![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 04/19/2025 Last Data Refresh: 04/18/2025 Report Generated from DOPPLER | |||||||||||
District | Northwest | Type | Retail Station | ||||||||
County | Escambia | Status | OPEN | ||||||||
ID | 8507979 | Latitude | 30° 32' 10.7755 | ||||||||
Name |
TEXACO FOOD STORE #4407 6500 W 9 MILE RD |
Longitude | 87° 23' 50.218 | ||||||||
PENSACOLA, FL 32526-4288 | LL Method | DPHO | |||||||||
Contact | PAUL BAISCH | LL Status | REVIEWED | ||||||||
Phone | (770) 338-2620 | Status Date | 09/20/2023 | ||||||||
Account Owner Information | |||||||||||
Name | PANHANDLE COMMERCIAL PROPERTIES LLC PO BOX 1565 Lawrenceville, GA 30046 |
Effective Date | 07/28/2003 | ||||||||
Contact | SCOTT MOON / JUAN VALENCIA | ||||||||||
Phone | (679) 994-0632 | ||||||||||
SCOTT@MAJORSMGMT.COM | |||||||||||
Placard # / Date | 681610 - 06/05/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | PANHANDLE COMMERCIAL PROPERTIES LLC PO BOX 1565 Lawrenceville, GA 30046 |
Effective Date | 07/28/2003 | ||||||||
Contact | SCOTT MOON / JUAN VALENCIA | ||||||||||
Phone | (679) 994-0632 | ||||||||||
SCOTT@MAJORSMGMT.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 20000 | Unleaded Gas (B) | 10/01/2008 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (L) Compartmented (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms (R) Double wall - tank jacket |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (N) Approved synthetic material |
(3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 8068 | Unleaded Gas (B) | 12/01/1981 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (H) Impressed current CP (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (N) Approved synthetic material |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 8068 | Unleaded Gas (B) | 12/01/1981 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (H) Impressed current CP (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (N) Approved synthetic material |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 6048 | Unleaded Gas (B) | 12/01/1981 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (H) Impressed current CP (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (N) Approved synthetic material |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 12/31/2024 | 12/31/2025 | TOKIO MARINE SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 12/31/2022 | 12/31/2023 | TOKIO MARINE SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 12/31/2020 | 12/31/2021 | TOKIO MARINE SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 12/31/2017 | 12/31/2018 | TOKIO MARINE SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 12/31/2016 | 12/31/2017 | TOKIO MARINE SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 12/31/2015 | 12/31/2016 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 12/31/2013 | 12/31/2014 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 04/15/2012 | 04/15/2013 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 04/15/2010 | 04/15/2011 | ZURICH-AMERICAN | ||||||||
INSURANCE | 04/15/2008 | 04/15/2009 | ZURICH-AMERICAN | ||||||||
INSURANCE | 04/15/2007 | 04/15/2008 | ZURICH-AMERICAN | ||||||||
INSURANCE | 04/23/1994 | 04/23/1995 | PLUS | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
RRBD | 02/13/2006 | 02/16/2006 | COMPLIANCE ASSURANCE | ||||||||
TCI | 02/09/2006 | 02/16/2006 | SIGNIFICANT OUT-OF-COMPLIANCE | JOHN S. STEVENSON | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 03/10/2005 | 03/10/2005 | COMPLIANCE ASSURANCE | ||||||||
TCI | 02/24/2005 | 02/28/2005 | MINOR OUT-OF-COMPLIANCE | JOSEPH D. THAYER | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 01/27/2004 | 01/29/2004 | JOHN S. STEVENSON | 0/2 | COMPLIANCE ASSURANCE | ||||||
Completion Notes PAUL BAISCH DELIVERED TO OUR OFFICE DOCUMENTS CORRECTING OPEN VIOLATIONS | |||||||||||
TCR | 12/23/2003 | 12/29/2003 | MINOR OUT-OF-COMPLIANCE | JOHN S. STEVENSON | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 09/12/2003 | 09/12/2003 | COMPLIANCE ASSURANCE | ||||||||
TCI | 08/20/2003 | 08/22/2003 | SIGNIFICANT OUT-OF-COMPLIANCE | JOHN S. STEVENSON | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 10/10/2002 | 10/17/2002 | MINOR OUT-OF-COMPLIANCE | JOHN S. STEVENSON | 0/3 | COMPLIANCE ASSURANCE | |||||
TCR | 06/05/2002 | 06/11/2002 | MINOR OUT-OF-COMPLIANCE | JOHN S. STEVENSON | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 03/26/2002 | 03/27/2002 | COMPLIANCE ASSURANCE | ||||||||
TCI | 10/30/2001 | 12/06/2001 | MINOR OUT-OF-COMPLIANCE | STEVENSON_JS | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 09/21/2000 | 10/16/2000 | STEVENSON_JS | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 09/20/2000 | 09/26/2000 | MINOR OUT-OF-COMPLIANCE | STEVENSON_JS | 0/3 | COMPLIANCE ASSURANCE | |||||
TIN | 05/24/2000 | 05/26/2000 | IN-COMPLIANCE | HOLLINGSHEAD_JB | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 10/25/1999 | 12/08/1999 | STEVENSON_JS | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 09/02/1999 | 09/20/1999 | SIGNIFICANT OUT-OF-COMPLIANCE | STEVENSON_JS | 0/3 | COMPLIANCE ASSURANCE | |||||
TIN | 01/11/1999 | 03/05/1999 | IN-COMPLIANCE | JOHN B HOLLINGSHEAD | 0/3 | COMPLIANCE ASSURANCE | |||||
UTII | 11/06/1998 | 12/09/1998 | MINOR OUT-OF-COMPLIANCE | COMPLIANCE ASSURANCE | |||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Document Management | 02/19/2025 | Satisfied | ELLIOTT_EV_1 | Incident | |||||||
Letter | 02/19/2025 | Satisfied | ELLIOTT_EV_1 | Compliance Assistance | |||||||
Document Management | 02/18/2025 | Satisfied | ELLIOTT_EV_1 | Incident | |||||||
Site Inspection | 02/17/2025 | Major Out of Compliance | ELLIOTT_EV_1 | 0/1 | Routine Compliance | ||||||
Electronic Communication | 02/17/2025 | Satisfied | ELLIOTT_EV_1 | Routine Compliance | |||||||
Enforcement Tracking | 08/22/2023 | Closed Without Enforcement | GILLMAN_M | Enforcement | |||||||
Letter | 08/22/2023 | Satisfied | GILLMAN_M | Enforcement | |||||||
Enforcement Referral | 05/30/2023 | Accepted | ELLIOTT_EV_1 | Enforcement | |||||||
Record Document | 03/06/2023 | Satisfied | ELLIOTT_EV_1 | Compliance Assistance | |||||||
Site Inspection | 02/24/2023 | Minor Out of Compliance | ELLIOTT_EV_1 | 0/1 | Routine Compliance | ||||||
Letter | 02/24/2023 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
TCAR | 07/12/2022 | Satisfied | GARTIN_D | Component Closure | |||||||
Letter | 07/11/2022 | Satisfied | WILSON_ML_1 | Component Closure | |||||||
Letter | 07/11/2022 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Document Management | 07/11/2022 | Satisfied | WILSON_ML_1 | Component Closure | |||||||
Electronic Communication | 04/25/2022 | Satisfied | GARTIN_D | Component Installation | |||||||
Letter | 02/25/2022 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Issue Document | 02/25/2022 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Record Document | 02/24/2022 | Satisfied | GARTIN_D | Compliance Assistance | |||||||
Letter | 12/27/2021 | Satisfied | WILSON_ML_1 | Component Installation | |||||||
Issue Document | 12/27/2021 | Satisfied | WILSON_ML_1 | Component Installation | |||||||
Electronic Communication | 12/21/2021 | Satisfied | GARTIN_D | Component Installation | |||||||
Site Inspection | 12/21/2021 | In Compliance | GARTIN_D | 0/1 | Component Installation | ||||||
Issue Document | 09/07/2021 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Letter | 09/07/2021 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Record Document | 08/27/2021 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Record Document | 08/02/2021 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Letter | 05/24/2021 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Site Inspection | 05/24/2021 | Minor Out of Compliance | WILSON_ML_1 | 0/1 | Routine Compliance | ||||||
Issue Document | 05/24/2021 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Electronic Communication | 05/20/2021 | Satisfied | WILSON_ML_1 | Routine Compliance | |||||||
Letter | 10/03/2018 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Issue Document | 10/03/2018 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Electronic Communication | 10/03/2018 | Satisfied | BRAGG_SD_2 | Compliance Assistance | |||||||
Electronic Communication | 10/01/2018 | Satisfied | BRAGG_SD_2 | Compliance Assistance | |||||||
Electronic Communication | 09/05/2018 | Satisfied | BRAGG_SD_2 | Compliance Assistance | |||||||
Letter | 08/15/2018 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Site Inspection | 08/15/2018 | Minor Out of Compliance | BRAGG_SD_2 | 0/1 | Routine Compliance | ||||||
Issue Document | 08/15/2018 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Phone Conversation | 08/03/2018 | Satisfied | BRAGG_SD_2 | Routine Compliance | |||||||
Site Inspection | 12/01/2016 | In Compliance | PAYNE_CL_1 | 0/1 | Non-Compliance | ||||||
Letter | 09/12/2016 | Satisfied | WILSON_ML_1 | Non-Compliance | |||||||
Letter | 08/08/2016 | Satisfied | WILSON_ML_1 | Non-Compliance | |||||||
Site Inspection | 08/05/2016 | Minor Out of Compliance | PAYNE_CL_1 | 0/1 | Routine Compliance | ||||||
Site Inspection | 06/19/2014 | In Compliance | PAYNE_CL_1 | 0/1 | Routine Compliance | ||||||
Emergency Preparedness Information | 05/28/2014 | Satisfied | PAYNE_CL_1 | Routine Compliance | |||||||
Site Inspection | 05/14/2012 | In Compliance | PORTER_AJ_1 | 0/1 | Routine Compliance | ||||||
Emergency Preparedness Information | 05/14/2012 | Satisfied | PORTER_AJ_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 12/17/2010 | Satisfied | TISSINGTON_AB_1 | Routine Compliance | |||||||
Site Inspection | 12/17/2010 | In Compliance | TISSINGTON_AB_1 | 0/1 | Routine Compliance | ||||||
Site Inspection | 05/14/2010 | In Compliance | TISSINGTON_AB_1 | 0/1 | Routine Compliance | ||||||
Emergency Preparedness Information | 05/14/2010 | Satisfied | TISSINGTON_AB_1 | Routine Compliance | |||||||
Site Inspection | 11/07/2008 | In Compliance | TISSINGTON_AB_1 | 0/1 | Installation | ||||||
Site Inspection | 08/05/2008 | In Compliance | TISSINGTON_AB_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 08/05/2008 | In Compliance | TISSINGTON_AB_1 | 0/3 | Closure | ||||||
Site Inspection | 04/23/2008 | In Compliance | TISSINGTON_AB_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 04/23/2008 | Satisfied | TISSINGTON_AB_1 | Routine Compliance | |||||||
Record Document | 06/11/2007 | Satisfied | TISSINGTON_AB_1 | Non-Compliance | |||||||
Letter | 06/07/2007 | Satisfied | TISSINGTON_AB_1 | Non-Compliance | |||||||
Site Inspection | 06/07/2007 | Minor Out of Compliance | TISSINGTON_AB_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/06/2007 | Satisfied | STEVENSON_JS | Routine Compliance | |||||||
Emergency Preparedness Information | 09/21/2006 | Satisfied | STEVENSON_JS | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
02/17/2025 | 6073 | Minor | 4.9 Spill containment, dispenser liners, and piping sumps not accessible. Water or regulated substances not removed. | Have all the liquid removed and properly disposed of from the Regular and Premium STP Sumps. Send a work invoice or labeled pictures of the cleaned sumps to the inspector for review to clear the violation. Email: Emily.Elliott@FLHealth.gov | |||||||
02/17/2025 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | Have a certified technician perform a hydrostatic test on dispenser 3/4 sump to determine the integrity of the sump and ensure it is liquid tight. Once completed, send a copy of the results, that includes all test data, to the inspector for review to clear the violation. Email: Emily.Elliott@FLHealth.gov | |||||||
02/17/2025 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | Investigate the reason and source for liquid to be present in the interstitial space. Determine if the liquid contains any petroleum-based product. Contact Emily.Elliott@FLHealth.gov with results of the type of liquids present in the interstitial space and prior to conducting any repairs or replacements. | |||||||
02/17/2025 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | Have a certified contractor replace the damaged components to ensure dispenser 1/2 sump is liquid tight. Contact the inspector a minimum of 30 days prior to replacement activities for to receive the appropriate paperwork. Closure Sampling will be required. Once work is completed have the integrity of the sump tested to verify, they are liquid tight. Email: Emily.Elliott@FLHealth.gov | |||||||
02/17/2025 | 6009 | Minor | 4.1 Incident Notification Form (INF) not received in a timely manner. | Complete and submit an INF for the incident that occurred. Email the INF to the inspector. Email: Emily.Elliott@FLHealth.gov | |||||||
02/17/2025 | 6009 | Minor | 4.1 Incident Notification Form (INF) not received in a timely manner. | Complete and submit an INF for the incident that occurred. Email the INF to the inspector. Email: Emily.Elliott@FLHealth.gov | |||||||
02/17/2025 | 6014 | SNC-B | 4.2 Incident investigation not initiated within 24-hours (or by next business day) to determine if discharge occurred. | Conduct Closure Sampling at the time of repair/replacement of components for dispenser 1/2 sump that failed integrity testing on 07/24/2024 to determine if a discharge occurred. Once the investigation has been completed submit a Closure Assessment Report to this office for review. Email: Emily.Elliott@FLHealth.gov | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
01/19/1994 | INACTIVE | 7 | PETROLEUM LIABILITY AND RESTORATION INSURANCE PROGRAM-ELIGIBLE | ||||||||
09/27/1989 | INACTIVE | 7 | PETROLEUM LIABILITY AND RESTORATION INSURANCE PROGRAM-ELIGIBLE | ||||||||
09/25/1988 | INACTIVE | 7 | EARLY DETECTION INCENTIVE-ELIGIBLE | ||||||||