Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Southwest | Type | Retail Station | ||||||||
County | Pasco | Status | OPEN | ||||||||
ID | 8514936 | Latitude | 28° 22' 30.4286 | ||||||||
Name |
SUNOCO #0776-8468 14922 US HWY 301 |
Longitude | 82° 11' 24.9527 | ||||||||
DADE CITY, FL 33523-2831 | LL Method | DGPS | |||||||||
Contact | VJ PATEL | LL Status | REVIEWED | ||||||||
Phone | (352) 567-2620 | Status Date | 10/01/2003 | ||||||||
Account Owner Information | |||||||||||
Name | MARUTI REAL ESTATES INVEST LLC 14922 US HWY 301 DADE CITY, FL 33523 |
Effective Date | 05/15/2007 | ||||||||
Contact | VIJAY PATEL | ||||||||||
Phone | (941) 380-6942 | ||||||||||
Placard # / Date | 705083 - 02/04/2025 | ||||||||||
Property Owner Information | |||||||||||
Name | RESEARCH ENTERPRISES USA ONE INC 14106 US HWY 19 HUDSON, FL 34667 |
Effective Date | 01/25/2006 | ||||||||
Contact | VIJAY PATEL | ||||||||||
Phone | (941) 380-6942 | ||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 8000 | Unleaded Gas (B) | 08/01/1977 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (B) Internal lining (C) Steel (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1R1 | 12000 | Unleaded Gas (B) | 10/01/2008 | UNDERGROUND | Out of Service (T) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (M) Spill containment bucket (N) Flow shut-Off (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 8000 | Unleaded Gas (B) | 08/01/1977 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (B) Internal lining (C) Steel (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2R1 | 12000 | Unleaded Gas (B) | 10/01/2008 | UNDERGROUND | Out of Service (T) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (M) Spill containment bucket (N) Flow shut-Off (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 8000 | Unleaded Gas (B) | 08/01/1977 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (B) Internal lining (C) Steel (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 4000 | Vehicular Diesel (D) | 08/01/1977 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (B) Internal lining (C) Steel (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 4000 | Vehicular Diesel (D) | 08/01/1977 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (B) Internal lining (C) Steel (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 4000 | Vehicular Diesel (D) | 08/01/1977 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (B) Internal lining (C) Steel (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 04/18/2020 | 04/18/2021 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 04/18/2019 | 04/18/2020 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 04/18/2018 | 04/18/2019 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 04/18/2017 | 04/18/2018 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 03/12/2013 | 03/12/2015 | AMERICAN SAFETY INDEMNITY CO | ||||||||
INSURANCE | 02/06/2012 | 02/06/2013 | ZURICH-AMERICAN | ||||||||
INSURANCE | 02/06/2010 | 02/06/2011 | ZURICH-AMERICAN | ||||||||
NONE | 02/06/2009 | 02/06/2010 | |||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 04/26/2006 | 05/02/2006 | SIGNIFICANT OUT-OF-COMPLIANCE | RODRIGUEZ, IVAN | 0/6 | COMPLIANCE ASSURANCE | |||||
IRFR | 10/11/2005 | RODRIGUEZ, IVAN | 0/5 | DISCHARGE PROJECT | |||||||
TCR | 09/01/2005 | 09/06/2005 | IN-COMPLIANCE | RODRIGUEZ, IVAN | 0/5 | COMPLIANCE ASSURANCE | |||||
TDI | 08/23/2005 | 08/24/2005 | IN-COMPLIANCE | RODRIGUEZ, IVAN | 0/6 | DISCHARGE PROJECT | |||||
DCCR | 08/10/2005 | 08/24/2005 | RODRIGUEZ, IVAN | 0/6 | DISCHARGE PROJECT | ||||||
DRFR | 08/10/2005 | 08/17/2005 | RODRIGUEZ, IVAN | 0/6 | DISCHARGE PROJECT | ||||||
IRFR | 06/13/2005 | 07/15/2005 | CONDOLEON,GEORGE | 0/0 | DISCHARGE PROJECT | ||||||
TCI | 05/25/2005 | 06/02/2005 | IN-COMPLIANCE | CONDOLEON, GEORGE | 0/6 | COMPLIANCE ASSURANCE | |||||
TCI | 04/30/2004 | 05/05/2004 | MINOR OUT-OF-COMPLIANCE | HANSEN, DAVID | 0/6 | COMPLIANCE ASSURANCE | |||||
RRBD | 06/10/2003 | 06/12/2003 | COMPLIANCE ASSURANCE | ||||||||
TCI | 04/08/2003 | 04/16/2003 | MINOR OUT-OF-COMPLIANCE | RODRIGUEA, IVAN | 0/6 | COMPLIANCE ASSURANCE | |||||
TCR | 04/30/2002 | 05/03/2002 | IN-COMPLIANCE | HANSEN, DAVID | 0/6 | COMPLIANCE ASSURANCE | |||||
TCI | 02/26/2002 | 03/05/2002 | MINOR OUT-OF-COMPLIANCE | HANSEN, DAVID | 0/6 | COMPLIANCE ASSURANCE | |||||
TCR | 11/28/2000 | 12/01/2000 | IN-COMPLIANCE | HANSEN | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 10/23/2000 | 11/08/2000 | MINOR OUT-OF-COMPLIANCE | HANSEN | 0/6 | COMPLIANCE ASSURANCE | |||||
NCLI | 10/23/2000 | 11/01/2000 | HANSEN | 0/3 | COMPLIANCE ASSURANCE | ||||||
TCR | 04/05/2000 | 04/20/2000 | IN-COMPLIANCE | HARRIS | 0/6 | COMPLIANCE ASSURANCE | |||||
NCLI | 03/20/2000 | 03/22/2000 | HARRIS | 0/6 | COMPLIANCE ASSURANCE | ||||||
TCI | 03/13/2000 | 03/22/2000 | SIGNIFICANT OUT-OF-COMPLIANCE | HARRIS | 0/6 | COMPLIANCE ASSURANCE | |||||
TCR | 09/17/1999 | 09/17/1999 | IN-COMPLIANCE | HARRIS | 0/6 | COMPLIANCE ASSURANCE | |||||
NCLI | 07/01/1999 | 07/06/1999 | HARRIS | 0/6 | COMPLIANCE ASSURANCE | ||||||
TCR | 06/29/1999 | 07/06/1999 | SIGNIFICANT OUT-OF-COMPLIANCE | HARRIS_DAL | 0/6 | COMPLIANCE ASSURANCE | |||||
NCLI | 01/29/1999 | 03/10/1999 | HARRISLDA | 0/6 | COMPLIANCE ASSURANCE | ||||||
TCI | 01/15/1999 | 02/25/1999 | SIGNIFICANT OUT-OF-COMPLIANCE | HARRIS_DAL | 0/6 | COMPLIANCE ASSURANCE | |||||
UTCI | 04/22/1998 | 04/29/1998 | SIGNIFICANT OUT-OF-COMPLIANCE | COMPLIANCE ASSURANCE | |||||||
Completion Notes ROUTINE COMPLIANCE | |||||||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Site Inspection | 02/05/2025 | Major Out of Compliance | TUCKER_SX_1 | 0/2 | Routine Compliance | ||||||
Record Document | 02/05/2025 | Satisfied | TUCKER_SX_1 | Routine Compliance | |||||||
Electronic Communication | 11/21/2024 | Satisfied | TUCKER_SX_1 | Routine Compliance | |||||||
Enforcement Referral | 02/27/2023 | Accepted | JUARISTIC_GK_1 | Enforcement | |||||||
Site Inspection | 01/10/2023 | Major Out of Compliance | JUARISTIC_GK_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 12/21/2022 | Satisfied | JUARISTIC_GK_1 | Routine Compliance | |||||||
Site Inspection | 09/22/2020 | In Compliance | JUARISTIC_GK_1 | 0/2 | Routine Compliance | ||||||
Letter | 09/22/2020 | Satisfied | JUARISTIC_GK_1 | Routine Compliance | |||||||
Letter | 12/21/2018 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Record Document | 12/21/2018 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Site Inspection | 12/10/2018 | Major Out of Compliance | JUARISTIC_GK_1 | 0/2 | Routine Compliance | ||||||
Letter | 12/10/2018 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Electronic Communication | 10/24/2018 | Satisfied | JUARISTIC_GK_1 | Routine Compliance | |||||||
Enforcement Tracking | 05/08/2017 | Closed Without Enforcement | CULBRETH_L | Enforcement | |||||||
Issue Document | 05/08/2017 | Satisfied | CULBRETH_L | Enforcement | |||||||
Electronic Communication | 05/04/2017 | Satisfied | CULBRETH_L | Enforcement | |||||||
Site Inspection | 05/04/2017 | In Compliance | JUARISTIC_GK_1 | 0/2 | Non-Compliance | ||||||
Electronic Communication | 05/04/2017 | Satisfied | CULBRETH_L | Enforcement | |||||||
Meeting | 04/28/2017 | Satisfied | JUARISTIC_GK_1 | Non-Compliance | |||||||
Record Document | 04/28/2017 | Satisfied | JUARISTIC_GK_1 | Non-Compliance | |||||||
Record Document | 04/28/2017 | Satisfied | JUARISTIC_GK_1 | Non-Compliance | |||||||
Electronic Communication | 03/22/2017 | Satisfied | CULBRETH_L | Enforcement | |||||||
Electronic Communication | 02/09/2017 | Satisfied | CULBRETH_L | Enforcement | |||||||
Site Inspection | 11/30/2016 | Major Out of Compliance | JUARISTIC_GK_1 | 0/2 | Routine Compliance | ||||||
Letter | 11/30/2016 | Satisfied | JUARISTIC_GK_1 | Non-Compliance | |||||||
Enforcement Referral | 12/02/2015 | Accepted | HONEY_K | Enforcement | |||||||
Letter | 07/28/2015 | Satisfied | JUARISTIC_GK_1 | Non-Compliance | |||||||
Electronic Communication | 07/08/2015 | Satisfied | JUARISTIC_GK_1 | Non-Compliance | |||||||
Electronic Communication | 07/07/2015 | Satisfied | JUARISTIC_GK_1 | Non-Compliance | |||||||
Electronic Communication | 06/02/2015 | Satisfied | JUARISTIC_GK_1 | Non-Compliance | |||||||
Site Inspection | 05/26/2015 | Major Out of Compliance | JUARISTIC_GK_1 | 0/2 | Routine Compliance | ||||||
Letter | 05/26/2015 | Satisfied | JUARISTIC_GK_1 | Non-Compliance | |||||||
Site Inspection | 04/10/2014 | In Compliance | ROGGELIN_EM_1 | 0/1 | Non-Compliance | ||||||
Phone Conversation | 04/02/2014 | Satisfied | JUARISTIC_GK_1 | Non-Compliance | |||||||
Letter | 03/03/2014 | Satisfied | JUARISTIC_GK_1 | Non-Compliance | |||||||
Site Inspection | 02/28/2014 | Minor Out of Compliance | JUARISTIC_GK_1 | 0/2 | Routine Compliance | ||||||
Issue Document | 11/25/2013 | Satisfied | ROGGELIN_EM_1 | Closure | |||||||
Enforcement Tracking | 06/25/2013 | Closed With Enforcement | PEDIGO_L | Enforcement | |||||||
Incident | 05/28/2013 | Has not led to Discharge | LONGEN_JL_1 | Incident | |||||||
Site Inspection | 05/24/2013 | In Compliance | LONGEN_JL_1 | 0/2 | Installation | ||||||
Electronic Communication | 05/10/2013 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Site Inspection | 05/10/2013 | In Compliance | LONGEN_JL_1 | 0/2 | Closure | ||||||
Emergency Preparedness Information | 04/26/2013 | Satisfied | LONGEN_JL_1 | Routine Compliance | |||||||
Site Inspection | 04/26/2013 | Major Out of Compliance | LONGEN_JL_1 | 0/2 | Routine Compliance | ||||||
Letter | 04/26/2013 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Issue Document | 07/03/2012 | Satisfied | PEDIGO_L | Enforcement | |||||||
Record Document | 07/03/2012 | Satisfied | MEETZE_A | Routine Compliance | |||||||
Electronic Communication | 07/03/2012 | Satisfied | PEDIGO_L | Enforcement | |||||||
Electronic Communication | 07/03/2012 | Satisfied | PEDIGO_L | Enforcement | |||||||
Site Inspection | 05/10/2012 | Minor Out of Compliance | BAUER_DR_1 | 0/2 | Routine Compliance | ||||||
Letter | 05/10/2012 | Satisfied | BAUER_DR_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 04/27/2012 | Satisfied | BAUER_DR_1 | Routine Compliance | |||||||
Discharge Reporting | 10/31/2011 | Satisfied | PEDIGO_L | Discharge | |||||||
Issue Document | 05/18/2011 | Satisfied | PEDIGO_L | Enforcement | |||||||
Site Inspection | 08/31/2010 | Major Out of Compliance | BAUER_DR_1 | 0/2 | Routine Compliance | ||||||
Letter | 08/31/2010 | Satisfied | BAUER_DR_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 08/23/2010 | Satisfied | BAUER_DR_1 | Routine Compliance | |||||||
Issue Document | 06/29/2010 | Satisfied | PEDIGO_L | Enforcement | |||||||
Document Management | 03/05/2010 | Complete | PEDIGO_L | Discharge | |||||||
Enforcement Referral | 11/20/2009 | Accepted | PEDIGO_L | Enforcement | |||||||
Record Document | 10/08/2009 | Satisfied | CONDOLEON_GJ_1 | Non-Compliance | |||||||
Letter | 09/24/2009 | Satisfied | CONDOLEON_GJ_1 | Discharge | |||||||
Letter | 09/24/2009 | Satisfied | CONDOLEON_GJ_1 | Non-Compliance | |||||||
TCAR | 07/31/2009 | Satisfied | CONDOLEON_GJ_1 | Closure | |||||||
Letter | 06/15/2009 | Satisfied | MARTIN_JM | Non-Compliance | |||||||
Site Inspection | 06/15/2009 | Major Out of Compliance | MARTIN_JM | 0/6 | Routine Compliance | ||||||
Letter | 06/05/2009 | Satisfied | MARTIN_JM | Non-Compliance | |||||||
TCAR | 03/05/2009 | Satisfied | MARTIN_JM | Closure | |||||||
Record Document | 01/26/2009 | Satisfied | MARTIN_JM | Non-Compliance | |||||||
Record Document | 01/12/2009 | Satisfied | MARTIN_JM | Non-Compliance | |||||||
Letter | 01/06/2009 | Satisfied | MARTIN_JM | Non-Compliance | |||||||
Letter | 11/25/2008 | Satisfied | MARTIN_JM | Non-Compliance | |||||||
Site Inspection | 11/25/2008 | Major Out of Compliance | MARTIN_JM | 0/2 | Installation | ||||||
Site Inspection | 10/22/2008 | In Compliance | MARTIN_JM | 0/7 | Closure | ||||||
Record Document | 09/17/2008 | Satisfied | MARTIN_JM | Non-Compliance | |||||||
Letter | 06/13/2008 | Satisfied | MARTIN_JM | Non-Compliance | |||||||
Site Inspection | 06/13/2008 | Major Out of Compliance | MARTIN_JM | 0/6 | Routine Compliance | ||||||
Letter | 03/30/2007 | Satisfied | CONDOLEON_GJ_1 | Non-Compliance | |||||||
Site Inspection | 03/30/2007 | Minor Out of Compliance | CONDOLEON_GJ_1 | 0/6 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/14/2007 | Satisfied | RODRIGUEZ_IN | Routine Compliance | |||||||
Emergency Preparedness Information | 09/20/2006 | Satisfied | RODRIGUEZ_IN | Routine Compliance | |||||||
Letter | 07/31/2006 | Satisfied | RODRIGUEZ_IN | Non-Compliance | |||||||
Site Inspection | 07/31/2006 | Minor Out of Compliance | RODRIGUEZ_IN | 0/6 | Non-Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
01/10/2023 | 6079 | SNC-B | 4.10 USTs not closed with 90 days of discovery, or not meeting requirements, unable to be repaired or no FR. | A storage tank system where financial responsibility is not maintained must be permanently closed. Close the USTs. | |||||||
01/10/2023 | 6012 | SNC-A | 2.9 No financial responsibility instrument or expired instrument for > 180 days. | Provide proof of current financial responsibility. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
09/04/2009 | COMPLETED | 60 | |||||||||
08/10/2005 | COMPLETED | 60 | |||||||||
11/07/1988 | COMPLETED | 50 | EARLY DETECTION INCENTIVE-ELIGIBLE | ||||||||