Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
||||||||||
Cover Page Report | |||||||||||
Report Run Date: 02/02/2025 Last Data Refresh: 02/01/2025 Report Generated from DOPPLER | |||||||||||
District | Northeast | Type | Retail Station | ||||||||
County | Madison | Status | OPEN | ||||||||
ID | 8510674 | Latitude | 30° 25' 11.2335 | ||||||||
Name |
JIFFY FOOD STORE #317 8267 E US HWY 90 |
Longitude | 83° 17' 55.604 | ||||||||
LEE, FL 32059-9719 | LL Method | DPHO | |||||||||
Contact | SHAUN FREEMAN | LL Status | REVIEWED | ||||||||
Phone | (850) 971-5749 | Status Date | 04/14/2003 | ||||||||
Account Owner Information | |||||||||||
Name | CO FREE INC - JIFFY FOOD STORES 1102 HOWARD ST E Live Oak, FL 32064 |
Effective Date | 07/01/1985 | ||||||||
Contact | SHAUN FREEMAN | ||||||||||
Phone | (386) 362-1320 | ||||||||||
JIFFYFOODSTORES@YAHOO.COM | |||||||||||
Placard # / Date | 679364 - 06/05/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | CO FREE INC - JIFFY FOOD STORES 1102 HOWARD ST E Live Oak, FL 32064 |
Effective Date | 12/11/2001 | ||||||||
Contact | SHAUN FREEMAN | ||||||||||
Phone | (386) 362-1320 | ||||||||||
JIFFYFOODSTORES@YAHOO.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 16000 | Unleaded Gas (B) | 11/01/2001 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (I) Double wall (L) Compartmented (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms (V) Pipeless UST w/containment |
(B) Steel/galvanized metal (J) Pressurized piping system (K) Dispenser liners (P) Internal pipe/internal sump riser |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 10000 | Unleaded Gas (B) | 05/01/1979 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (H) Impressed current CP (M) Spill containment bucket (O) Tight fill |
(B) Steel/galvanized metal (E) Cathodic protection (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 8000 | Unleaded Gas (B) | 05/01/1979 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (H) Impressed current CP (M) Spill containment bucket (O) Tight fill |
(B) Steel/galvanized metal (E) Cathodic protection (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 8000 | Unleaded Gas (B) | 05/01/1979 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (H) Impressed current CP (M) Spill containment bucket (O) Tight fill |
(B) Steel/galvanized metal (E) Cathodic protection (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 8000 | Vehicular Diesel (D) | 05/01/1979 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (H) Impressed current CP (M) Spill containment bucket (O) Tight fill |
(B) Steel/galvanized metal (E) Cathodic protection (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 05/09/2024 | 05/09/2025 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 05/09/2023 | 05/09/2024 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 05/09/2022 | 05/09/2023 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 05/09/2021 | 05/09/2022 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 05/09/2020 | 05/09/2021 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 05/09/2019 | 05/09/2020 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 05/09/2017 | 05/09/2018 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 05/09/2016 | 05/09/2017 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 05/09/2015 | 05/09/2016 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 05/09/2014 | 05/09/2015 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 05/09/2012 | 05/09/2013 | ILLINOIS UNION | ||||||||
INSURANCE | 05/09/2011 | 05/09/2012 | ILLINOIS UNION | ||||||||
INSURANCE | 05/09/2010 | 05/09/2011 | ILLINOIS UNION | ||||||||
INSURANCE | 05/09/2009 | 05/09/2010 | ILLINOIS UNION | ||||||||
INSURANCE | 05/09/2004 | 05/09/2005 | ILLINOIS UNION | ||||||||
INSURANCE | 05/09/2004 | 05/09/2005 | ILLINOIS UNION | ||||||||
INSURANCE | 05/09/2004 | 05/09/2005 | ILLINOIS UNION | ||||||||
INSURANCE | 05/09/2004 | 05/09/2005 | ILLINOIS UNION | ||||||||
INSURANCE | 05/09/1996 | 05/09/1997 | FPLIPA | ||||||||
INSURANCE | 05/09/1994 | 05/09/1996 | PLUS | ||||||||
INSURANCE | 05/09/1989 | 05/09/1994 | FPLIPA | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 10/27/2005 | 11/09/2005 | IN-COMPLIANCE | STEVE SNIPES | 0/1 | COMPLIANCE ASSURANCE | |||||
CWOE | 06/22/2005 | 06/23/2005 | STEVE SNIPES | 0/1 | COMPLIANCE ASSURANCE | ||||||
RRBD | 06/22/2005 | 06/23/2005 | PAUL HUTCHERSON | 0/1 | COMPLIANCE ASSURANCE | ||||||
NCLI | 12/10/2004 | 12/13/2004 | WAYNE ERATO | 0/1 | COMPLIANCE ASSURANCE | ||||||
TCI | 11/17/2004 | 12/01/2004 | MINOR OUT-OF-COMPLIANCE | WAYNE ERATO | 0/1 | COMPLIANCE ASSURANCE | |||||
RRBD | 06/30/2004 | 11/02/2004 | LUBINSKI | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes PLRIP CLAIM RECEIVED BY LEWIS CORNMAN. | |||||||||||
CNLI | 06/28/2004 | 11/02/2004 | LUBINSKI | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes SAR REQUEST LETTER SENT OUT. PLIRP CLAIM RECEIVED LATER - PLIRP ELIGIBILITY BEING CONSIDERED. SA REQUEST LETTER ON HOLD. | |||||||||||
MEET | 06/22/2004 | 11/02/2004 | LUBINSKI | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes MEETING IN TALLAHASSEE - PCS #6, NED, AET INC., BOB FINGAR, RON COCHRAN, MR. FREEMAN. DECIDED TO ACCEPT PLIRP CLAIM, BUT WILL REQUIRE SA UNRIL ELIGIBILITY DETERMINED. | |||||||||||
RRBD | 04/12/2004 | 05/25/2004 | LUBINSKI | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes AET, INC. NOW THINKS JIFFY 317 ROBLEM COMES FROM TOWN OF LEE CONTAMINATION; WANTS MEETING TO DISCUSSS 1994 SITE INVESTIGATION REPORT. CONTACTED MIKE BLAND AND PAUL GRUSLOVIC AND RONNI TO ATTEND. | |||||||||||
RRBD | 03/25/2004 | 04/05/2004 | LUBINSKI | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes RP HIRED AET, INC. TO DO ASSESSMENT. | |||||||||||
TCI | 09/17/2003 | 10/07/2003 | IN-COMPLIANCE | WAYNE ERATO | 0/1 | COMPLIANCE ASSURANCE | |||||
Completion Notes ANNUAL OPERABILITY TEST OF EURO MONITOR PERFORMED WHILE ON SITE | |||||||||||
NOVO | 02/07/2003 | 02/07/2003 | LUBINSKI | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes DRAFT NOV SENT TO OGC FOR REVIEW. AS OF MARCH 2004, PUT ON HOLD - RP HIRED AET INC. TO COMPLETE ASSESSMENT. | |||||||||||
TCI | 10/24/2002 | 11/01/2002 | IN-COMPLIANCE | WAYNE ERATO | 0/1 | COMPLIANCE ASSURANCE | |||||
Completion Notes NO VIOLATIONS FOUND | |||||||||||
RRBD | 02/11/2002 | 02/15/2002 | COMPLIANCE ASSURANCE | ||||||||
LTR | 02/07/2002 | 02/07/2002 | WAYNE ERATO | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes NCL FOR DRF DUE TO LCAR RESULTS | |||||||||||
TIN | 11/15/2001 | 11/30/2001 | IN-COMPLIANCE | WAYNE ERATO | 0/1 | COMPLIANCE ASSURANCE | |||||
Completion Notes INSTALLATION OF NEW EUROTANK SYSTEM | |||||||||||
TXI | 11/13/2001 | 11/30/2001 | SIGNIFICANT OUT-OF-COMPLIANCE | DAN MACDONALD | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes REMOVAL OF OLD SYSTEM | |||||||||||
COND | 08/22/2001 | 09/26/2001 | LUBINSKI | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes $35,000 PENALTY DUE. FIRST 2 OF 5 PENALTY PAYMENTS MADE. | |||||||||||
TCI | 11/08/2000 | 12/01/2000 | IN-COMPLIANCE | WAYNE ERATO | 0/4 | COMPLIANCE ASSURANCE | |||||
Completion Notes VERIFIED SIR PROGRAM | |||||||||||
RRBD | 08/18/2000 | 09/22/2000 | LUBINSKI | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RECEIVED SIR RD, ALL TEST RESULTS | |||||||||||
LTR | 07/10/2000 | 07/12/2000 | LUBINSKI | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes ACKNOWLEDGED RESPONSE FROM CO-FREE, SET AUG 25 DUE DATE. | |||||||||||
WLI | 06/19/2000 | 06/19/2000 | LUBINSKI | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes W/ PENALTIES | |||||||||||
CRDE | 12/14/1999 | 12/15/1999 | WAYNE ERATO | 0/4 | COMPLIANCE ASSURANCE | ||||||
Completion Notes FACILITY REFERRED TO DISTRICT | |||||||||||
NCLI | 12/14/1999 | 12/15/1999 | WAYNE ERATO | 0/4 | COMPLIANCE ASSURANCE | ||||||
Completion Notes FACILITY NEEDS APPROVED RELEASE DETECTION | |||||||||||
TCI | 12/14/1999 | 12/15/1999 | SIGNIFICANT OUT-OF-COMPLIANCE | WAYNE ERATO | 0/4 | COMPLIANCE ASSURANCE | |||||
Completion Notes FACILITY NEEDS AN APPROVED RELEASE DETECTION METHOD | |||||||||||
TCI | 03/18/1999 | 03/30/1999 | SIGNIFICANT OUT-OF-COMPLIANCE | HARDEE_J | 0/4 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Electronic Communication | 11/13/2024 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Site Inspection | 11/13/2024 | Major Out of Compliance | ZIMMERMAN_RA_2 | 0/1 | Routine Compliance | ||||||
Letter | 11/13/2024 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Electronic Communication | 10/11/2024 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Enforcement Referral | 03/11/2024 | Accepted | ZIMMERMAN_RA_2 | Enforcement | |||||||
Site Inspection | 10/25/2022 | Minor Out of Compliance | ZIMMERMAN_RA_2 | 0/1 | Routine Compliance | ||||||
Electronic Communication | 10/25/2022 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Letter | 10/25/2022 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Electronic Communication | 10/10/2022 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Letter | 01/08/2021 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Electronic Communication | 01/08/2021 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Site Inspection | 01/08/2021 | Minor Out of Compliance | ZIMMERMAN_RA_2 | 0/1 | Routine Compliance | ||||||
Phone Conversation | 12/03/2020 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Enforcement Tracking | 10/15/2018 | Closed Without Enforcement | OLIVA_L | Enforcement | |||||||
Site Inspection | 01/08/2018 | Minor Out of Compliance | ZIMMERMAN_RA_2 | 0/1 | Routine Compliance | ||||||
Letter | 01/08/2018 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Electronic Communication | 01/08/2018 | Satisfied | ZIMMERMAN_RA_2 | Routine Compliance | |||||||
Phone Conversation | 12/07/2017 | Satisfied | ZIMMERMAN_RA_2 | Routine Compliance | |||||||
Record Document | 08/18/2016 | Satisfied | GRAHAM_DL_1 | Non-Compliance | |||||||
Letter | 06/16/2016 | Satisfied | GRAHAM_DL_1 | Non-Compliance | |||||||
Letter | 12/30/2015 | Satisfied | GRAHAM_DL_1 | Non-Compliance | |||||||
Site Inspection | 12/30/2015 | Minor Out of Compliance | GRAHAM_DL_1 | 0/1 | Routine Compliance | ||||||
Electronic Communication | 12/07/2015 | Satisfied | GRAHAM_DL_1 | Routine Compliance | |||||||
Phone Conversation | 12/07/2015 | Satisfied | GRAHAM_DL_1 | Routine Compliance | |||||||
Record Document | 05/19/2015 | Satisfied | GRAHAM_DL_1 | Non-Compliance | |||||||
Letter | 09/12/2014 | Satisfied | GRAHAM_DL_1 | Non-Compliance | |||||||
Enforcement Tracking | 02/10/2014 | Closed Without Enforcement | KIRTS_B | Enforcement | |||||||
Site Inspection | 01/31/2014 | Minor Out of Compliance | GRAHAM_DL_1 | 0/1 | Routine Compliance | ||||||
Letter | 01/31/2014 | Satisfied | GRAHAM_DL_1 | Non-Compliance | |||||||
Electronic Communication | 10/01/2013 | Satisfied | LUBINSKI_D | Enforcement | |||||||
Electronic Communication | 09/16/2013 | Satisfied | LUBINSKI_D | Enforcement | |||||||
Electronic Communication | 09/03/2013 | Satisfied | LUBINSKI_D | Enforcement | |||||||
Electronic Communication | 09/03/2013 | Satisfied | LUBINSKI_D | Enforcement | |||||||
Electronic Communication | 09/03/2013 | Satisfied | LUBINSKI_D | Enforcement | |||||||
Electronic Communication | 09/03/2013 | Satisfied | LUBINSKI_D | Enforcement | |||||||
Enforcement Referral | 07/10/2013 | Accepted | LUBINSKI_D | Enforcement | |||||||
Letter | 03/12/2013 | Satisfied | GRAHAM_DL_1 | Non-Compliance | |||||||
Letter | 10/30/2012 | Satisfied | GRAHAM_DL_1 | Non-Compliance | |||||||
Site Inspection | 10/30/2012 | Minor Out of Compliance | GRAHAM_DL_1 | 0/1 | Routine Compliance | ||||||
Emergency Preparedness Information | 10/30/2012 | Satisfied | GRAHAM_DL_1 | Routine Compliance | |||||||
Issue Document | 09/08/2011 | Satisfied | SNIPES_SR_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/08/2011 | Satisfied | SNIPES_SR_1 | Routine Compliance | |||||||
Site Inspection | 09/08/2011 | In Compliance | SNIPES_SR_1 | 0/1 | Routine Compliance | ||||||
Issue Document | 08/16/2011 | Satisfied | SNIPES_SR_1 | Routine Compliance | |||||||
Enforcement Referral | 07/22/2011 | Accepted | LUBINSKI_D | Enforcement | |||||||
Emergency Preparedness Information | 10/07/2010 | Satisfied | SNIPES_SR_1 | Routine Compliance | |||||||
Site Inspection | 10/07/2010 | In Compliance | SNIPES_SR_1 | 0/1 | Routine Compliance | ||||||
Issue Document | 10/07/2010 | Satisfied | SNIPES_SR_1 | Routine Compliance | |||||||
Enforcement Tracking | 07/02/2010 | Closed With Enforcement | LUBINSKI_D | Enforcement | |||||||
Issue Document | 04/28/2010 | Satisfied | SNIPES_SR_1 | Routine Compliance | |||||||
Discharge Reporting | 04/23/2010 | Satisfied | DOHANEY_T | Discharge | |||||||
Site Inspection | 10/01/2009 | In Compliance | SNIPES_SR_1 | 0/1 | Routine Compliance | ||||||
Emergency Preparedness Information | 10/01/2009 | Satisfied | SNIPES_SR_1 | Routine Compliance | |||||||
Issue Document | 09/11/2009 | Satisfied | SNIPES_SR_1 | Routine Compliance | |||||||
Site Inspection | 09/11/2009 | In Compliance | SNIPES_SR_1 | 0/1 | Installation | ||||||
Issue Document | 09/10/2009 | Satisfied | SNIPES_SR_1 | Routine Compliance | |||||||
Site Inspection | 09/10/2009 | In Compliance | SNIPES_SR_1 | 0/1 | Closure | ||||||
Issue Document | 08/13/2009 | Satisfied | SNIPES_SR_1 | Routine Compliance | |||||||
Issue Document | 07/15/2009 | Satisfied | TOWLE_M | Discharge | |||||||
Record Document | 07/14/2009 | Satisfied | TOWLE_M | Discharge | |||||||
Record Document | 04/28/2009 | Satisfied | TOWLE_M | Discharge | |||||||
Issue Document | 04/28/2009 | Satisfied | TOWLE_M | Discharge | |||||||
Record Document | 03/16/2009 | Satisfied | LUBINSKI_D | Enforcement | |||||||
Record Document | 12/08/2008 | Satisfied | LUBINSKI_D | Discharge | |||||||
Issue Document | 12/02/2008 | Satisfied | TOWLE_M | Enforcement | |||||||
Emergency Preparedness Information | 11/04/2008 | Satisfied | SNIPES_SR_1 | Routine Compliance | |||||||
Site Inspection | 11/04/2008 | In Compliance | SNIPES_SR_1 | 0/1 | Routine Compliance | ||||||
Phone Conversation | 07/14/2008 | Satisfied | LUBINSKI_D | Enforcement | |||||||
Issue Document | 07/14/2008 | Satisfied | LUBINSKI_D | Discharge | |||||||
Enforcement Referral | 07/08/2008 | Accepted | LUBINSKI_D | Enforcement | |||||||
Emergency Preparedness Information | 10/23/2007 | Satisfied | SNIPES_SR_1 | Routine Compliance | |||||||
Site Inspection | 10/23/2007 | In Compliance | SNIPES_SR_1 | 0/1 | Routine Compliance | ||||||
Issue Document | 09/25/2007 | Satisfied | LUBINSKI_D | Discharge | |||||||
Emergency Preparedness Information | 05/23/2007 | Satisfied | SNIPES_SR_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 02/13/2007 | Satisfied | SNIPES_SR_1 | Routine Compliance | |||||||
Record Document | 01/25/2007 | Satisfied | DOHANEY_T | Discharge | |||||||
Site Inspection | 10/16/2006 | In Compliance | SNIPES_SR_1 | 0/1 | Routine Compliance | ||||||
Emergency Preparedness Information | 09/24/2006 | Satisfied | SNIPES_SR_1 | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
No Open Violations Found | |||||||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
01/10/2002 | ACTIVE | 81 | |||||||||
01/10/2002 | ACTIVE | 81 | |||||||||