Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Southeast | Type | Retail Station | ||||||||
County | Monroe | Status | OPEN | ||||||||
ID | 8511678 | Latitude | 24° 42' 12.6178 | ||||||||
Name |
PANCHOS FUEL SUPPLY CORP 1280 OCEANVIEW AVE |
Longitude | 81° 6' 34.8814 | ||||||||
MARATHON, FL 33050-2115 | LL Method | DPHO | |||||||||
Contact | EMILY PALMA | LL Status | REVIEWED | ||||||||
Phone | (305) 743-2281 | Status Date | 02/14/2024 | ||||||||
Account Owner Information | |||||||||||
Name | PANCHO FUEL SUPPLY CORP 1280 OCEANVIEW AVE Marathon, FL 33050 |
Effective Date | 09/20/1996 | ||||||||
Contact | EMILY PALMA | ||||||||||
Phone | (305) 743-2281 | ||||||||||
PANCHOSFUEL1280@COMCAST.NET | |||||||||||
Placard # / Date | 705466 - 04/01/2025 | ||||||||||
Property Owner Information | |||||||||||
Name | PANCHO FUEL SUPPLY CORP 1280 OCEANVIEW AVE Marathon, FL 33050 |
Effective Date | 02/23/2009 | ||||||||
Contact | EMILY PALMA | ||||||||||
Phone | (305) 743-2281 | ||||||||||
PANCHOSFUEL1280@COMCAST.NET | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 1000 | Vehicular Diesel (D) | 11/01/2020 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (F) Double wall |
(5) Electronic monitor dispenser liners (H) Mechanical line leak detector |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 1000 | Unleaded Gas (B) | 11/01/2020 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (F) Double wall |
(5) Electronic monitor dispenser liners (H) Mechanical line leak detector |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 2000 | Unleaded Gas (B) | 11/01/2020 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (F) Double wall |
(5) Electronic monitor dispenser liners (H) Mechanical line leak detector |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 15000 | Vehicular Diesel (D) | 05/01/1990 | UNDERGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (F) Fiberglass clad steel (M) Spill containment bucket (O) Tight fill |
(B) Steel/galvanized metal (C) Fiberglass (D) External protective coating (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (D) SPCC Plan (H) Mechanical line leak detector (L) Automatic tank gauging - USTs (N) Groundwater monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 15000 | Unleaded Gas (B) | 11/01/1994 | UNDERGROUND | Out of Service (T) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (I) Double wall (L) Compartmented (M) Spill containment bucket (N) Flow shut-Off |
(C) Fiberglass (F) Double wall (H) Air/Seaport hydrant system (J) Pressurized piping system (K) Dispenser liners |
(F) Monitor dbl wall tank space | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 15000 | Unleaded Gas (B) | 11/01/1994 | UNDERGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (I) Double wall (L) Compartmented (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (D) SPCC Plan (F) Monitor dbl wall tank space (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 10000 | Vehicular Diesel (D) | ABOVEGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(D) Unknown | (C) Fiberglass | (8) Manually sampled wells | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 01/01/2023 | 01/01/2024 | SCOTTSDALE INSURANCE COMPANY | ||||||||
INSURANCE | 01/01/2022 | 01/01/2023 | SCOTTSDALE INSURANCE COMPANY | ||||||||
INSURANCE | 01/01/2021 | 01/01/2022 | SCOTTSDALE INSURANCE COMPANY | ||||||||
INSURANCE | 01/22/2020 | 01/22/2021 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 01/18/2019 | 01/18/2020 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 01/18/2018 | 01/19/2019 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 01/18/2016 | 01/18/2017 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 01/18/2014 | 01/18/2015 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 01/18/2013 | 01/18/2014 | LIBERTY MUTUAL | ||||||||
INSURANCE | 10/20/2011 | 10/20/2012 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 03/09/2007 | 03/09/2008 | ESSEX | ||||||||
INSURANCE | 10/07/1994 | 10/07/1996 | FPLIPA | ||||||||
INSURANCE | 09/13/1991 | 09/13/1994 | FPLIPA | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
CRDE | 10/18/2005 | 10/18/2005 | WINKLER | 0/2 | COMPLIANCE ASSURANCE | ||||||
TCR | 10/17/2005 | 10/18/2005 | SIGNIFICANT OUT-OF-COMPLIANCE | WINKLER | 0/2 | COMPLIANCE ASSURANCE | |||||
NCLI | 07/14/2005 | 07/14/2005 | WINKLER | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 07/14/2005 | 07/14/2005 | SIGNIFICANT OUT-OF-COMPLIANCE | WINKLER,PEREZ,HAMMONTREE | 0/2 | COMPLIANCE ASSURANCE | |||||
DPRI | 04/28/2005 | 04/29/2005 | C PEREZ | 0/2 | TERMINAL FACILITY PROJECT | ||||||
Completion Notes DPRI CERTIFICATE ISSUED #97939. | |||||||||||
TCR | 04/28/2005 | 04/29/2005 | IN-COMPLIANCE | C PEREZ | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes ALL PREVIOUS VIOLATIONS HAVE BEEN CORRECTED. DPRI CERTIFICATE ISSUED. | |||||||||||
NCLI | 03/16/2005 | 03/16/2005 | C PEREZ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes NCLI FAXED AND MAILED TO FACILITY. | |||||||||||
TCR | 03/15/2005 | 03/16/2005 | SIGNIFICANT OUT-OF-COMPLIANCE | C PEREZ | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes INCON SYSTEM NEEDS TO BE RE-SET, SPCC NEEDS TO BE UPDATED, DW TANK NEEDS INTERSTICIAL MONITORING. | |||||||||||
REX | 03/02/2005 | 03/02/2005 | C PEREZ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes FACILITY REQUESTED RE-INSPECTIONS TO BE EXTENDED UNTIL 3/08/2005. REQUEST WAS GRANTED. | |||||||||||
RRBD | 01/25/2005 | 01/26/2005 | C PEREZ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes FACILITY FAXED COPY OF TANK, LINES, LINE LEAK DETECTORS AND ATG TESTS. | |||||||||||
NCLI | 01/19/2005 | 01/19/2005 | C PEREZ | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 01/14/2005 | 01/19/2005 | SIGNIFICANT OUT-OF-COMPLIANCE | C PEREZ | 0/2 | COMPLIANCE ASSURANCE | |||||
TCR | 04/21/2004 | 05/11/2004 | SIGNIFICANT OUT-OF-COMPLIANCE | TREBESCH_CL | 0/2 | COMPLIANCE ASSURANCE | |||||
WLI | 03/12/2004 | 03/12/2004 | TREBESCH | 0/2 | COMPLIANCE ASSURANCE | ||||||
Completion Notes FINAL WLI BEFORE CRDE-30 DAYS TO COMPLY WITH WLI | |||||||||||
TCR | 03/11/2004 | 03/12/2004 | SIGNIFICANT OUT-OF-COMPLIANCE | TREBESCH | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes FACILITY WAS WARNED AGAIN TO COME INTO COMPLIANCE WITH ALL RULES OF 62-761. THEY HAVE 30 DAYS TO COMPLY OR CASE WILL BE CRDE. | |||||||||||
WLI | 12/12/2003 | 12/12/2003 | TREBESCH | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes WLI FOR SNC A & B VIOLATIONS TO BE CORRECTED WITHIN 30 DAYS | |||||||||||
TCR | 12/04/2003 | 12/12/2003 | SIGNIFICANT OUT-OF-COMPLIANCE | TREBESCH | 0/2 | COMPLIANCE ASSURANCE | |||||
NCLI | 09/23/2003 | 09/23/2003 | TREBESCH_CL | 0/0 | COMPLIANCE ASSURANCE | ||||||
TIN | 09/05/2003 | 09/23/2003 | IN-COMPLIANCE | TREBESCH_CL | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes INSTALLED ENVIRON TANK FLANGE AND SUMP. INSTALLED 3" FG PRIMARY PIPE WITH 4" SECONDARY PIPING. ALSO INSTALLED ABOVE GROUND SW BLACK IRON PIPING AND SOLENOID VALVE AT TERMINAL END OF SW BLACK IRON PIPING. PASSED ALL HYDRO AND PRESS. TESTS. | |||||||||||
TCI | 09/05/2003 | 09/23/2003 | SIGNIFICANT OUT-OF-COMPLIANCE | TREBESCH_CL | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes SW FIBER CLAD STEEL DIESEL TANK (#2) SUCTION. DW FIBERGLASS UNLEADED GAS UST PRESSURE. FG PIPING TO STEEL ABOVE GRADE. | |||||||||||
TCI | 01/22/2003 | 02/11/2003 | IN-COMPLIANCE | DEIDRICK | 0/2 | COMPLIANCE ASSURANCE | |||||
TCI | 02/20/2002 | 02/21/2002 | SIGNIFICANT OUT-OF-COMPLIANCE | SHULAW | 0/2 | COMPLIANCE ASSURANCE | |||||
TCR | 03/05/2001 | 03/05/2001 | IN-COMPLIANCE | LAWRENCE_W | 0/2 | COMPLIANCE ASSURANCE | |||||
TCI | 02/28/2001 | 02/28/2001 | MINOR OUT-OF-COMPLIANCE | LAWRENCE_W | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes MGR NOT ON SITE, SEC'Y UNABLE TO HELP WITH INFO | |||||||||||
TCI | 03/27/2000 | 03/28/2000 | IN-COMPLIANCE | LAWRENCE_W | 0/2 | COMPLIANCE ASSURANCE | |||||
TCI | 04/21/1999 | 04/23/1999 | IN-COMPLIANCE | LAWRENCE_W | 0/2 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Site Inspection | 12/04/2024 | Major Out of Compliance | SMITH_SAM | 3/1 | Routine Compliance | ||||||
Letter | 07/24/2024 | Satisfied | WELLS_J | Enforcement | |||||||
Letter | 09/27/2021 | Satisfied | MARCONI_E | Enforcement | |||||||
Enforcement Referral | 09/27/2021 | Accepted | MARCONI_E | Enforcement | |||||||
Site Inspection | 09/22/2021 | Major Out of Compliance | MARCONI_E | 0/1 | Component Closure | ||||||
Record Document | 08/24/2021 | Satisfied | MARCONI_E | Compliance Assistance | |||||||
Letter | 04/07/2021 | Satisfied | MARCONI_E | Compliance Assistance | |||||||
Site Inspection | 02/22/2021 | Major Out of Compliance | MARCONI_E | 0/1 | Routine Compliance | ||||||
Phone Conversation | 01/19/2021 | Satisfied | MARCONI_E | Routine Compliance | |||||||
Phone Conversation | 01/19/2021 | Satisfied | MARCONI_E | Routine Compliance | |||||||
Letter | 08/27/2018 | Satisfied | WINKLER_MG_1 | Routine Compliance | |||||||
Site Inspection | 08/27/2018 | In Compliance | WINKLER_MG_1 | 0/1 | Routine Compliance | ||||||
Site Inspection | 01/21/2016 | In Compliance | WINKLER_MG_1 | 0/1 | Routine Compliance | ||||||
Site Inspection | 04/03/2014 | Minor Out of Compliance | WINKLER_MG_1 | 0/1 | Routine Compliance | ||||||
Letter | 04/03/2014 | Satisfied | WINKLER_MG_1 | Non-Compliance | |||||||
Document Management | 04/29/2013 | Complete | WINKLER_MG_1 | Discharge | |||||||
Record Document | 03/27/2013 | Satisfied | WINKLER_MG_1 | Non-Compliance | |||||||
Document Management | 01/23/2013 | Complete | WINKLER_MG_1 | Discharge | |||||||
Letter | 01/17/2013 | Satisfied | WINKLER_MG_1 | Non-Compliance | |||||||
Site Inspection | 01/17/2013 | Major Out of Compliance | WINKLER_MG_1 | 0/2 | Routine Compliance | ||||||
Incident | 01/14/2013 | Has not led to Discharge | WINKLER_MG_1 | Incident | |||||||
Document Management | 01/14/2013 | Complete | WINKLER_MG_1 | Incident | |||||||
Issue Document | 08/15/2012 | Satisfied | RUSSELL_E | Routine Compliance | |||||||
Site Inspection | 07/26/2012 | In Compliance | WINKLER_MG_1 | 0/2 | Closure | ||||||
Electronic Communication | 04/10/2012 | Satisfied | RUSSELL_E | Routine Compliance | |||||||
Record Document | 10/05/2011 | Satisfied | WINKLER_MG_1 | Non-Compliance | |||||||
Letter | 09/27/2011 | Satisfied | WINKLER_MG_1 | Non-Compliance | |||||||
Site Inspection | 09/27/2011 | Major Out of Compliance | WINKLER_MG_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 09/21/2010 | Major Out of Compliance | WINKLER_MG_1 | 0/2 | Routine Compliance | ||||||
Letter | 09/21/2010 | Satisfied | WINKLER_MG_1 | Non-Compliance | |||||||
Site Inspection | 10/23/2009 | Major Out of Compliance | WINKLER_MG_1 | 0/2 | Routine Compliance | ||||||
Letter | 10/23/2009 | Satisfied | WINKLER_MG_1 | Non-Compliance | |||||||
Letter | 09/09/2009 | Satisfied | WINKLER_MG_1 | Non-Compliance | |||||||
Site Inspection | 09/09/2009 | Major Out of Compliance | WINKLER_MG_1 | 0/2 | Non-Compliance | ||||||
Letter | 09/09/2009 | Satisfied | WINKLER_MG_1 | Non-Compliance | |||||||
Phone Conversation | 01/08/2009 | Satisfied | WINKLER_MG_1 | Routine Compliance | |||||||
Letter | 01/08/2009 | Satisfied | WINKLER_MG_1 | Non-Compliance | |||||||
Meeting | 01/07/2009 | Satisfied | WINKLER_MG_1 | Routine Compliance | |||||||
Site Inspection | 10/17/2008 | Major Out of Compliance | WINKLER_MG_1 | 0/2 | Routine Compliance | ||||||
Letter | 10/17/2008 | Satisfied | WINKLER_MG_1 | Non-Compliance | |||||||
Site Inspection | 04/16/2008 | Major Out of Compliance | MELE_V | 0/2 | Routine Compliance | ||||||
Site Inspection | 04/16/2008 | Major Out of Compliance | PEREZ_CA | 0/2 | Closure | ||||||
Meeting | 04/16/2008 | Satisfied | PEREZ_CA | Installation | |||||||
Site Inspection | 04/16/2008 | Major Out of Compliance | MELE_V | 0/2 | QA/QC | ||||||
Site Inspection | 03/29/2007 | In Compliance | HAMMONTREE_TD | 0/2 | Routine Compliance | ||||||
Record Document | 03/05/2007 | Satisfied | WINKLER_MG_1 | Routine Compliance | |||||||
Record Document | 03/05/2007 | Satisfied | WINKLER_MG_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 02/05/2007 | Satisfied | HAMMONTREE_TD | Routine Compliance | |||||||
Emergency Preparedness Information | 09/19/2006 | Satisfied | WINKLER_MG_1 | Routine Compliance | |||||||
TCAR | 09/19/2006 | Satisfied | WINKLER_MG_1 | Closure | |||||||
Letter | 06/01/2006 | Satisfied | PEREZ_CA | Closure | |||||||
TCAR | 05/18/2006 | Satisfied | WINKLER_MG_1 | Closure | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
09/12/2024 | 6002 | Minor | 2.1 Operator Training records not available. | Provide A/B and C Operator Certifications to the Department. | |||||||
08/06/2024 | 6076 | Minor | 4.7 Requirements not met for out-of-service systems. | Update the status of the UST of the registration. If out-of-service perform visual inspection annually and send documentation to the Department. | |||||||
07/22/2024 | 6003 | Minor | 2.2 Registration Form not submitted for a new system, change in service, closure, owner change, or discovery of unregistered facility. | Submit registration form to tankregistration@FloridaDEP.gov and the Department. Update the status of the underground storage tank to closed since it has been out-of-service over 90 days and add the three (3) aboveground storage tanks as in-service. | |||||||
07/22/2024 | 7089 | Minor | 1.11 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Provide dispenser sump integrity testing documentation or conduct testing and send results to the Department. | |||||||
07/22/2024 | 7003 | Minor | 1.3 Registration fees not paid (not receiving fuel). | Register and Pay registration fees for the ASTs. | |||||||
07/22/2024 | 7125 | SNC-A | 1.17 Owner, operator, or supplier deposited motor fuel into storage tank without current valid registration placard. | Register the 3-ASTs with the Department and post placard in plain view. Submit fuel receipts from November 2020 to present to the Department. | |||||||
07/22/2024 | 7004 | Minor | 1.4 Placard not displayed (or available upon request). | Register the 3-ASTs with the Department and post placard in plain view. Submit fuel receipts from November 2020 to present to the Department. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
07/13/1992 | ACTIVE | 8 | PETROLEUM LIABILITY AND RESTORATION INSURANCE PROGRAM-ELIGIBLE | ||||||||