement Tracking 01/12/2018 Closed Without Enforcement HARRIS_MJ Enforcement
 
Letter 01/12/2018 Satisfied HARRIS_MJ Enforcement
 
Electronic Communication 01/12/2018 Satisfied HARRIS_MJ Enforcement
 
Enforcement Referral 10/27/2017 Accepted RICHARDS_JE_1 Enforcement
 
Electronic Communication 10/05/2017 Satisfied MONDO_PW_1 Compliance Assistance
 
Letter 09/27/2017 Satisfied MONDO_PW_1 Compliance Assistance
 
Site Inspection 09/26/2017 Minor Out of Compliance MONDO_PW_1 0/2 Compliance Assistance
 
Letter 08/26/2017 Satisfied RICHARDS_JE_1 Compliance Assistance
 
Electronic Communication 07/18/2017 Satisfied MONDO_PW_1 Routine Compliance
 
Letter 05/01/2017 Satisfied SPIRKO_LS_1 Non-Compliance
 
Electronic Communication 05/01/2017 Satisfied SPIRKO_LS_1 Routine Compliance
 
Site Inspection 05/01/2017 Minor Out of Compliance SPIRKO_LS_1 0/2 Routine Compliance
 
Electronic Communication 04/10/2017 Satisfied SPIRKO_LS_1 Routine Compliance
 
Site Inspection 03/20/2015 In Compliance WILLIAMS_AK_1 0/2 Routine Compliance
 
Electronic Communication 03/20/2015 Satisfied WILLIAMS_AK_1 Routine Compliance
 
Emergency Preparedness Information 03/19/2015 Satisfied WILLIAMS_AK_1 Routine Compliance
 
Emergency Preparedness Information 02/21/2013 Satisfied WILLIAMS_AK_1 Routine Compliance
 
Site Inspection 02/21/2013 In Compliance WILLIAMS_AK_1 0/2 Routine Compliance
 
Site Inspection 06/01/2011 In Compliance BORISADE_KA_1 0/2 Routine Compliance
 
Emergency Preparedness Information 05/27/2011 Satisfied BORISADE_KA_1 Routine Compliance
 
Site Inspection 06/25/2010 In Compliance HOLLOWAY_RW_1 0/2 Routine Compliance
 
Site Inspection 01/02/2009 In Compliance BORISADE_KA_1 0/2 Routine Compliance
 
Emergency Preparedness Information 12/30/2008 Satisfied BORISADE_KA_1 Routine Compliance
 
Emergency Preparedness Information 01/09/2008 Satisfied BORISADE_KA_1 Routine Compliance
 
Site Inspection 11/26/2007 In Compliance BORISADE_KA_1 0/2 Routine Compliance
 
Site Inspection 05/09/2007 In Compliance BORISADE_KA_1 0/2 Routine Compliance
 
Emergency Preparedness Information 02/13/2007 Satisfied BORISADE_KA_1 Routine Compliance
 
Emergency Preparedness Information 09/24/2006 Satisfied GRIFFIN_TW_1 Routine Compliance
 
 
 
No Open AOCs Found
 
 
Open Violations
 
Insp Date Vio # Significance Violation Text Corrective Action
12/03/2024 6063 SNC-B 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. Repair and or replace the Premium DW piping in the STP sump. Provide EQD Inspector with photo and testing documentation of the Premium double walled piping.
 
12/03/2024 6006 Minor 2.5 Placard not displayed (or available upon request). Post placard at facility and provide photo documentation to the EQD Inspector.
 
12/03/2024 6012 SNC-A 2.9 No financial responsibility instrument or expired instrument for > 180 days. Acquire Certificate of Financial Responsibility for tanks #3 & #4 for Quick Stop-Main St. 1255 N. Main St. Jacksonville, FL 32206 and provide proof to the EQD Inspector.
 
12/03/2024 6063 SNC-B 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. Repair and or replace the Premium STP sump sensor and provide passing documentation to the EQD Inspector.
 
12/03/2024 6014 SNC-B 4.2 Incident investigation not initiated within 24-hours (or by next business day) to determine if discharge occurred. Facility must submit an incident notification form. Responsible Party must determine if a discharge to the environment occurred or not. Incident investigation and resolution documentation must be provided. Sampling may be required.
 
12/03/2024 6013 Minor 2.10 Appropriate paperwork for financial responsibility improperly completed or maintained. Once Certificate of Financial Responsibility has been obtained, provide Part P of Certificate of Financial Responsibility to the EQD Inspector.
 
12/03/2024 6014 SNC-B 4.2 Incident investigation not initiated within 24-hours (or by next business day) to determine if discharge occurred. Facility must submit an incident notification form. Responsible Party must determine if a discharge to the environment occurred or not. Incident investigation and resolution documentation must be provided. Sampling may be required.
 
10/29/2020 4081 Minor 2.9 Records of current training certificates for designated Class A, B, and C operators shall be maintained for as long as the operators are designated for that facility not kept. Records of current training certificates for designated Class A, B, and C operators shall be maintained for as long as the operators are designated for that facility.
 
 
 
Discharge Information
 
Discharge
Date
  Clean Up
Status
Score Eligibility Info Site Manager Phone
07/31/1991   COMPLETED 55 PETROLEUM LIABILITY AND RESTORATION INSURANCE PROGRAM-ELIGIBLE
 
08/17/1987   COMPLETED 55 EARLY DETECTION INCENTIVE-ELIGIBLE