DEP Logo Florida Department of
Environmental Protection


Bob Martinez Center
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
Storage Tanks &
Contamination
Monitoring Information
 
Cover Page Report
Report Run Date: 02/23/2025        Last Data Refresh: 02/22/2025        Report Generated from DOPPLER
 
District Southwest   Type    Retail Station
 
County Pinellas   Status    OPEN
 
ID 8515552   Latitude    27° 59' 25.5931
 
Name GIANT OIL #180
23977 US HWY 19 N
Longitude    82° 43' 45.2084
  CLEARWATER, FL 34625 LL Method    DGPS
 
Contact BARBARA WHITTAKER/AMANDA SKINNER   LL Status    REVIEWED
 
Phone (813) 740-0422   Status Date    11/17/2003
 
Account Owner Information
 
Name GIANT OIL INC
1806 N FRANKLIN ST
Tampa, FL 33602
Effective Date    02/25/2013
 
Contact BARBARA WHITTAKER
 
Phone (813) 740-0422
 
Email B.WHITTAKER@GIANTOIL.COM
  Placard # / Date    681038 - 06/05/2024
Property Owner Information
 
Name GIANT OIL INC
1806 N FRANKLIN ST
Tampa, FL 33602
Effective Date    02/25/2013
 
Contact BARBARA WHITTAKER
 
Phone (813) 740-0422
 
Email B.WHITTAKER@GIANTOIL.COM
 
 
 
 
 
 
 
 
 
Tank Tank Size Content Installed Placement Status
4 10000 Unleaded Gas (B) 05/01/1996 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
(R) Double wall - tank jacket
  (J) Pressurized piping system
(K) Dispenser liners
(M) Double wall - pipe jacket
(Z) DEP approved piping
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
 
 
Tank Tank Size Content Installed Placement Status
5 12000 Unleaded Gas (B) 05/01/1996 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(C) Steel
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
(R) Double wall - tank jacket
  (J) Pressurized piping system
(K) Dispenser liners
(M) Double wall - pipe jacket
(Z) DEP approved piping
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
 
 
Tank Tank Size Content Installed Placement Status
6 12000 Unleaded Gas (B) 05/01/1996 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
(R) Double wall - tank jacket
  (J) Pressurized piping system
(K) Dispenser liners
(M) Double wall - pipe jacket
(Z) DEP approved piping
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
 
 
Tank Tank Size Content Installed Placement Status
1 10152 Leaded Gas (A) 07/01/1967 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve   (B) Steel/galvanized metal (8) Manually sampled wells
 
 
Tank Tank Size Content Installed Placement Status
1R1 8000 Unleaded Gas (B) 02/01/1989 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(E) Fiberglass
(M) Spill containment bucket
(O) Tight fill
  (C) Fiberglass
(J) Pressurized piping system
(8) Manually sampled wells
(H) Mechanical line leak detector
 
 
Tank Tank Size Content Installed Placement Status
2 10152 Unleaded Gas (B) 07/01/1967 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve   (B) Steel/galvanized metal (8) Manually sampled wells
 
 
Tank Tank Size Content Installed Placement Status
2R1 8000 Unleaded Gas (B) 02/01/1989 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(E) Fiberglass
(M) Spill containment bucket
(O) Tight fill
  (C) Fiberglass
(J) Pressurized piping system
(8) Manually sampled wells
(H) Mechanical line leak detector
 
 
Tank Tank Size Content Installed Placement Status
3 8084 Unleaded Gas (B) 07/01/1967 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve   (B) Steel/galvanized metal (8) Manually sampled wells
 
 
Tank Tank Size Content Installed Placement Status
3R1 8000 Unleaded Gas (B) 02/01/1989 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(E) Fiberglass
(M) Spill containment bucket
(O) Tight fill
  (C) Fiberglass
(J) Pressurized piping system
(8) Manually sampled wells
(H) Mechanical line leak detector
 
 
Insurance Documents
 
FR Type   Effective Date Expiration Date Company Name
INSURANCE   07/30/2023 07/30/2025 ACE AMERICAN INSURANCE COMPANY
INSURANCE   07/30/2022 07/30/2023 ACE AMERICAN INSURANCE COMPANY
INSURANCE   07/30/2021 07/30/2022 ACE AMERICAN INSURANCE COMPANY
INSURANCE   07/30/2020 07/30/2021 ACE AMERICAN INSURANCE COMPANY
INSURANCE   07/30/2019 07/30/2020 ACE AMERICAN INSURANCE COMPANY
INSURANCE   02/08/2019 02/08/2020 NAUTILUS INSURANCE COMPANY
INSURANCE   02/08/2018 02/08/2019 NAUTILUS INSURANCE COMPANY
INSURANCE   07/30/2016 07/30/2017 ACE
INSURANCE   07/30/2016 07/30/2017 ACE
INSURANCE   07/30/2015 07/30/2016 ACE
INSURANCE   02/08/2015 02/08/2016 NAUTILUS INSURANCE COMPANY
INSURANCE   07/30/2013 07/30/2014 ACE
INSURANCE   02/08/2013 02/08/2014 NAUTILUS INSURANCE COMPANY
INSURANCE   02/08/2012 02/08/2013 NAUTILUS INSURANCE COMPANY
INSURANCE   07/30/2011 07/30/2012 ZURICH-AMERICAN
INSURANCE   07/30/2010 07/30/2011 ZURICH-AMERICAN
INSURANCE   07/30/2009 07/30/2010 ZURICH-AMERICAN
INSURANCE   07/30/2008 07/30/2009 ZURICH-AMERICAN
 
 
Legacy Compliance Activity Information
 
Activity
Code
Date
Initiated
Date
Completed
Results Inspector AST/UST
Count
Description
LTR 04/14/2006 04/14/2006 BARNETT 0/0 COMPLIANCE ASSURANCE
 
TCI 04/12/2006 04/14/2006 IN-COMPLIANCE BARNETT 0/3 COMPLIANCE ASSURANCE
 
CNLI 01/14/2005 01/14/2005 ROGGELIN 0/0 DISCHARGE PROJECT
 
LTR 11/08/2004 01/14/2005 MOORE 0/0 DISCHARGE PROJECT
 
 Completion Notes MEMO TO COMPLIANCE PROGRAM FROM PINELLAS CLEANUP - DISCUSS GW CONTAMINATION
 
SRRV 10/13/2004 01/14/2005 PENDYAL 0/0 DISCHARGE PROJECT
 
 Completion Notes CLEANUP PROGRAM RCVD ANALYTICAL DATA CONFIRM NEW GROUNDWATER CONTAMINATION
 
RRBD 09/29/2004 10/19/2004 PINK 0/0 COMPLIANCE ASSURANCE
 
RRBD 09/02/2004 09/16/2004 COMPLIANCE ASSURANCE
 
NCLI 08/23/2004 08/31/2004 PINK 0/0 COMPLIANCE ASSURANCE
 
TCI 08/23/2004 08/31/2004 SIGNIFICANT OUT-OF-COMPLIANCE PINK 0/3 COMPLIANCE ASSURANCE
 
CALL 04/15/2004 04/19/2004 ROGGELIN 0/0 DISCHARGE PROJECT
 
 Completion Notes SPOKE WITH JERRY PELLEGRINO OF DISCOVERY TANK TESTING. INITIAL VACUUM TEST OF INTERSTICE AT 9.93 INCHES HG; PER TCI, INTERSTICE WILL REQUIRE 15 INCHES HG FOR 12-HOURS.
 
LTR 03/31/2004 04/19/2004 ROGGELIN 0/0 DISCHARGE PROJECT
 
 Completion Notes CRITIQUE OF PROTOCOL USED TO TEST TANK INTERSTICE
 
IRFR 02/20/2004 04/19/2004 ROGGELIN 0/0 DISCHARGE PROJECT
 
 Completion Notes SUBMITTAL DUE TO DETECTION OF PRODUCT IN REG UL TANK INTERSTICE
 
LTR 02/13/2004 02/15/2004 ROGGELIN 0/0 DISCHARGE PROJECT
 
TCR 02/12/2004 02/15/2004 IN-COMPLIANCE ROGGELIN 0/3 DISCHARGE PROJECT
 
 Completion Notes INF DUE TO CUSTOMER VEHICLE IMPACT ON DISPENSER 11/12. BOTH SHEAR VALVES TRIPPED. AWAITING REPAIR.
 
PDNE 01/06/2004 01/06/2004 REEDER_J 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes UTILIZED TO CLOSE VIOLATIONS - J A SOWERS
 
RRBD 12/16/2003 12/30/2003 COMPLIANCE ASSURANCE
 
SV 12/11/2003 12/15/2003 REEDER_J 0/0 COMPLIANCE ASSURANCE
 
NCLI 10/21/2003 10/22/2003 ROGGELIN 0/0 DISCHARGE PROJECT
 
 Completion Notes LTR TO RESTRUCTURE PROPERTIES RE ACTION TAKEN IN RESPONSE TO INF. REQUESTED CONTRACTOR WORK-ORDER/INVOICE INFO ON REPAIR ACTIONS.
 
LTR 10/21/2003 10/22/2003 ROGGELIN 0/0 COMPLIANCE ASSURANCE
 
TXI 10/17/2003 11/10/2003 IN-COMPLIANCE ROGGELIN 0/3 COMPLIANCE ASSURANCE
 
 Completion Notes COMPLETED ON SAME FORM AS TIN
 
TIN 10/17/2003 10/21/2003 MINOR OUT-OF-COMPLIANCE ROGGELIN 0/3 COMPLIANCE ASSURANCE
 
 Completion Notes INF OF 9/19/2003 RESULTED IN REPLACEMENT OF TCI PIPING WITH APT COAX PIPING WITHIN FORMER TCI-SECONDARY. PRECISION PETROLEUM CONTRACTOR. COMPLETED ON SAME FORM AS TXI
 
IRFR 09/19/2003 10/21/2003 ROGGELIN 0/0 DISCHARGE PROJECT
 
 Completion Notes FAILURE OF SECTION OF TCI PIPING BETWEEN SOUTH-CENTER & SOUTHEAST REGULAR DISPENSERS. SUBSEQUENT FAILURE OF ONE ADDITIONAL SECTION OF REGULAR LINE & ONE SECTION OF PREMIUM DURING LINE REPLACEMENT ACTIVITIES. SEE TIN DATED 10/17/03
 
NCLI 08/20/2003 08/25/2003 ROGGELIN 0/0 DISCHARGE PROJECT
 
NCLI 02/18/2003 02/19/2003 TAM 0/0 COMPLIANCE ASSURANCE
 
TCI 02/17/2003 02/19/2003 SIGNIFICANT OUT-OF-COMPLIANCE TAM 0/3 COMPLIANCE ASSURANCE
 
 Completion Notes DW WHITE ENVIROFLEX
 
RRBD 12/17/2001 01/06/2002 COMPLIANCE ASSURANCE
 
NCLI 12/12/2001 01/02/2002 HALSCOTT 0/0 COMPLIANCE ASSURANCE
 
TCI 12/12/2001 12/28/2001 MINOR OUT-OF-COMPLIANCE HALSCOTT 0/3 COMPLIANCE ASSURANCE
 
RRBD 06/01/2001 06/23/2001 COMPLIANCE ASSURANCE
 
RRBD 02/19/2001 03/20/2001 COMPLIANCE ASSURANCE
 
TCI 12/20/2000 12/29/2000 SIGNIFICANT OUT-OF-COMPLIANCE HALSCOTT 0/3 COMPLIANCE ASSURANCE
 
TCR 06/27/2000 07/10/2000 MINOR OUT-OF-COMPLIANCE CASTOR 0/0 COMPLIANCE ASSURANCE
 
TCDI 08/20/1999 09/14/1999 SIGNIFICANT OUT-OF-COMPLIANCE ROGGELIN 0/0 COMPLIANCE ASSURANCE
 
 
 
Compliance Activity Information
 
Activity
Code
Date
Completed
Results Inspector AST/UST
Count
Description
Letter 02/04/2025 Satisfied MUSLIC_A_1 Compliance Assistance
 
Site Inspection 02/04/2025 Major Out of Compliance MUSLIC_A_1 0/3 Routine Compliance
 
Electronic Communication 12/27/2024 Satisfied MUSLIC_A_1 Routine Compliance
 
Letter 06/09/2023 Satisfied SHOCK_E_1 Compliance Assistance
 
Record Document 06/09/2023 Satisfied SHOCK_E_1 Compliance Assistance
 
Letter 04/24/2023 Satisfied SHOCK_E_1 Compliance Assistance
 
Site Inspection 04/24/2023 Minor Out of Compliance SHOCK_E_1 0/3 Routine Compliance
 
Electronic Communication 03/27/2023 Satisfied SHOCK_E_1 Routine Compliance
 
Letter 05/25/2021 Satisfied STRAUSS_RH_1 Compliance Assistance
 
Record Document 05/25/2021 Satisfied STRAUSS_RH_1 Compliance Assistance
 
Record Document 05/25/2021 Satisfied STRAUSS_RH_1 Compliance Assistance
 
Site Inspection 03/31/2021 Minor Out of Compliance STRAUSS_RH_1 0/3 Routine Compliance
 
Letter 03/31/2021 Satisfied STRAUSS_RH_1 Compliance Assistance
 
Electronic Communication 03/08/2021 Satisfied STRAUSS_RH_1 Routine Compliance
 
Letter 02/06/2019 Satisfied STRAUSS_RH_1 Compliance Assistance
 
Record Document 02/06/2019 Satisfied STRAUSS_RH_1 Compliance Assistance
 
Letter 01/11/2019 Satisfied STRAUSS_RH_1 Compliance Assistance
 
Site Inspection 01/11/2019 Minor Out of Compliance STRAUSS_RH_1 0/3 Routine Compliance
 
Electronic Communication 01/09/2019 Satisfied STRAUSS_RH_1 Routine Compliance
 
Record Document 01/06/2017 Satisfied STRAUSS_RH_1 Routine Compliance
 
Site Inspection 08/24/2016 Minor Out of Compliance STRAUSS_RH_1 0/3 Routine Compliance
 
Letter 08/24/2016 Satisfied STRAUSS_RH_1 Non-Compliance
 
Incident 03/24/2016 Has not led to Discharge STRAUSS_RH_1 Incident
 
Enforcement Tracking 03/17/2016 Closed Without Enforcement PEDIGO_L Enforcement
 
Incident 06/15/2015 Has not led to Discharge SOWERS_JA_1 Incident
 
Record Document 06/03/2014 Satisfied COLSON_NJ_1 Non-Compliance
 
Letter 04/17/2014 Satisfied COLSON_NJ_1 Non-Compliance
 
Site Inspection 04/17/2014 Major Out of Compliance COLSON_NJ_1 0/3 Routine Compliance
 
Electronic Communication 09/20/2013 Satisfied JUEDES_HC_1 Non-Compliance
 
Site Inspection 09/20/2013 In Compliance JUEDES_HC_1 0/3 Non-Compliance
 
Record Document 08/27/2013 Satisfied JUEDES_HC_1 Non-Compliance
 
Site Inspection 07/05/2013 Minor Out of Compliance JUEDES_HC_1 0/3 Non-Compliance
 
Letter 07/05/2013 Satisfied JUEDES_HC_1 Non-Compliance
 
Record Document 03/18/2013 Satisfied JUEDES_HC_1 Non-Compliance
 
Letter 03/05/2013 Satisfied JUEDES_HC_1 Non-Compliance
 
Emergency Preparedness Information 02/27/2013 Satisfied JUEDES_HC_1 Routine Compliance
 
Site Inspection 02/27/2013 Minor Out of Compliance JUEDES_HC_1 0/3 Routine Compliance
 
Site Inspection 12/31/2012 Minor Out of Compliance STRAUSS_RH_1 0/3 Non-Compliance
 
Letter 12/31/2012 Satisfied STRAUSS_RH_1 Non-Compliance
 
Site Inspection 12/31/2012 Minor Out of Compliance STRAUSS_RH_1 0/3 Installation
 
Letter 12/31/2012 Satisfied STRAUSS_RH_1 Non-Compliance
 
Site Inspection 12/31/2012 Minor Out of Compliance STRAUSS_RH_1 0/3 Closure
 
Letter 12/31/2012 Satisfied STRAUSS_RH_1 Non-Compliance
 
Issue Document 06/27/2012 Satisfied PEDIGO_L Enforcement
 
Issue Document 06/27/2012 Satisfied PEDIGO_L Enforcement
 
Issue Document 06/05/2012 Satisfied STRAUSS_RH_1 Closure
 
Document Management 06/04/2012 Complete ROGGELIN_EM_1 Closure
 
Letter 06/04/2012 Satisfied ROGGELIN_EM_1 Closure
 
TCAR 06/04/2012 Satisfied ROGGELIN_EM_1 Closure
 
Letter 01/27/2012 Satisfied LONGEN_JL_1 Non-Compliance
 
Emergency Preparedness Information 01/27/2012 Satisfied LONGEN_JL_1 Non-Compliance
 
Site Inspection 01/27/2012 Major Out of Compliance LONGEN_JL_1 0/3 Routine Compliance
 
Enforcement Referral 01/19/2012 Accepted PEDIGO_L Enforcement
 
Electronic Communication 01/19/2012 Satisfied PEDIGO_L Enforcement
 
Document Management 09/27/2011 Complete SOWERS_JA_1 Discharge
 
Discharge Reporting 09/27/2011 Satisfied LONGEN_JL_1 Discharge
 
Letter 09/26/2011 Satisfied LONGEN_JL_1 Discharge
 
TCAR 05/24/2011 Satisfied SOWERS_JA_1 Closure
 
Letter 05/24/2011 Satisfied SOWERS_JA_1 Closure
 
Site Inspection 04/27/2011 In Compliance LONGEN_JL_1 0/3 Installation
 
Site Inspection 04/21/2011 In Compliance LONGEN_JL_1 0/3 Closure
 
Record Document 03/09/2011 Satisfied LONGEN_JL_1 Non-Compliance
 
Site Inspection 02/25/2011 Minor Out of Compliance LONGEN_JL_1 0/3 Non-Compliance
 
Letter 02/25/2011 Satisfied LONGEN_JL_1 Non-Compliance
 
Letter 11/24/2010 Satisfied LONGEN_JL_1 Non-Compliance
 
Site Inspection 11/24/2010 Major Out of Compliance LONGEN_JL_1 0/3 Routine Compliance
 
Site Inspection 05/18/2010 Minor Out of Compliance LONGEN_JL_1 0/1 Closure
 
Letter 05/18/2010 Satisfied LONGEN_JL_1 Non-Compliance
 
Letter 05/18/2010 Satisfied LONGEN_JL_1 Non-Compliance
 
Site Inspection 05/18/2010 Minor Out of Compliance LONGEN_JL_1 0/1 Installation
 
Record Document 04/23/2010 Satisfied LONGEN_JL_1 Non-Compliance
 
Letter 03/26/2010 Satisfied LONGEN_JL_1 Non-Compliance
 
Site Inspection 03/26/2010 Major Out of Compliance LONGEN_JL_1 0/3 Routine Compliance
 
TCAR 03/06/2009 Satisfied STRAUSS_RH_1 Closure
 
Record Document 02/04/2009 Satisfied LONGEN_JL_1 Non-Compliance
 
Site Inspection 12/23/2008 Minor Out of Compliance LONGEN_JL_1 0/3 Routine Compliance
 
Site Inspection 09/26/2008 In Compliance LONGEN_JL_1 0/1 Closure
 
Site Inspection 09/26/2008 In Compliance LONGEN_JL_1 0/1 Installation
 
Site Inspection 11/05/2007 In Compliance BARNETT_JX 0/3 Routine Compliance
 
Emergency Preparedness Information 11/05/2007 Satisfied BARNETT_JX Routine Compliance
 
Site Inspection 02/27/2007 In Compliance BARNETT_JX 0/3 Routine Compliance
 
Emergency Preparedness Information 02/07/2007 Satisfied STRAUSS_RH_1 Routine Compliance
 
Emergency Preparedness Information 09/20/2006 Satisfied STRAUSS_RH_1 Routine Compliance
 
 
 
No Open AOCs Found
 
 
Open Violations
 
Insp Date Vio # Significance Violation Text Corrective Action
02/04/2025 6029 Minor 4.1 Any component(s) of the storage tank system not installed according to manufacturer's instructions. Properly install PUL STP sump liquid sensor and ensure it is in working order and submit proof of compliance (photo documentation).
 
02/04/2025 6072 Minor 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. Submit 2024 integrity test results of PUL and DSL double-walled spill buckets and RUL single-walled spill bucket. If tests were not completed in 2024, complete integrity tests of the spill buckets and submit test results to this office.
 
02/04/2025 6015 Minor 4.3 Incident investigation not completed within 14 days, and/or no DRF or written confirmation received at the end of the 14-day investigation period. Submit records showing that investigation of the incident was completed within 14 days of discovery of the incident to determine if a discharge has occurred. The investigation must include STP sump integrity test results and line leak detector operability test results and any other supporting documents.
 
02/04/2025 6014 SNC-B 4.2 Incident investigation not initiated within 24-hours (or by next business day) to determine if discharge occurred. Submit the records showing that the actions were taken within 24 hours of discovery to investigate the incident.
 
02/04/2025 6073 Minor 4.9 Spill containment, dispenser liners, and piping sumps not accessible. Water or regulated substances not removed. Remove and properly dispose of petroleum contact water from spill buckets and STP sumps and submit proof of compliance (photo documentation and/or waste manifest).
 
02/04/2025 6062 Minor 2.5 Release detection devices not tested annually. Submit 2024 2024 operability test results not available for PUL and DSL spill bucket gauges. If test was not completed in 2024, complete operability test of spill bucket gauges and submit test results to this office.
 
 
 
Discharge Information
 
Discharge
Date
  Clean Up
Status
Score Eligibility Info Site Manager Phone
06/09/2011   INACTIVE 30
 
08/25/2004   ACTIVE 30
 
07/17/1999   INACTIVE 30
 
05/14/1996   INACTIVE 30