Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
||||||||||
Cover Page Report | |||||||||||
Report Run Date: 02/02/2025 Last Data Refresh: 02/01/2025 Report Generated from DOPPLER | |||||||||||
District | Northwest | Type | Retail Station | ||||||||
County | Escambia | Status | OPEN | ||||||||
ID | 8507895 | Latitude | 30° 25' 40.3824 | ||||||||
Name |
LUCKY 7 DISCOUNT #2 4121 MOBILE HWY |
Longitude | 87° 16' 13.3753 | ||||||||
PENSACOLA, FL 32506 | LL Method | DPHO | |||||||||
Contact | SEAN NGUYEN | LL Status | REVIEWED | ||||||||
Phone | (850) 332-6026 | Status Date | 08/12/2013 | ||||||||
Account Owner Information | |||||||||||
Name | PHAM, THANG THI 572 LANDER ST CANTONMENT, FL 32533 |
Effective Date | 10/07/2010 | ||||||||
Contact | CHAU NGUYEN | ||||||||||
Phone | (850) 470-0060 | ||||||||||
CHAUNGUYEN@BELLSOUTH.NET | |||||||||||
Placard # / Date | 671271 - 10/21/2023 | ||||||||||
Property Owner Information | |||||||||||
Name | PHAM, THANG THI 572 LANDER ST CANTONMENT, FL 32533 |
Effective Date | 10/07/2010 | ||||||||
Contact | CHAU NGUYEN | ||||||||||
Phone | (850) 470-0060 | ||||||||||
CHAUNGUYEN@BELLSOUTH.NET | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 20000 | Unleaded Gas (B) | 06/01/2010 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (L) Compartmented (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms (R) Double wall - tank jacket |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 8000 | Leaded Gas (A) | 10/01/1969 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel |
(C) Fiberglass | (Y) Unknown | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1R1 | 10000 | Unleaded Gas (B) | 04/01/1989 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (G) Sacrificial anode CP (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (E) Cathodic protection (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 6000 | Unleaded Gas (B) | 10/01/1969 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel |
(C) Fiberglass | (Y) Unknown | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2R1 | 10000 | Unleaded Gas (B) | 04/01/1989 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (G) Sacrificial anode CP (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (E) Cathodic protection (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 8000 | Unleaded Gas (B) | 10/01/1969 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel |
(C) Fiberglass | (Y) Unknown | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3R1 | 10000 | Unleaded Gas (B) | 04/01/1989 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (G) Sacrificial anode CP (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (E) Cathodic protection (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 500 | Waste Oil (L) | 04/01/1989 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (G) Sacrificial anode CP (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(B) Steel/galvanized metal (E) Cathodic protection (J) Pressurized piping system (K) Dispenser liners |
(8) Manually sampled wells (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 560 | Kerosene (K) | 07/01/1990 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment |
(A) Abv, no soil contact (B) Steel/galvanized metal |
(I) Not required | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
EXEMPT-NOT REQUIRED | |||||||||||
EXEMPT-NOT REQUIRED | |||||||||||
INSURANCE | 08/29/2022 | 08/29/2023 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 06/08/2019 | 06/08/2020 | CRUM & FORSTER INDEMNITY | ||||||||
INSURANCE | 06/08/2017 | 06/08/2019 | CRUM & FORSTER INDEMNITY | ||||||||
INSURANCE | 06/08/2015 | 06/08/2016 | CRUM & FORSTER INDEMNITY | ||||||||
INSURANCE | 05/08/2015 | 05/08/2017 | ESSEX | ||||||||
INSURANCE | 03/26/2013 | 03/26/2015 | AMERICAN SAFETY | ||||||||
INSURANCE | 09/23/2010 | 09/23/2011 | ZURICH-AMERICAN | ||||||||
INSURANCE | 04/20/2008 | 04/20/2009 | ILLINOIS UNION | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 11/17/2005 | 11/28/2005 | IN-COMPLIANCE | ARTHUR B. TISSINGTON | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes NO VIOLATIONS NOTED AT TIME. | |||||||||||
TCI | 12/15/2004 | 12/16/2004 | IN-COMPLIANCE | ARTHUR B. TISSINGTON | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 12/17/2003 | 12/29/2003 | IN-COMPLIANCE | ARTHUR B. TISSINGTON | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 11/18/2002 | 12/02/2002 | COMPLIANCE ASSURANCE | ||||||||
TCI | 11/06/2002 | 11/18/2002 | SIGNIFICANT OUT-OF-COMPLIANCE | REGINALD W. BRADLEY | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 12/19/2001 | 01/14/2002 | IN-COMPLIANCE | REGINALD BRADLEY | 0/3 | COMPLIANCE ASSURANCE | |||||
TCR | 12/11/2000 | 12/27/2000 | IN-COMPLIANCE | HUTCHERSON_VP | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 10/24/2000 | 11/02/2000 | MINOR OUT-OF-COMPLIANCE | HUTCHERSON_VP | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 12/28/1999 | 01/04/2000 | HUTCHERSON_VP | 0/0 | COMPLIANCE ASSURANCE | ||||||
TIN | 12/21/1999 | 01/03/2000 | IN-COMPLIANCE | HOLLINGSHEAD_JB | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 09/30/1999 | 10/07/1999 | MINOR OUT-OF-COMPLIANCE | HUTCHERSON_VP | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 03/22/1999 | 04/02/1999 | HOLLINGSHEAD_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 02/22/1999 | 03/01/1999 | MINOR OUT-OF-COMPLIANCE | JOHN B HOLLINGSHEAD | 0/3 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Electronic Communication | 10/23/2024 | Satisfied | PROFFITT_B | Routine Compliance | |||||||
Enforcement Referral | 03/20/2024 | Accepted | ELLIOTT_EV_1 | Enforcement | |||||||
Letter | 12/14/2023 | Satisfied | BRISTOL_S | Component Closure | |||||||
TCAR | 12/14/2023 | Satisfied | BRISTOL_S | Component Closure | |||||||
Letter | 12/13/2023 | Satisfied | ELLIOTT_EV_1 | Compliance Assistance | |||||||
Site Inspection | 12/13/2023 | Major Out of Compliance | ELLIOTT_EV_1 | 0/1 | Routine Compliance | ||||||
Electronic Communication | 12/11/2023 | Satisfied | ELLIOTT_EV_1 | Routine Compliance | |||||||
Site Inspection | 01/27/2023 | Major Out of Compliance | ELLIOTT_EV_1 | 0/1 | Component Installation | ||||||
Letter | 01/27/2023 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Enforcement Tracking | 12/09/2022 | Closed Without Enforcement | MATHERLY_H | Enforcement | |||||||
Phone Conversation | 10/26/2022 | Satisfied | MATHERLY_H | Enforcement | |||||||
Letter | 10/13/2022 | Satisfied | MATHERLY_H | Enforcement | |||||||
Enforcement Referral | 08/24/2022 | Accepted | GARTIN_D | Enforcement | |||||||
Electronic Communication | 08/18/2022 | Satisfied | GARTIN_D | Compliance Assistance | |||||||
Letter | 08/03/2022 | Satisfied | MATHERLY_H | Enforcement | |||||||
Enforcement Referral | 07/22/2022 | Accepted | GARTIN_D | Enforcement | |||||||
Letter | 06/10/2022 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Site Inspection | 06/02/2022 | Major Out of Compliance | GARTIN_D | 0/1 | Routine Compliance | ||||||
Electronic Communication | 06/02/2022 | Satisfied | GARTIN_D | Routine Compliance | |||||||
Issue Document | 05/06/2022 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Letter | 05/06/2022 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Site Inspection | 05/03/2022 | Major Out of Compliance | GARTIN_D | 0/1 | Component Installation | ||||||
Electronic Communication | 05/03/2022 | Satisfied | GARTIN_D | Component Installation | |||||||
Electronic Communication | 05/03/2022 | Satisfied | GARTIN_D | Component Installation | |||||||
Enforcement Tracking | 07/09/2020 | Closed Without Enforcement | BRISTOL_S | Enforcement | |||||||
Electronic Communication | 01/17/2020 | Satisfied | BRAGG_SD_2 | Compliance Assistance | |||||||
Phone Conversation | 12/27/2019 | Satisfied | BRAGG_SD_2 | Compliance Assistance | |||||||
Phone Conversation | 12/27/2019 | Satisfied | BRAGG_SD_2 | Compliance Assistance | |||||||
Electronic Communication | 12/06/2019 | Satisfied | BRAGG_SD_2 | Compliance Assistance | |||||||
Electronic Communication | 12/06/2019 | Satisfied | BRAGG_SD_2 | Compliance Assistance | |||||||
Phone Conversation | 12/06/2019 | Satisfied | BRAGG_SD_2 | Compliance Assistance | |||||||
Enforcement Referral | 11/21/2019 | Accepted | BRAGG_SD_2 | Enforcement | |||||||
Electronic Communication | 08/26/2019 | Satisfied | BRAGG_SD_2 | Compliance Assistance | |||||||
Letter | 08/22/2019 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Issue Document | 08/22/2019 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Site Inspection | 08/21/2019 | Minor Out of Compliance | BRAGG_SD_2 | 0/1 | Routine Compliance | ||||||
Phone Conversation | 08/07/2019 | Satisfied | BRAGG_SD_2 | Routine Compliance | |||||||
Record Document | 05/02/2017 | Satisfied | BRAGG_SD_2 | Non-Compliance | |||||||
Site Inspection | 03/17/2017 | Minor Out of Compliance | BRAGG_SD_2 | 0/1 | Non-Compliance | ||||||
Record Document | 02/27/2017 | Satisfied | BRAGG_SD_2 | Non-Compliance | |||||||
Letter | 02/27/2017 | Satisfied | WILSON_ML_1 | Non-Compliance | |||||||
Site Inspection | 02/24/2017 | Major Out of Compliance | BRAGG_SD_2 | 0/1 | Routine Compliance | ||||||
Record Document | 06/16/2015 | Satisfied | PAYNE_CL_1 | Non-Compliance | |||||||
Letter | 05/18/2015 | Satisfied | WILSON_ML_1 | Non-Compliance | |||||||
Site Inspection | 05/15/2015 | Major Out of Compliance | PAYNE_CL_1 | 0/1 | Routine Compliance | ||||||
Emergency Preparedness Information | 05/04/2015 | Satisfied | PAYNE_CL_1 | Routine Compliance | |||||||
Site Inspection | 07/18/2014 | In Compliance | PAYNE_CL_1 | 0/1 | Non-Compliance | ||||||
Record Document | 07/14/2014 | Satisfied | PAYNE_CL_1 | Non-Compliance | |||||||
Record Document | 07/14/2014 | Satisfied | PAYNE_CL_1 | Non-Compliance | |||||||
Letter | 06/12/2014 | Satisfied | DAURIA_KL_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 06/11/2014 | Satisfied | PAYNE_CL_1 | Routine Compliance | |||||||
Site Inspection | 06/11/2014 | Minor Out of Compliance | PAYNE_CL_1 | 0/1 | Routine Compliance | ||||||
Site Inspection | 08/18/2011 | In Compliance | TISSINGTON_AB_1 | 0/1 | Routine Compliance | ||||||
Emergency Preparedness Information | 08/18/2011 | Satisfied | TISSINGTON_AB_1 | Routine Compliance | |||||||
Site Inspection | 03/08/2011 | In Compliance | PORTER_AJ_1 | 0/1 | Routine Compliance | ||||||
Site Inspection | 09/02/2010 | In Compliance | PORTER_AJ_1 | 0/3 | Installation | ||||||
Site Inspection | 06/10/2010 | In Compliance | PORTER_AJ_1 | 0/3 | Closure | ||||||
Meeting | 04/08/2010 | Satisfied | PORTER_AJ_1 | Routine Compliance | |||||||
Letter | 03/19/2010 | Satisfied | PIERCE_LL_1 | Non-Compliance | |||||||
Site Inspection | 03/17/2010 | Minor Out of Compliance | PORTER_AJ_1 | 0/3 | Routine Compliance | ||||||
Phone Conversation | 06/04/2009 | Satisfied | TISSINGTON_AB_1 | Routine Compliance | |||||||
Phone Conversation | 05/12/2009 | Satisfied | STEVENSON_JS | Non-Compliance | |||||||
Site Inspection | 05/06/2009 | Major Out of Compliance | STEVENSON_JS | 0/3 | Routine Compliance | ||||||
Record Document | 05/07/2008 | Satisfied | STEVENSON_JS | Non-Compliance | |||||||
Record Document | 04/24/2008 | Satisfied | STEVENSON_JS | Routine Compliance | |||||||
Site Inspection | 04/21/2008 | In Compliance | STEVENSON_JS | 0/3 | Routine Compliance | ||||||
Site Inspection | 07/18/2007 | In Compliance | STEVENSON_JS | 0/3 | Non-Compliance | ||||||
Letter | 02/20/2007 | Satisfied | STEVENSON_JS | Non-Compliance | |||||||
Emergency Preparedness Information | 02/06/2007 | Satisfied | STEVENSON_JS | Routine Compliance | |||||||
Record Document | 12/21/2006 | Satisfied | STEVENSON_JS | Non-Compliance | |||||||
Site Inspection | 11/14/2006 | Major Out of Compliance | STEVENSON_JS | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 09/20/2006 | Satisfied | THAYER_JD_1 | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
12/13/2023 | 6062 | Minor | 2.5 Release detection devices not tested annually. | Have a certified technician test the ATG System for proper operation. Once completed, send a copy of the results, that includes all test data, to the inspector for review to clear the violation. Email: Emily.Elliott@FLHealth.gov | |||||||
12/13/2023 | 6046 | Minor | 4.14 Dispensers not installed and maintained according to standards. | Have a certified contractor remove the valves beneath dispenser 5/6. Email a copy of the work invoice indicating to the inspector for review to clear the violation. The work invoice must indicate that the valves have been removed. Email: Emily.Elliott@FLHealth.gov | |||||||
12/13/2023 | 6062 | Minor | 2.5 Release detection devices not tested annually. | Have a certified technician test the Spill Bucket Gauges for proper operation. Once completed, send a copy of the results, that includes all test data, to the inspector for review to clear the violation. Email: Emily.Elliott@FLHealth.gov | |||||||
12/13/2023 | 6066 | Minor | 4.4 Not repaired per applicable standards. | Have a certified contractor/technician repair the Premium Electrical Line in the STP Sump. Email a detailed work invoice to the inspector and a picture of the sump after work has been completed. Email: Emily.Elliott@FLHelath.gov | |||||||
12/13/2023 | 6073 | Minor | 4.9 Spill containment, dispenser liners, and piping sumps not accessible. Water or regulated substances not removed. | Have the liquid removed and properly disposed of from the spill containments. Email a copy of the work invoice to the inspector for review and pictures. Email: Emily.Elliott@FLHealth.gov | |||||||
12/13/2023 | 6011 | SNC-B | 2.8 No financial responsibility instrument or expired instrument for < 180 days. | Provide documentation of Financial Responsibility showing a start date of 08/29/2023. If facility does not have any Financial Responsibility, obtain retro-active coverage. Have the Retro-Active date start 08/29/2023. Submit a copy of the FDEP Financial Mechanisms Part C or Part D Form and a Part P Form to the inspector for review to clear the violation. Email: Emily.Elliott@FLHealth.gov | |||||||
12/13/2023 | 6056 | SNC-B | 2.4 Release detection not tested or visually inspected once a month or problems found during the visual inspections not recorded. | Start conducting and continue conducting monthly visual inspections. Provide the inspector at least three months of monthly visual inspections that do not exceed 35 days. The monthly inspections can’t be prefilled out for the year. Email the inspector the paperwork to clear the violation. Email: Emily.Elliott@FLHealth.gov | |||||||
12/13/2023 | 6002 | Minor | 2.1 Operator Training records not available. | Have the owner or operator take Class A and Class B Operator Training. Have each employee of the facility take Class C Operator Training. Email to the inspector Class A, Class B and Class C Operator Training Certificates for review. Email: Emily.Elliott@FLHealth.gov. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
01/30/1988 | COMPLETED | 57 | EARLY DETECTION INCENTIVE-ELIGIBLE | ||||||||