![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Northwest | Type | Retail Station | ||||||||
County | Leon | Status | OPEN | ||||||||
ID | 8510400 | Latitude | 30° 25' 35 | ||||||||
Name |
CIRCLE K #2705169 2849 APALACHEE PKY |
Longitude | 84° 13' 56 | ||||||||
TALLAHASSEE, FL 32301 | LL Method | DPHO | |||||||||
Contact | GRAHAM BIGGS | LL Status | REVIEWED | ||||||||
Phone | (919) 774-6700 | Status Date | 07/06/2015 | ||||||||
Account Owner Information | |||||||||||
Name | CIRCLE K STORES INC 1100 Situs Ct Raleigh, NC 27606-5446 |
Effective Date | 07/08/1999 | ||||||||
Contact | IRA LEWIS | ||||||||||
Phone | (423) 400-2480 | ||||||||||
ILEWIS@CIRCLEK.COM | |||||||||||
Placard # / Date | 697500 - 06/28/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | RI CS2 LLC 11995 El Camino Real San Diego, CA 92130-2539 |
Effective Date | 12/12/2016 | ||||||||
Contact | |||||||||||
Phone | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 12000 | Unleaded Gas (B) | 04/01/1991 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 12000 | Unleaded Gas (B) | 04/01/1991 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
8 | 12000 | Unleaded Gas (B) | 04/01/1991 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 12000 | Leaded Gas (A) | 11/01/1973 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(B) Steel/galvanized metal (C) Fiberglass (D) External protective coating |
(8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 12000 | Gasohol (C) | 11/01/1973 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(B) Steel/galvanized metal (C) Fiberglass (D) External protective coating |
(8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 12000 | Gasohol (C) | 11/01/1973 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(B) Steel/galvanized metal (C) Fiberglass (D) External protective coating |
(8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 1000 | Other Non Regulated (Z) | 11/01/1973 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(B) Steel/galvanized metal (C) Fiberglass |
(I) Not required | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 1000 | Other Non Regulated (Z) | 11/01/1973 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(B) Steel/galvanized metal (C) Fiberglass |
(I) Not required | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 04/28/2024 | 08/26/2025 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 04/30/2023 | 08/28/2024 | |||||||||
FULLY FUNDED TRUST | 04/24/2022 | 08/21/2023 | |||||||||
INSURANCE | 12/01/2020 | 12/01/2021 | NAVIGATORS SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2019 | 12/01/2020 | NAVIGATORS SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2017 | 12/01/2018 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2014 | 12/01/2015 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2013 | 12/01/2016 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2013 | 12/01/2014 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2012 | 12/01/2013 | CHUBB | ||||||||
INSURANCE | 12/01/2011 | 12/01/2012 | CHUBB | ||||||||
INSURANCE | 12/17/2010 | 12/17/2011 | CHUBB | ||||||||
INSURANCE | 12/18/2009 | 12/17/2010 | CHUBB | ||||||||
INSURANCE | 12/17/2008 | 12/17/2009 | AMERICAN INTERNATIONAL SPECIALTY LINES | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
CWOE | 10/13/2005 | 10/13/2005 | HATCHER | 0/3 | COMPLIANCE ASSURANCE | ||||||
TCR | 10/12/2005 | 10/13/2005 | IN-COMPLIANCE | HATCHER | 0/3 | COMPLIANCE ASSURANCE | |||||
NCLI | 09/07/2005 | 09/13/2005 | FRENCH | 0/3 | COMPLIANCE ASSURANCE | ||||||
TCI | 08/24/2005 | 09/13/2005 | MINOR OUT-OF-COMPLIANCE | HATCHER | 0/3 | COMPLIANCE ASSURANCE | |||||
TIN | 08/16/2005 | 10/12/2005 | IN-COMPLIANCE | HATCHER | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes FIBERGLASS PIPING AND DISPENSER LINER INSTALL | |||||||||||
TCR | 11/04/2004 | 12/14/2004 | IN-COMPLIANCE | FRENCH | 0/3 | COMPLIANCE ASSURANCE | |||||
CWOE | 11/04/2004 | 12/14/2004 | FRENCH | 0/3 | COMPLIANCE ASSURANCE | ||||||
RRBD | 10/27/2004 | 12/14/2004 | FRENCH | 0/3 | COMPLIANCE ASSURANCE | ||||||
NCLI | 10/01/2004 | 10/05/2004 | FRENCH | 0/3 | COMPLIANCE ASSURANCE | ||||||
TCI | 09/28/2004 | 10/05/2004 | MINOR OUT-OF-COMPLIANCE | HATCHER | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 01/26/2004 | 01/26/2004 | FRENCH | 0/3 | DISCHARGE PROJECT | ||||||
Completion Notes ADDTIONAL PAPERWORK RECEIVED, OK | |||||||||||
DSNR | 01/26/2004 | 01/26/2004 | FRENCH | 0/3 | DISCHARGE PROJECT | ||||||
RRBD | 01/23/2004 | 01/26/2004 | FRENCH | 0/3 | DISCHARGE PROJECT | ||||||
Completion Notes RECEIVED CASE REPORT, UNCLEAR | |||||||||||
IRFR | 12/31/2003 | 01/26/2004 | FRENCH | /3 | DISCHARGE PROJECT | ||||||
Completion Notes REG UL INTERSTITIAL ALARM | |||||||||||
TCI | 09/02/2003 | 09/03/2003 | IN-COMPLIANCE | HATCHER | 0/3 | COMPLIANCE ASSURANCE | |||||
NCLI | 11/07/2002 | 11/07/2002 | FRENCH | 0/3 | COMPLIANCE ASSURANCE | ||||||
TCR | 11/05/2002 | 11/07/2002 | MINOR OUT-OF-COMPLIANCE | HATCHER | 0/3 | COMPLIANCE ASSURANCE | |||||
NCLI | 08/26/2002 | 08/26/2002 | FRENCH | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 08/26/2002 | 08/26/2002 | MINOR OUT-OF-COMPLIANCE | HATCHER | 0/3 | COMPLIANCE ASSURANCE | |||||
NCLI | 11/30/2001 | 11/30/2001 | ROSS | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCR | 11/29/2001 | 11/30/2001 | MINOR OUT-OF-COMPLIANCE | ROSS | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes LKS. STILL AT 7/8 DISPENSER - UL AND PREM. | |||||||||||
RRBD | 11/19/2001 | 11/30/2001 | ROSS | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes REPAIR RECORDS | |||||||||||
NCLI | 10/31/2001 | 10/31/2001 | ROSS | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCR | 10/24/2001 | 10/31/2001 | MINOR OUT-OF-COMPLIANCE | ROSS | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 10/05/2001 | 10/31/2001 | ROSS | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes REPAIR RECORDS | |||||||||||
NCLI | 08/17/2001 | 08/17/2001 | ROSS | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 08/14/2001 | 08/17/2001 | MINOR OUT-OF-COMPLIANCE | ROSS | 0/3 | COMPLIANCE ASSURANCE | |||||
TCR | 11/22/2000 | 11/22/2000 | IN-COMPLIANCE | ROSS | 0/3 | COMPLIANCE ASSURANCE | |||||
CWOE | 11/22/2000 | 11/22/2000 | ROSS | 0/1 | COMPLIANCE ASSURANCE | ||||||
Completion Notes SENSOR FOR UNLEADED TANK, L3, REPAIRED. | |||||||||||
RRBD | 11/20/2000 | 11/22/2000 | ROSS | 0/1 | DISCHARGE PROJECT | ||||||
Completion Notes FINAL SENSOR REPAIR RECORDS PROVIDED | |||||||||||
DSNR | 11/20/2000 | 11/22/2000 | ROSS | 0/1 | DISCHARGE PROJECT | ||||||
Completion Notes BAD WIRE CONNECTIONS ON INTERSITIAL SENSOR FOR UNLEADED TANK. REPAIRED - OK | |||||||||||
NCLI | 11/03/2000 | 11/03/2000 | ROSS | 0/1 | COMPLIANCE ASSURANCE | ||||||
TCR | 10/31/2000 | 11/03/2000 | MINOR OUT-OF-COMPLIANCE | SHEFFIELD | 0/3 | COMPLIANCE ASSURANCE | |||||
TIN | 10/18/2000 | 11/03/2000 | IN-COMPLIANCE | SHEFFIELD | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes ADDITION OF NEW DISPENSERS LOCATIONS TO EXISTING SYSTEM | |||||||||||
NCLI | 08/28/2000 | 08/28/2000 | ROSS | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 08/24/2000 | 08/25/2000 | MINOR OUT-OF-COMPLIANCE | SHEFFIELD | 0/3 | COMPLIANCE ASSURANCE | |||||
IRFR | 08/02/2000 | 08/03/2000 | ROSS | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes INTERSTIAL ALARM REG UNLEADED. | |||||||||||
RRBD | 01/06/2000 | 01/06/2000 | ROSS | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes TEST RESULT FOR INTERSTITIAL TANK SENSORS PROVIDED. | |||||||||||
CWOE | 01/06/2000 | 01/06/2000 | ROSS | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes INTERSTITIAL SENSOR ANNUAL TEST RESULTS PROVIDED. | |||||||||||
NCLI | 10/12/1999 | 10/13/1999 | ROSS | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 09/23/1999 | 10/08/1999 | MINOR OUT-OF-COMPLIANCE | SHEFFIELD | 0/3 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Electronic Communication | 02/20/2025 | Satisfied | FRENCH_EC_1 | Incident | |||||||
Enforcement Referral | 01/27/2025 | Accepted | FRENCH_EC_1 | Enforcement | |||||||
Letter | 10/22/2024 | Satisfied | FRENCH_EC_1 | Compliance Assistance | |||||||
Site Inspection | 10/22/2024 | Major Out of Compliance | HATCHER_JD_1 | 0/3 | Routine Compliance | ||||||
Electronic Communication | 01/20/2023 | Satisfied | FRENCH_EC_1 | Compliance Assistance | |||||||
Letter | 01/20/2023 | Satisfied | FRENCH_EC_1 | Compliance Assistance | |||||||
Site Inspection | 10/25/2022 | Major Out of Compliance | HATCHER_JD_1 | 0/3 | Routine Compliance | ||||||
Letter | 10/25/2022 | Satisfied | HATCHER_JD_1 | Compliance Assistance | |||||||
Phone Conversation | 06/15/2021 | Satisfied | FRENCH_EC_1 | Complaint | |||||||
Electronic Communication | 01/06/2021 | Satisfied | FRENCH_EC_1 | Compliance Assistance | |||||||
Site Inspection | 01/06/2021 | In Compliance | FRENCH_EC_1 | 0/3 | Compliance Assistance | ||||||
Letter | 10/30/2020 | Satisfied | HATCHER_JD_1 | Non-Compliance | |||||||
Site Inspection | 10/30/2020 | Major Out of Compliance | HATCHER_JD_1 | 0/3 | Routine Compliance | ||||||
Electronic Communication | 09/13/2018 | Satisfied | HATCHER_JD_1 | Compliance Assistance | |||||||
Letter | 08/16/2018 | Satisfied | HATCHER_JD_1 | Compliance Assistance | |||||||
Site Inspection | 08/16/2018 | Minor Out of Compliance | HATCHER_JD_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 09/29/2016 | In Compliance | HATCHER_JD_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 09/09/2015 | In Compliance | HATCHER_JD_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 08/21/2014 | Satisfied | HATCHER_JD_1 | Routine Compliance | |||||||
Site Inspection | 08/21/2014 | In Compliance | HATCHER_JD_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 12/03/2013 | In Compliance | HATCHER_JD_1 | 0/3 | Non-Compliance | ||||||
Letter | 09/23/2013 | Satisfied | HATCHER_JD_1 | Non-Compliance | |||||||
Site Inspection | 09/23/2013 | Minor Out of Compliance | HATCHER_JD_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 11/20/2012 | In Compliance | FRENCH_EC_1 | 0/3 | Non-Compliance | ||||||
Record Document | 10/12/2012 | Satisfied | FRENCH_EC_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 09/19/2012 | Satisfied | HATCHER_JD_1 | Routine Compliance | |||||||
Letter | 09/19/2012 | Satisfied | HATCHER_JD_1 | Non-Compliance | |||||||
Site Inspection | 09/19/2012 | Minor Out of Compliance | HATCHER_JD_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 08/24/2011 | Satisfied | HATCHER_JD_1 | Routine Compliance | |||||||
Site Inspection | 08/19/2011 | In Compliance | HATCHER_JD_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 09/27/2010 | In Compliance | HATCHER_JD_1 | 0/3 | Non-Compliance | ||||||
Letter | 08/31/2010 | Satisfied | HATCHER_JD_1 | Non-Compliance | |||||||
Site Inspection | 08/31/2010 | Minor Out of Compliance | HATCHER_JD_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 08/31/2010 | Satisfied | HATCHER_JD_1 | Routine Compliance | |||||||
Incident | 03/24/2010 | Has not led to Discharge | FRENCH_EC_1 | Incident | |||||||
Document Management | 03/24/2010 | Complete | FRENCH_EC_1 | Incident | |||||||
Emergency Preparedness Information | 09/02/2009 | Satisfied | HATCHER_JD_1 | Routine Compliance | |||||||
Site Inspection | 09/02/2009 | In Compliance | HATCHER_JD_1 | 0/3 | Routine Compliance | ||||||
Record Document | 10/15/2008 | Satisfied | HATCHER_JD_1 | Non-Compliance | |||||||
Site Inspection | 09/30/2008 | Minor Out of Compliance | HATCHER_JD_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 09/30/2008 | Satisfied | HATCHER_JD_1 | Routine Compliance | |||||||
Site Inspection | 09/30/2008 | In Compliance | FRENCH_EC_1 | 0/3 | Non-Compliance | ||||||
Letter | 09/30/2008 | Satisfied | HATCHER_JD_1 | Non-Compliance | |||||||
Site Inspection | 08/30/2007 | In Compliance | HATCHER_JD_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 05/21/2007 | Satisfied | HATCHER_JD_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 02/13/2007 | Satisfied | HATCHER_JD_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/22/2006 | Satisfied | HATCHER_JD_1 | Routine Compliance | |||||||
Letter | 08/30/2006 | Satisfied | HATCHER_JD_1 | Non-Compliance | |||||||
Site Inspection | 08/30/2006 | Minor Out of Compliance | HATCHER_JD_1 | 0/3 | Routine Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
10/08/2024 | 6057 | SNC-B | 4.7 Release detection not installed, operated, and maintained per manufacturer's instructions and standards. | Repair or replace faulty line leak detector, retest and provide test results to this department. Repair or replace tank 2 Reg UL sump sensor and provide test results to this department. | |||||||
10/03/2024 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | Remove rust. Repair or replace Reg UL T2 sump sensor. Program ATG to read Reg UL T2 sump sensor, retest and provide testing results to this department. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
05/26/1988 | ACTIVE | 61 | EARLY DETECTION INCENTIVE-ELIGIBLE | ||||||||