Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
||||||||||
Cover Page Report | |||||||||||
Report Run Date: 02/02/2025 Last Data Refresh: 02/01/2025 Report Generated from DOPPLER | |||||||||||
District | Southwest | Type | Retail Station | ||||||||
County | Pinellas | Status | OPEN | ||||||||
ID | 8515587 | Latitude | 27° 57' 37.3078 | ||||||||
Name |
GULF TO BAY SHELL #094 1701 GULF TO BAY BLVD |
Longitude | 82° 46' .2802 | ||||||||
CLEARWATER, FL 33755-6502 | LL Method | DPHO | |||||||||
Contact | LL Status | REVIEWED | |||||||||
Phone | (727) 331-1696 | Status Date | 09/09/2003 | ||||||||
Account Owner Information | |||||||||||
Name | AFFY08 LLC 1701 GULF TO BAY BLVD CLEARWATER, FL 33755 |
Effective Date | 07/14/2023 | ||||||||
Contact | TABASSUM LAKHANI | ||||||||||
Phone | (727) 331-1696 | ||||||||||
TABUAFZAL@YAHOO.COM | |||||||||||
Placard # / Date | 690931 - 06/18/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | AUTOMATED PETROLEUM & ENERGY CO INC (APEC) PO BOX 1110 Brandon, FL 33509-1110 |
Effective Date | 05/10/2021 | ||||||||
Contact | BILL MCKNIGHT | RICK HERWEH | ||||||||||
Phone | (813) 681-4279 | ||||||||||
RICK@APECGAS.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 9684 | Unleaded Gas (B) | 08/01/1996 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 9684 | Unleaded Gas (B) | 08/01/1996 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 9684 | Unleaded Gas (B) | 08/01/1996 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 10000 | Unleaded Gas (B) | 01/01/1974 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (B) Internal lining (C) Steel (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(8) Manually sampled wells (H) Mechanical line leak detector |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 10000 | Unleaded Gas (B) | 01/01/1974 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (B) Internal lining (C) Steel (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(8) Manually sampled wells (H) Mechanical line leak detector |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 4000 | Unleaded Gas (B) | 01/01/1974 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (B) Internal lining (C) Steel (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(8) Manually sampled wells (H) Mechanical line leak detector |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 04/05/2024 | 04/05/2025 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 12/01/2019 | 12/01/2020 | NAVIGATORS SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2018 | 12/01/2019 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2017 | 12/01/2018 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2016 | 12/01/2017 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2014 | 12/01/2015 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2011 | 12/01/2013 | CHUBB | ||||||||
INSURANCE | 12/17/2010 | 12/17/2011 | CHUBB | ||||||||
INSURANCE | 12/17/2009 | 12/17/2010 | CHUBB | ||||||||
INSURANCE | 12/17/2008 | 12/17/2009 | AMERICAN INTERNATIONAL SPECIALTY LINES | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
RRBD | 04/06/2006 | 04/17/2006 | SOWERS | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes UPDATED TEST RESULTS SUBMITTED | |||||||||||
LTR | 03/28/2006 | 04/17/2006 | SOWERS | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes EMAIL TO FRAN FRANCONI ABOUT NO LEAK RATE INIDICATED ON TEST RESULTS FOR L L D'S | |||||||||||
RRBD | 03/03/2006 | 04/17/2006 | BARNETT | 0/0 | COMPLIANCE ASSURANCE | ||||||
NCLI | 03/01/2006 | 03/01/2006 | BARNETT | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 02/27/2006 | 03/01/2006 | MINOR OUT-OF-COMPLIANCE | BARNETT | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 07/29/2005 | 08/09/2005 | COMPLIANCE ASSURANCE | ||||||||
CWOE | 07/29/2005 | 08/09/2005 | ROGGELIN | 0/0 | COMPLIANCE ASSURANCE | ||||||
NCLI | 07/11/2005 | 08/09/2005 | ROGGELIN | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 06/23/2005 | 07/01/2005 | MINOR OUT-OF-COMPLIANCE | ROGGELIN | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 05/03/2004 | 05/23/2004 | COMPLIANCE ASSURANCE | ||||||||
NCLI | 04/23/2004 | 04/29/2004 | FRAZIER | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 04/20/2004 | 04/29/2004 | SIGNIFICANT OUT-OF-COMPLIANCE | FRAZIER | 0/3 | COMPLIANCE ASSURANCE | |||||
LTR | 11/03/2002 | 11/05/2002 | TAM | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 11/01/2002 | 11/05/2002 | IN-COMPLIANCE | TAM | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes AMERON DW FRP PIPE | |||||||||||
TCI | 09/04/2001 | 09/09/2001 | IN-COMPLIANCE | HALSCOTT | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 09/05/2000 | 10/30/2000 | HALSCOTT | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 08/25/2000 | 09/07/2000 | MINOR OUT-OF-COMPLIANCE | HALSCOTT | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 05/10/2000 | 05/22/2000 | IN-COMPLIANCE | CASTOR | 0/3 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Record Document | 05/16/2024 | Satisfied | MUSLIC_A_1 | Compliance Assistance | |||||||
Record Document | 05/09/2024 | Satisfied | MUSLIC_A_1 | Compliance Assistance | |||||||
Record Document | 04/29/2024 | Satisfied | MUSLIC_A_1 | Compliance Assistance | |||||||
Site Inspection | 04/08/2024 | Major Out of Compliance | MUSLIC_A_1 | 0/3 | Routine Compliance | ||||||
Letter | 04/08/2024 | Satisfied | MUSLIC_A_1 | Compliance Assistance | |||||||
Enforcement Referral | 01/11/2023 | Accepted | SHOCK_E_1 | Enforcement | |||||||
Electronic Communication | 10/24/2022 | Satisfied | SHOCK_E_1 | Compliance Assistance | |||||||
Record Document | 10/24/2022 | Satisfied | SHOCK_E_1 | Compliance Assistance | |||||||
Letter | 06/28/2022 | Satisfied | SHOCK_E_1 | Compliance Assistance | |||||||
Site Inspection | 06/28/2022 | Major Out of Compliance | SHOCK_E_1 | 0/3 | Compliance Assistance | ||||||
Electronic Communication | 05/20/2022 | Satisfied | SHOCK_E_1 | Routine Compliance | |||||||
Letter | 05/13/2022 | Satisfied | SHOCK_E_1 | Compliance Assistance | |||||||
Site Inspection | 05/12/2022 | Minor Out of Compliance | SHOCK_E_1 | 0/3 | Routine Compliance | ||||||
Electronic Communication | 05/06/2022 | Satisfied | SHOCK_E_1 | Routine Compliance | |||||||
Electronic Communication | 05/04/2022 | Satisfied | SHOCK_E_1 | Routine Compliance | |||||||
Letter | 03/06/2020 | Satisfied | STRAUSS_RH_1 | Compliance Assistance | |||||||
Record Document | 03/06/2020 | Satisfied | STRAUSS_RH_1 | Compliance Assistance | |||||||
Letter | 02/05/2020 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Site Inspection | 02/05/2020 | Major Out of Compliance | STRAUSS_RH_1 | 0/3 | Routine Compliance | ||||||
Electronic Communication | 01/31/2020 | Satisfied | STRAUSS_RH_1 | Routine Compliance | |||||||
Incident | 08/02/2019 | Has not led to Discharge | STRAUSS_RH_1 | Incident | |||||||
Incident | 06/04/2019 | Has not led to Discharge | STRAUSS_RH_1 | Incident | |||||||
Document Management | 06/04/2019 | Satisfied | STRAUSS_RH_1 | Incident | |||||||
Document Management | 02/16/2018 | Satisfied | STRAUSS_RH_1 | Incident | |||||||
Site Inspection | 01/05/2018 | In Compliance | STRAUSS_RH_1 | 0/3 | Compliance Assistance | ||||||
Letter | 01/05/2018 | Satisfied | STRAUSS_RH_1 | Compliance Assistance | |||||||
Site Inspection | 12/11/2017 | Minor Out of Compliance | STRAUSS_RH_1 | 0/3 | Routine Compliance | ||||||
Letter | 12/11/2017 | Satisfied | STRAUSS_RH_1 | Compliance Assistance | |||||||
Electronic Communication | 12/04/2017 | Satisfied | STRAUSS_RH_1 | Routine Compliance | |||||||
Site Inspection | 09/03/2015 | In Compliance | STRAUSS_RH_1 | 0/3 | Routine Compliance | ||||||
Electronic Communication | 09/03/2015 | Satisfied | STRAUSS_RH_1 | Routine Compliance | |||||||
Electronic Communication | 08/26/2015 | Satisfied | STRAUSS_RH_1 | Routine Compliance | |||||||
Site Inspection | 10/29/2013 | In Compliance | JUEDES_HC_1 | 0/3 | Non-Compliance | ||||||
Electronic Communication | 10/29/2013 | Satisfied | JUEDES_HC_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 09/11/2013 | Satisfied | JUEDES_HC_1 | Routine Compliance | |||||||
Site Inspection | 09/11/2013 | Minor Out of Compliance | JUEDES_HC_1 | 0/3 | Routine Compliance | ||||||
Letter | 09/11/2013 | Satisfied | JUEDES_HC_1 | Non-Compliance | |||||||
Incident | 10/25/2011 | Has not led to Discharge | LONGEN_JL_1 | Incident | |||||||
Emergency Preparedness Information | 08/05/2011 | Satisfied | LONGEN_JL_1 | Routine Compliance | |||||||
Letter | 08/04/2011 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Site Inspection | 08/04/2011 | Minor Out of Compliance | LONGEN_JL_1 | 0/3 | Routine Compliance | ||||||
Incident | 10/28/2010 | Has not led to Discharge | LONGEN_JL_1 | Incident | |||||||
Record Document | 07/22/2010 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Record Document | 07/19/2010 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Site Inspection | 07/15/2010 | Minor Out of Compliance | LONGEN_JL_1 | 0/3 | Routine Compliance | ||||||
Letter | 07/15/2010 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Incident | 07/15/2010 | Has not led to Discharge | LONGEN_JL_1 | Incident | |||||||
Site Inspection | 05/15/2009 | In Compliance | LONGEN_JL_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 10/28/2008 | In Compliance | BARNETT_JX | 0/6 | Installation | ||||||
Record Document | 07/14/2008 | Satisfied | ROGGELIN_EM_1 | Routine Compliance | |||||||
Record Document | 07/03/2008 | Satisfied | BARNETT_JX | Non-Compliance | |||||||
Letter | 06/26/2008 | Satisfied | BARNETT_JX | Non-Compliance | |||||||
Site Inspection | 06/26/2008 | Major Out of Compliance | BARNETT_JX | 0/3 | Routine Compliance | ||||||
Record Document | 03/12/2008 | Satisfied | ROGGELIN_EM_1 | Routine Compliance | |||||||
Record Document | 03/05/2008 | Satisfied | ROGGELIN_EM_1 | Routine Compliance | |||||||
Record Document | 03/05/2008 | Satisfied | ROGGELIN_EM_1 | Routine Compliance | |||||||
Record Document | 03/05/2008 | Satisfied | ROGGELIN_EM_1 | Routine Compliance | |||||||
Letter | 03/03/2008 | Satisfied | ROGGELIN_EM_1 | Non-Compliance | |||||||
Site Inspection | 02/26/2008 | Minor Out of Compliance | ROGGELIN_EM_1 | 0/3 | Non-Compliance | ||||||
Site Inspection | 02/08/2007 | Minor Out of Compliance | ROGGELIN_EM_1 | 0/3 | Non-Compliance | ||||||
Emergency Preparedness Information | 02/05/2007 | Satisfied | STRAUSS_RH_1 | Routine Compliance | |||||||
Site Inspection | 01/05/2007 | Minor Out of Compliance | SOWERS_JA_1 | 0/3 | Routine Compliance | ||||||
Letter | 01/05/2007 | Satisfied | SOWERS_JA_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 09/19/2006 | Satisfied | STRAUSS_RH_1 | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
06/27/2022 | 6013 | Minor | 2.10 Appropriate paperwork for financial responsibility improperly completed or maintained. | Provide copy of current storage tank insurance policy, typically Part C or Part D, and also provide copy of current Certificate of Financial Responsibility Part P. | |||||||
06/27/2022 | 6073 | Minor | 4.9 Spill containment, dispenser liners, and piping sumps not accessible. Water or regulated substances not removed. | Remove liquids (PCW) from all primary spill buckets, and from the secondary spill bucket at the PUL fill, and provide documentation that liquids (PCW) have been removed. | |||||||
06/27/2022 | 6057 | SNC-B | 4.7 Release detection not installed, operated, and maintained per manufacturer's instructions and standards. | Make repairs to electronic monitoring sensor located in the MID grade STP sump and provide documentation. | |||||||
05/12/2022 | 6074 | Minor | 2.8 Improper maintenance of records. Records requiring to be maintained for 3 years or for the life of the system not kept by facility. Records not provided within 5 business days. | Provide current registration placard, financial responsibility / tank insurance documents, underground storage tank operators certificates A, B and C, monthly visual inspections and annual operability testing results. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
11/30/1995 | COMPLETED | 53 | |||||||||
01/29/1987 | COMPLETED | 30 | EARLY DETECTION INCENTIVE-ELIGIBLE | ||||||||