![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/11/2025 Last Data Refresh: 05/10/2025 Report Generated from DOPPLER | |||||||||||
District | Northwest | Type | Retail Station | ||||||||
County | Okaloosa | Status | OPEN | ||||||||
ID | 8512223 | Latitude | 30° 42' 54.3953 | ||||||||
Name |
BROWN'S GROCERY 531 HWY 90 WEST |
Longitude | 86° 44' 50.1912 | ||||||||
HOLT, FL 32564-9407 | LL Method | DGPS | |||||||||
Contact | PRIYAL PATEL | LL Status | REVIEWED | ||||||||
Phone | (850) 537-8111 | Status Date | 11/03/2003 | ||||||||
Account Owner Information | |||||||||||
Name | HOLT HWY 90 GAS AND FOOD MART LLC 531 HWY 90 W HOLT, FL 32564 |
Effective Date | 06/24/2024 | ||||||||
Contact | PRIYAL PATEL | ||||||||||
Phone | (850) 537-8111 | ||||||||||
531HWY90@GMAIL.COM | |||||||||||
Placard # / Date | 703524 - 11/07/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | 531 REAL ESTATE HOLDINGS LLC 531 HWY 90 W HOLT, FL 32564 |
Effective Date | 06/14/2024 | ||||||||
Contact | PRIYAL PATEL | ||||||||||
Phone | (850) 537-8111 | ||||||||||
531HWY90@GMAIL.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 12000 | Unleaded Gas (B) | 10/01/1999 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (G) Sacrificial anode CP (I) Double wall (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (N) Approved synthetic material |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 2000 | Unleaded Gas (B) | 10/01/1981 | UNDERGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (C) Fiberglass | (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs (T) Annual tightness test/Inventory |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 1000 | Unleaded Gas (B) | 10/01/1981 | UNDERGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (C) Fiberglass | (H) Mechanical line leak detector (T) Annual tightness test/Inventory |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 1000 | Unleaded Gas (B) | 10/01/1981 | UNDERGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (C) Fiberglass | (H) Mechanical line leak detector (T) Annual tightness test/Inventory |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 3000 | Unleaded Gas (B) | 10/01/1991 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (G) Sacrificial anode CP (M) Spill containment bucket (O) Tight fill |
(G) Pipe trench liner (I) Suction piping system (K) Dispenser liners (M) Double wall - pipe jacket |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (L) Automatic tank gauging - USTs (S) Statistical Inventory Reconcile (V) Suction pump check valve |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 2000 | Unleaded Gas (B) | 10/01/1991 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (G) Sacrificial anode CP (M) Spill containment bucket (O) Tight fill |
(G) Pipe trench liner (I) Suction piping system (K) Dispenser liners (M) Double wall - pipe jacket |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (L) Automatic tank gauging - USTs (S) Statistical Inventory Reconcile (V) Suction pump check valve |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 2000 | Unleaded Gas (B) | 10/01/1991 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (G) Sacrificial anode CP (M) Spill containment bucket (O) Tight fill |
(G) Pipe trench liner (I) Suction piping system (K) Dispenser liners (M) Double wall - pipe jacket |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile (T) Annual tightness test/Inventory (V) Suction pump check valve |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 10/17/2024 | 10/17/2025 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 07/05/2022 | 07/05/2023 | CRUM & FORSTER SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 07/05/2021 | 07/05/2022 | CRUM & FORSTER SPECIALTY INS. CO. | ||||||||
INSURANCE | 07/05/2020 | 07/05/2022 | LLOYDS OF LONDON | ||||||||
INSURANCE | 07/05/2018 | 07/05/2019 | CRUM & FORSTER SPECIALTY INS. CO. | ||||||||
INSURANCE | 06/22/2015 | 06/22/2016 | CRUM & FORSTER INDEMNITY | ||||||||
INSURANCE | 07/05/2013 | 07/05/2014 | ACE | ||||||||
INSURANCE | 07/05/2011 | 07/05/2012 | ACE | ||||||||
INSURANCE | 07/05/2010 | 07/05/2011 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 07/05/2009 | 07/05/2010 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 07/05/2008 | 07/05/2009 | COMMERCE & INDUSTRY | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 10/10/2005 | 10/21/2005 | IN-COMPLIANCE | JOHN S. STEVENSON | 0/1 | COMPLIANCE ASSURANCE | |||||
TIN | 07/01/2005 | 07/25/2005 | IN-COMPLIANCE | JOHN S. STEVENSON | 1/0 | COMPLIANCE ASSURANCE | |||||
TCR | 06/21/2005 | 06/23/2005 | SIGNIFICANT OUT-OF-COMPLIANCE | JOHN S. STEVENSON | 0/1 | COMPLIANCE ASSURANCE | |||||
TCI | 04/21/2005 | 04/26/2005 | MINOR OUT-OF-COMPLIANCE | JOHN S. STEVENSON | 0/1 | COMPLIANCE ASSURANCE | |||||
TCI | 03/25/2004 | 03/30/2004 | IN-COMPLIANCE | J. SCOTT HALE | 0/1 | COMPLIANCE ASSURANCE | |||||
TCI | 01/14/2003 | 01/21/2003 | IN-COMPLIANCE | V. PAUL HUTCHERSON | 0/1 | COMPLIANCE ASSURANCE | |||||
TCI | 05/07/2002 | 05/28/2002 | MINOR OUT-OF-COMPLIANCE | V. PAUL HUTCHERSON | 0/1 | COMPLIANCE ASSURANCE | |||||
RRBD | 02/12/2001 | 02/19/2001 | COMPLIANCE ASSURANCE | ||||||||
TCI | 12/07/2000 | 12/28/2000 | MINOR OUT-OF-COMPLIANCE | THAYER_JD | 0/1 | COMPLIANCE ASSURANCE | |||||
RRBD | 06/01/2000 | 06/06/2000 | THAYER_JD | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 05/08/2000 | 05/15/2000 | MINOR OUT-OF-COMPLIANCE | THAYER_JD | 0/1 | COMPLIANCE ASSURANCE | |||||
TIN | 10/29/1999 | 11/02/1999 | IN-COMPLIANCE | THAYER_JD | 0/1 | COMPLIANCE ASSURANCE | |||||
TXI | 10/06/1999 | 10/12/1999 | IN-COMPLIANCE | THAYER_JD | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 01/14/1999 | 06/10/1999 | THAYER_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RECEIVED LETTER | |||||||||||
UTCI | 12/03/1998 | 12/28/1998 | MINOR OUT-OF-COMPLIANCE | COMPLIANCE ASSURANCE | |||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Letter | 04/21/2025 | Satisfied | MILLS_KJ | Enforcement | |||||||
Enforcement Referral | 04/08/2025 | Accepted | GARTIN_D | Enforcement | |||||||
Electronic Communication | 01/03/2025 | Satisfied | ELLIOTT_EV_1 | Routine Compliance | |||||||
Letter | 12/11/2024 | Satisfied | ELLIOTT_EV_1 | Compliance Assistance | |||||||
Site Inspection | 12/10/2024 | Major Out of Compliance | ELLIOTT_EV_1 | 0/1 | Routine Compliance | ||||||
Letter | 06/23/2023 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Letter | 06/23/2023 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Record Document | 06/21/2023 | Satisfied | GARTIN_D | Compliance Assistance | |||||||
Electronic Communication | 06/20/2023 | Satisfied | GARTIN_D | Compliance Assistance | |||||||
Record Document | 06/09/2023 | Satisfied | GARTIN_D | Compliance Assistance | |||||||
Electronic Communication | 06/09/2023 | Satisfied | GARTIN_D | Compliance Assistance | |||||||
Letter | 06/09/2023 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Site Inspection | 04/12/2023 | Major Out of Compliance | GARTIN_D | 0/1 | Routine Compliance | ||||||
Letter | 04/12/2023 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Electronic Communication | 04/11/2023 | Satisfied | GARTIN_D | Routine Compliance | |||||||
Electronic Communication | 04/11/2023 | Satisfied | GARTIN_D | Routine Compliance | |||||||
Electronic Communication | 12/02/2021 | Satisfied | MERRITT_S | Enforcement | |||||||
Electronic Communication | 12/02/2021 | Satisfied | MERRITT_S | Enforcement | |||||||
Enforcement Tracking | 12/02/2021 | Closed Without Enforcement | TESSIER_A | Enforcement | |||||||
Phone Conversation | 10/07/2021 | Satisfied | TESSIER_A | Enforcement | |||||||
Electronic Communication | 10/07/2021 | Satisfied | TESSIER_A | Enforcement | |||||||
Letter | 09/09/2021 | Satisfied | TESSIER_A | Enforcement | |||||||
Enforcement Referral | 07/28/2021 | Accepted | PANGAHAS_RL_1 | Enforcement | |||||||
Electronic Communication | 07/20/2021 | Satisfied | PANGAHAS_RL_1 | Compliance Assistance | |||||||
Electronic Communication | 07/20/2021 | Satisfied | PANGAHAS_RL_1 | Compliance Assistance | |||||||
Electronic Communication | 07/20/2021 | Satisfied | PANGAHAS_RL_1 | Compliance Assistance | |||||||
Record Document | 07/20/2021 | Satisfied | PANGAHAS_RL_1 | Compliance Assistance | |||||||
Issue Document | 04/21/2021 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Electronic Communication | 04/21/2021 | Satisfied | PANGAHAS_RL_1 | Routine Compliance | |||||||
Site Inspection | 04/21/2021 | Major Out of Compliance | PANGAHAS_RL_1 | 0/1 | Routine Compliance | ||||||
Phone Conversation | 04/21/2021 | Satisfied | PANGAHAS_RL_1 | Routine Compliance | |||||||
Letter | 04/21/2021 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Electronic Communication | 04/21/2021 | Satisfied | PANGAHAS_RL_1 | Routine Compliance | |||||||
Letter | 07/18/2018 | Satisfied | WILSON_ML_1 | Routine Compliance | |||||||
Issue Document | 07/18/2018 | Satisfied | WILSON_ML_1 | Routine Compliance | |||||||
Electronic Communication | 07/18/2018 | Satisfied | PANGAHAS_RL_1 | Routine Compliance | |||||||
Site Inspection | 07/18/2018 | In Compliance | PANGAHAS_RL_1 | 0/1 | Routine Compliance | ||||||
Phone Conversation | 07/18/2018 | Satisfied | PANGAHAS_RL_1 | Routine Compliance | |||||||
Site Inspection | 02/25/2016 | In Compliance | BRAZILE_DO_1 | 0/1 | Routine Compliance | ||||||
Site Inspection | 06/05/2014 | In Compliance | BRAZILE_DO_1 | 0/1 | Routine Compliance | ||||||
Meeting | 05/18/2012 | Satisfied | PORTER_AJ_1 | Non-Compliance | |||||||
Letter | 05/10/2012 | Satisfied | PURDY_EM_1 | Non-Compliance | |||||||
Site Inspection | 05/03/2012 | Minor Out of Compliance | PORTER_AJ_1 | 0/1 | Routine Compliance | ||||||
Emergency Preparedness Information | 05/03/2012 | Satisfied | PORTER_AJ_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 05/02/2011 | Satisfied | TISSINGTON_AB_1 | Routine Compliance | |||||||
Site Inspection | 05/02/2011 | In Compliance | TISSINGTON_AB_1 | 0/1 | Routine Compliance | ||||||
Enforcement Tracking | 06/09/2010 | Closed Without Enforcement | GILLMAN_M | Enforcement | |||||||
Emergency Preparedness Information | 05/12/2010 | Satisfied | TISSINGTON_AB_1 | Routine Compliance | |||||||
Site Inspection | 05/12/2010 | In Compliance | TISSINGTON_AB_1 | 0/1 | Routine Compliance | ||||||
Letter | 01/05/2009 | Satisfied | TISSINGTON_AB_1 | Non-Compliance | |||||||
Site Inspection | 12/19/2008 | Minor Out of Compliance | TISSINGTON_AB_1 | 0/1 | Routine Compliance | ||||||
Emergency Preparedness Information | 12/19/2008 | Satisfied | TISSINGTON_AB_1 | Routine Compliance | |||||||
Letter | 08/04/2008 | Satisfied | STEVENSON_JS | Non-Compliance | |||||||
Enforcement Referral | 07/17/2008 | Accepted | GILLMAN_M | Enforcement | |||||||
Record Document | 06/27/2008 | Satisfied | STEVENSON_JS | Non-Compliance | |||||||
Site Inspection | 06/20/2008 | Major Out of Compliance | STEVENSON_JS | 0/1 | Non-Compliance | ||||||
Letter | 05/16/2008 | Satisfied | STEVENSON_JS | Non-Compliance | |||||||
Site Inspection | 05/05/2008 | Major Out of Compliance | STEVENSON_JS | 0/1 | Routine Compliance | ||||||
Letter | 06/13/2007 | Satisfied | STEVENSON_JS | Non-Compliance | |||||||
Site Inspection | 06/06/2007 | Major Out of Compliance | STEVENSON_JS | 0/1 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/14/2007 | Satisfied | STEVENSON_JS | Routine Compliance | |||||||
Emergency Preparedness Information | 09/25/2006 | Satisfied | STEVENSON_JS | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
12/10/2024 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Have a certified technician test the integrity of the dispenser sumps. Once completed, send a copy of the results, that includes all test data, to the inspector for review to clear the violation. Email: Emily.Elliott@FLHealth.gov | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
06/06/1997 | COMPLETED | 51 | |||||||||
04/28/1997 | COMPLETED | 51 | PETROLEUM LIABILITY AND RESTORATION INSURANCE PROGRAM-ELIGIBLE | ||||||||
12/28/1988 | COMPLETED | 51 | EARLY DETECTION INCENTIVE-ELIGIBLE | ||||||||