![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/18/2025 Last Data Refresh: 05/17/2025 Report Generated from DOPPLER | |||||||||||
District | Southwest | Type | Retail Station | ||||||||
County | Pasco | Status | OPEN | ||||||||
ID | 8515006 | Latitude | 28° 15' 58.3459 | ||||||||
Name |
ST JOSEPH & VERENA INC 7502 US HWY 19 |
Longitude | 82° 43' 37.6189 | ||||||||
NEW PORT RICHEY, FL 34652-1241 | LL Method | DPHO | |||||||||
Contact | ESMAT HANNA | LL Status | REVIEWED | ||||||||
Phone | (727) 835-7111 | Status Date | 11/09/2003 | ||||||||
Account Owner Information | |||||||||||
Name | ST JOSEPH & VERENA INC 7502 US HWY 19 NEW PORT RICHEY, FL 34652 |
Effective Date | 07/25/2019 | ||||||||
Contact | ESMAT HANNA | ||||||||||
Phone | (352) 613-6951 | ||||||||||
SMILEFOOD8719@GMAIL.COM | |||||||||||
Placard # / Date | 683226 - 06/05/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | ST JOSEPH & VERENA INC 7502 US HWY 19 NEW PORT RICHEY, FL 34652 |
Effective Date | 07/25/2019 | ||||||||
Contact | ESMAT HANNA | ||||||||||
Phone | (352) 613-6951 | ||||||||||
SMILEFOOD8719@GMAIL.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
10 | 12000 | Unleaded Gas (B) | 05/01/1999 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (L) Compartmented (M) Spill containment bucket (N) Flow shut-Off (R) Double wall - tank jacket |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
8 | 8000 | Vehicular Diesel (D) | 05/01/1999 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (M) Spill containment bucket (N) Flow shut-Off (R) Double wall - tank jacket |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
9 | 12000 | Unleaded Gas (B) | 05/01/1999 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (L) Compartmented (M) Spill containment bucket (N) Flow shut-Off (R) Double wall - tank jacket |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 4000 | Kerosene (K) | 07/01/1969 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel (M) Spill containment bucket |
(B) Steel/galvanized metal (E) Cathodic protection (J) Pressurized piping system |
(8) Manually sampled wells (H) Mechanical line leak detector (M) Manual tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 4000 | Unleaded Gas (B) | 07/01/1969 | UNDERGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel (M) Spill containment bucket |
(B) Steel/galvanized metal (E) Cathodic protection (J) Pressurized piping system |
(8) Manually sampled wells (H) Mechanical line leak detector (M) Manual tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 4000 | Unleaded Gas (B) | 07/01/1969 | UNDERGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel (M) Spill containment bucket |
(B) Steel/galvanized metal (E) Cathodic protection (J) Pressurized piping system |
(8) Manually sampled wells (H) Mechanical line leak detector (M) Manual tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 4000 | Unleaded Gas (B) | 07/01/1969 | UNDERGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel (M) Spill containment bucket |
(B) Steel/galvanized metal (E) Cathodic protection (J) Pressurized piping system |
(8) Manually sampled wells (H) Mechanical line leak detector (M) Manual tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 4000 | Unleaded Gas (B) | 07/01/1969 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel (M) Spill containment bucket |
(B) Steel/galvanized metal (E) Cathodic protection (J) Pressurized piping system |
(8) Manually sampled wells (H) Mechanical line leak detector (M) Manual tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 4000 | Unleaded Gas (B) | 07/01/1969 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel (M) Spill containment bucket |
(B) Steel/galvanized metal (E) Cathodic protection (J) Pressurized piping system |
(8) Manually sampled wells (H) Mechanical line leak detector (M) Manual tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 4000 | Unleaded Gas (B) | 07/01/1977 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel (M) Spill containment bucket |
(B) Steel/galvanized metal (E) Cathodic protection (J) Pressurized piping system |
(8) Manually sampled wells (H) Mechanical line leak detector (M) Manual tank gauging - USTs |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 01/08/2016 | 01/07/2017 | CRUM & FORSTER SPECIALTY INS. CO. | ||||||||
INSURANCE | 12/24/2013 | 12/24/2014 | AMERICAN SAFETY INDEMNITY CO | ||||||||
INSURANCE | 01/07/2012 | 01/07/2012 | AMERICAN SAFETY INDEMNITY CO | ||||||||
INSURANCE | 01/07/2012 | 01/07/2012 | AMERICAN SAFETY INDEMNITY CO | ||||||||
INSURANCE | 01/07/2012 | 01/07/2013 | AMERICAN SAFETY INDEMNITY CO | ||||||||
INSURANCE | 01/07/2010 | 01/07/2011 | AMERICAN SAFETY INDEMNITY CO | ||||||||
INSURANCE | 12/23/2008 | 12/23/2009 | ZURICH-AMERICAN | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
SV | 10/28/2005 | CONDOLEON,GJ | 0/0 | COMPLIANCE ASSURANCE | |||||||
NCLI | 10/12/2005 | 10/17/2005 | CONDOLEON, GEORGE | 0/0 | COMPLIANCE ASSURANCE | ||||||
SV | 10/07/2005 | CONDOLEON, GEORGE | 0/0 | COMPLIANCE ASSURANCE | |||||||
TCI | 07/26/2005 | 08/18/2005 | MINOR OUT-OF-COMPLIANCE | RODRIGUEZ, IVAN | 0/3 | COMPLIANCE ASSURANCE | |||||
TEQA | 07/26/2005 | 10/06/2005 | LEWIS_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 11/12/2004 | 11/19/2004 | MINOR OUT-OF-COMPLIANCE | RODRIGUEZ, IVAN | 0/3 | COMPLIANCE ASSURANCE | |||||
TEQA | 02/04/2004 | 10/06/2005 | LEWIS_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCR | 09/04/2003 | 09/26/2003 | SIGNIFICANT OUT-OF-COMPLIANCE | RODRIGUEZ, IVAN | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 09/04/2003 | 10/06/2005 | COMPLIANCE ASSURANCE | ||||||||
TCI | 08/12/2003 | 08/28/2003 | SIGNIFICANT OUT-OF-COMPLIANCE | RODRIGUEZ, IVAN | 0/3 | COMPLIANCE ASSURANCE | |||||
TCR | 12/12/2001 | 12/13/2001 | IN-COMPLIANCE | HANSEN, DAVE | 0/3 | COMPLIANCE ASSURANCE | |||||
TCR | 10/18/2001 | 11/16/2001 | SIGNIFICANT OUT-OF-COMPLIANCE | HANSEN | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 08/29/2001 | 09/04/2001 | MINOR OUT-OF-COMPLIANCE | HANSEN | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 04/19/2000 | 04/27/2000 | IN-COMPLIANCE | PETERSON | 0/3 | COMPLIANCE ASSURANCE | |||||
TIN | 09/07/1999 | 09/07/1999 | IN-COMPLIANCE | PETERSON | 0/3 | COMPLIANCE ASSURANCE | |||||
TXI | 05/04/1999 | 06/02/1999 | IN-COMPLIANCE | PETERSON_JE | 0/3 | COMPLIANCE ASSURANCE | |||||
UTXI | 04/04/1997 | 07/01/1997 | SIGNIFICANT OUT-OF-COMPLIANCE | PETERSON_JE | 0/4 | COMPLIANCE ASSURANCE | |||||
Completion Notes CLOSURE INSPECTION | |||||||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Site Inspection | 05/23/2024 | Major Out of Compliance | JUARISTIC_GK_1 | 0/3 | Routine Compliance | ||||||
Phone Conversation | 07/26/2023 | Satisfied | JUARISTIC_GK_1 | Routine Compliance | |||||||
Electronic Communication | 07/12/2023 | Satisfied | JUARISTIC_GK_1 | Routine Compliance | |||||||
Letter | 07/23/2021 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Site Inspection | 07/23/2021 | Major Out of Compliance | JUARISTIC_GK_1 | 0/3 | Routine Compliance | ||||||
Electronic Communication | 07/02/2021 | Satisfied | JUARISTIC_GK_1 | Routine Compliance | |||||||
Enforcement Referral | 07/24/2019 | Accepted | JUARISTIC_GK_1 | Enforcement | |||||||
Phone Conversation | 06/18/2019 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Electronic Communication | 06/18/2019 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Electronic Communication | 06/18/2019 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Issue Document | 04/19/2019 | Satisfied | PEDIGO_L | Enforcement | |||||||
Issue Document | 04/19/2019 | Satisfied | PEDIGO_L | Enforcement | |||||||
Enforcement Tracking | 04/19/2019 | Closed Without Enforcement | PEDIGO_L | Enforcement | |||||||
Phone Conversation | 04/16/2019 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Letter | 03/21/2019 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Site Inspection | 03/21/2019 | Major Out of Compliance | JUARISTIC_GK_1 | 0/3 | Routine Compliance | ||||||
Electronic Communication | 02/20/2019 | Satisfied | JUARISTIC_GK_1 | Routine Compliance | |||||||
Electronic Communication | 11/27/2017 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Electronic Communication | 11/27/2017 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Site Inspection | 09/20/2017 | Major Out of Compliance | JUARISTIC_GK_1 | 0/3 | Compliance Assistance | ||||||
Letter | 09/20/2017 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Phone Conversation | 09/20/2017 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Electronic Communication | 07/01/2016 | Satisfied | JUARISTIC_GK_1 | Non-Compliance | |||||||
Record Document | 07/01/2016 | Satisfied | JUARISTIC_GK_1 | Non-Compliance | |||||||
Site Inspection | 06/13/2016 | Major Out of Compliance | JUARISTIC_GK_1 | 0/3 | Routine Compliance | ||||||
Letter | 06/13/2016 | Satisfied | JUARISTIC_GK_1 | Non-Compliance | |||||||
Phone Conversation | 04/26/2016 | Satisfied | JUARISTIC_GK_1 | Routine Compliance | |||||||
Meeting | 04/26/2016 | Satisfied | JUARISTIC_GK_1 | Routine Compliance | |||||||
Phone Conversation | 04/22/2016 | Satisfied | JUARISTIC_GK_1 | Routine Compliance | |||||||
Incident | 06/15/2015 | Has not led to Discharge | SOWERS_JA_1 | Incident | |||||||
Enforcement Referral | 12/02/2014 | Accepted | PEDIGO_L | Enforcement | |||||||
Letter | 07/30/2014 | Satisfied | JUARISTIC_GK_1 | Non-Compliance | |||||||
Site Inspection | 07/28/2014 | Minor Out of Compliance | JUARISTIC_GK_1 | 0/3 | Non-Compliance | ||||||
Electronic Communication | 07/25/2014 | Satisfied | JUARISTIC_GK_1 | Non-Compliance | |||||||
Electronic Communication | 07/25/2014 | Satisfied | JUARISTIC_GK_1 | Non-Compliance | |||||||
Letter | 06/27/2014 | Satisfied | JUARISTIC_GK_1 | Non-Compliance | |||||||
Site Inspection | 06/26/2014 | Major Out of Compliance | JUARISTIC_GK_1 | 0/3 | Non-Compliance | ||||||
Electronic Communication | 06/17/2014 | Satisfied | JUARISTIC_GK_1 | Non-Compliance | |||||||
Letter | 06/13/2014 | Satisfied | JUARISTIC_GK_1 | Non-Compliance | |||||||
Site Inspection | 05/06/2014 | Major Out of Compliance | JUARISTIC_GK_1 | 0/3 | Non-Compliance | ||||||
Letter | 05/06/2014 | Satisfied | JUARISTIC_GK_1 | Non-Compliance | |||||||
Phone Conversation | 04/17/2014 | Satisfied | JUARISTIC_GK_1 | Non-Compliance | |||||||
Letter | 03/03/2014 | Satisfied | JUARISTIC_GK_1 | Non-Compliance | |||||||
Site Inspection | 03/03/2014 | Major Out of Compliance | JUARISTIC_GK_1 | 0/3 | Routine Compliance | ||||||
Phone Conversation | 01/03/2014 | Satisfied | JUARISTIC_GK_1 | Non-Compliance | |||||||
Letter | 01/03/2014 | Satisfied | JUARISTIC_GK_1 | Non-Compliance | |||||||
Issue Document | 11/25/2013 | Satisfied | ROGGELIN_EM_1 | Closure | |||||||
Document Management | 02/27/2013 | Complete | ROGGELIN_EM_1 | Closure | |||||||
Letter | 02/27/2013 | Satisfied | ROGGELIN_EM_1 | Closure | |||||||
TCAR | 02/27/2013 | Satisfied | ROGGELIN_EM_1 | Closure | |||||||
Site Inspection | 01/07/2013 | Major Out of Compliance | ROGGELIN_EM_1 | 0/1 | Installation | ||||||
Letter | 01/07/2013 | Satisfied | ROGGELIN_EM_1 | Non-Compliance | |||||||
Site Inspection | 12/21/2012 | Major Out of Compliance | ROGGELIN_EM_1 | 0/1 | Closure | ||||||
Letter | 12/21/2012 | Satisfied | ROGGELIN_EM_1 | Non-Compliance | |||||||
Record Document | 12/13/2012 | Satisfied | SOWERS_JA_1 | Non-Compliance | |||||||
Record Document | 12/13/2012 | Satisfied | SOWERS_JA_1 | Non-Compliance | |||||||
Document Management | 12/13/2012 | Complete | SOWERS_JA_1 | Incident | |||||||
Site Inspection | 11/14/2012 | Major Out of Compliance | SOWERS_JA_1 | 0/3 | Non-Compliance | ||||||
Letter | 11/14/2012 | Satisfied | SOWERS_JA_1 | Non-Compliance | |||||||
Letter | 10/10/2012 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 10/10/2012 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Site Inspection | 10/10/2012 | Major Out of Compliance | LONGEN_JL_1 | 0/3 | Routine Compliance | ||||||
Record Document | 02/21/2012 | Satisfied | MEETZE_A | QA/QC | |||||||
Site Inspection | 02/20/2012 | Minor Out of Compliance | MEETZE_A | 0/3 | QA/QC | ||||||
Letter | 02/20/2012 | Satisfied | MEETZE_A | Non-Compliance | |||||||
Site Inspection | 01/17/2012 | Major Out of Compliance | CONDOLEON_GJ_1 | 0/3 | Routine Compliance | ||||||
Letter | 01/17/2012 | Satisfied | CONDOLEON_GJ_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 01/12/2012 | Satisfied | CONDOLEON_GJ_1 | Routine Compliance | |||||||
Enforcement Tracking | 03/25/2011 | Closed With Enforcement | CULBRETH_L | Enforcement | |||||||
Enforcement Referral | 03/25/2011 | Accepted | CULBRETH_L | Enforcement | |||||||
Record Document | 12/28/2010 | Satisfied | CONDOLEON_GJ_1 | Non-Compliance | |||||||
Record Document | 12/03/2010 | Satisfied | CONDOLEON_GJ_1 | Non-Compliance | |||||||
Letter | 12/01/2010 | Satisfied | CONDOLEON_GJ_1 | Non-Compliance | |||||||
Site Inspection | 12/01/2010 | Major Out of Compliance | CONDOLEON_GJ_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 11/13/2009 | Minor Out of Compliance | CONDOLEON_GJ_1 | 0/3 | Routine Compliance | ||||||
Letter | 11/13/2009 | Satisfied | CONDOLEON_GJ_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 11/12/2009 | Satisfied | CONDOLEON_GJ_1 | Routine Compliance | |||||||
Record Document | 05/01/2009 | Satisfied | MARSH_L | Non-Compliance | |||||||
Emergency Preparedness Information | 02/09/2009 | Satisfied | CONDOLEON_GJ_1 | Routine Compliance | |||||||
Site Inspection | 02/09/2009 | Minor Out of Compliance | CONDOLEON_GJ_1 | 0/3 | Routine Compliance | ||||||
Letter | 02/09/2009 | Satisfied | CONDOLEON_GJ_1 | Non-Compliance | |||||||
Record Document | 01/23/2008 | Satisfied | CONDOLEON_GJ_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 12/18/2007 | Satisfied | CONDOLEON_GJ_1 | Routine Compliance | |||||||
Site Inspection | 12/18/2007 | Minor Out of Compliance | CONDOLEON_GJ_1 | 0/3 | Routine Compliance | ||||||
Letter | 12/18/2007 | Satisfied | CONDOLEON_GJ_1 | Non-Compliance | |||||||
Record Document | 12/07/2007 | Satisfied | CONDOLEON_GJ_1 | Non-Compliance | |||||||
Letter | 08/15/2007 | Satisfied | CONDOLEON_GJ_1 | Non-Compliance | |||||||
Site Inspection | 08/15/2007 | Minor Out of Compliance | CONDOLEON_GJ_1 | 0/3 | Installation | ||||||
Letter | 08/15/2007 | Satisfied | CONDOLEON_GJ_1 | Non-Compliance | |||||||
Site Inspection | 08/15/2007 | Minor Out of Compliance | CONDOLEON_GJ_1 | 0/3 | Closure | ||||||
Meeting | 07/18/2007 | Satisfied | CONDOLEON_GJ_1 | Non-Compliance | |||||||
Letter | 07/18/2007 | Satisfied | CONDOLEON_GJ_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 02/09/2007 | Satisfied | CONDOLEON_GJ_1 | Routine Compliance | |||||||
Meeting | 02/09/2007 | Satisfied | CONDOLEON_GJ_1 | Non-Compliance | |||||||
Record Document | 12/29/2006 | Satisfied | CONDOLEON_GJ_1 | Non-Compliance | |||||||
Site Inspection | 12/21/2006 | Major Out of Compliance | CONDOLEON_GJ_1 | 0/3 | Routine Compliance | ||||||
Letter | 12/21/2006 | Satisfied | CONDOLEON_GJ_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 09/21/2006 | Satisfied | CONDOLEON_GJ_1 | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
05/23/2024 | 6012 | SNC-A | 2.9 No financial responsibility instrument or expired instrument for > 180 days. | Provide proof of financial responsibility to this office immediately. | |||||||
05/23/2024 | 6079 | SNC-B | 4.10 USTs not closed with 90 days of discovery, or not meeting requirements, unable to be repaired or no FR. | Provide proof of financial responsibility or permanently close FDEP Tank IDs 8, 9, and 10. | |||||||
07/23/2021 | 4048 | Minor | 4.2 Double-walled spill containment system does not allow for interstitial monitoring. | Remove PCW to provide a monitoring point for the E0 spill bucket secondary. | |||||||
07/23/2021 | 4076 | Minor | 4.11 Failure to conduct required periodic containment and interstitial integrity testing. | Test the single-walled spill buckets, and submit the test results to this office. The single-walled spill buckets shall be tested annually. | |||||||
07/23/2021 | 4077 | Minor | 4.12 Spill containment, sumps, and interstices not accessible. Water/regulated substances not timely removed. Petroleum contact water not properly managed. | Remove and properly dispose of the PCW in the E0 spill bucket. | |||||||
07/23/2021 | 4031 | Minor | 4.9 Storage tank system component not installed according to manufacturer's instructions. | Install the E0 sump sensor, horizontally, at the bottom of the sump, per manufacturer specifications. | |||||||
07/23/2021 | 4079 | Minor | 2.7 Records requiring 3 years documentation period not kept by facility. | All above mentioned records shall be maintained for at least 3 years, and made available, for review, at the time of inspection. Provide all requested records. | |||||||
07/23/2021 | 4046 | Minor | 4.23 Fillbox covers not marked according to requirements. | Clearly mark the spill bucket lid for E0 gas. | |||||||
07/23/2021 | 4059 | SNC-B | 4.1 Release detection, including visual inspections not being conducted monthly (not to exceed 35 days.) For electronically monitored sumps, visual inspections not conducted every 6 months. This violation may lead to Placard Revocation and Delivery Prohibition. | At least once a month, but not exceeding 35 days, every component of a storage tank system that contains, transfers, or stores, or is designed to contain, transfer, or store regulated substances that can be inspected visually, shall be visually inspected and documented as to its condition. Provide the next two consecutive months of release detection to this office. | |||||||
07/23/2021 | 4080 | Minor | 2.8 Records required for life of system not kept by facility. | Financial Responsibility and Incident Investigation results shall be maintained for the life of the system. | |||||||
07/23/2021 | 4062 | SNC-B | 4.6 Electronic release detection devices not inspected monthly. | At least once a month, but not exceeding 35 days, every component of a storage tank system that contains, transfers, or stores, or is designed to contain, transfer, or store regulated substances that can be inspected visually, shall be visually inspected and documented as to its condition. Provide the next two consecutive months of release detection to this office. | |||||||
07/23/2021 | 4057 | Minor | 4.31 Overfill protection devices not registered or tested annually. | Test the overfill protection devices, and submit the test results to this office. | |||||||
07/23/2021 | 4016 | SNC-B | 2.5 Incident investigation not initiated within 24-hours of discovery. | Notification of the discovery of any incident shall be made to the county on an INF within 72 hours of the discovery. In cases where an INF is required to be submitted, the investigation shall be completed within 14 days of the date of discovery of the incident. Provide an explanation and resolution for the above documented fuel alarms | |||||||
07/23/2021 | 4076 | Minor | 4.11 Failure to conduct required periodic containment and interstitial integrity testing. | Test the double-walled spill buckets, piping transition sumps, STP sumps, and under dispenser containments. Submit the test results to this office. These components shall be tested at least once every 36 | |||||||
07/23/2021 | 4004 | Minor | 2.3 Registration Form not submitted for change in service or closure. | Update the registration with the correct content (B-Unleaded Gas, No Ethanol) for tank 8. | |||||||
07/23/2021 | 4078 | Minor | 2.6 Required records not available within 5 working days notice. | All records, whether in paper or electronic format, shall be dated and available for inspection by the Department. Submit all requested records to this office. | |||||||
07/23/2021 | 4067 | Minor | 4.2 Release detection devices not tested annually. | Test the release detection and overfill protection devices, and submit the test results to this office. | |||||||
07/23/2021 | 4025 | Minor | 4.3 Secondary containment does not direct a release to a monitoring point. | Provide a monitoring point for the DW piping interstice in each STP and piping sump. | |||||||
07/23/2021 | 4014 | SNC-B | 2.9 Failure to maintain and demonstrate financial responsibility. This violation may lead to Placard Revocation and Delivery Prohibition. | Provide proof of financial responsibility. | |||||||
07/23/2021 | 4012 | Minor | 2.3 For an incident, notification not received in a timely manner. | A record of alarms, investigation results, and resolutions shall be maintained for all alarms. All alarms are considered an incident and shall be investigated within 24-hours, to determine if a discharge has occurred. Notification of the discovery of any incident shall be made to the county on an INF within 72 hours of the discovery. In cases where an INF is required to be submitted, the investigation shall be completed within 14 days of the date of discovery of the incident. Provide an explanation and resolution for the above documented fuel alarms. | |||||||
07/23/2021 | 4001 | Minor | 2.2 Operator certification requirements not met. | Owners or operators shall identify and designate at least one named individual for each class of operator – Class A, Class B, and Class C. Provide A/B and C training certificates. | |||||||
03/21/2019 | 4041 | SNC-B | 4.18 Shear valve not installed properly. This violation may lead to Placard Revocation and Delivery Prohibition. | Properly cap the piping in the UDC with no dispenser or properly mount the shear valve in the UDC. | |||||||
03/21/2019 | 4077 | Minor | 4.12 Spill containment, sumps, and interstices not accessible. Water/regulated substances not timely removed. Petroleum contact water not properly managed. | Remove and properly dispose of the liquid in the REC-90 spill bucket interstice. | |||||||
03/21/2019 | 4057 | Minor | 4.31 Overfill protection devices not registered or tested annually. | Test the overfill protection devices and submit the test results to this office. | |||||||
03/21/2019 | 4014 | SNC-B | 2.9 Failure to maintain and demonstrate financial responsibility. This violation may lead to Placard Revocation and Delivery Prohibition. | Provide proof of financial responsibility. | |||||||
03/21/2019 | 4007 | Minor | 2.6 Registration fees not paid, placard not posted. | Obtain the current placard and display in plain view at the facility. | |||||||
03/21/2019 | 4068 | Minor | 4.3 Storage tank system has a not repaired component which has or could cause a release or discharge. | Repair/replace the penetration boots in UDC 5/6. | |||||||
03/21/2019 | 4067 | Minor | 4.2 Release detection devices not tested annually. | Test the release detection devices and submit the test results to this office. | |||||||
03/21/2019 | 4012 | Minor | 2.3 For an incident, notification not received in a timely manner. | Submit an INF and provide an explanation for the missing dispenser. | |||||||
03/21/2019 | 4001 | Minor | 2.2 Operator certification requirements not met. | Provide proper training for all store employees and designate at least one operator for Class A/B. | |||||||
03/21/2019 | 4078 | Minor | 2.6 Required records not available within 5 working days notice. | Provide the requested records. | |||||||
03/21/2019 | 4068 | Minor | 4.3 Storage tank system has a not repaired component which has or could cause a release or discharge. | Repair/replace the REC-90 spill bucket. | |||||||
03/21/2019 | 4076 | Minor | 4.11 Failure to conduct required periodic containment and interstitial integrity testing. | Test the storage tank components and submit the test results to this office. | |||||||
03/21/2019 | 4012 | Minor | 2.3 For an incident, notification not received in a timely manner. | Submit an INF and investigate the possible damaged boots in UDC 5/6. | |||||||
03/21/2019 | 4076 | Minor | 4.11 Failure to conduct required periodic containment and interstitial integrity testing. | Test the S/W spill buckets and submit the test results to this office. | |||||||
03/21/2019 | 4012 | Minor | 2.3 For an incident, notification not received in a timely manner. | Submit an INF and investigate the source of liquid in the REC-90 spill bucket interstice. | |||||||
03/21/2019 | 4032 | SNC-B | 4.10 Storage tank system not installed according to reference guidelines. | Test the sensors and ensure all sensors are labeled correctly. | |||||||
03/21/2019 | 4065 | SNC-B | 4.2 Storage tank release detection requirements not met. | Provide an explanation for all documented fuel alarms. | |||||||
03/21/2019 | 4079 | Minor | 2.7 Records requiring 3 years documentation period not kept by facility. | Provide the requested records. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
09/01/1986 | ACTIVE | 11 | EARLY DETECTION INCENTIVE-ELIGIBLE | ||||||||
08/13/1986 | ACTIVE | 11 | EARLY DETECTION INCENTIVE-ELIGIBLE | ||||||||