![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Southwest | Type | Retail Station | ||||||||
County | Pinellas | Status | OPEN | ||||||||
ID | 8515473 | Latitude | 27° 52' 46.5379 | ||||||||
Name |
REBEL #836 11800 66TH ST N |
Longitude | 82° 43' 46.5954 | ||||||||
LARGO, FL 33773 | LL Method | DGPS | |||||||||
Contact | CINDY LIGHT | LL Status | REVIEWED | ||||||||
Phone | (727) 477-1835 | Status Date | 11/17/2003 | ||||||||
Account Owner Information | |||||||||||
Name | FUTURE ENERGY FLORIDA INC 1450 N BENSON AVE, UN#A UPLAND, CA 91786 |
Effective Date | 08/11/2021 | ||||||||
Contact | CHITTAL SHAH / CHRIS DEVELLEREZ 909-394-4728 | ||||||||||
Phone | (951) 313-7490 | ||||||||||
LICENSING@CARENTERPRISES.NET | |||||||||||
Placard # / Date | 699966 - 07/23/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | ANABI REAL ESTATE DEVELOPMENT LLC 1450 N BENSON AVE, UN#A UPLAND, CA 91786 |
Effective Date | 08/11/2021 | ||||||||
Contact | SUMMER IREIFEJ / RAWA ANABI | ||||||||||
Phone | (909) 394-4728 | ||||||||||
SIREIFEJ@CARENTERPRISES.NET | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 10000 | Ethanol E10 (8) | 10/01/2001 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (G) Electronic line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 10000 | Ethanol E10 (8) | 10/01/2001 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (G) Electronic line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 10000 | Ethanol E10 (8) | 10/01/2001 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (G) Electronic line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 10000 | Vehicular Diesel (D) | 10/01/2001 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (G) Electronic line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 10000 | Unleaded Gas (B) | 04/01/1983 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (H) Impressed current CP (I) Double wall (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms |
(B) Steel/galvanized metal (E) Cathodic protection (J) Pressurized piping system (K) Dispenser liners |
(4) Visual inspect dispenser liners (G) Electronic line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 10000 | Unleaded Gas (B) | 04/01/1983 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (H) Impressed current CP (M) Spill containment bucket (O) Tight fill |
(B) Steel/galvanized metal (E) Cathodic protection (J) Pressurized piping system (K) Dispenser liners |
(4) Visual inspect dispenser liners (G) Electronic line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 10000 | Unleaded Gas (B) | 04/01/1983 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (H) Impressed current CP (M) Spill containment bucket (O) Tight fill |
(B) Steel/galvanized metal (E) Cathodic protection (J) Pressurized piping system (K) Dispenser liners |
(4) Visual inspect dispenser liners (G) Electronic line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 05/14/2023 | 05/14/2024 | IRONSHORE SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 05/14/2021 | 05/14/2022 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
SURETY BOND | 01/01/2021 | 12/31/2021 | |||||||||
SURETY BOND | 01/01/2020 | 12/31/2020 | |||||||||
SURETY BOND | 01/01/2019 | 12/31/2019 | |||||||||
SURETY BOND | 01/01/2018 | 12/31/2018 | |||||||||
SURETY BOND | 01/01/2017 | 12/31/2017 | LIBERTY MUTUAL | ||||||||
SURETY BOND | 11/01/2015 | 12/31/2016 | LIBERTY MUTUAL | ||||||||
SURETY BOND | 01/01/2015 | 12/31/2015 | TRAVELERS | ||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 04/30/2014 | 04/29/2015 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 04/25/2013 | 04/24/2014 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 04/20/2012 | 04/19/2013 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 04/30/2011 | 04/29/2012 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 04/29/2010 | 04/30/2011 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 04/30/2008 | 04/29/2009 | |||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
LTR | 03/29/2006 | 03/30/2006 | BARNETT | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 03/23/2006 | 03/30/2006 | IN-COMPLIANCE | BARNETT | 0/4 | COMPLIANCE ASSURANCE | |||||
LTR | 12/27/2004 | 01/02/2005 | ROGGELIN | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 11/29/2004 | 01/02/2005 | IN-COMPLIANCE | ROGGELIN | 0/4 | COMPLIANCE ASSURANCE | |||||
RRBD | 05/03/2004 | 06/01/2004 | ROGGELIN | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes CROMPCO LLD & LINE TEST DATED 04/14/04 | |||||||||||
TCI | 04/01/2004 | 04/02/2004 | IN-COMPLIANCE | ROGGELIN | 0/4 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING TYPE NOT NOTED | |||||||||||
LTR | 04/01/2004 | 04/02/2004 | ROGGELIN | 0/0 | COMPLIANCE ASSURANCE | ||||||
RRBD | 07/17/2003 | 07/25/2003 | COMPLIANCE ASSURANCE | ||||||||
NCLI | 06/06/2003 | 06/09/2003 | ROGGELIN | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 05/30/2003 | 06/09/2003 | SIGNIFICANT OUT-OF-COMPLIANCE | ROGGELIN | 0/4 | COMPLIANCE ASSURANCE | |||||
Completion Notes AO SMITH DW PIPE | |||||||||||
LTR | 09/24/2002 | 10/09/2002 | HALSCOTT | 0/0 | DISCHARGE PROJECT | ||||||
LTR | 09/12/2002 | 10/09/2002 | HALSCOTT | 0/0 | DISCHARGE PROJECT | ||||||
LTR | 09/10/2002 | 10/09/2002 | HALSCOTT | 0/0 | DISCHARGE PROJECT | ||||||
LTR | 07/16/2002 | 07/30/2002 | HALSCOTT | 0/0 | DISCHARGE PROJECT | ||||||
LTR | 05/22/2002 | 05/26/2002 | HALSCOTT | 0/0 | DISCHARGE PROJECT | ||||||
LTR | 04/03/2002 | 04/08/2002 | HALSCOTT | 0/0 | DISCHARGE PROJECT | ||||||
NCLI | 02/12/2002 | 02/25/2002 | STRAUSS | 0/0 | COMPLIANCE ASSURANCE | ||||||
TIN | 02/05/2002 | 02/24/2002 | IN-COMPLIANCE | STRAUSS | 0/4 | COMPLIANCE ASSURANCE | |||||
TXI | 10/19/2001 | 10/29/2001 | SIGNIFICANT OUT-OF-COMPLIANCE | TAM | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 10/18/2001 | 10/29/2001 | COMPLIANCE ASSURANCE | ||||||||
RRBD | 07/23/2001 | 08/02/2001 | COMPLIANCE ASSURANCE | ||||||||
TCI | 04/06/2001 | 04/22/2001 | MINOR OUT-OF-COMPLIANCE | ROGGELIN | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 07/17/2000 | 08/06/2000 | ROGGELIN | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 06/09/2000 | 06/13/2000 | SIGNIFICANT OUT-OF-COMPLIANCE | ROGGELIN | 0/3 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Letter | 08/22/2024 | Satisfied | PEDIGO_L | Enforcement | |||||||
Letter | 08/15/2024 | Satisfied | MUSLIC_A_1 | Component Closure | |||||||
TCAR | 08/15/2024 | Satisfied | MUSLIC_A_1 | Component Closure | |||||||
Document Management | 08/15/2024 | Satisfied | MUSLIC_A_1 | Component Closure | |||||||
Record Document | 08/12/2024 | Satisfied | TUCKER_SX_1 | Compliance Assistance | |||||||
Site Inspection | 07/29/2024 | Major Out of Compliance | MUSLIC_A_1 | 0/4 | Compliance Assistance | ||||||
Record Document | 07/12/2024 | Satisfied | MUSLIC_A_1 | Compliance Assistance | |||||||
Record Document | 06/28/2024 | Satisfied | TUCKER_SX_1 | Compliance Assistance | |||||||
Electronic Communication | 06/04/2024 | Satisfied | TUCKER_SX_1 | Routine Compliance | |||||||
Enforcement Referral | 02/13/2024 | Accepted | TUCKER_SX_1 | Enforcement | |||||||
Enforcement Referral | 02/13/2024 | Accepted | JUARISTIC_GK_1 | Enforcement | |||||||
Site Inspection | 02/07/2024 | Major Out of Compliance | TUCKER_SX_1 | 0/4 | Routine Compliance | ||||||
Electronic Communication | 01/18/2024 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Electronic Communication | 01/18/2024 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Electronic Communication | 01/18/2024 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Electronic Communication | 01/18/2024 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Electronic Communication | 01/09/2024 | Satisfied | JUARISTIC_GK_1 | Routine Compliance | |||||||
Record Document | 10/10/2023 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Letter | 10/10/2023 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Letter | 10/10/2023 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Record Document | 10/10/2023 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Electronic Communication | 10/05/2023 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Site Inspection | 05/23/2022 | Major Out of Compliance | COLSON_NJ_1 | 0/4 | Routine Compliance | ||||||
Letter | 05/23/2022 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Electronic Communication | 04/28/2022 | Satisfied | COLSON_NJ_1 | Routine Compliance | |||||||
Letter | 01/17/2020 | Satisfied | COLSON_NJ_1 | Routine Compliance | |||||||
Site Inspection | 01/17/2020 | In Compliance | COLSON_NJ_1 | 0/4 | Routine Compliance | ||||||
Electronic Communication | 12/27/2019 | Satisfied | COLSON_NJ_1 | Routine Compliance | |||||||
Issue Document | 05/25/2017 | Satisfied | COLSON_NJ_1 | Routine Compliance | |||||||
Site Inspection | 05/25/2017 | In Compliance | COLSON_NJ_1 | 0/4 | Routine Compliance | ||||||
Electronic Communication | 05/01/2017 | Satisfied | COLSON_NJ_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 11/07/2014 | Satisfied | COLSON_NJ_1 | Routine Compliance | |||||||
Issue Document | 11/07/2014 | Satisfied | COLSON_NJ_1 | Routine Compliance | |||||||
Site Inspection | 11/07/2014 | In Compliance | COLSON_NJ_1 | 0/4 | Routine Compliance | ||||||
Site Inspection | 02/28/2013 | In Compliance | SOWERS_JA_1 | 0/4 | Non-Compliance | ||||||
Letter | 07/11/2012 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Site Inspection | 07/11/2012 | Minor Out of Compliance | LONGEN_JL_1 | 0/4 | Routine Compliance | ||||||
Record Document | 07/07/2011 | Satisfied | SOWERS_JA_1 | Non-Compliance | |||||||
Site Inspection | 05/09/2011 | Minor Out of Compliance | LONGEN_JL_1 | 0/4 | Routine Compliance | ||||||
Letter | 05/09/2011 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 05/09/2011 | Satisfied | LONGEN_JL_1 | Routine Compliance | |||||||
Site Inspection | 05/27/2010 | In Compliance | SOWERS_JA_1 | 0/4 | Routine Compliance | ||||||
Site Inspection | 04/23/2009 | In Compliance | LONGEN_JL_1 | 0/4 | Routine Compliance | ||||||
Record Document | 04/23/2008 | Satisfied | SOWERS_JA_1 | Non-Compliance | |||||||
Letter | 02/21/2008 | Satisfied | SOWERS_JA_1 | Non-Compliance | |||||||
Site Inspection | 02/21/2008 | Minor Out of Compliance | SOWERS_JA_1 | 0/4 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/11/2008 | Satisfied | SOWERS_JA_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 02/06/2007 | Satisfied | LONGEN_JL_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/21/2006 | Satisfied | STRAUSS_RH_1 | Routine Compliance | |||||||
Site Inspection | 09/06/2006 | Minor Out of Compliance | LONGEN_JL_1 | 0/3 | Non-Compliance | ||||||
Letter | 08/31/2006 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Site Inspection | 08/04/2006 | Minor Out of Compliance | LONGEN_JL_1 | 0/4 | Routine Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
02/02/2024 | 6064 | SNC-A | 4.2 Not repaired or isolated component or piping which has cause a discharge or release. | Repair/replace severely corroded dispenser frames in disrepair to Dispensers 7/8, 5/6 11/12. | |||||||
02/02/2024 | 6056 | SNC-B | 2.4 Release detection not tested or visually inspected once a month or problems found during the visual inspections not recorded. | Provide documentation for visual inspections. Inspections conducted at least once a month, but not exceeding 35 days, every component of a storage tank system that contains, transfers, or stores, or is designed to contain, transfer, or store regulated substances that can be inspected visually shall be visually inspected and documented as to its condition. A monthly visual inspection is not required for any system component using an electronic release detection method. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
01/05/1988 | COMPLETED | 10 | EARLY DETECTION INCENTIVE-ELIGIBLE | ||||||||