![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Northeast | Type | Retail Station | ||||||||
County | Gilchrist | Status | OPEN | ||||||||
ID | 8508501 | Latitude | 29° 47' 44 | ||||||||
Name |
MOONS ROCK BLUFF GENERAL STORE 6519 NW CR 340 |
Longitude | 82° 55' 4 | ||||||||
BELL, FL 32619 | LL Method | AGPS | |||||||||
Contact | MAMUNUR RASHID | LL Status | REVIEWED | ||||||||
Phone | (386) 935-2002 | Status Date | 04/08/2003 | ||||||||
Account Owner Information | |||||||||||
Name | NEJU INC 6519 NW CR 340 BELL, FL 32619 |
Effective Date | 02/28/2014 | ||||||||
Contact | MAMUNUR RASHID | ||||||||||
Phone | (386) 935-2002 | ||||||||||
Placard # / Date | 705814 - 05/07/2025 | ||||||||||
Property Owner Information | |||||||||||
Name | NEJU INC 6519 NW CR 340 BELL, FL 32619 |
Effective Date | 02/28/2014 | ||||||||
Contact | MAMUNUR RASHID | ||||||||||
Phone | (386) 935-2002 | ||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 12000 | Unleaded Gas (B) | 09/01/1993 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (I) Double wall (L) Compartmented (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 1500 | Unleaded Gas (B) | 07/01/1981 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (C) Fiberglass | (Y) Unknown | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 2000 | Leaded Gas (A) | 07/01/1981 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (C) Fiberglass | (Y) Unknown | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 550 | Kerosene (K) | 06/01/1993 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (A) Abv, no soil contact | (I) Not required | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 05/03/2025 | 05/03/2026 | LIBERTY SURPLUS INSURANCE CORPORATION | ||||||||
INSURANCE | 06/13/2017 | 06/13/2018 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 06/13/2016 | 06/13/2017 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 06/13/2015 | 06/13/2016 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 06/13/2014 | 06/13/2015 | ACE | ||||||||
INSURANCE | 06/13/2013 | 06/13/2014 | ACE | ||||||||
INSURANCE | 04/16/2011 | 04/16/2012 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 04/16/2010 | 04/16/2011 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 04/16/2009 | 04/16/2010 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 08/31/1989 | 08/31/1990 | FPLIPA | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCR | 03/23/2005 | 03/25/2005 | IN-COMPLIANCE | SHEFFIELD_C | 0/1 | COMPLIANCE ASSURANCE | |||||
Completion Notes FILL LIDS HAVE BEEN PAINTED, SPILL BUCKETS AND SUMPS EMPTIED. | |||||||||||
RRBD | 03/08/2005 | 03/09/2005 | SHEFFIELD_C | 0/1 | COMPLIANCE ASSURANCE | ||||||
Completion Notes REC'D LETTER FROM MS MYER WITH COPY OF THE LEAK DETECTOR TEST. LEAK DETECTORS TESTED 2-7-05 BY DOWN UNDER, BOTH PASSED. | |||||||||||
NCLI | 02/11/2005 | 02/11/2005 | SHEFFIELD_C | /1 | COMPLIANCE ASSURANCE | ||||||
SVQA | 02/10/2005 | 03/01/2005 | DOHANEY_T | 0/1 | COMPLIANCE ASSURANCE | ||||||
Completion Notes QA INSPECTION CONDUCTED DURING PROGRAM REVIEW. | |||||||||||
TCI | 02/10/2005 | 02/11/2005 | MINOR OUT-OF-COMPLIANCE | SHEFFIELD_C | 0/1 | COMPLIANCE ASSURANCE | |||||
RRBD | 03/10/2004 | 03/10/2004 | SHEFFIELD_C | 0/1 | COMPLIANCE ASSURANCE | ||||||
Completion Notes REC'D FAX WITH MONTHLY VISUAL INSPECTIONS FOR THE LAST TWO MONTHS. | |||||||||||
TCI | 01/13/2004 | 01/21/2004 | MINOR OUT-OF-COMPLIANCE | SHEFFIELD_C | 0/1 | COMPLIANCE ASSURANCE | |||||
Completion Notes LEAK DETECTORS CHECKED BY J&J EQUIPMENT ON 8-28-03 | |||||||||||
TCR | 02/21/2003 | 03/13/2003 | IN-COMPLIANCE | SHEFFIELD_C | 0/1 | COMPLIANCE ASSURANCE | |||||
Completion Notes CHECKED MONTHLY LOG OF VISUAL INSPECTIONS,& SPILL BUCKETS AND SUMP WERE EMPTIED OF WATER. | |||||||||||
RRBD | 02/12/2003 | 02/13/2003 | SHEFFIELD_C | 0/1 | COMPLIANCE ASSURANCE | ||||||
Completion Notes REC'D COPY OF LINE TEST AND LEAK DETECTOR TEST. TESTED BY DOWN UNDER TESTING OF FLORIDA, INC. ON 1-10-03 AND PASSED. | |||||||||||
TCI | 12/12/2002 | 01/08/2003 | MINOR OUT-OF-COMPLIANCE | SHEFFIELD_C | 0/1 | COMPLIANCE ASSURANCE | |||||
RRBD | 11/28/2001 | 11/29/2001 | SHEFFIELD_C | 0/1 | COMPLIANCE ASSURANCE | ||||||
Completion Notes REC'D TEST RESULTS FOR LEAK DET. | |||||||||||
CALL | 11/09/2001 | 11/09/2001 | SHEFFIELD_C | 0/1 | COMPLIANCE ASSURANCE | ||||||
Completion Notes MS. MYER CALLED AND REPORTED SHE HAD PAINTED THE FILL LIDS AND SCHEDULED LEAK DET. TEST. | |||||||||||
TCI | 10/30/2001 | 11/07/2001 | MINOR OUT-OF-COMPLIANCE | SHEFFIELD_C | 0/1 | COMPLIANCE ASSURANCE | |||||
TCR | 12/19/2000 | 01/05/2001 | IN-COMPLIANCE | SHEFFIELD_C | 0/1 | COMPLIANCE ASSURANCE | |||||
TCI | 10/25/2000 | 11/14/2000 | MINOR OUT-OF-COMPLIANCE | SHEFFIELD_C | 0/1 | COMPLIANCE ASSURANCE | |||||
TCI | 02/25/2000 | 03/02/2000 | MINOR OUT-OF-COMPLIANCE | SHEFFIELD_C | 0/1 | COMPLIANCE ASSURANCE | |||||
RRBD | 10/22/1999 | 10/26/1999 | SHEFFIELD_C | 0/1 | COMPLIANCE ASSURANCE | ||||||
TCI | 04/09/1999 | 05/14/1999 | SIGNIFICANT OUT-OF-COMPLIANCE | ASBELL | 0/1 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Letter | 03/31/2025 | Satisfied | KEIM_MJ_1 | Compliance Assistance | |||||||
Electronic Communication | 03/31/2025 | Satisfied | KEIM_MJ_1 | Routine Compliance | |||||||
Site Inspection | 03/31/2025 | Major Out of Compliance | KEIM_MJ_1 | 0/1 | Routine Compliance | ||||||
Electronic Communication | 03/31/2025 | Satisfied | KEIM_MJ_1 | Routine Compliance | |||||||
Letter | 08/06/2024 | Satisfied | JACKSON_SM | Enforcement | |||||||
Enforcement Referral | 05/03/2024 | Accepted | HARRINGTON_RD_1 | Enforcement | |||||||
Meeting | 06/14/2023 | Satisfied | KEIM_MJ_1 | Routine Compliance | |||||||
Letter | 06/14/2023 | Satisfied | KEIM_MJ_1 | Compliance Assistance | |||||||
Site Inspection | 06/14/2023 | Major Out of Compliance | KEIM_MJ_1 | 0/1 | Routine Compliance | ||||||
Electronic Communication | 06/14/2023 | Satisfied | KEIM_MJ_1 | Routine Compliance | |||||||
Phone Conversation | 06/14/2023 | Satisfied | KEIM_MJ_1 | Routine Compliance | |||||||
Phone Conversation | 06/14/2023 | Satisfied | KEIM_MJ_1 | Routine Compliance | |||||||
Electronic Communication | 10/04/2022 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Site Inspection | 06/08/2021 | Major Out of Compliance | KEIM_MJ_1 | 0/1 | Routine Compliance | ||||||
Electronic Communication | 06/08/2021 | Satisfied | KEIM_MJ_1 | Routine Compliance | |||||||
Letter | 06/08/2021 | Satisfied | KEIM_MJ_1 | Compliance Assistance | |||||||
Meeting | 06/08/2021 | Satisfied | KEIM_MJ_1 | Routine Compliance | |||||||
Letter | 02/19/2018 | Satisfied | RAMSEY_TH_1 | Compliance Assistance | |||||||
Record Document | 02/19/2018 | Satisfied | RAMSEY_TH_1 | Compliance Assistance | |||||||
Electronic Communication | 02/19/2018 | Satisfied | RAMSEY_TH_1 | Compliance Assistance | |||||||
Letter | 01/19/2018 | Satisfied | RAMSEY_TH_1 | Compliance Assistance | |||||||
Site Inspection | 01/19/2018 | Minor Out of Compliance | RAMSEY_TH_1 | 0/1 | Routine Compliance | ||||||
Electronic Communication | 01/19/2018 | Satisfied | RAMSEY_TH_1 | Routine Compliance | |||||||
Electronic Communication | 12/04/2017 | Satisfied | RAMSEY_TH_1 | Routine Compliance | |||||||
Site Inspection | 04/08/2016 | In Compliance | HILL_K | 0/1 | Routine Compliance | ||||||
Emergency Preparedness Information | 03/10/2015 | Satisfied | SHULAW_BJ_1 | Routine Compliance | |||||||
Site Inspection | 03/10/2015 | In Compliance | SHULAW_BJ_1 | 0/1 | Routine Compliance | ||||||
Record Document | 10/21/2014 | Satisfied | KASSEES_RP_1 | Non-Compliance | |||||||
Issue Document | 06/10/2014 | Satisfied | PEREA_AO_1 | Non-Compliance | |||||||
Record Document | 06/09/2014 | Satisfied | KASSEES_RP_1 | Non-Compliance | |||||||
Letter | 06/09/2014 | Satisfied | KASSEES_RP_1 | Non-Compliance | |||||||
Issue Document | 02/24/2014 | Satisfied | PEREA_AO_1 | Non-Compliance | |||||||
Letter | 02/23/2014 | Satisfied | KASSEES_RP_1 | Non-Compliance | |||||||
Site Inspection | 02/23/2014 | Minor Out of Compliance | KASSEES_RP_1 | 0/1 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/11/2014 | Satisfied | KASSEES_RP_1 | Routine Compliance | |||||||
Site Inspection | 02/10/2012 | In Compliance | SHULAW_BJ_1 | 0/1 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/10/2012 | Satisfied | SHULAW_BJ_1 | Routine Compliance | |||||||
Site Inspection | 03/25/2011 | In Compliance | SHULAW_BJ_1 | 0/1 | Routine Compliance | ||||||
Meeting | 09/06/2010 | Satisfied | SHULAW_BJ_1 | Non-Compliance | |||||||
Letter | 04/06/2010 | Satisfied | SHULAW_BJ_1 | Non-Compliance | |||||||
Site Inspection | 04/06/2010 | Minor Out of Compliance | SHULAW_BJ_1 | 0/1 | Routine Compliance | ||||||
Site Inspection | 06/16/2009 | In Compliance | SHULAW_BJ_1 | 0/1 | Non-Compliance | ||||||
Letter | 06/10/2009 | Satisfied | SHULAW_BJ_1 | Non-Compliance | |||||||
Site Inspection | 06/09/2009 | Major Out of Compliance | SHULAW_BJ_1 | 0/1 | Non-Compliance | ||||||
Site Inspection | 03/30/2009 | Major Out of Compliance | SHULAW_BJ_1 | 0/1 | Routine Compliance | ||||||
Letter | 03/30/2009 | Satisfied | SHULAW_BJ_1 | Non-Compliance | |||||||
Site Inspection | 11/14/2007 | In Compliance | KASSEES_RP_1 | 0/1 | Routine Compliance | ||||||
Emergency Preparedness Information | 11/08/2007 | Satisfied | KASSEES_RP_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 11/08/2007 | Satisfied | KASSEES_RP_1 | Routine Compliance | |||||||
Site Inspection | 04/21/2007 | In Compliance | KASSEES_RP_1 | 0/1 | Non-Compliance | ||||||
Site Inspection | 04/05/2007 | Major Out of Compliance | KASSEES_RP_1 | 0/1 | Routine Compliance | ||||||
Letter | 04/05/2007 | Satisfied | KASSEES_RP_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 02/16/2007 | Satisfied | KASSEES_RP_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/29/2006 | Satisfied | KASSEES_RP_1 | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
06/07/2021 | 4014 | SNC-B | 2.9 Failure to maintain and demonstrate financial responsibility. This violation may lead to Placard Revocation and Delivery Prohibition. | Obtain or forward the current insurance policy including the certificate of financial responsibility to the inspector to address this violation. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
12/30/1988 | COMPLETED | ||||||||||