![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/17/2025 Last Data Refresh: 05/16/2025 Report Generated from DOPPLER | |||||||||||
District | Northeast | Type | Retail Station | ||||||||
County | Duval | Status | OPEN | ||||||||
ID | 8507534 | Latitude | 30° 20' 18.3035 | ||||||||
Name |
MERYLE UNIVERSITY INC 1721 N UNIVERSITY BLVD |
Longitude | 81° 36' 8.2417 | ||||||||
JACKSONVILLE, FL 32211-4565 | LL Method | DPHO | |||||||||
Contact | GEORGE DAHI | LL Status | REVIEWED | ||||||||
Phone | (904) 627-5096 | Status Date | 02/01/2024 | ||||||||
Account Owner Information | |||||||||||
Name | MERYLE UNIVERSITY BLVD N 2995 MCCRONE WAY JACKSONVILLE, FL 32216 |
Effective Date | 06/02/2023 | ||||||||
Contact | GEOGE DAHI | ||||||||||
Phone | (904) 627-5096 | ||||||||||
DAHIGEORGE1@GMAIL.COM | |||||||||||
Placard # / Date | 696651 - 06/27/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | ELIO FOOD STORE INC 1721 UNIV BLVD N JACKSONVILLE, FL 32211 |
Effective Date | 07/13/2020 | ||||||||
Contact | ELIO CHAMOUN | LOULOU DAKHEEL | ||||||||||
Phone | (904) 299-9066 | ||||||||||
ELIOCHAMOUN@YAHOO.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 15000 | Unleaded Gas (B) | 07/01/2005 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 15000 | Vehicular Diesel (D) | 07/01/2005 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (I) Double wall (L) Compartmented (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
8 | 15000 | Unleaded Gas (B) | 07/01/2005 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 3000 | Kerosene (K) | 06/01/1982 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 8000 | Vehicular Diesel (D) | 06/01/1982 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 12000 | Unleaded Gas (B) | 06/01/1982 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (H) Impressed current CP (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(B) Steel/galvanized metal (E) Cathodic protection (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 12000 | Unleaded Gas (B) | 06/01/1982 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (H) Impressed current CP (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(B) Steel/galvanized metal (E) Cathodic protection (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 12000 | Unleaded Gas (B) | 06/01/1982 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (H) Impressed current CP (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(B) Steel/galvanized metal (E) Cathodic protection (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 08/01/2022 | 08/01/2023 | COMMERCE AND INDUSTRY INSURANCE COMPANY | ||||||||
INSURANCE | 08/01/2020 | 08/01/2021 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 08/01/2018 | 08/01/2019 | COLONY | ||||||||
INSURANCE | 08/01/2017 | 08/01/2018 | COLONY | ||||||||
INSURANCE | 08/01/2016 | 08/01/2017 | COLONY | ||||||||
INSURANCE | 08/01/2015 | 08/01/2016 | COLONY | ||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 01/01/2014 | 12/31/2014 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 01/01/2012 | 12/31/2012 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 12/01/2009 | 12/01/2010 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 12/01/2008 | 12/31/2009 | |||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 02/09/2006 | 02/10/2006 | IN-COMPLIANCE | MEDICUS | 0/3 | COMPLIANCE ASSURANCE | |||||
LTR | 09/15/2005 | 09/16/2005 | MCINTOSH | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes NEED DRF TO CONSIDER NFA. CONTAMINATED SOIL REMOVED. | |||||||||||
LTR | 09/15/2005 | 09/16/2005 | GRIFFIN | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes TCAR REQUIREMENTS SATISFIED. NFA REQUEST FORWARDED TO PETROLEUM CLEANUP ACTIVITY. | |||||||||||
MDR | 08/16/2005 | 01/10/2006 | GRIFFIN | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes DATED 8/16/05 RECIEVED 8/16/05. 599.66 TONS OF CONTAMINATED SOIL REMOVED FROM SITE. | |||||||||||
MDR | 08/16/2005 | 09/16/2005 | GRIFFIN | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes TCAR & REQUEST FOR NFA RECEIVED. | |||||||||||
TIN | 07/21/2005 | 08/10/2005 | IN-COMPLIANCE | CARROLL | 0/3 | COMPLIANCE ASSURANCE | |||||
TIN | 07/21/2005 | 08/10/2005 | IN-COMPLIANCE | CARROLL | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes STORE OPEN - ATG - PRINT-OUT FOR SENSORS OK. ALL FUNCTIONS NORMAL. | |||||||||||
TIV | 07/14/2005 | 08/10/2005 | IN-COMPLIANCE | CARROLL | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes INSTALLING MPD'S - CHECKED EQUIPMENT LIST | |||||||||||
TIV | 07/12/2005 | 08/10/2005 | IN-COMPLIANCE | CARROLL | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING INSTALLED - STPS SPILL AND DISPENSERS LINERS HYDRO TEST OK. | |||||||||||
TIV | 07/06/2005 | 08/10/2005 | IN-COMPLIANCE | CARROLL | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes INSTALLING THE STP SUMPS TO THE TANK TOPS - SUMPS PETRO FIBERGLASS - ALSO INSTALLING OPW SPILL CONTAINMENT | |||||||||||
TIV | 07/01/2005 | 08/10/2005 | IN-COMPLIANCE | CARROLL | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes SAME | |||||||||||
LTR | 07/01/2005 | 07/01/2005 | ALLEN | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes FUEL SYSTEM REMOVAL | |||||||||||
TIV | 06/29/2005 | 08/10/2005 | IN-COMPLIANCE | CARROLL | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes ONE OF THE 15,000 GAL TANK HAS THE VACUUM GUAGE MISSING - CONTRACTOR TO INSTALL NEW GUAGE AND VACUUM. | |||||||||||
TIV | 06/28/2005 | 08/10/2005 | IN-COMPLIANCE | CARROLL | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes TANKS INSTALLED OVER WEEKEND. | |||||||||||
DCCR | 06/24/2005 | 01/10/2006 | GRIFFIN | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes FACILITY IS REQUESTING AN NFA. CONFIRMATION OF DISCHARGE BASED UPON CLOSURE REPORT ANALYTICAL RESULTS. | |||||||||||
TII | 06/24/2005 | 08/10/2005 | IN-COMPLIANCE | CARROLL | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes SHEET PILE & DIGGING TANK INSTALLATION 3 EA. TANKS INSTALLED SATURDAY 6/25/05 - MODERN WEKDING 12,000 GAL. 1- 15,000 GAL & 1-15,000 GAL COMP - 1100/4000 PREM/DIESEL. | |||||||||||
TXI | 06/16/2005 | 07/01/2005 | IN-COMPLIANCE | CARROLL | 0/5 | COMPLIANCE ASSURANCE | |||||
Completion Notes TANKS HAVE EXTENSIVE CORROSION. REMOVED AND SENT TO SCRAP | |||||||||||
SV | 06/15/2005 | 07/01/2005 | CARROLL | 0/5 | COMPLIANCE ASSURANCE | ||||||
Completion Notes REMOVING DISPENSERS & ISLANDS. INSTALL SHEET PILES. REMOVE KERO TANK. | |||||||||||
SV | 06/14/2005 | 07/01/2005 | CARROLL | 0/5 | COMPLIANCE ASSURANCE | ||||||
Completion Notes BREAKING CONCRETE | |||||||||||
CALL | 06/09/2005 | 06/09/2005 | CARROLL | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes 48/HRS - TANK INSTALL & TANK REMOVAL. COMMENCE ON OR ABOUT 6/13/05. | |||||||||||
TCI | 03/08/2005 | 03/23/2005 | IN-COMPLIANCE | YATES | 0/5 | COMPLIANCE ASSURANCE | |||||
TCI | 03/26/2004 | 03/27/2004 | IN-COMPLIANCE | YATES_R | 0/5 | COMPLIANCE ASSURANCE | |||||
TCI | 09/12/2002 | 09/18/2002 | IN-COMPLIANCE | CARROLL_A | 0/5 | COMPLIANCE ASSURANCE | |||||
TCI | 09/24/2001 | 09/27/2001 | IN-COMPLIANCE | CARROLL_A | 0/5 | COMPLIANCE ASSURANCE | |||||
TCI | 10/31/2000 | 11/06/2000 | IN-COMPLIANCE | CARROLL_A | 0/5 | COMPLIANCE ASSURANCE | |||||
TCI | 01/04/2000 | 01/26/2000 | IN-COMPLIANCE | CARROLL_A | 0/5 | COMPLIANCE ASSURANCE | |||||
TCI | 07/30/1999 | 12/09/1999 | IN-COMPLIANCE | ASSIDY_J | 0/5 | COMPLIANCE ASSURANCE | |||||
CWOE | 06/30/1999 | 07/01/1999 | HOFFMAN_J | 0/0 | UST COMPLIANCE PROJECT | ||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Letter | 03/13/2024 | Satisfied | DALLAS_R | Enforcement | |||||||
Enforcement Referral | 11/28/2023 | Accepted | GAINEY_H_1 | Enforcement | |||||||
Electronic Communication | 09/20/2023 | Satisfied | BRANCH_BL_1 | Compliance Assistance | |||||||
Electronic Communication | 09/20/2023 | Satisfied | BRANCH_BL_1 | Compliance Assistance | |||||||
Letter | 05/24/2023 | Satisfied | BRANCH_BL_1 | Compliance Assistance | |||||||
Site Inspection | 05/24/2023 | Major Out of Compliance | BRANCH_BL_1 | 0/3 | Routine Compliance | ||||||
Letter | 02/09/2022 | Satisfied | QUICK_V | Enforcement | |||||||
Enforcement Tracking | 02/09/2022 | Closed Without Enforcement | QUICK_V | Enforcement | |||||||
Letter | 02/09/2022 | Satisfied | QUICK_V | Enforcement | |||||||
Issue Document | 02/08/2022 | Satisfied | QUICK_V | Enforcement | |||||||
Site Inspection | 12/02/2021 | In Compliance | MCKINLEY_DN_1 | 0/3 | Compliance Assistance | ||||||
Enforcement Referral | 10/15/2021 | Accepted | COLE_K | Enforcement | |||||||
Enforcement Tracking | 10/11/2021 | Closed Without Enforcement | SOLTIS_C | Enforcement | |||||||
Electronic Communication | 06/03/2021 | Satisfied | MCKINLEY_DN_1 | Compliance Assistance | |||||||
Enforcement Referral | 04/29/2021 | Accepted | RICHARDS_JE_1 | Enforcement | |||||||
Letter | 01/29/2021 | Satisfied | MCKINLEY_DN_1 | Compliance Assistance | |||||||
Site Inspection | 01/29/2021 | Major Out of Compliance | MCKINLEY_DN_1 | 0/3 | Routine Compliance | ||||||
Enforcement Tracking | 07/10/2019 | Closed Without Enforcement | OLIVA_L | Enforcement | |||||||
Letter | 07/10/2019 | Satisfied | OLIVA_L | Enforcement | |||||||
Enforcement Referral | 01/11/2019 | Accepted | GREGORY_HM_1 | Enforcement | |||||||
Letter | 10/17/2018 | Satisfied | LUNN_RJ_1 | Compliance Assistance | |||||||
Electronic Communication | 10/01/2018 | Satisfied | LUNN_RJ_1 | Compliance Assistance | |||||||
Site Inspection | 09/19/2018 | Minor Out of Compliance | LUNN_RJ_1 | 0/3 | Routine Compliance | ||||||
Electronic Communication | 08/14/2018 | Satisfied | LUNN_RJ_1 | Routine Compliance | |||||||
Site Inspection | 02/01/2016 | In Compliance | TOWLE_M | 0/3 | QA/QC | ||||||
Electronic Communication | 12/11/2015 | Satisfied | LUNN_RJ_1 | Routine Compliance | |||||||
Site Inspection | 12/03/2015 | In Compliance | LUNN_RJ_1 | 0/3 | Routine Compliance | ||||||
Meeting | 10/24/2014 | Satisfied | DEFALCO_L | QA/QC | |||||||
Emergency Preparedness Information | 01/27/2014 | Satisfied | LUNN_RJ_1 | Routine Compliance | |||||||
Electronic Communication | 01/23/2014 | Satisfied | LUNN_RJ_1 | Routine Compliance | |||||||
Site Inspection | 01/15/2014 | In Compliance | LUNN_RJ_1 | 0/3 | Routine Compliance | ||||||
Electronic Communication | 02/14/2012 | Satisfied | LUNN_RJ_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 02/06/2012 | Satisfied | LUNN_RJ_1 | Routine Compliance | |||||||
Site Inspection | 02/06/2012 | In Compliance | LUNN_RJ_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 10/22/2010 | In Compliance | LUNN_RJ_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 10/19/2009 | In Compliance | WILLIAMS_AK_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 09/03/2008 | Satisfied | HOLLOWAY_RW_1 | Routine Compliance | |||||||
Site Inspection | 09/03/2008 | In Compliance | HOLLOWAY_RW_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 01/29/2008 | Satisfied | HOLLOWAY_RW_1 | Routine Compliance | |||||||
Site Inspection | 01/22/2008 | In Compliance | HOLLOWAY_RW_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 04/09/2007 | In Compliance | MEDICUS_KN | 0/3 | Non-Compliance | ||||||
Site Inspection | 02/27/2007 | Minor Out of Compliance | MEDICUS_KN | 0/5 | Routine Compliance | ||||||
Letter | 02/27/2007 | Satisfied | MEDICUS_KN | Non-Compliance | |||||||
Emergency Preparedness Information | 02/14/2007 | Satisfied | MEDICUS_KN | Routine Compliance | |||||||
Emergency Preparedness Information | 09/25/2006 | Satisfied | GRIFFIN_TW_1 | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
05/24/2023 | 6006 | Minor | 2.5 Placard not displayed (or available upon request). | Provide a photo to EQD for review of the current tank registration placard displayed in plain view. | |||||||
05/23/2023 | 6003 | Minor | 2.2 Registration Form not submitted for a new system, change in service, closure, owner change, or discovery of unregistered facility. | Submit a completed registration form to tank registration which reflects the change in ownership. | |||||||
05/23/2023 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Have the double-walled spill buckets tested for integrity, according to manufacturers specifications, and provide documentation to EQD for review. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
09/26/1989 | COMPLETED | 88 | |||||||||
08/14/1988 | COMPLETED | 88 | EARLY DETECTION INCENTIVE-ELIGIBLE | ||||||||