DEP Logo Florida Department of
Environmental Protection


Bob Martinez Center
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
Storage Tanks &
Contamination
Monitoring Information
 
Cover Page Report
Report Run Date: 05/09/2025        Last Data Refresh: 05/08/2025        Report Generated from DOPPLER
 
District Northwest   Type    Retail Station
 
County Escambia   Status    OPEN
 
ID 8507862   Latitude    30° 32' 2.7187
 
Name CIRCLE K #2721592
3225 W 9 MILE RD
Longitude    87° 19' 54.4826
  PENSACOLA, FL 32534-9445 LL Method    DPHO
 
Contact SCOTT JANASHAK   LL Status    REVIEWED
 
Phone (850) 549-2879   Status Date    08/06/2013
 
Account Owner Information
 
Name CIRCLE K STORES INC
1100 Situs Ct
Raleigh, NC 27606-5446
Effective Date    01/07/2016
 
Contact IRA LEWIS
 
Phone (423) 400-2480
 
Email ILEWIS@CIRCLEK.COM
  Placard # / Date    697480 - 06/28/2024
Property Owner Information
 
Name THE PANTRY INC
305 Gregson Dr
Cary, NC 27511-6496
Effective Date    07/20/2009
 
Contact BRENT PUZAK | RAMON INCIONG (386) 916-6267
 
Phone (919) 774-6700
 
Email GBIGGS@CIRCLEK.COM
 
 
 
 
 
 
 
 
 
Tank Tank Size Content Installed Placement Status
14 20000 Vehicular Diesel (D) 06/01/2009 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(F) Fiberglass clad steel
(M) Spill containment bucket
(R) Double wall - tank jacket
  (C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
 
 
Tank Tank Size Content Installed Placement Status
15 20000 Unleaded Gas (B) 06/01/2009 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(F) Fiberglass clad steel
(M) Spill containment bucket
(R) Double wall - tank jacket
  (C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
 
 
Tank Tank Size Content Installed Placement Status
16 5000 Unleaded Gas (B) 06/01/2009 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(F) Fiberglass clad steel
(M) Spill containment bucket
(R) Double wall - tank jacket
  (C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
 
 
Tank Tank Size Content Installed Placement Status
1 12000 Leaded Gas (A) 06/01/1983 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(G) Sacrificial anode CP   (C) Fiberglass (H) Mechanical line leak detector
 
 
Tank Tank Size Content Installed Placement Status
10 10000 Vehicular Diesel (D) 07/01/1989 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(C) Steel
(G) Sacrificial anode CP
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
(P) Level gauges/alarms
  (C) Fiberglass
(J) Pressurized piping system
(K) Dispenser liners
(M) Double wall - pipe jacket
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
(S) Statistical Inventory Reconcile
 
 
Tank Tank Size Content Installed Placement Status
11 10000 Vehicular Diesel (D) 07/01/1989 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(C) Steel
(G) Sacrificial anode CP
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
(P) Level gauges/alarms
  (C) Fiberglass
(J) Pressurized piping system
(K) Dispenser liners
(M) Double wall - pipe jacket
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
(S) Statistical Inventory Reconcile
 
 
Tank Tank Size Content Installed Placement Status
12 10000 Vehicular Diesel (D) 07/01/1989 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(C) Steel
(G) Sacrificial anode CP
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
(P) Level gauges/alarms
  (C) Fiberglass
(J) Pressurized piping system
(K) Dispenser liners
(M) Double wall - pipe jacket
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
(S) Statistical Inventory Reconcile
 
 
Tank Tank Size Content Installed Placement Status
13 20000 Vehicular Diesel (D) 06/01/2009 UNDERGROUND Closed In Place (A)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(F) Fiberglass clad steel
(M) Spill containment bucket
(R) Double wall - tank jacket
  (C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
 
 
Tank Tank Size Content Installed Placement Status
2 12000 Unleaded Gas (B) 06/01/1983 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(G) Sacrificial anode CP   (C) Fiberglass (H) Mechanical line leak detector
 
 
Tank Tank Size Content Installed Placement Status
3 12000 Unleaded Gas (B) 06/01/1983 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(G) Sacrificial anode CP   (C) Fiberglass (H) Mechanical line leak detector
 
 
Tank Tank Size Content Installed Placement Status
4 12000 Vehicular Diesel (D) 06/01/1983 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(G) Sacrificial anode CP   (C) Fiberglass (H) Mechanical line leak detector
 
 
Tank Tank Size Content Installed Placement Status
5 12000 Vehicular Diesel (D) 06/01/1983 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(G) Sacrificial anode CP   (C) Fiberglass (H) Mechanical line leak detector
 
 
Tank Tank Size Content Installed Placement Status
6 10000 Unleaded Gas (B) 07/01/1989 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(C) Steel
(G) Sacrificial anode CP
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
(P) Level gauges/alarms
  (C) Fiberglass
(J) Pressurized piping system
(K) Dispenser liners
(M) Double wall - pipe jacket
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
(S) Statistical Inventory Reconcile
 
 
Tank Tank Size Content Installed Placement Status
7 10000 Unleaded Gas (B) 07/01/1989 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(C) Steel
(G) Sacrificial anode CP
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
(P) Level gauges/alarms
  (C) Fiberglass
(J) Pressurized piping system
(K) Dispenser liners
(M) Double wall - pipe jacket
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
(S) Statistical Inventory Reconcile
 
 
Tank Tank Size Content Installed Placement Status
8 10000 Unleaded Gas (B) 07/01/1989 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(C) Steel
(G) Sacrificial anode CP
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
(P) Level gauges/alarms
  (C) Fiberglass
(J) Pressurized piping system
(K) Dispenser liners
(M) Double wall - pipe jacket
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
(S) Statistical Inventory Reconcile
 
 
Tank Tank Size Content Installed Placement Status
9 10000 Unleaded Gas (B) 07/01/1989 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(C) Steel
(G) Sacrificial anode CP
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
(P) Level gauges/alarms
  (C) Fiberglass
(J) Pressurized piping system
(K) Dispenser liners
(M) Double wall - pipe jacket
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
(S) Statistical Inventory Reconcile
 
 
Insurance Documents
 
FR Type   Effective Date Expiration Date Company Name
GUARANTEE   04/30/2023 08/28/2024
GUARANTEE   04/25/2021 08/27/2022
INSURANCE   12/01/2019 12/01/2020 NAVIGATORS SPECIALTY INSURANCE CO
INSURANCE   12/01/2019 12/01/2020 IRONSHORE SPECIALTY INSURANCE CO
INSURANCE   12/01/2018 12/01/2019 IRONSHORE SPECIALTY INSURANCE CO
INSURANCE   12/01/2017 12/01/2018 IRONSHORE SPECIALTY INSURANCE CO
INSURANCE   12/01/2016 12/01/2017 IRONSHORE SPECIALTY INSURANCE CO
INSURANCE   10/31/2015 10/31/2016 IRONSHORE SPECIALTY INSURANCE CO
INSURANCE   10/31/2014 10/31/2015 IRONSHORE SPECIALTY INSURANCE CO
INSURANCE   12/01/2013 12/01/2016 IRONSHORE SPECIALTY INSURANCE CO
INSURANCE   11/01/2013 11/01/2014 IRONSHORE SPECIALTY INSURANCE CO
INSURANCE   11/01/2011 11/01/2012 IRONSHORE SPECIALTY INSURANCE CO
INSURANCE   11/01/2010 11/01/2011 ENDURANCE AMERICAN SPECIALTY INS CO
INSURANCE   11/01/2009 11/01/2010 ENDURANCE AMERICAN SPECIALTY INS CO
INSURANCE   05/08/2009 05/08/2010 ZURICH-AMERICAN
 
 
Legacy Compliance Activity Information
 
Activity
Code
Date
Initiated
Date
Completed
Results Inspector AST/UST
Count
Description
RRBD 06/01/2005 06/02/2005 COMPLIANCE ASSURANCE
 
TCI 03/02/2005 03/03/2005 MINOR OUT-OF-COMPLIANCE JOSEPH D. THAYER 0/6 COMPLIANCE ASSURANCE
 
RRBD 04/08/2004 05/04/2004 COMPLIANCE ASSURANCE
 
TCI 03/03/2004 03/09/2004 MINOR OUT-OF-COMPLIANCE JOSEPH D. THAYER 0/7 COMPLIANCE ASSURANCE
 
TCR 06/04/2003 06/06/2003 IN-COMPLIANCE J. SCOTT HALE 0/7 COMPLIANCE ASSURANCE
 
TCR 01/16/2003 01/31/2003 MINOR OUT-OF-COMPLIANCE REGINALD W. BRADLEY /7 COMPLIANCE ASSURANCE
 
TCI 11/27/2002 12/04/2002 SIGNIFICANT OUT-OF-COMPLIANCE REGINALD W. BRADLEY 0/7 COMPLIANCE ASSURANCE
 
TCR 06/20/2002 06/24/2002 SIGNIFICANT OUT-OF-COMPLIANCE REGINALD W. BRADLEY 0/7 COMPLIANCE ASSURANCE
 
TCI 01/11/2002 01/16/2002 SIGNIFICANT OUT-OF-COMPLIANCE REGINALD BRADLEY 7/0 COMPLIANCE ASSURANCE
 
TCR 12/04/2000 12/27/2000 IN-COMPLIANCE HUTCHERSON_VP 0/7 COMPLIANCE ASSURANCE
 
TCI 11/22/2000 12/04/2000 MINOR OUT-OF-COMPLIANCE HUTCHERSON_VP 0/7 COMPLIANCE ASSURANCE
 
RRBD 11/15/1999 11/15/1999 HUTCHERSON_VP 0/0 COMPLIANCE ASSURANCE
 
TCI 10/15/1999 10/19/1999 MINOR OUT-OF-COMPLIANCE HUTCHERSON_VP 0/7 COMPLIANCE ASSURANCE
 
TIN 01/27/1999 03/05/1999 IN-COMPLIANCE JOHN B HOLLINGSHEAD 0/7 COMPLIANCE ASSURANCE
 
UTCI 05/08/1998 06/05/1998 SIGNIFICANT OUT-OF-COMPLIANCE COMPLIANCE ASSURANCE
 
 
 
Compliance Activity Information
 
Activity
Code
Date
Completed
Results Inspector AST/UST
Count
Description
Electronic Communication 07/30/2024 Satisfied LYTTLE_A Enforcement
 
Enforcement Tracking 07/30/2024 Closed With Enforcement BRISTOL_S Enforcement
 
TCAR 05/20/2024 Satisfied PAYNE_CL_1 Component Closure
 
Document Management 05/20/2024 Satisfied ELLIOTT_EV_1 Incident
 
Letter 05/20/2024 Satisfied PAYNE_CL_1 Component Closure
 
Document Management 05/20/2024 Satisfied PAYNE_CL_1 Component Closure
 
Incident 05/20/2024 Has not led to Discharge ELLIOTT_EV_1 Incident
 
Enforcement Referral 05/14/2024 Accepted ELLIOTT_EV_1 Enforcement
 
Letter 04/09/2024 Satisfied PAYNE_CL_1 Component Closure
 
Document Management 04/08/2024 Satisfied PAYNE_CL_1 Component Closure
 
Electronic Communication 04/05/2024 Satisfied ELLIOTT_EV_1 Compliance Assistance
 
Site Inspection 02/19/2024 Major Out of Compliance ELLIOTT_EV_1 0/3 Routine Compliance
 
Letter 02/19/2024 Satisfied ELLIOTT_EV_1 Compliance Assistance
 
Electronic Communication 02/12/2024 Satisfied ELLIOTT_EV_1 Routine Compliance
 
Letter 02/07/2024 Satisfied ELLIOTT_EV_1 Component Installation
 
Site Inspection 02/07/2024 Major Out of Compliance ELLIOTT_EV_1 0/3 Component Installation
 
Electronic Communication 04/13/2023 Satisfied MATHERLY_H Enforcement
 
Letter 06/09/2022 Satisfied TOMAS_M Enforcement
 
Enforcement Referral 05/19/2022 Accepted GARTIN_D Enforcement
 
Electronic Communication 05/13/2022 Satisfied GARTIN_D Compliance Assistance
 
Electronic Communication 04/21/2022 Satisfied GARTIN_D Routine Compliance
 
Electronic Communication 04/21/2022 Satisfied GARTIN_D Compliance Assistance
 
Electronic Communication 04/21/2022 Satisfied GARTIN_D Compliance Assistance
 
Electronic Communication 04/21/2022 Satisfied GARTIN_D Compliance Assistance
 
Record Document 02/25/2022 Satisfied WILSON_ML_1 Compliance Assistance
 
Issue Document 02/25/2022 Satisfied WILSON_ML_1 Compliance Assistance
 
Letter 02/25/2022 Satisfied WILSON_ML_1 Compliance Assistance
 
Electronic Communication 02/24/2022 Satisfied GARTIN_D Routine Compliance
 
Site Inspection 02/24/2022 Major Out of Compliance GARTIN_D 0/3 Routine Compliance
 
Letter 01/07/2021 Satisfied WILSON_ML_1 Closure
 
Issue Document 01/07/2021 Satisfied WILSON_ML_1 Closure
 
TCAR 01/07/2021 Satisfied PAYNE_CL_1 Closure
 
Document Management 01/07/2021 Satisfied WILSON_ML_1 Closure
 
Letter 10/23/2020 Satisfied WILSON_ML_1 Closure
 
Document Management 10/23/2020 Satisfied WILSON_ML_1 Closure
 
Issue Document 10/23/2020 Satisfied WILSON_ML_1 Closure
 
Incident 10/19/2020 Has not led to Discharge PAYNE_CL_1 Incident
 
Document Management 07/27/2020 Satisfied BRAGG_SD_2 Incident
 
Issue Document 07/22/2020 Satisfied WILSON_ML_1 Compliance Assistance
 
Letter 07/22/2020 Satisfied WILSON_ML_1 Compliance Assistance
 
Site Inspection 07/21/2020 Major Out of Compliance BRAGG_SD_2 0/3 Routine Compliance
 
Issue Document 09/25/2018 Satisfied WILSON_ML_1 Compliance Assistance
 
Letter 09/25/2018 Satisfied WILSON_ML_1 Compliance Assistance
 
Electronic Communication 09/25/2018 Satisfied BRAGG_SD_2 Compliance Assistance
 
Electronic Communication 09/24/2018 Satisfied BRAGG_SD_2 Compliance Assistance
 
Electronic Communication 08/29/2018 Satisfied WILSON_ML_1 Installation
 
Electronic Communication 08/29/2018 Satisfied WILSON_ML_1 Installation
 
Electronic Communication 08/28/2018 Satisfied BRAGG_SD_2 Compliance Assistance
 
Issue Document 08/27/2018 Satisfied WILSON_ML_1 Closure
 
TCAR 08/27/2018 Satisfied PAYNE_CL_1 Closure
 
Letter 08/27/2018 Satisfied WILSON_ML_1 Closure
 
Electronic Communication 08/24/2018 Satisfied BRAGG_SD_2 Compliance Assistance
 
Electronic Communication 08/17/2018 Satisfied BRAGG_SD_2 Compliance Assistance
 
Letter 08/14/2018 Satisfied WILSON_ML_1 Compliance Assistance
 
Issue Document 08/14/2018 Satisfied WILSON_ML_1 Compliance Assistance
 
Site Inspection 08/13/2018 Major Out of Compliance BRAGG_SD_2 0/4 Installation
 
Issue Document 08/06/2018 Satisfied WILSON_ML_1 Compliance Assistance
 
Letter 08/06/2018 Satisfied WILSON_ML_1 Compliance Assistance
 
Site Inspection 08/03/2018 Major Out of Compliance BRAGG_SD_2 0/4 Routine Compliance
 
Document Management 07/31/2018 Satisfied WILSON_ML_1 Closure
 
Site Inspection 07/30/2018 In Compliance BRAGG_SD_2 0/4 Closure
 
Electronic Communication 07/11/2018 Satisfied BRAGG_SD_2 Routine Compliance
 
Letter 07/02/2018 Satisfied WILSON_ML_1 Closure
 
Issue Document 07/02/2018 Satisfied WILSON_ML_1 Closure
 
Incident 06/25/2018 Has not led to Discharge BRAGG_SD_2 Incident
 
Document Management 05/24/2018 Satisfied WILSON_ML_1 Closure
 
Document Management 04/06/2018 Satisfied BRAGG_SD_2 Incident
 
Document Management 07/21/2017 Satisfied PAYNE_CL_1 Incident
 
Incident 07/21/2017 Has not led to Discharge PAYNE_CL_1 Incident
 
Site Inspection 07/28/2016 In Compliance PAYNE_CL_1 0/4 Routine Compliance
 
Incident 01/05/2016 Has not led to Discharge PAYNE_CL_1 Incident
 
Document Management 08/17/2015 Complete PAYNE_CL_1 Incident
 
TCAR 08/05/2014 Satisfied DAURIA_KL_1 Closure
 
Letter 08/05/2014 Satisfied DAURIA_KL_1 Closure
 
Site Inspection 07/16/2014 In Compliance PAYNE_CL_1 0/4 Closure
 
Site Inspection 07/15/2014 In Compliance PAYNE_CL_1 0/4 Installation
 
Site Inspection 06/19/2014 In Compliance PAYNE_CL_1 0/4 Routine Compliance
 
Incident 08/15/2013 Has not led to Discharge PAYNE_CL_1 Incident
 
Document Management 07/15/2013 Complete PAYNE_CL_1 Incident
 
Document Management 07/15/2013 Complete PAYNE_CL_1 Incident
 
Site Inspection 08/03/2012 In Compliance PAYNE_CL_1 0/4 Non-Compliance
 
Letter 06/12/2012 Satisfied PURDY_EM_1 Non-Compliance
 
Emergency Preparedness Information 06/06/2012 Satisfied PORTER_AJ_1 Routine Compliance
 
Site Inspection 06/06/2012 Minor Out of Compliance PORTER_AJ_1 0/4 Routine Compliance
 
Letter 12/09/2010 Satisfied PIERCE_LL_1 Non-Compliance
 
Site Inspection 12/08/2010 Minor Out of Compliance TISSINGTON_AB_1 0/4 Routine Compliance
 
Emergency Preparedness Information 12/08/2010 Satisfied TISSINGTON_AB_1 Routine Compliance
 
Emergency Preparedness Information 12/08/2010 Satisfied TISSINGTON_AB_1 Routine Compliance
 
Letter 02/05/2010 Satisfied PIERCE_LL_1 Non-Compliance
 
Document Management 02/03/2010 Complete TISSINGTON_AB_1 Routine Compliance
 
Emergency Preparedness Information 02/01/2010 Satisfied TISSINGTON_AB_1 Routine Compliance
 
Site Inspection 02/01/2010 Minor Out of Compliance TISSINGTON_AB_1 0/4 Routine Compliance
 
Letter 01/12/2010 Satisfied PIERCE_LL_1 Discharge
 
Discharge Reporting 01/11/2010 Satisfied PORTER_AJ_1 Discharge
 
Record Document 12/31/2009 Satisfied PORTER_AJ_1 Discharge
 
Site Inspection 12/31/2009 In Compliance PORTER_AJ_1 0/4 Discharge
 
Document Management 12/31/2009 Complete PORTER_AJ_1 Discharge
 
Site Inspection 06/25/2009 In Compliance THAYER_JD_1 0/4 Installation
 
Phone Conversation 06/18/2009 Satisfied THAYER_JD_1 Installation
 
Site Inspection 06/05/2009 In Compliance HALE_JS_1 0/4 Closure
 
Letter 03/13/2009 Satisfied STEVENSON_JS Discharge
 
Letter 03/13/2009 Satisfied STEVENSON_JS Closure
 
Site Inspection 01/09/2009 In Compliance STEVENSON_JS 0/1 Closure
 
Site Inspection 01/09/2009 In Compliance STEVENSON_JS 0/1 Installation
 
Letter 11/24/2008 Satisfied STEVENSON_JS Non-Compliance
 
Site Inspection 11/13/2008 Minor Out of Compliance STEVENSON_JS 0/7 Routine Compliance
 
Phone Conversation 10/16/2008 Satisfied STEVENSON_JS Non-Compliance
 
Letter 05/02/2008 Satisfied STEVENSON_JS Non-Compliance
 
Site Inspection 04/23/2008 Minor Out of Compliance STEVENSON_JS 0/7 Routine Compliance
 
Emergency Preparedness Information 04/23/2008 Satisfied STEVENSON_JS Routine Compliance
 
Letter 07/31/2007 Satisfied THAYER_JD_1 Closure
 
TCAR 07/23/2007 Complete THAYER_JD_1 Closure
 
Phone Conversation 06/29/2007 Satisfied TISSINGTON_AB_1 Non-Compliance
 
Emergency Preparedness Information 06/26/2007 Satisfied TISSINGTON_AB_1 Routine Compliance
 
Site Inspection 06/19/2007 Minor Out of Compliance TISSINGTON_AB_1 0/7 Installation
 
Letter 06/19/2007 Satisfied TISSINGTON_AB_1 Non-Compliance
 
Letter 06/19/2007 Satisfied TISSINGTON_AB_1 Non-Compliance
 
Site Inspection 06/19/2007 Minor Out of Compliance TISSINGTON_AB_1 0/7 Closure
 
Letter 06/12/2007 Satisfied STEVENSON_JS Non-Compliance
 
Site Inspection 06/06/2007 Minor Out of Compliance STEVENSON_JS 0/7 Routine Compliance
 
Emergency Preparedness Information 05/21/2007 Satisfied HALE_JS_1 Routine Compliance
 
Emergency Preparedness Information 02/06/2007 Satisfied HALE_JS_1 Routine Compliance
 
Emergency Preparedness Information 09/20/2006 Satisfied THAYER_JD_1 Routine Compliance
 
Site Inspection 06/28/2006 In Compliance STEVENSON_JS 0/7 Installation
 
Site Inspection 04/28/2006 In Compliance TISSINGTON_AB_1 0/12 Routine Compliance
 
 
 
No Open AOCs Found
 
 
No Open Violations Found
 
 
Discharge Information
 
Discharge
Date
  Clean Up
Status
Score Eligibility Info Site Manager Phone
07/08/2009   COMPLETED
 
03/09/2009   COMPLETED
 
01/10/1991   COMPLETED 11
 
07/27/1989   ACTIVE 56 PETROLEUM LIABILITY AND RESTORATION INSURANCE PROGRAM-ELIGIBLE
 
09/16/1986   COMPLETED 56