![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Northwest | Type | Retail Station | ||||||||
County | Escambia | Status | OPEN | ||||||||
ID | 8508100 | Latitude | 30° 26' 43.1731 | ||||||||
Name |
SUNFLOWER FOOD MART 1412 W FAIRFIELD DR |
Longitude | 87° 14' 4.0031 | ||||||||
PENSACOLA, FL 32501-1104 | LL Method | DGPS | |||||||||
Contact | SHIOUL HAQUE | LL Status | REVIEWED | ||||||||
Phone | (850) 637-1457 | Status Date | 10/15/2003 | ||||||||
Account Owner Information | |||||||||||
Name | SS FOOD MART TWO LLC 1412 W FAIRFIELD DR PENSACOLA, FL 32501 |
Effective Date | 08/01/2024 | ||||||||
Contact | SHIOUL HAQUE | ||||||||||
Phone | (850) 261-9295 | ||||||||||
SUNFLOWERFOODMART1412@GMAIL.COM | |||||||||||
Placard # / Date | |||||||||||
Property Owner Information | |||||||||||
Name | SMART MART 1412 W FAIRFIELD DR PENSACOLA, FL 32501-1104 |
Effective Date | 07/15/2020 | ||||||||
Contact | RAMI ABU OKAB | ||||||||||
Phone | (850) 776-1617 | ||||||||||
RAMIOKAB@GMAIL.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 10000 | Vehicular Diesel (D) | 02/01/1994 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (G) Sacrificial anode CP (I) Double wall (L) Compartmented (M) Spill containment bucket (O) Tight fill |
(B) Steel/galvanized metal (J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
8 | 10000 | Unleaded Gas (B) | 02/01/1994 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (G) Sacrificial anode CP (I) Double wall (L) Compartmented (M) Spill containment bucket (O) Tight fill |
(B) Steel/galvanized metal (J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 6000 | Unleaded Gas (B) | 07/01/1976 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 6000 | Unleaded Gas (B) | 07/01/1976 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 6000 | Vehicular Diesel (D) | 07/01/1976 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 6000 | Unleaded Gas (B) | 07/01/1976 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 560 | Waste Oil (L) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (O) Tight fill |
(B) Steel/galvanized metal | (X) None | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 1000 | Misc Petrol-Based Product (X) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (O) Tight fill |
(B) Steel/galvanized metal | (X) None | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 08/09/2019 | 08/09/2020 | COLONY INSURANCE COMPANY | ||||||||
INSURANCE | 08/13/2018 | 08/13/2019 | COLONY | ||||||||
INSURANCE | 08/09/2016 | 08/09/2017 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 08/09/2014 | 08/09/2015 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 08/09/2012 | 08/09/2013 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 08/09/2010 | 08/09/2011 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 08/09/2009 | 08/09/2010 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 08/09/2008 | 08/09/2009 | COMMERCE & INDUSTRY | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 02/20/2006 | 02/21/2006 | IN-COMPLIANCE | ARTHUR B. TISSINGTON | 0/2 | COMPLIANCE ASSURANCE | |||||
TCR | 03/08/2005 | 03/10/2005 | IN-COMPLIANCE | ARTHUR B. TISSINGTON | 0/2 | COMPLIANCE ASSURANCE | |||||
TCR | 02/28/2005 | 03/03/2005 | MINOR OUT-OF-COMPLIANCE | ARTHUR B. TISSINGTON | 0/2 | COMPLIANCE ASSURANCE | |||||
TCI | 01/11/2005 | 01/18/2005 | MINOR OUT-OF-COMPLIANCE | ARTHUR B. TISSINGTON | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes 2 DAMAGED DISPENSERS HAVE SHEAR VALVES CLOSED | |||||||||||
TCI | 01/20/2004 | 01/26/2004 | IN-COMPLIANCE | A. B. TISSINGTON | 0/2 | COMPLIANCE ASSURANCE | |||||
TCI | 02/17/2003 | 02/25/2003 | IN-COMPLIANCE | JOHN S. STEVENSON | 0/2 | COMPLIANCE ASSURANCE | |||||
TCI | 02/13/2002 | 02/25/2002 | IN-COMPLIANCE | JOHN S. STEVENSON | 0/2 | COMPLIANCE ASSURANCE | |||||
TCI | 02/12/2001 | 02/26/2001 | IN-COMPLIANCE | STEVENSON_JS | 0/2 | COMPLIANCE ASSURANCE | |||||
TCI | 04/11/2000 | 04/20/2000 | IN-COMPLIANCE | STEVENSON_JS | 0/2 | COMPLIANCE ASSURANCE | |||||
TCI | 04/06/1999 | 04/28/1999 | IN-COMPLIANCE | STEVENSON_J | 0/2 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Letter | 03/27/2025 | Satisfied | MILLS_KJ | Enforcement | |||||||
Electronic Communication | 12/06/2024 | Satisfied | PROFFITT_B | Enforcement | |||||||
Enforcement Referral | 11/19/2024 | Accepted | ELLIOTT_EV_1 | Enforcement | |||||||
Document Management | 08/23/2024 | Satisfied | ELLIOTT_EV_1 | Incident | |||||||
Electronic Communication | 08/20/2024 | Satisfied | ELLIOTT_EV_1 | Compliance Assistance | |||||||
Letter | 08/20/2024 | Satisfied | ELLIOTT_EV_1 | Compliance Assistance | |||||||
Record Document | 08/19/2024 | Satisfied | ELLIOTT_EV_1 | Compliance Assistance | |||||||
Record Document | 08/16/2024 | Satisfied | ELLIOTT_EV_1 | Compliance Assistance | |||||||
Electronic Communication | 07/02/2024 | Satisfied | ELLIOTT_EV_1 | Compliance Assistance | |||||||
Site Inspection | 05/23/2024 | Major Out of Compliance | ELLIOTT_EV_1 | 0/2 | Routine Compliance | ||||||
Letter | 05/23/2024 | Satisfied | ELLIOTT_EV_1 | Compliance Assistance | |||||||
Meeting | 05/22/2024 | Satisfied | ELLIOTT_EV_1 | Routine Compliance | |||||||
Letter | 08/22/2022 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Record Document | 08/10/2022 | Satisfied | GARTIN_D | Compliance Assistance | |||||||
Record Document | 08/09/2022 | Satisfied | GARTIN_D | Compliance Assistance | |||||||
Phone Conversation | 08/09/2022 | Satisfied | GARTIN_D | Compliance Assistance | |||||||
Letter | 06/08/2022 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Site Inspection | 05/24/2022 | Major Out of Compliance | GARTIN_D | 0/2 | Routine Compliance | ||||||
Electronic Communication | 05/24/2022 | Satisfied | GARTIN_D | Routine Compliance | |||||||
Enforcement Tracking | 08/25/2021 | Closed Without Enforcement | GILLMAN_M | Enforcement | |||||||
Enforcement Tracking | 08/25/2021 | Closed Without Enforcement | GILLMAN_M | Enforcement | |||||||
TCAR | 03/17/2020 | Satisfied | PAYNE_CL_1 | Closure | |||||||
Letter | 03/16/2020 | Satisfied | WILSON_ML_1 | Discharge | |||||||
Issue Document | 03/16/2020 | Satisfied | WILSON_ML_1 | Discharge | |||||||
Document Management | 03/16/2020 | Satisfied | WILSON_ML_1 | Closure | |||||||
Discharge Reporting | 03/16/2020 | Satisfied | BRAGG_SD_2 | Discharge | |||||||
Document Management | 03/13/2020 | Satisfied | BRAGG_SD_2 | Discharge | |||||||
Electronic Communication | 03/12/2020 | Satisfied | DECKER_K | Enforcement | |||||||
Incident | 03/09/2020 | Led to Discharge (Incident promoted) | BRAGG_SD_2 | Incident | |||||||
Letter | 03/09/2020 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Electronic Communication | 03/09/2020 | Satisfied | BRAGG_SD_2 | Compliance Assistance | |||||||
Site Inspection | 03/09/2020 | Major Out of Compliance | BRAGG_SD_2 | 0/2 | Installation | ||||||
Issue Document | 03/09/2020 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Document Management | 02/14/2020 | Satisfied | BRAGG_SD_2 | Incident | |||||||
Enforcement Referral | 01/08/2020 | Accepted | BRAGG_SD_2 | Enforcement | |||||||
Phone Conversation | 01/06/2020 | Satisfied | BRAGG_SD_2 | Compliance Assistance | |||||||
Electronic Communication | 01/06/2020 | Satisfied | BRAGG_SD_2 | Compliance Assistance | |||||||
Electronic Communication | 10/11/2019 | Satisfied | BRAGG_SD_2 | Compliance Assistance | |||||||
Letter | 10/09/2019 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Issue Document | 10/09/2019 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Site Inspection | 10/09/2019 | Major Out of Compliance | BRAGG_SD_2 | 0/2 | Routine Compliance | ||||||
Enforcement Referral | 09/16/2019 | Accepted | WILSON_ML_1 | Enforcement | |||||||
Phone Conversation | 09/10/2019 | Satisfied | BRAGG_SD_2 | Routine Compliance | |||||||
Record Document | 07/21/2017 | Satisfied | BRAGG_SD_2 | Compliance Assistance | |||||||
Record Document | 06/20/2017 | Satisfied | BRAGG_SD_2 | Compliance Assistance | |||||||
Letter | 06/07/2017 | Satisfied | WILSON_ML_1 | Non-Compliance | |||||||
Letter | 05/05/2017 | Satisfied | WILSON_ML_1 | Non-Compliance | |||||||
Site Inspection | 05/04/2017 | Major Out of Compliance | BRAGG_SD_2 | 0/2 | Routine Compliance | ||||||
Site Inspection | 06/01/2015 | In Compliance | PAYNE_CL_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 05/14/2015 | Satisfied | PAYNE_CL_1 | Routine Compliance | |||||||
Site Inspection | 12/27/2012 | In Compliance | PAYNE_CL_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 12/27/2012 | Satisfied | PAYNE_CL_1 | Routine Compliance | |||||||
Site Inspection | 01/24/2011 | In Compliance | PORTER_AJ_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 01/21/2011 | Satisfied | PORTER_AJ_1 | Routine Compliance | |||||||
Site Inspection | 01/20/2010 | In Compliance | PORTER_AJ_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 01/20/2010 | Satisfied | PORTER_AJ_1 | Routine Compliance | |||||||
Site Inspection | 05/08/2009 | In Compliance | STEVENSON_JS | 0/2 | Routine Compliance | ||||||
Site Inspection | 11/29/2007 | In Compliance | TISSINGTON_AB_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 11/29/2007 | Satisfied | TISSINGTON_AB_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 05/21/2007 | Satisfied | STEVENSON_JS | Routine Compliance | |||||||
Letter | 04/23/2007 | Satisfied | STEVENSON_JS | Non-Compliance | |||||||
Site Inspection | 04/17/2007 | Minor Out of Compliance | STEVENSON_JS | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/06/2007 | Satisfied | THAYER_JD_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/21/2006 | Satisfied | HALE_JS_1 | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
08/20/2024 | 6013 | Minor | 2.10 Appropriate paperwork for financial responsibility improperly completed or maintained. | Complete the FDEP Financial Mechanism Part P Form to match the Insurance Part C/D Form. Once completed, send the Part C/D Form and a completed Part P Form to the inspector for review to clear the violation. Email: Emily.Elliott@FLHealth.gov | |||||||
08/20/2024 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | Have a certified contractor replace the damaged component(s) to ensure dispense sumps are liquid tight. Contact the inspector a minimum of 30 days prior to replacement activities for to receive the appropriate paperwork. Once work is completed have the integrity of dispenser sumps tested to verify, they are liquid tight. Email: Emily.Elliott@FLHealth.gov | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
03/08/2020 | COMPLETED | ||||||||||
11/29/1988 | COMPLETED | 10 | EARLY DETECTION INCENTIVE-ELIGIBLE | ||||||||