![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Northeast | Type | Retail Station | ||||||||
County | Putnam | Status | OPEN | ||||||||
ID | 8515696 | Latitude | 29° 38' 56.5712 | ||||||||
Name |
PALATKA MOBILE 900 REID ST |
Longitude | 81° 38' 17.1552 | ||||||||
PALATKA, FL 32177 | LL Method | DGPS | |||||||||
Contact | GURPREET SINGH | LL Status | REVIEWED | ||||||||
Phone | (201) 208-4363 | Status Date | 10/13/2003 | ||||||||
Account Owner Information | |||||||||||
Name | BHUDEV LLC 900 REID ST PALATKA, FL 32177 |
Effective Date | 03/04/2021 | ||||||||
Contact | GURPREET SINGH | ||||||||||
Phone | (201) 208-4363 | ||||||||||
YSINGH3434@GMAIL.COM | |||||||||||
Placard # / Date | 695445 - 06/26/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | KIRAT LLC 323 SAINT JOHNS FOREST BLVD ST JOHNS, FL 32259 |
Effective Date | 03/05/2021 | ||||||||
Contact | GURPREET SINGH | ||||||||||
Phone | (201) 208-4363 | ||||||||||
GSINGHM36@YAHOO.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 20000 | Unleaded Gas (B) | 02/01/2002 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (I) Double wall (L) Compartmented (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 10000 | Vehicular Diesel (D) | 02/01/2002 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 10000 | Unleaded Gas (B) | 07/01/1974 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel (H) Impressed current CP (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(B) Steel/galvanized metal (E) Cathodic protection (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 10000 | Unleaded Gas (B) | 07/01/1974 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel (H) Impressed current CP (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(B) Steel/galvanized metal (E) Cathodic protection (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
8 | 6000 | Unleaded Gas (B) | 07/01/1974 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel (H) Impressed current CP (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(B) Steel/galvanized metal (E) Cathodic protection (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 02/23/2022 | 02/23/2024 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 02/23/2021 | 02/23/2022 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 06/18/2018 | 06/18/2019 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 06/18/2017 | 06/18/2018 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 06/18/2015 | 06/18/2017 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 06/18/2014 | 06/18/2015 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 06/18/2013 | 06/18/2014 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 06/18/2012 | 06/18/2013 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 06/18/2008 | 06/18/2009 | COMMERCE & INDUSTRY | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 04/27/2005 | 04/27/2005 | IN-COMPLIANCE | FLOWERS_D | 0/2 | COMPLIANCE ASSURANCE | |||||
TCI | 05/11/2004 | 05/11/2004 | IN-COMPLIANCE | FLOWERS_D | 0/2 | COMPLIANCE ASSURANCE | |||||
TCI | 05/19/2003 | 05/20/2003 | IN-COMPLIANCE | FLOWERS_D | 0/2 | COMPLIANCE ASSURANCE | |||||
RRBD | 06/20/2002 | 06/20/2002 | FLOWERS_D | 0/2 | DISCHARGE PROJECT | ||||||
RRBD | 06/20/2002 | 06/20/2002 | FLOWERS_D | 0/2 | COMPLIANCE ASSURANCE | ||||||
TCR | 06/20/2002 | 06/20/2002 | IN-COMPLIANCE | FLOWERS_D | 0/2 | COMPLIANCE ASSURANCE | |||||
TIN | 05/21/2002 | 05/21/2002 | SIGNIFICANT OUT-OF-COMPLIANCE | FLOWERS_D | 0/2 | COMPLIANCE ASSURANCE | |||||
TXI | 02/13/2002 | 02/14/2002 | IN-COMPLIANCE | FLOWERS_D | 0/3 | COMPLIANCE ASSURANCE | |||||
SV | 02/11/2002 | 02/14/2002 | FLOWERS_D | 0/3 | COMPLIANCE ASSURANCE | ||||||
TCI | 03/29/2001 | 03/30/2001 | IN-COMPLIANCE | FLOWERS_D | 0/3 | COMPLIANCE ASSURANCE | |||||
TCDI | 01/19/2000 | 01/24/2000 | IN-COMPLIANCE | FLOWERS_D | 0/3 | COMPLIANCE ASSURANCE | |||||
TDI | 01/19/2000 | 01/24/2000 | IN-COMPLIANCE | FLOWERS_D | 0/3 | DISCHARGE PROJECT | |||||
TCR | 08/19/1999 | 08/20/1999 | IN-COMPLIANCE | FLOWERS_D | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 04/26/1999 | 04/26/1999 | MINOR OUT-OF-COMPLIANCE | FLOWERS_D | 0/3 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Letter | 02/22/2024 | Satisfied | MILLS_MM | Enforcement | |||||||
Record Document | 01/14/2024 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Letter | 11/24/2023 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Electronic Communication | 11/24/2023 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Site Inspection | 11/23/2023 | Major Out of Compliance | HARRINGTON_RD_1 | 0/2 | Routine Compliance | ||||||
Enforcement Referral | 08/25/2023 | Accepted | HARRINGTON_RD_1 | Enforcement | |||||||
Electronic Communication | 07/29/2022 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Letter | 12/10/2021 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Electronic Communication | 12/10/2021 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Site Inspection | 12/09/2021 | Major Out of Compliance | HARRINGTON_RD_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 11/01/2021 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Letter | 12/31/2019 | Satisfied | RAMSEY_TH_1 | Compliance Assistance | |||||||
Record Document | 12/31/2019 | Satisfied | RAMSEY_TH_1 | Compliance Assistance | |||||||
Electronic Communication | 12/31/2019 | Satisfied | RAMSEY_TH_1 | Compliance Assistance | |||||||
Issue Document | 12/04/2019 | Satisfied | RAMSEY_TH_1 | Compliance Assistance | |||||||
Electronic Communication | 02/04/2019 | Satisfied | RAMSEY_TH_1 | Routine Compliance | |||||||
Site Inspection | 02/04/2019 | Minor Out of Compliance | RAMSEY_TH_1 | 0/2 | Routine Compliance | ||||||
Letter | 02/04/2019 | Satisfied | RAMSEY_TH_1 | Compliance Assistance | |||||||
Electronic Communication | 01/23/2019 | Satisfied | RAMSEY_TH_1 | Routine Compliance | |||||||
Electronic Communication | 06/14/2018 | Satisfied | RAMSEY_TH_1 | Closure | |||||||
TCAR | 06/14/2018 | Satisfied | RAMSEY_TH_1 | Closure | |||||||
Letter | 06/14/2018 | Satisfied | RAMSEY_TH_1 | Closure | |||||||
Letter | 06/11/2018 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Electronic Communication | 06/09/2018 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Record Document | 02/04/2018 | Satisfied | HARRINGTON_RD_1 | Installation | |||||||
Enforcement Tracking | 01/22/2018 | Closed Without Enforcement | HARRIS_MJ | Enforcement | |||||||
Letter | 01/22/2018 | Satisfied | HARRIS_MJ | Enforcement | |||||||
Record Document | 01/19/2018 | Satisfied | HARRIS_MJ | Enforcement | |||||||
Site Inspection | 01/11/2018 | In Compliance | HARRINGTON_RD_1 | 0/2 | Installation | ||||||
Electronic Communication | 01/11/2018 | Satisfied | HARRINGTON_RD_1 | Installation | |||||||
Site Inspection | 12/29/2017 | Minor Out of Compliance | HARRINGTON_RD_1 | 0/2 | Closure | ||||||
Letter | 10/03/2017 | Satisfied | HARRIS_MJ | Compliance Assistance | |||||||
Phone Conversation | 10/03/2017 | Satisfied | HARRIS_MJ | Compliance Assistance | |||||||
Enforcement Referral | 08/24/2017 | Accepted | HARRINGTON_RD_1 | Enforcement | |||||||
Letter | 06/27/2017 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Site Inspection | 12/14/2016 | Minor Out of Compliance | HARRINGTON_RD_1 | 0/2 | Routine Compliance | ||||||
Letter | 12/14/2016 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 02/10/2015 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Site Inspection | 02/10/2015 | Minor Out of Compliance | HARRINGTON_RD_1 | 0/2 | Routine Compliance | ||||||
Record Document | 02/10/2015 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 04/03/2013 | Satisfied | CERIC_M_1 | Routine Compliance | |||||||
Site Inspection | 04/03/2013 | In Compliance | CERIC_M_1 | 0/2 | Routine Compliance | ||||||
Record Document | 08/19/2011 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Record Document | 05/24/2011 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Letter | 04/28/2011 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Site Inspection | 04/28/2011 | Major Out of Compliance | HARRINGTON_RD_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 04/30/2009 | In Compliance | BROWN_JZ | 0/3 | Routine Compliance | ||||||
Record Document | 11/14/2007 | Satisfied | BARNETT_PC_1 | Non-Compliance | |||||||
Site Inspection | 11/06/2007 | Major Out of Compliance | BARNETT_PC_1 | 0/2 | Routine Compliance | ||||||
Letter | 11/06/2007 | Satisfied | BARNETT_PC_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 10/25/2007 | Satisfied | BARNETT_PC_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 05/22/2007 | Satisfied | BARNETT_PC_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 02/15/2007 | Satisfied | BARNETT_PC_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/21/2006 | Satisfied | FLOWERS_D | Routine Compliance | |||||||
Site Inspection | 04/19/2006 | In Compliance | FLOWERS_D | 0/5 | Routine Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
11/23/2023 | 6013 | Minor | 2.10 Appropriate paperwork for financial responsibility improperly completed or maintained. | Provide current CFR. (The form will be sent to the facility with this email). | |||||||
11/23/2023 | 6062 | Minor | 2.5 Release detection devices not tested annually. | Provide current sensor and line leak detector test result documentation. | |||||||
12/09/2021 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | Address the 93 sump corrosion issue. Provide verification. | |||||||
12/09/2021 | 6053 | Minor | 4.7 Primary overfill protection not provided, registered, or tested as required. | Test the overfill prevention devices. Provie result documentation. | |||||||
12/09/2021 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | Loosen the piping test boots in the sumps. Provide verification. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
12/14/1985 | ACTIVE | 10 | EARLY DETECTION INCENTIVE-ELIGIBLE | KASSEES_A | |||||||