![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Northeast | Type | Retail Station | ||||||||
County | Madison | Status | OPEN | ||||||||
ID | 8510706 | Latitude | 30° 28' 9.1395 | ||||||||
Name |
FAST TRACK #429 408 E BASE ST |
Longitude | 83° 24' 35.4075 | ||||||||
MADISON, FL 32340-2702 | LL Method | DPHO | |||||||||
Contact | BETHANY CLARK | LL Status | REVIEWED | ||||||||
Phone | (850) 973-3399 | Status Date | 04/14/2003 | ||||||||
Account Owner Information | |||||||||||
Name | FAST TRACK STORES INC 1450 N BENSON AVE SUITE A UPLAND, CA 91786 |
Effective Date | 06/11/2024 | ||||||||
Contact | CHITTAH SHAH | ||||||||||
Phone | (909) 394-4728 | ||||||||||
COMPLIANCE@REBELCSTORES.COM | |||||||||||
Placard # / Date | 692809 - 06/21/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | ANABI REAL ESTATE DEVELOPMENT LLC 1450 N BENSON AVE, UN#A UPLAND, CA 91786 |
Effective Date | 06/11/2024 | ||||||||
Contact | SUMMER IREIFEJ / RAWA ANABI | ||||||||||
Phone | (909) 394-4728 | ||||||||||
SIREIFEJ@CARENTERPRISES.NET | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
8 | 16000 | Ethanol E10 (8) | 01/29/2014 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (L) Compartmented (M) Spill containment bucket (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 8000 | Leaded Gas (A) | 10/01/1976 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(C) Fiberglass | (H) Mechanical line leak detector | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 8000 | Leaded Gas (A) | 10/01/1976 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(C) Fiberglass | (H) Mechanical line leak detector | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 8000 | Unleaded Gas (B) | 10/01/1976 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(C) Fiberglass | (H) Mechanical line leak detector | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 4000 | Unleaded Gas (B) | 10/01/1976 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(C) Fiberglass | (H) Mechanical line leak detector | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 8000 | Unleaded Gas (B) | 12/01/1988 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (N) Approved synthetic material |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 8000 | Unleaded Gas (B) | 12/01/1988 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (N) Approved synthetic material |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 8000 | Unleaded Gas (B) | 12/01/1988 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (N) Approved synthetic material |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
NONE | |||||||||||
INSURANCE | 06/11/2024 | 06/11/2029 | NAVIGATORS SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 01/24/2024 | 01/26/2025 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 01/26/2023 | 01/26/2024 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 01/26/2022 | 01/26/2023 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 01/26/2021 | 01/26/2022 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 01/26/2020 | 01/26/2021 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 01/26/2019 | 01/26/2020 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 01/26/2018 | 01/26/2019 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 01/26/2016 | 01/26/2017 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 01/26/2015 | 01/26/2016 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 01/26/2014 | 01/26/2015 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 01/26/2014 | 01/26/2015 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 01/26/2009 | 01/26/2010 | ZURICH-AMERICAN | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 10/28/2005 | IN-COMPLIANCE | STEVE SNIPES | 0/3 | COMPLIANCE ASSURANCE | ||||||
TCQA | 12/07/2004 | 01/03/2005 | IN-COMPLIANCE | LUBINSKI_D | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes QA INSPECTION CONDUCTED FOR ANNUAL PROGRAM REVIEW. | |||||||||||
TCI | 10/13/2004 | 10/18/2004 | IN-COMPLIANCE | WAYNE ERATO | 0/3 | COMPLIANCE ASSURANCE | |||||
CWOE | 06/23/2004 | 06/24/2004 | WAYNE ERATO | 0/0 | COMPLIANCE ASSURANCE | ||||||
RRBD | 06/23/2004 | 06/24/2004 | WAYNE ERATO | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RECEICVED NOTICE OF WORK COMPLETE. | |||||||||||
WLI | 04/13/2004 | 04/13/2004 | WAYNE ERATO | 0/0 | COMPLIANCE ASSURANCE | ||||||
NCLI | 01/07/2004 | 01/08/2004 | WAYNE ERATO | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes DISPENSER 7/8 NEEDS VALVE ANCHORED. DISPENSER 3/4 SHOWS WETTING | |||||||||||
TCI | 11/20/2003 | 12/31/2003 | MINOR OUT-OF-COMPLIANCE | WAYNE ERATO | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes DISPENSER 7 NEEDS SHEAR VALVE. | |||||||||||
IRFR | 07/30/2003 | 08/18/2003 | WAYNE ERATO | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes INF FILED FOR INCONCLUSIVE SIR RESULTS. | |||||||||||
TCI | 11/26/2002 | 12/04/2002 | IN-COMPLIANCE | WAYNE ERATO | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes NEXT RETROFIT DATE 12-31-2009 FOR TANKS | |||||||||||
TCI | 01/11/2002 | 02/01/2002 | IN-COMPLIANCE | WAYNE ERATO | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes IN COMPLIANCE | |||||||||||
TCI | 08/25/2000 | 08/31/2000 | IN-COMPLIANCE | WAYNE ERATO | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes FACILITY IN COMPLIANCE | |||||||||||
TCI | 11/29/1999 | 11/29/1999 | IN-COMPLIANCE | WAYNE ERATO | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes SIR IN PLACE.FACILITY IN COMPLIANCE | |||||||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Letter | 05/05/2025 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Electronic Communication | 05/05/2025 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Site Inspection | 05/05/2025 | Major Out of Compliance | ZIMMERMAN_RA_2 | 0/1 | Routine Compliance | ||||||
Letter | 05/05/2025 | Satisfied | MCNEIL_A | Compliance Assistance | |||||||
Enforcement Tracking | 05/01/2025 | Closed Without Enforcement | MCNEIL_A | Enforcement | |||||||
Electronic Communication | 02/11/2025 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Letter | 09/18/2024 | Satisfied | MCNEIL_A | Enforcement | |||||||
Enforcement Referral | 08/07/2024 | Accepted | ZIMMERMAN_RA_2 | Enforcement | |||||||
Site Inspection | 12/16/2022 | Minor Out of Compliance | ZIMMERMAN_RA_2 | 0/1 | Routine Compliance | ||||||
Electronic Communication | 12/16/2022 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Letter | 12/16/2022 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Electronic Communication | 11/07/2022 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Electronic Communication | 10/14/2022 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Site Inspection | 08/02/2020 | Minor Out of Compliance | ZIMMERMAN_RA_2 | 0/1 | Routine Compliance | ||||||
Electronic Communication | 08/02/2020 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Letter | 08/02/2020 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Electronic Communication | 07/01/2020 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Letter | 12/06/2019 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Record Document | 12/06/2019 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Site Inspection | 07/27/2018 | Minor Out of Compliance | ZIMMERMAN_RA_2 | 0/1 | Routine Compliance | ||||||
Electronic Communication | 07/27/2018 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Letter | 07/27/2018 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Electronic Communication | 07/06/2018 | Satisfied | ZIMMERMAN_RA_2 | Routine Compliance | |||||||
Site Inspection | 09/29/2016 | In Compliance | GRAHAM_DL_1 | 0/1 | Routine Compliance | ||||||
Issue Document | 09/29/2016 | Satisfied | GRAHAM_DL_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 12/02/2014 | Satisfied | GRAHAM_DL_1 | Routine Compliance | |||||||
Site Inspection | 12/02/2014 | In Compliance | GRAHAM_DL_1 | 0/1 | Routine Compliance | ||||||
Electronic Communication | 11/19/2014 | Satisfied | GRAHAM_DL_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 08/15/2014 | Satisfied | GRAHAM_DL_1 | Installation | |||||||
Site Inspection | 08/15/2014 | Major Out of Compliance | GRAHAM_DL_1 | 0/3 | Installation | ||||||
Letter | 08/15/2014 | Satisfied | GRAHAM_DL_1 | Non-Compliance | |||||||
Enforcement Tracking | 02/13/2014 | Closed With Enforcement | KIRTS_B | Enforcement | |||||||
Letter | 01/30/2014 | Satisfied | GRAHAM_DL_1 | Non-Compliance | |||||||
Site Inspection | 01/29/2014 | Major Out of Compliance | GRAHAM_DL_1 | 0/3 | Closure | ||||||
Letter | 07/30/2013 | Satisfied | GRAHAM_DL_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 07/30/2013 | Satisfied | GRAHAM_DL_1 | Routine Compliance | |||||||
Site Inspection | 07/30/2013 | Major Out of Compliance | GRAHAM_DL_1 | 0/3 | Routine Compliance | ||||||
Electronic Communication | 05/06/2013 | Satisfied | LUBINSKI_D | Enforcement | |||||||
Letter | 06/29/2012 | Satisfied | GRAHAM_DL_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 06/29/2012 | Satisfied | GRAHAM_DL_1 | Routine Compliance | |||||||
Site Inspection | 06/29/2012 | Major Out of Compliance | GRAHAM_DL_1 | 0/3 | Routine Compliance | ||||||
Meeting | 12/28/2011 | Satisfied | SNIPES_SR_1 | Non-Compliance | |||||||
Phone Conversation | 09/19/2011 | Satisfied | SNIPES_SR_1 | Enforcement | |||||||
Emergency Preparedness Information | 10/01/2010 | Satisfied | SNIPES_SR_1 | Routine Compliance | |||||||
Letter | 09/30/2010 | Satisfied | SNIPES_SR_1 | Non-Compliance | |||||||
Site Inspection | 09/30/2010 | Major Out of Compliance | SNIPES_SR_1 | 0/3 | Routine Compliance | ||||||
Issue Document | 06/30/2010 | Satisfied | DOHANEY_T | Enforcement | |||||||
Enforcement Referral | 05/13/2010 | Accepted | LUBINSKI_D | Enforcement | |||||||
Emergency Preparedness Information | 10/14/2009 | Satisfied | SNIPES_SR_1 | Routine Compliance | |||||||
Issue Document | 10/13/2009 | Satisfied | SNIPES_SR_1 | Routine Compliance | |||||||
Site Inspection | 10/13/2009 | In Compliance | SNIPES_SR_1 | 0/3 | Routine Compliance | ||||||
Issue Document | 08/13/2009 | Satisfied | SNIPES_SR_1 | Routine Compliance | |||||||
Site Inspection | 02/13/2009 | In Compliance | TOWLE_M | 0/7 | Non-Compliance | ||||||
Emergency Preparedness Information | 11/03/2008 | Satisfied | SNIPES_SR_1 | Routine Compliance | |||||||
Site Inspection | 11/03/2008 | In Compliance | SNIPES_SR_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 10/30/2007 | In Compliance | SNIPES_SR_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 10/30/2007 | Satisfied | SNIPES_SR_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 05/23/2007 | Satisfied | SNIPES_SR_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 02/13/2007 | Satisfied | SNIPES_SR_1 | Routine Compliance | |||||||
Site Inspection | 10/16/2006 | In Compliance | SNIPES_SR_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 09/27/2006 | Satisfied | SNIPES_SR_1 | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
05/05/2025 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | Remove corrosion from the regular STP sump pump head, electrical conduit and product pipe fittings, repaint or reseal pump head, electrical conduit and pipe fittings with protective coating in the facilities RUL STP sump to help prevent future corrosion; email proof of violation resolution to ACEPD – work order and pictures after corrosion removal. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
11/02/1992 | COMBINED | 61 | PETROLEUM LIABILITY AND RESTORATION INSURANCE PROGRAM-ELIGIBLE | ||||||||
07/11/1991 | ACTIVE | 61 | PETROLEUM LIABILITY AND RESTORATION INSURANCE PROGRAM-ELIGIBLE | ||||||||