![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 04/19/2025 Last Data Refresh: 04/18/2025 Report Generated from DOPPLER | |||||||||||
District | Southwest | Type | Retail Station | ||||||||
County | Polk | Status | OPEN | ||||||||
ID | 8515674 | Latitude | 28° 0' 39.8081 | ||||||||
Name |
BABAS FOOD AND FUEL INC. 2905 REYNOLDS RD AND MAINE ST |
Longitude | 81° 53' 29.552 | ||||||||
LAKELAND, FL 33803 | LL Method | DPHO | |||||||||
Contact | TIJO MANKIDIYAN | LL Status | REVIEWED | ||||||||
Phone | (863) 514-7642 | Status Date | 08/11/2003 | ||||||||
Account Owner Information | |||||||||||
Name | Baba's food and fuel inc. 6625 Florida Avenue South Lakeland, FL 33813 |
Effective Date | 08/29/2023 | ||||||||
Contact | TIJO MANKIDIYAN | ||||||||||
Phone | (863) 514-7642 | ||||||||||
babaslakeland@gmail.com | |||||||||||
Placard # / Date | 684787 - 06/06/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | Baba's food and fuel inc. 6625 Florida Avenue South Lakeland, FL 33813 |
Effective Date | 08/29/2023 | ||||||||
Contact | TIJO MANKIDIYAN | ||||||||||
Phone | (863) 514-7642 | ||||||||||
babaslakeland@gmail.com | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 16000 | Unleaded Gas (B) | 05/01/1998 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (L) Compartmented (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 10000 | Vehicular Diesel (D) | 05/01/1998 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 8000 | Unleaded Gas (B) | 10/01/1974 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (O) Tight fill |
(B) Steel/galvanized metal (I) Suction piping system |
(8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 8000 | Unleaded Gas (B) | 10/01/1974 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (O) Tight fill |
(B) Steel/galvanized metal (I) Suction piping system |
(8) Manually sampled wells | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 01/12/2021 | 01/12/2022 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 01/12/2020 | 01/12/2021 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 01/12/2019 | 01/12/2020 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 01/12/2018 | 01/12/2019 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 11/12/2017 | 11/12/2018 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 01/12/2017 | 01/12/2018 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 11/12/2016 | 11/12/2017 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 01/12/2016 | 01/12/2017 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 01/12/2015 | 01/12/2016 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 01/12/2012 | 01/12/2013 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 01/12/2012 | 01/13/2013 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 01/12/2011 | 01/12/2012 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 01/12/2010 | 01/12/2011 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 01/12/2008 | 01/12/2010 | COMMERCE & INDUSTRY | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
NCLI | 05/02/2006 | 05/02/2006 | CROWELL_M | 0/1 | COMPLIANCE ASSURANCE | ||||||
Completion Notes REQUESTED: STATEMENT FROM CONTRACTOR THAT ALL TESTS WERE PERFORMED AND PASSED. | |||||||||||
NCLI | 05/02/2006 | 05/02/2006 | CASSELS_C | 0/2 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RESOLVES VIOLATION: 1010, 1138. | |||||||||||
TIN | 05/01/2006 | 05/02/2006 | MINOR OUT-OF-COMPLIANCE | CROWELL_M | /1 | COMPLIANCE ASSURANCE | |||||
Completion Notes NINE PHOTOS. INSTALLED: 80-90 FOOT OF AO SMITH RED THREAD IIA (EQ #252) RIGID DOUBLE WALLED FIBERGLASS UNDERGROUND PIPING. | |||||||||||
SV | 04/27/2006 | 04/27/2006 | SLAPPEY_W | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes PRIMARY LINE PRESSURE TEST. TEST PASSED. | |||||||||||
TXI | 04/26/2006 | 05/02/2006 | MINOR OUT-OF-COMPLIANCE | CASSELS_C | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes SIX PHOTOS. REMOVED: GREEN FLEX PIPE. | |||||||||||
RRBD | 09/14/2005 | 03/17/2006 | CROWELL_M | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RESOLVES #1062, 1066, & 1091. | |||||||||||
RRBD | 09/12/2005 | 03/17/2006 | CROWELL_M | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RESOLVES VIOLATION #1103, 1117, & 1010. | |||||||||||
NCLI | 08/31/2005 | 09/02/2005 | JENKINS_N | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes WARNING NOTICE. | |||||||||||
NCLI | 08/09/2005 | 08/09/2005 | CROWELL_M | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes REQUESTED: 2 MONTHLY VISUALS, LEAK DETECTOR TEST RESULTS, ANNUAL OPERABILITY TEST RESULTS INCIDENT NOTIFICATION FORM. | |||||||||||
TCI | 07/08/2005 | 08/09/2005 | SIGNIFICANT OUT-OF-COMPLIANCE | CROWELL_M | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes NO PHOTOS TAKEN. PIPING- PISCES SYSTEM EQ-285 DOUBLE-WALL FLEX-GREEN COLOR. | |||||||||||
TCI | 07/20/2004 | 08/03/2004 | IN-COMPLIANCE | GONZALEZ_J | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes NO PHOTOS TAKEN. PIPING-OPW FUELING COMPONENTS. PISCES SYSTEM EQ-285 DOUBLE-WALL FLEX-GREEN COLOR. | |||||||||||
TCI | 03/04/2003 | 03/27/2003 | IN-COMPLIANCE | HUGHES_J | 0/2 | COMPLIANCE ASSURANCE | |||||
RRBD | 02/14/2002 | 06/27/2002 | SACLARIDES_M | 0/0 | COMPLIANCE ASSURANCE | ||||||
NCLI | 01/24/2002 | 01/25/2002 | SACLARIDES_M | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 01/17/2002 | 01/25/2002 | MINOR OUT-OF-COMPLIANCE | SACLARIDES_M | 0/2 | COMPLIANCE ASSURANCE | |||||
CALL | 01/04/2002 | 01/25/2002 | SACLARIDES_M | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes SCHEDULE TCI | |||||||||||
RRBD | 02/16/2001 | 02/28/2001 | COMPLIANCE ASSURANCE | ||||||||
TCI | 02/14/2001 | 02/27/2001 | MINOR OUT-OF-COMPLIANCE | SACLARIDES | 0/2 | COMPLIANCE ASSURANCE | |||||
RRBD | 04/03/2000 | 05/08/2000 | HUGHES_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
RRBD | 04/03/2000 | 05/08/2000 | HUGHES_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
NCLI | 03/22/2000 | 03/30/2000 | HUGHES_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 03/14/2000 | 03/30/2000 | MINOR OUT-OF-COMPLIANCE | HUGHES_J | 0/2 | COMPLIANCE ASSURANCE | |||||
TIN | 01/11/1999 | 02/23/1999 | IN-COMPLIANCE | HUGHES_J | 0/2 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Letter | 12/11/2024 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Electronic Communication | 12/11/2024 | Satisfied | GLENN_LE_1 | Routine Compliance | |||||||
Electronic Communication | 12/11/2024 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Site Inspection | 10/31/2024 | Major Out of Compliance | GLENN_LE_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 08/16/2023 | Satisfied | GONZALEZ_OA_1 | Compliance Assistance | |||||||
Electronic Communication | 10/05/2021 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Letter | 10/05/2021 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Incident | 10/05/2021 | Has not led to Discharge | GLENN_LE_1 | Incident | |||||||
Electronic Communication | 10/05/2021 | Satisfied | GLENN_LE_1 | Routine Compliance | |||||||
Electronic Communication | 10/05/2021 | Satisfied | GLENN_LE_1 | Routine Compliance | |||||||
Electronic Communication | 10/05/2021 | Satisfied | GLENN_LE_1 | Routine Compliance | |||||||
Electronic Communication | 10/05/2021 | Satisfied | GLENN_LE_1 | Routine Compliance | |||||||
Document Management | 10/05/2021 | Satisfied | GLENN_LE_1 | Incident | |||||||
Site Inspection | 10/01/2021 | Minor Out of Compliance | GLENN_LE_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 08/12/2019 | In Compliance | GLENN_LE_1 | 0/1 | Compliance Assistance | ||||||
Electronic Communication | 08/12/2019 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Electronic Communication | 08/12/2019 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Electronic Communication | 08/12/2019 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Letter | 08/12/2019 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Electronic Communication | 08/12/2019 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Electronic Communication | 07/27/2019 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Electronic Communication | 07/27/2019 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Electronic Communication | 06/20/2019 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Site Inspection | 04/29/2019 | Minor Out of Compliance | GLENN_LE_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 04/29/2019 | Satisfied | GLENN_LE_1 | Routine Compliance | |||||||
Electronic Communication | 04/29/2019 | Satisfied | GLENN_LE_1 | Routine Compliance | |||||||
Electronic Communication | 04/29/2019 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Electronic Communication | 04/29/2019 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Letter | 04/29/2019 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Document Management | 04/29/2019 | Satisfied | GLENN_LE_1 | Incident | |||||||
Incident | 04/29/2019 | Has not led to Discharge | GLENN_LE_1 | Incident | |||||||
Electronic Communication | 03/20/2017 | Satisfied | WILLIAMSON_KE_1 | Non-Compliance | |||||||
Site Inspection | 03/20/2017 | In Compliance | WILLIAMSON_KE_1 | 0/2 | Non-Compliance | ||||||
Document Management | 03/07/2017 | Satisfied | WILLIAMSON_KE_1 | Incident | |||||||
Incident | 03/07/2017 | Has not led to Discharge | WILLIAMSON_KE_1 | Incident | |||||||
Electronic Communication | 03/01/2017 | Satisfied | WILLIAMSON_KE_1 | Non-Compliance | |||||||
Letter | 03/01/2017 | Satisfied | WILLIAMSON_KE_1 | Non-Compliance | |||||||
Site Inspection | 03/01/2017 | Minor Out of Compliance | WILLIAMSON_KE_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 02/10/2017 | Satisfied | WILLIAMSON_KE_1 | Routine Compliance | |||||||
Electronic Communication | 05/22/2015 | Satisfied | MERRYMAN_DT_1 | Routine Compliance | |||||||
Site Inspection | 05/22/2015 | In Compliance | MERRYMAN_DT_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 07/26/2012 | In Compliance | WINN_JP_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 06/30/2012 | In Compliance | CASSELS_CR_1 | 0/1 | Installation | ||||||
Record Document | 05/10/2012 | Satisfied | NEWBERG_DR_1 | Closure | |||||||
Site Inspection | 05/10/2012 | In Compliance | NEWBERG_DR_1 | 0/2 | Closure | ||||||
Phone Conversation | 04/16/2012 | Satisfied | CASSELS_CR_1 | Closure | |||||||
Phone Conversation | 04/16/2012 | Satisfied | CASSELS_CR_1 | Installation | |||||||
Phone Conversation | 10/27/2011 | Satisfied | CASSELS_CR_1 | Non-Compliance | |||||||
Site Inspection | 10/27/2011 | In Compliance | CASSELS_CR_1 | 0/2 | Non-Compliance | ||||||
Site Inspection | 08/29/2011 | Major Out of Compliance | CASSELS_CR_1 | 0/2 | Routine Compliance | ||||||
Letter | 08/29/2011 | Satisfied | CASSELS_CR_1 | Non-Compliance | |||||||
Site Inspection | 07/09/2010 | In Compliance | CASSELS_CR_1 | 0/2 | Routine Compliance | ||||||
Document Management | 05/19/2010 | Satisfied | CASSELS_CR_1 | Discharge | |||||||
TCAR | 11/12/2009 | Satisfied | CASSELS_CR_1 | Closure | |||||||
Site Inspection | 10/02/2009 | In Compliance | DERY_WC_1 | 0/1 | Installation | ||||||
Site Inspection | 10/02/2009 | In Compliance | DERY_WC_1 | 0/1 | Closure | ||||||
Letter | 09/22/2009 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Letter | 08/24/2009 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Meeting | 07/09/2009 | Satisfied | BELL_JM_1 | Closure | |||||||
Letter | 07/09/2009 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
TCAR | 07/09/2009 | Satisfied | DERY_WC_1 | Closure | |||||||
Site Inspection | 07/09/2009 | Major Out of Compliance | DERY_WC_1 | 0/2 | Routine Compliance | ||||||
Phone Conversation | 07/06/2009 | Satisfied | DERY_WC_1 | Routine Compliance | |||||||
Letter | 01/28/2009 | Satisfied | BELL_JM_1 | Discharge | |||||||
Record Document | 01/22/2009 | Satisfied | DERY_WC_1 | Closure | |||||||
TCAR | 01/21/2009 | Satisfied | BELL_JM_1 | Closure | |||||||
Issue Document | 01/07/2009 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Letter | 11/25/2008 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Site Inspection | 09/23/2008 | In Compliance | DERY_WC_1 | 0/1 | Installation | ||||||
Site Inspection | 09/23/2008 | In Compliance | DERY_WC_1 | 0/1 | Closure | ||||||
Letter | 07/15/2008 | Satisfied | SLAPPEY_WR_1 | Non-Compliance | |||||||
Site Inspection | 07/15/2008 | Minor Out of Compliance | SLAPPEY_WR_1 | 0/2 | Routine Compliance | ||||||
Enforcement Referral | 03/07/2008 | Accepted | RANDOLPH_L | Enforcement | |||||||
Enforcement Tracking | 03/07/2008 | Closed Without Enforcement | RANDOLPH_L | Enforcement | |||||||
TCAR | 02/19/2008 | Satisfied | DERY_WC_1 | Closure | |||||||
Issue Document | 02/08/2008 | Satisfied | WINN_JP_1 | Non-Compliance | |||||||
Record Document | 02/05/2008 | Satisfied | WINN_JP_1 | Non-Compliance | |||||||
Site Inspection | 02/01/2008 | In Compliance | WINN_JP_1 | 0/4 | Non-Compliance | ||||||
Issue Document | 12/20/2007 | Satisfied | WINN_JP_1 | Non-Compliance | |||||||
Site Inspection | 10/22/2007 | Minor Out of Compliance | WINN_JP_1 | 0/2 | Routine Compliance | ||||||
Letter | 10/22/2007 | Satisfied | WINN_JP_1 | Non-Compliance | |||||||
Site Inspection | 06/01/2007 | In Compliance | DERY_WC_1 | 0/2 | Routine Compliance | ||||||
Phone Conversation | 05/03/2007 | Satisfied | DERY_WC_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 02/08/2007 | Satisfied | NEWBERG_DR_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/29/2006 | Satisfied | NEWBERG_DR_1 | Routine Compliance | |||||||
Record Document | 08/22/2006 | Satisfied | CROWELL_MP | Non-Compliance | |||||||
Proof of Contamination | 07/28/2006 | Satisfied | CASSELS_CR_1 | Discharge | |||||||
Proof of Contamination | 07/28/2006 | Satisfied | CASSELS_CR_1 | Discharge | |||||||
Site Inspection | 05/22/2006 | Minor Out of Compliance | CASSELS_CR_1 | 0/4 | Discharge | ||||||
Letter | 05/22/2006 | Satisfied | CASSELS_CR_1 | Discharge | |||||||
Letter | 05/19/2006 | Satisfied | CASSELS_CR_1 | Discharge | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
10/31/2024 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Test records must be provided to the Department or testing must be performed immediately and a copy of the test results provided to the Department. | |||||||
10/31/2024 | 6048 | SNC-B | 4.4 Dispenser sumps not installed to allow for release detection. | Deflector plating must be installed in each dispenser to direct any possible leaks to the liners and the Department notified. | |||||||
10/31/2024 | 6056 | SNC-B | 2.4 Release detection not tested or visually inspected once a month or problems found during the visual inspections not recorded. | 09/2021 to present, monthly release detection monitoring records or the next two months (November & December 2024) of inspections must be provided to the Department as they are performed. | |||||||
10/31/2024 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Test records must be provided to the Department or testing must be performed immediately and a copy of the test results provided to the Department. | |||||||
10/31/2024 | 6073 | Minor | 4.9 Spill containment, dispenser liners, and piping sumps not accessible. Water or regulated substances not removed. | Water must be removed and the Department notified. | |||||||
10/31/2024 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | Leak must be repaired and the Department notified. | |||||||
10/31/2024 | 6062 | Minor | 2.5 Release detection devices not tested annually. | Test records must be provided to the Department or testing must be performed immediately and a copy of the test results provided to the Department. | |||||||
10/31/2024 | 6073 | Minor | 4.9 Spill containment, dispenser liners, and piping sumps not accessible. Water or regulated substances not removed. | Fuel must be removed from liner and the Department notified. | |||||||
10/31/2024 | 6013 | Minor | 2.10 Appropriate paperwork for financial responsibility improperly completed or maintained. | Either the FDEP Storage Tank Insurance Endorsement – Part C Form or the FDEP Storage Tank Certificate of Insurance – Part D Forms (but not both) for the 2022 to 2024 time period (usually found as last few pages in full policy packet), must be provided to the Department. | |||||||
10/31/2024 | 6053 | Minor | 4.7 Primary overfill protection not provided, registered, or tested as required. | Test records must be provided to the Department or testing must be performed immediately and a copy of the test results provided to the Department. | |||||||
10/31/2024 | 6014 | SNC-B | 4.2 Incident investigation not initiated within 24-hours (or by next business day) to determine if discharge occurred. | An investigation must be performed to determine the cause of the water intrusion with the results provided to the Department. | |||||||
10/31/2024 | 6062 | Minor | 2.5 Release detection devices not tested annually. | Test records must be provided to the Department or testing must be performed immediately and a copy of the test results provided to the Department. | |||||||
10/31/2024 | 6013 | Minor | 2.10 Appropriate paperwork for financial responsibility improperly completed or maintained. | CFR-Part P forms must be completed by facility personnel for the 2022 to 2024 time period, and copies provided to the Department. | |||||||
10/31/2024 | 6002 | Minor | 2.1 Operator Training records not available. | The class A, B, and C operator certifications are overdue and must be obtained immediately with copies of the certificates provided to the Department. | |||||||
10/31/2024 | 6011 | SNC-B | 2.8 No financial responsibility instrument or expired instrument for < 180 days. | A signed copy of the full insurance policies with all endorsements and amendments for the 2022 to 2024 time period, must be provided to the Department. | |||||||
10/31/2024 | 6009 | Minor | 4.1 Incident Notification Form (INF) not received in a timely manner. | An Incident Notification Form (INF) must be completed and provided to the Department. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
01/23/2009 | COMPLETED | 10 | |||||||||
05/09/2006 | COMPLETED | 10 | |||||||||